CN104005330A - Telescopic floating bridge - Google Patents

Telescopic floating bridge Download PDF

Info

Publication number
CN104005330A
CN104005330A CN201410020775.5A CN201410020775A CN104005330A CN 104005330 A CN104005330 A CN 104005330A CN 201410020775 A CN201410020775 A CN 201410020775A CN 104005330 A CN104005330 A CN 104005330A
Authority
CN
China
Prior art keywords
bridge
hinged
bridge deck
assembly
side frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410020775.5A
Other languages
Chinese (zh)
Other versions
CN104005330B (en
Inventor
贾锡明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Bei Ou Composite Manufacturing Co Ltd
Original Assignee
Zhejiang Bei Ou Composite Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Bei Ou Composite Manufacturing Co Ltd filed Critical Zhejiang Bei Ou Composite Manufacturing Co Ltd
Priority to CN201410020775.5A priority Critical patent/CN104005330B/en
Publication of CN104005330A publication Critical patent/CN104005330A/en
Application granted granted Critical
Publication of CN104005330B publication Critical patent/CN104005330B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a telescopic floating bridge which comprises a support frame and bridge panels. The support frame comprises two rows of side frames; the side frames are connected with side frame telescopic drive devices; the two side frames are connected integrally through a transverse rod; each row of the side frame is a linked telescopic structure which is formed by sequentially hinging multiple groups of X-shaped hinged components; each component is provided with a foldable connecting rod in a connecting manner; the bridge panels are hinged to the transverse rod; the bridge panels are hinged end to end to form an integral body; the support frame in a telescopic structure is unfolded when being used and shrunk when being out of use, so that convenience is brought to transportation; the support frame can stretch out and draw back, so that the support frame is unnecessary to be set up on site, but can be set up at the usual time and directly transported to the site and unfolded for use. The telescopic floating bridge is fast in set-up speed, can open up traffic of two sides of rivers rapidly, and is suitable for rescue, and disaster relief or military affairs.

