CN103988793B - A kind of tunnel type hatching equipment - Google Patents

A kind of tunnel type hatching equipment Download PDF

Info

Publication number
CN103988793B
CN103988793B CN201410235297.XA CN201410235297A CN103988793B CN 103988793 B CN103988793 B CN 103988793B CN 201410235297 A CN201410235297 A CN 201410235297A CN 103988793 B CN103988793 B CN 103988793B
Authority
CN
China
Prior art keywords
incubation space
blower fan
control system
temperature control
tunnel type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410235297.XA
Other languages
Chinese (zh)
Other versions
CN103988793A (en
Inventor
李根平
刘凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI RUIGE ELECTRONIC TECHNOLOGY Co Ltd
Original Assignee
ANHUI RUIGE ELECTRONIC TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI RUIGE ELECTRONIC TECHNOLOGY Co Ltd filed Critical ANHUI RUIGE ELECTRONIC TECHNOLOGY Co Ltd
Priority to CN201410235297.XA priority Critical patent/CN103988793B/en
Publication of CN103988793A publication Critical patent/CN103988793A/en
Application granted granted Critical
Publication of CN103988793B publication Critical patent/CN103988793B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ventilation (AREA)

Abstract

The invention discloses a kind of tunnel type hatching equipment, comprise ground, be oppositely arranged on described ground left wall and right wall, the Qianmen being arranged on described left wall and right wall two ends and back door, lid are located at the ceiling at described left wall and right wall top and are laid on four guide rails of described floor surface, also comprise partition door, the first temperature control system, the second temperature control system, first stir blower fan and second and stir blower fan; Incubation space barrier is the first incubation space and the second incubation space by described partition door; Described first stirring blower fan, the first temperature control system are arranged in described first incubation space; Described second stirring blower fan, the second temperature control system are arranged in described second incubation space.The present invention had both avoided when newly entering to incubate birds, beasts and eggs and had caused huge temperature ictus to the embryo of other batch, substantially improve the thermograde of whole tunnel type hatching equipment, then avoid the injury that mid-term, high temperature caused embryonic development, significantly improve incubation rate and strong young rate.