Description

Flexible pontoon bridge
Technical field
The present invention relates to bridge field, especially a kind of flexible pontoon bridge that can stretch and can realize fast erecting.
Background technology
Pontoon bridge ancient times is called boat beam.It replaces bridge pier with ship boat, therefore there is the title of " floating boat ", " floating purlin ", " bridge of boats ", belongs to provisional bridge.Characteristic due to pontoon bridge, is militarily often employed, and therefore claims again on " war bridge ".
Traditional pontoon bridge all needs to have the boat that can suspend or case as supporter, and this just need to all be fixed into each supporter one, also needs supporter and pontic to fix, otherwise easily causes supporter separated with pontic, occurs dangerous.Supporter is all fixed into one, the time needing is longer, and fixed support body is also more difficult in water.Also need other equipment to transport supporter, and can only be fixed one by one, set up cumbersome.
The erection mode of tradition pontoon bridge, hindered the popularization of pontoon bridge, also by increasing other bridge, given and substitute, if can solve the problem that pontoon bridge sets up speed, just can highlight the characteristic of pontoon bridge, pontoon bridge is applied, in emergency situations, can be played the effect of fast open passway, when especially speedily carrying out rescue work, can play the effect of life passage.
Summary of the invention
The object of this invention is to provide a kind of flexible pontoon bridge, integral structure, lightweight, intensity is large, and the speed of setting up is fast, can lead to two sides, river course by fast open.
The invention solves existing pontoon bridge and need on the water surface, fix the supporter suspending, transport with the set time longly, hindered the defect of the progress of bridge erection, a kind of flexible pontoon bridge is provided, integral structure, without the supporter of suspension, the speed of setting up is fast.
The present invention has also solved existing pontoon bridge and has belonged to one by one to connect and set up, and sets up the defect of operation trouble, and a kind of flexible pontoon bridge is provided, and integral structure, only need at one end operate, and can complete bridge erection, sets up conveniently.
It is huge that the present invention has also solved existing pontoon bridge piece volumes, transports inconvenient defect, and a kind of flexible pontoon bridge is provided, and flexible span is large, and after shrinking, volume is little, transports conveniently.
The technical solution adopted for the present invention to solve the technical problems is: a kind of flexible pontoon bridge, comprise bracing frame and bridge deck, bracing frame is stretching structure, bracing frame comprises two row's bogie side frames, on bogie side frame, be connected with bogie side frame retractable driving device, between side frames, by transverse bar, link into an integrated entity, every row's bogie side frame by organizing the hinged assembly that the is X-shaped hinged linkage telescopic structure forming successively more, on each assembly, be all connected with folding connecting rod, on transverse bar, be hinged with bridge deck, the hinged one that is of bridge deck head and the tail, bridge deck extend to the other end from one end of flexible pontoon bridge, bridge deck in flexible pontoon bridge two ends are cantilever panel.Bracing frame is stretching structure, during use, launches, and the used time does not shrink, convenient transportation; Bracing frame flexible, need not build at scene like this, can build at ordinary times, and transporting directly to on-the-spot expansion can use, and the speed of setting up is fast, can open fast the traffic of two sides, river course, be applicable to speedily carry out rescue work and the disaster relief or military affairs in; Bracing frame is put up into a single integrated structure at ordinary times, without the supporter suspending, the speed of setting up is fast; Bogie side frame adopts the hinged assembly that is X-shaped of many groups, flexible convenient; Easy to operate, bogie side frame retractable driving device directly drives one end of bogie side frame, just the other end can be set up to opposite bank, river course.
As preferably, assembly comprises two support bars, and the centre of support bar is hinged, and the end by support bar between adjacent component is hinged, and transverse bar is connected to hinged position in the middle of support bar.
As preferably, the connecting rod on each assembly is divided into connecting rod and lower link, and upper rod hinge connection is in the upper side position of assembly, and lower link is articulated with the lower side position of assembly.
As preferably, upper connecting rod is folding to lower recess, and the articulated position of upper connecting rod self is in upside, and lower link is folding for upwards arching upward, and the articulated position of lower link self is in downside.
As preferably, hinged between bridge deck is the one-sided hinged and lower side in bridge deck, and the end face of bridge deck is plane, after bridge deck flatten, the mutual butt of end face, bridge deck be folded into upwards arch upward folding.This mode can be born downward active force, supports more stable.
As preferably, when bridge deck flatten, upper connecting rod and lower link also flatten simultaneously; When bridge deck fold, upper connecting rod and lower link are also simultaneously folding; Upper rod hinge connection is in the outside of bogie side frame upper end, and lower link is articulated with the inner side of bogie side frame lower end.
As preferably, bridge deck are two rows, and in the position near bogie side frame, the distance between two bridge deck just in time meets the span requirement of car gage respectively; On transverse bar between two bridge deck, be also equipped with dismountable middle bed board.Bridge deck are two rows, alleviate the weight of pontoon bridge integral body, and middle bed board facilitates pedestrian to pass through.
As preferably, bogie side frame retractable driving device comprises driving shaft, the group of drive rods being connected with driving shaft, and group of drive rods is connected with the assembly of bogie side frame, and group of drive rods drives assembly to make assembly rotate flexible around the hinge point of himself.
As preferably, bogie side frame retractable driving device comprises a base, driving shaft is hinged on base, group of drive rods is two, be respectively main drive rod and from drive rod, from the end of drive rod, be provided with chute, from the middle part of drive rod, be provided with chute, main drive rod one end is connected with driving shaft, the other end of main drive rod plugs with the chute in the middle of drive rod, from the hinge of the chute of drive rod end and the support bar end of assembly, plug, from the other end of drive rod, be hinged to base.
As preferably, on driving shaft, be fixed with and drive handwheel or drive motors, bogie side frame retractable driving device totally two groups be arranged on respectively in side frames, the group of drive rods of side frames retractable driving device is connected with assembly according to contrary direction; Bogie side frame adopts high-strength carbon fiber composite material to make.
The invention has the beneficial effects as follows: bracing frame is stretching structure, during use, launch, the used time does not shrink, convenient transportation; Bracing frame flexible, need not build at scene like this, can build at ordinary times, and transporting directly to on-the-spot expansion can use, and the speed of setting up is fast, can open fast the traffic of two sides, river course, be applicable to speedily carry out rescue work and the disaster relief or military affairs in.
Accompanying drawing explanation
Fig. 1 is a kind of perspective view of the present invention;
Fig. 2 is a kind of lateral view of the present invention;
Fig. 3 is a kind of contraction state schematic diagram of the present invention;
Fig. 4 is a kind of support frame structure schematic diagram of the present invention;
Fig. 5 is a kind of use view of the present invention;
In figure: 1, bogie side frame, 2, connecting rod, 3, assembly, 4, lower link, 5, support bar, 6, upper connecting rod, 7, bridge deck, 8, cantilever panel, 9, transverse bar, 10, bogie side frame retractable driving device, 11, base, 12, driving shaft, 13, group of drive rods, 14, main drive rod, 15, from drive rod, 16, chute, 17, drive handwheel, 18, sheer pole.
The specific embodiment
Below by specific embodiment, and by reference to the accompanying drawings, technical scheme of the present invention is described in further detail.
Embodiment: a kind of flexible pontoon bridge (referring to accompanying drawing 1 accompanying drawing 2), comprise bracing frame and bridge deck 7, bracing frame comprises two row's bogie side frames 1, between side frames, by transverse bar 8 and sheer pole 18, links into an integrated entity.Bogie side frame adopts high-strength carbon fiber composite material to make.
The every row's bogie side frame hinged assembly 3 that is X-shaped of many groups hinged linkage telescopic structure forming successively of serving as reasons, assembly comprises two support bars 5, and the centre of support bar is hinged, and the end by support bar between adjacent component is hinged.
The end of transverse bar is connected in the middle hinged position of assembly, and the end of sheer pole is connected in hinged position, assembly support bar lower end.
On each assembly, be all connected with folding connecting rod 2, connecting rod is divided into connecting rod 6 and lower link 4, and upper connecting rod is two and is articulated with between assembly two post uppers, and lower link is two and is articulated with between assembly two support bar lower ends (referring to accompanying drawing 4).Same assembly two on rod hinge connection position in upper connecting rod end face upper side edge place, the end face of upper connecting rod is plane, upper connecting rod flattens the mutual butt of end face, connecting rod is folding to lower recess around hinge point on two.Two lower link hinge point of same assembly are in lower link end face lower side place, and the end face of lower link is plane, and lower link flattens the mutual butt of end face, and two lower links upwards arch upward folding around hinge point.The outer fix of upper connecting rod in side frames, the relative inner position of lower link in side frames.
On transverse bar, be hinged with bridge deck 7, the hinged one that is of bridge deck head and the tail, bridge deck extend to the other end from one end of flexible pontoon bridge, the bridge deck in flexible pontoon bridge two ends are that cantilever panel 8(is referring to accompanying drawing 1).Bridge deck are two rows, and in the position near bogie side frame, the distance between two bridge deck just in time meets the span requirement of car gage respectively.Hinged between bridge deck is the one-sided hinged and lower side in bridge deck, and the end face of bridge deck is plane, after bridge deck flatten, the mutual butt of end face, bridge deck be folded into upwards arch upward folding.When bridge deck flatten, upper connecting rod and lower link also flatten simultaneously; When bridge deck fold, upper connecting rod and lower link are also simultaneously folding.
The end position of bogie side frame is connected with bogie side frame retractable driving device 10, and bogie side frame retractable driving device comprises a base 11, is connected to the group of drive rods 13 on base.Base takes the shape of the letter U, on the sidewall of base, be hinged with driving shaft 12, group of drive rods comprises main drive rod 14 and from drive rod 15, from end and the centre position of drive rod, be provided with chute 16, one end of main drive rod is connected with driving shaft, the other end of main drive rod plugs to form with chute from drive rod middle part and is slidably connected, and plugs formation be slidably connected from the jointed shaft of one end of drive rod band chute and the post upper of assembly, is hinged to the bottom position of base from the other end of drive rod.On driving shaft, be fixed with and drive handwheel 17.Bogie side frame retractable driving device is two, be connected respectively to the end position of side frames, being connected with assembly according to contrary direction from drive rod of side frames retractable driving device, from the equal relative drive shaft of drive rod right side, tilt, on convenient operation, meet the manually operated custom of workman.
Rotating drive handwheel, driving shaft drives main drive rod to rotate, main drive rod end is moved and is driven from drive rod and rotates around its lower end pin joint in chute in the middle of drive rod, from drive rod upper end, drive the support bar of assembly to rotate around the middle pin joint of support bar, assembly shrinks and closes up (referring to accompanying drawing 3), goes up connecting rod simultaneously folding to lower recess, and lower link upwards arches upward folding, bridge deck upwards arch upward folding simultaneously, same collapsible the packing up of cantilever panel.
After bracing frame launches, upper connecting rod and lower link flatten, and bridge deck also flatten simultaneously, and cantilever panel supports to ground, two sides, river course, is now just communicated with two sides, river course (referring to accompanying drawing 5).
Above-described embodiment is a kind of preferred version of the present invention, not the present invention is done to any pro forma restriction, also has other variant and remodeling under the prerequisite that does not exceed the technical scheme that claim records.