Description

A kind of tunnel type hatching equipment
Technical field
The present invention relates to incubation equipment, particularly relate to a kind of tunnel type hatching equipment.
Background technology
Tunnel type hatching equipment obtains the favor in hatchery due to the power savings advantages of its brilliance.Its energy conservation characteristic shows two aspects: the input power of whole stirring blower fan is about 1.5Kw, its egg-containing amount is but 90720 simultaneously, and by contrast egg-containing amount be 19200 incubation equipment to stir the input power of blower fan be about 2Kw, only this block power savings advantages of blower fan is very obvious.Be the air current composition mode of its uniqueness in addition on the one hand, metabolic for avian embryonic later stage heat is directly used in the early stage avian embryonic of heating (embryo now absorbs heat) by the air-flow heating process.
Be tunnel type hatching equipment 600 of the prior art as depicted in figs. 1 and 2, comprise ground 601, be oppositely arranged on left wall 602 on surface, described ground 601 and right wall 603, the Qianmen 604 being arranged on described left wall 602 and right wall 603 two ends and back door 605, lid are located at the ceiling 606 at described left wall 602 and right wall 603 top and are laid on four guide rails 607 on surface, ground 601, offer air inlet 608 and air outlet 609 at the two ends of ceiling 606.Qianmen 604 or back door 605 are two fan door bodies, and two fan door body symmetries are arranged on described left wall 602 and right wall 603.
Ground 601 of the prior art, ceiling 606, left wall 602, right wall 603, Qianmen 604 and back door 605 surround incubation space 610, the ground 601 of described incubation space is provided with the parking stall that incubated egg car 611 is stopped, the second stirring blower fan 612 is installed in described incubation space 610.
From chicken embryo heat production figure, just can see the increase along with chicken embryo embryo age, metabolic heat is increasing.Due to egg moisture evaporation endothermic, embryo absorbed heat generally slightly from 0-8 days age, was in thermal equilibrium state when 9 days, do not absorb heat also not heat release after 10 days aggregate performance be heat release, and As time goes on thermal discharge sharply strengthens.
Tunnel machine is that continuously setting egg(s) enters to incubate in batches, and in namely per week, 3 days setting egg(s)s once, and afterwards every 4 days setting egg(s)s once, until chicken embryo shifted out incubation equipment after 18 days half, rule is to young-generating machine.There are two kinds of situations in the process: one is that 6 parking stalls are all occupied full (12 egg cars), as shown in Figure 2; Another kind is that 5 parking stalls are all occupied full (ten egg cars), as shown in Figure 3.If 6 parking stalls are all occupied, air-flow through the 6th, 5,4 parking stalls are heated, cooled through the 3rd, 2,1 time.If 5 parking stalls are occupied, can think air-flow through the 5th, 4 parking stalls are heated, cooled through the 3rd, 2,1 time.
Be not difficult to find out from the schematic diagram of the thermograde Fig. 2 a, Fig. 3 a, thermograde and the desirable temperature curve of Fig. 3 a are very close: especially between 3 parking stalls and 4 parking stalls peak compare temperature more close to ideal curve with the height point of the temperature in Fig. 3 a.Totally unfavorable in the too high growth to chicken embryo of hatching temperature in mid-term, but due to the incubation temperature in other embryo age will be taken into account, the temperature in mid-term cannot be optimized further, especially when 6 parking stalls are all occupied full, this situation is more outstanding, in addition commercial broiler flocks egg is increasing now, thermograde is worsened further, have impact on chickling-surviving rate and hatching quality, and this is one of large shortcoming for tunnel incubation equipment.
Why when 6 parking stalls are all occupied full, thermograde worsens, and main cause is that windage is excessive, flow through egg district air-flow wind speed little, too high by the gas flow temperature after heating.And when only having 5 parking stalls (10 cars), the corresponding reduction of windage, air velocity strengthen, thermograde be improved significantly, be conducive to the growth of embryo.
Because the egg just entering to incubate is that the egg storehouse of temperature below 18 degree stores, therefore the temperature after entering to incubate at least 4 to 5 hours whole incubation equipments is all very low, cause low-temperature impact to the chicken embryo previously having entered to incubate, how to improve also is one of the task of promoting tunnel type hatching equipment quality.
Summary of the invention
The object of the invention is to solve the problems of the prior art, a kind of tunnel type hatching equipment is provided.
Technical scheme of the present invention is: a kind of tunnel type hatching equipment, comprise ground, be oppositely arranged on described ground left wall and right wall, be arranged on Qianmen and the back door at described left wall and right wall two ends, lid is located at the ceiling at described left wall and right wall top, and be laid on four guide rails of described floor surface, described ground, ceiling, left wall, right wall, Qianmen and back door surround incubation space, the ground of described incubation space is provided with incubated egg car parking stall, first stirring blower fan is installed in described incubation space, the ceiling at described incubation space top offers air inlet and air outlet, also comprise partition door, the first temperature control system, the second temperature control system and the second stirring blower fan, incubation space barrier is the first incubation space and the second incubation space by described partition door, offers the Inner eycle air port communicated with described second incubation space in described first incubation space, described air inlet and air outlet are opened in described second incubation space, described first stirring blower fan, the first temperature control system are arranged in described first incubation space, described second stirring blower fan, the second temperature control system are arranged in described second incubation space.
Preferably, the left end of described partition door connects the inwall of described left wall, and right-hand member connects the inwall of described right wall.
Preferably, described partition door is sliding door.
Preferably, described first stirs assembling inside the Qianmen of the first incubation space, and described first temperature control system installs the partition door place of the first incubation space.