Claims (10)

1. a flexible pontoon bridge, comprise bracing frame and bridge deck, it is characterized in that bracing frame is stretching structure, bracing frame comprises two row's bogie side frames, on bogie side frame, be connected with bogie side frame retractable driving device, between side frames, by transverse bar, link into an integrated entity, the every row's bogie side frame hinged assembly that is X-shaped of many groups hinged linkage telescopic structure forming successively of serving as reasons, on each assembly, be all connected with folding connecting rod, on transverse bar, be hinged with bridge deck, the hinged one that is of bridge deck head and the tail, bridge deck extend to the other end from one end of flexible pontoon bridge, bridge deck in flexible pontoon bridge two ends are cantilever panel.
2. flexible pontoon bridge according to claim 1, is characterized in that assembly comprises two support bars, and the centre of support bar is hinged, and the end by support bar between adjacent component is hinged, and transverse bar is connected to the middle hinged position of support bar.
3. flexible pontoon bridge according to claim 1, is characterized in that the connecting rod on each assembly is divided into connecting rod and lower link, and upper rod hinge connection is in the upper side position of assembly, and lower link is articulated with the lower side position of assembly.
4. flexible pontoon bridge according to claim 3, is characterized in that connecting rod is for folding to lower recess, and the articulated position of upper connecting rod self is in upside, and lower link is folding for upwards arching upward, and the articulated position of lower link self is in downside.
5. according to the flexible pontoon bridge described in claim 1 or 2 or 3 or 4, it is characterized in that hinged for the one-sided hinged and lower side in bridge deck between bridge deck, the end face of bridge deck is plane, after bridge deck flatten, the mutual butt of end face, bridge deck be folded into upwards arch upward folding.
6. flexible pontoon bridge according to claim 5, while it is characterized in that bridge deck flatten, upper connecting rod and lower link also flatten simultaneously; When bridge deck fold, upper connecting rod and lower link are also simultaneously folding; Upper rod hinge connection is in the outside of bogie side frame upper end, and lower link is articulated with the inner side of bogie side frame lower end.
7. according to the flexible pontoon bridge described in claim 1 or 2 or 3 or 4, it is characterized in that bridge deck are two rows, in the position near bogie side frame, the distance between two bridge deck just in time meets the span requirement of car gage respectively; On transverse bar between two bridge deck, be also equipped with dismountable middle bed board.
8. according to the flexible pontoon bridge described in claim 1 or 2 or 3 or 4, it is characterized in that bogie side frame retractable driving device comprises driving shaft, the group of drive rods being connected with driving shaft, group of drive rods is connected with the assembly of bogie side frame, and group of drive rods drives assembly to make assembly rotate flexible around the hinge point of himself.
9. flexible pontoon bridge according to claim 8, it is characterized in that bogie side frame retractable driving device comprises a base, driving shaft is hinged on base, group of drive rods is two, be respectively main drive rod and from drive rod, from the end of drive rod, be provided with chute, from the middle part of drive rod, be provided with chute, main drive rod one end is connected with driving shaft, the other end of main drive rod plugs with the chute in the middle of drive rod, from the hinge of the chute of drive rod end and the support bar end of assembly, plug, from the other end of drive rod, be hinged to base.
10. flexible pontoon bridge according to claim 9, it is characterized in that being fixed with and driving handwheel or drive motors on driving shaft, bogie side frame retractable driving device totally two groups be arranged on respectively in side frames, the group of drive rods of side frames retractable driving device is connected with assembly according to contrary direction; Bogie side frame adopts high-strength carbon fiber composite material to make.
CN201410020775.5A 2014-01-17 2014-01-17 Flexible pontoon bridge Active CN104005330B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410020775.5A CN104005330B (en) 2014-01-17 2014-01-17 Flexible pontoon bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410020775.5A CN104005330B (en) 2014-01-17 2014-01-17 Flexible pontoon bridge

Publications (2)

Publication Number Publication Date
CN104005330A true CN104005330A (en) 2014-08-27
CN104005330B CN104005330B (en) 2016-05-18

Family

ID=51366219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410020775.5A Active CN104005330B (en) 2014-01-17 2014-01-17 Flexible pontoon bridge

Country Status (1)

Country Link
CN (1) CN104005330B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104499418A (en) * 2014-12-03 2015-04-08 中山市公路钢结构制造有限公司 Folding assembly type vehicle-mounted bridge
CN105507131A (en) * 2015-12-01 2016-04-20 北京理工大学 Hybrid power mode floating bridge
CN106284051A (en) * 2016-09-14 2017-01-04 湖北华舟重工应急装备股份有限公司 A kind of vertical collapsible pontoon bridge of spanning
CN106758755A (en) * 2016-11-15 2017-05-31 东南大学 A kind of base-supporting folded truss bridge construction
CN106884372A (en) * 2017-03-09 2017-06-23 清华大学 A kind of big rigidity retractile bridge of use redundant structure
CN106930177A (en) * 2017-05-17 2017-07-07 杭州金知科技有限公司 A kind of telescopic emergency bridge
CN107012781A (en) * 2016-09-14 2017-08-04 湖北华舟重工应急装备股份有限公司 A kind of vertical collapsible pontoon bridge of high stability spanning
CN107012779A (en) * 2016-09-14 2017-08-04 湖北华舟重工应急装备股份有限公司 A kind of gathering of vertical collapsible pontoon bridge of spanning and method of deploying
CN107299677A (en) * 2017-07-08 2017-10-27 深圳市章贡禾精密五金有限公司 A kind of flexible balcony and its application method
CN108691302A (en) * 2017-04-07 2018-10-23 张传生 A kind of dike breach fast plugging device
RU185336U1 (en) * 2018-04-04 2018-11-30 Федеральное государственное бюджетное учреждение "Центральный научно-исследовательский испытательный институт инженерных войск" Министерства обороны Российской Федерации FLOOR FALSE BRIDGE
CN109653078A (en) * 2018-12-19 2019-04-19 浙江工业大学 A kind of jack-knife bridge of novel portable
CN109939405A (en) * 2019-04-25 2019-06-28 苏州瑞奇安机电科技有限公司 Fire hose protects bridge and fire-fighting equipment
CN114395974A (en) * 2022-02-08 2022-04-26 连云港创新储运设备制造有限公司 Steel structure trestle with extension frame and implementation method thereof
CN114809160A (en) * 2022-04-20 2022-07-29 自然资源部第二海洋研究所 Silt-preventing dredging structure and dredging method based on dam engineering