Preferably, described second stirs assembling at the partition door place of the second incubation space, and described second temperature control system is arranged on the back door place of the second incubation space.
Preferably, the first heater that described first temperature control system comprises the first temp probe and connects with it, described first temp probe is arranged on the outside of described partition door, and described first heater is arranged on described first and stirs blower fan place; The secondary heating mechanism that described second temperature control system comprises the second temp probe and connects with it, described second temp probe is arranged on inside described back door, and described secondary heating mechanism is arranged on described second and stirs blower fan place.
Preferably, described first stirs blower fan is provided with at least one fan with row, and being traditionally arranged to be three is one group; Described second stirs blower fan is provided with at least one fan with row, and generally arranging six is one group.
Preferably, described incubated egg car parking stall is six groups, be respectively 0 parking stall, 1 parking stall, 2 parking stalls, 3 parking stalls, 4 parking stalls and 5 parking stalls from left to right, wherein said 0 parking stall is in described first incubation space, and described 1 parking stall, 2 parking stalls, 3 parking stalls, 4 parking stalls and 5 parking stalls are in described second incubation space.
Preferably, two egg cars can be placed in described incubated egg car parking stall of often organizing.
Preferably, described Qianmen or back door are two fan door bodies, and described two fan door body symmetries are arranged on described left wall and right wall.
0 parking stall place in first incubation space of the present invention is owing to only having 2 egg cars, windage is very little, blower fan only configures two or three and enough meets instructions for use, 0 stall system per week is run and is only had twice as calculated: once continue 1.5 days, once continue 0.5 day, namely operate in a week 2 day time, therefore the stirring blower fan power consumption owing to increasing be original blower fan power consumption 1/7 less than, add there is certain gas exchanges between the first incubation space, the second incubation space, substantially maintain an equal level with original tunnel through the power consumption of measuring and calculating caused by heating.
The present invention had both avoided when newly entering to incubate and had caused huge temperature ictus to the embryo of other batch, the prior thermograde substantially improving whole tunnel type hatching equipment, then the injury that mid-term, high temperature caused embryonic development is avoided, significantly improve incubation rate and strong young rate, especially have more very large realistic meaning when the egg head of commercial meat bird is increasing.
Accompanying drawing explanation
Fig. 1 is the stereogram of prior art tunnel type hatching equipment;
Fig. 2 is the schematic diagram that prior art tunnel type hatching device interior is provided with six groups of egg cars;
Fig. 2 a is that prior art tunnel type hatching device interior is provided with six groups of egg car internal gas flow thermograde schematic diagrames;
Fig. 3 is the schematic diagram that prior art tunnel type hatching device interior is provided with five groups of egg cars;
Fig. 3 a is that prior art tunnel type hatching device interior is provided with five groups of egg car internal gas flow thermograde schematic diagrames;
Fig. 4 is the stereogram of tunnel type hatching equipment of the present invention;
Fig. 4 a is the stereogram that tunnel type hatching device interior of the present invention is provided with six groups of egg cars;
Fig. 5 is the schematic diagram that tunnel type hatching device interior of the present invention is provided with six groups of egg cars;
Fig. 5 a is tunnel type hatching device interior gas flow temperature gradient schematic diagram of the present invention.
Embodiment
The technological means realized to make the present invention, technical characteristic, goal of the invention and technique effect are easy to understand, and below in conjunction with concrete diagram, set forth the present invention further.
Be depicted as the tunnel type hatching equipment 100 in the present invention as Fig. 4 and Fig. 4 a, comprise ground 101, be oppositely arranged on left wall 102 on surface, described ground 101 and right wall 103, the Qianmen 104 being arranged on described left wall 102 and right wall 103 two ends and back door 105, lid are located at the ceiling 106 at described left wall 102 and right wall 103 top and are laid on four guide rails 107 on surface, ground 101.Qianmen 104 or back door 105 are two fan door bodies, and two fan door body symmetries are arranged on described left wall 102 and right wall 103.
Ground 101 in the present invention, ceiling 106, left wall 102, right wall 103, Qianmen 104 and back door 105 surround incubation space, the ground 101 of described incubation space is provided with incubated egg car parking stall, the first stirring blower fan 201 is installed in described incubation space.
The present invention also comprises partition door 300, second and stirs blower fan 401, first temperature control system and the second temperature control system.The left end of partition door 300 connects the inwall of described left wall 102, and right-hand member connects the inwall of described right wall 103.Partition door 300 in the present invention adopts sliding door, saves space on the one hand, and the egg car being convenient to 0 parking stall is on the other hand passed to 1 parking stall.
Incubation space barrier is the first incubation space 200 and the second incubation space 400 by the partition door 300 in the present invention; In described first incubation space 200, offer the Inner eycle air port 240 communicated with described second incubation space 400, this Inner eycle air port 240 can be opened on partition door 300.In described second incubation space 400, offer air inlet 403 and air outlet 404, air inlet 403 and air outlet 404 are distributed in the two ends of the second incubation space 400, be opened in be positioned at the second incubation space 400 ceiling 106 on.