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2507C (en) *
JPS6462600A (en) * 1987-09-01 1989-03-09 Zenya Kaiyo Service Kk Expansible transfer bridge
CN2554222Y (en) * 2001-05-31 2003-06-04 张赤兵 Quick extension and contract chain-link structure bridge
CN101479430A (en) * 2006-05-31 2009-07-08 德尚父子企业公司 Temporary bridge
WO2011055154A2 (en) * 2009-11-03 2011-05-12 Almasi Ferenc Mobile emergency bridge
JP2011256586A (en) * 2010-06-08 2011-12-22 Hoshikei Kinzokukogyo Co Ltd Structure
JP4967117B2 (en) * 2005-09-14 2012-07-04 国立大学法人広島大学 Stretching / shrinking device for structure and main frame thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL2507C (en) *
JPS6462600A (en) * 1987-09-01 1989-03-09 Zenya Kaiyo Service Kk Expansible transfer bridge
CN2554222Y (en) * 2001-05-31 2003-06-04 张赤兵 Quick extension and contract chain-link structure bridge
JP4967117B2 (en) * 2005-09-14 2012-07-04 国立大学法人広島大学 Stretching / shrinking device for structure and main frame thereof
CN101479430A (en) * 2006-05-31 2009-07-08 德尚父子企业公司 Temporary bridge
WO2011055154A2 (en) * 2009-11-03 2011-05-12 Almasi Ferenc Mobile emergency bridge
WO2011055154A3 (en) * 2009-11-03 2011-06-30 Almasi Ferenc Mobile emergency bridge
JP2011256586A (en) * 2010-06-08 2011-12-22 Hoshikei Kinzokukogyo Co Ltd Structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
夏志远等: "可展桥的应用和发展", 《世界桥梁》, no. 6, 28 November 2013 (2013-11-28) *
广岛大学社会合作与信息政策办公室 宣传小组: "完成了世界上第一座可折叠的桥梁"携带桥"的试制品!—"桥梁君"能成为世界的桥梁吗?", 《HTTP://WWW.HIROSHIMA-U.AC.JP/CN/TOP/KENKYU/NOW/NO20》, 15 December 2009 (2009-12-15) *