In the present invention first stirs blower fan 201, first temperature control system and is arranged in described first incubation space 200.Described first stirs blower fan 201 is arranged on inside the Qianmen 104 of the first incubation space 200, and first stirs blower fan 201 by the bottom connection of the fixture 2012 on pull bar 2011 with ceiling 106.In order to can make the temperature in the first incubation space 200 and distinguished and admirablely reach expection requirement, first in the present invention stirs blower fan 201 and is set to three axial flow blowers, 2013, three axial flow blowers 2013 and is arranged side by side, and has a certain degree with ceiling 106.
As shown in Figure 5, the first heater 2022 that first temperature control system comprises the first temp probe 2021 and connects with it, described first temp probe 2021 is arranged on described partition door 300 side relative with described Qianmen 104, be positioned at the top inside partition door 300, described first heater 2022 is arranged on the front end that described first stirs blower fan 201.The secondary heating mechanism 4022 that described second temperature control system comprises the second temp probe 4021 and connects with it, described second temp probe 4021 is arranged on the inner side at described back door 105, and described secondary heating mechanism 4022 is arranged on described second and stirs near blower fan 401.
The first temp probe 2021 and the second temp probe 4021 in the present invention, be respectively used to the temperature in detection first incubation space 200 and the second incubation space 400, when temperature reduces or do not reach the incubation temperature of expection, temperature sensor signal is sent to first heater 2022, secondary heating mechanism 4022 by the first temp probe 2021 and the second temp probe 4021, can ensure the temperature in the first incubation space 200 and the second incubation space 400, be normal incubation temperature.
The first temperature control system in the present invention also can be arranged on other positions of the first incubation space 200, and such as the first temp probe 2021 is arranged on Qianmen 104, left wall 102 or right wall 103; Second temperature control system is arranged on other positions in described second incubation space 400, and such as the second temp probe 4021 is arranged on partition door 300, left wall 102 or right wall 103.
In the present invention second stirs the inner side that blower fan 401 is arranged on partition door 300, in the top being specifically located at partition door 300 and the angle of ceiling 106 between the bottom of partition door 300, and second stirs blower fan 401 by the bottom connection of the fixture 2012 on above-mentioned pull bar 2011 with ceiling 106.In order to the temperature in the second incubation space 200 can be made and distinguished and admirablely reach expection requirement, in the present invention second stirs blower fan 201 and is set to six axial flow blowers 2013, also can according to the size of incubation space, the axial flow blower of setting varying number, six axial flow blowers 2013 are arranged side by side, and have a certain degree with ceiling 106, this angle stirs blower fan 201 substantially angulation with above-mentioned first is consistent.
Incubated egg car parking stall in the present invention is six groups, often organizes incubated egg car parking stall and can place two egg cars 500 side by side, and egg car 500 is placed in guide rail 107 to be convenient to move.The parking stall order of egg car 500 is set in the present invention in the following sequence, be respectively 0 parking stall, 1 parking stall, 2 parking stalls, 3 parking stalls, 4 parking stalls and 5 parking stalls from left to right, wherein said 0 parking stall is in described first incubation space 200, and described 1 parking stall, 2 parking stalls, 3 parking stalls, 4 parking stalls and 5 parking stalls are in described second incubation space 400.
Tunnel type hatching equipment 100 in the present invention arranges six parking stalls, 0 parking stall is set up in 1 left, parking stall, and between 0 parking stall and 1 parking stall, install moveable partition door 300 additional, first stirs blower fan 201, second stirs blower fan 401, independently the first temperature control system, the second temperature control system, forms the subenvironment of the first incubation space 200 that is different from 1 parking stall, 2 parking stalls, 3 parking stalls, 4 parking stalls and 5 parking stalls.
And the Inner eycle air port 240 in first incubation space 200 at place, the present invention 0 parking stall, can make above-mentioned first incubation space 200 and the second incubation space 400 on the right of it have a certain amount of gas exchanges.
Shown in figure 5 and Fig. 5 a, using method of the present invention is as follows:
1) birds, beasts and eggs newly entering to incubate are placed on 0 parking stall place, and because first stirs blower fan 201, first temperature control system and second to stir blower fan 401, second temperature control system separate, two incubation spaces can temperature control and carry out air stirring separately separately.Period has a certain amount of gas exchanges due to the first incubation space 200 with second incubation space 400 on the right, can utilize the metabolic heat produced in the second incubation space 400;
2) until reach 18.5 days age at the embryo of 5 parking stalls, and after rule shifts out tunnel incubation equipment 100, originally can move on to 1 parking stall at the egg car of 0 parking stall, all the other car bodies are to the right along moving.In 0 place, parking stall first incubation space first stirs blower fan 201 and the first temperature control system stall, restarts until the new egg of next group enters to incubate.
0 parking stall place in first incubation space of the present invention is owing to only having 2 egg cars, windage is very little, blower fan only configures two or three and enough meets instructions for use, 0 stall system per week is run and is only had twice as calculated: once continue 1.5 days, once continue 0.5 day, namely operate in a week 2 day time, therefore the stirring blower fan power consumption owing to increasing be original blower fan power consumption 1/7 less than, add there is certain gas exchanges between the first incubation space, the second incubation space, substantially maintain an equal level with original tunnel through the power consumption of measuring and calculating caused by heating.
The present invention had both avoided when newly entering to incubate and had caused huge temperature ictus to the embryo of other batch, the prior thermograde substantially improving whole tunnel type hatching equipment, then the injury that mid-term, high temperature caused embryonic development is avoided, significantly improve incubation rate and strong young rate, especially have more very