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104499418A (en) * 2014-12-03 2015-04-08 中山市公路钢结构制造有限公司 Folding assembly type vehicle-mounted bridge
CN105507131B (en) * 2015-12-01 2017-03-29 北京理工大学 A kind of pontoon bridge of hybrid power mode
CN105507131A (en) * 2015-12-01 2016-04-20 北京理工大学 Hybrid power mode floating bridge
CN106284051A (en) * 2016-09-14 2017-01-04 湖北华舟重工应急装备股份有限公司 A kind of vertical collapsible pontoon bridge of spanning
CN107012779B (en) * 2016-09-14 2019-01-04 中国船舶重工集团应急预警与救援装备股份有限公司 A kind of gathering of the vertical collapsible pontoon bridge of spanning and method of deploying
CN107012781A (en) * 2016-09-14 2017-08-04 湖北华舟重工应急装备股份有限公司 A kind of vertical collapsible pontoon bridge of high stability spanning
CN107012779A (en) * 2016-09-14 2017-08-04 湖北华舟重工应急装备股份有限公司 A kind of gathering of vertical collapsible pontoon bridge of spanning and method of deploying
CN106284051B (en) * 2016-09-14 2018-03-20 湖北华舟重工应急装备股份有限公司 A kind of vertical collapsible pontoon bridge of spanning
CN107012781B (en) * 2016-09-14 2019-03-08 湖北华舟重工应急装备股份有限公司 A kind of vertical collapsible pontoon bridge of high stability spanning
CN106758755A (en) * 2016-11-15 2017-05-31 东南大学 A kind of base-supporting folded truss bridge construction
CN106758755B (en) * 2016-11-15 2018-06-22 东南大学 A kind of base-supporting folded truss bridge structure
CN106884372A (en) * 2017-03-09 2017-06-23 清华大学 A kind of big rigidity retractile bridge of use redundant structure
CN108691302B (en) * 2017-04-07 2022-01-14 重庆环利水电工程咨询设计有限公司 Dykes and dams burst quick plugging device
CN108691302A (en) * 2017-04-07 2018-10-23 张传生 A kind of dike breach fast plugging device
CN106930177A (en) * 2017-05-17 2017-07-07 杭州金知科技有限公司 A kind of telescopic emergency bridge
CN106930177B (en) * 2017-05-17 2019-01-15 金华市秸和环保技术咨询有限公司 A kind of telescopic emergency bridge
CN107299677A (en) * 2017-07-08 2017-10-27 深圳市章贡禾精密五金有限公司 A kind of flexible balcony and its application method
RU185336U1 (en) * 2018-04-04 2018-11-30 Федеральное государственное бюджетное учреждение "Центральный научно-исследовательский испытательный институт инженерных войск" Министерства обороны Российской Федерации FLOOR FALSE BRIDGE
CN109653078A (en) * 2018-12-19 2019-04-19 浙江工业大学 A kind of jack-knife bridge of novel portable
CN109653078B (en) * 2018-12-19 2021-01-05 浙江工业大学 Portable folding bridge
CN109939405A (en) * 2019-04-25 2019-06-28 苏州瑞奇安机电科技有限公司 Fire hose protects bridge and fire-fighting equipment
CN114395974A (en) * 2022-02-08 2022-04-26 连云港创新储运设备制造有限公司 Steel structure trestle with extension frame and implementation method thereof
CN114809160A (en) * 2022-04-20 2022-07-29 自然资源部第二海洋研究所 Silt-preventing dredging structure and dredging method based on dam engineering
CN114809160B (en) * 2022-04-20 2023-10-20 自然资源部第二海洋研究所 Anti-clogging dredging structure and dredging method based on dam engineering

Also Published As

Publication number Publication date
CN104005330B (en) 2016-05-18

Similar Documents

Publication Publication Date Title
CN104005330B (en) Flexible pontoon bridge
US3826270A (en) Collapsible ice fishing house
CN104847163B (en) Assembly-free hinge-locked foldable tent
CN104890845A (en) Cross foldable automatic retracting and spreading wing type sail
US1504889A (en) Tent
CN201151470Y (en) Semisubmersible drilling platform
CN203775981U (en) Boom sprayer
CN203271255U (en) Tent frame bar
CN106702878A (en) Bidirectional and foldable truss arch bridge structure
US931529A (en) Convertible boat and tent.
RU2184809C1 (en) Floating bridge
US1193816A (en) Fish and crab trap
US1642267A (en) Folding tent
CN203623922U (en) Swinging guide rod type gangplank lifting and turning-over mechanism for ships
KR20120016550A (en) Cargo ship using sail
CN206033077U (en) Pontoon hangs uses foldable auxiliary
CN202299603U (en) Tent support which is convenient to unfold and retract
US1410830A (en) Tent
CN204876795U (en) Collapsible movable canopy frame
RU145679U1 (en) FOLDING CATAMARAN
CN206187278U (en) Folding boat
WO2019100983A1 (en) Lift net support
CN201460397U (en) Highly foldable centralized remote control type bracket
CN205696843U (en) A kind of portable folding infanette
RU2547670C1 (en) Collapsible catamaran boat

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant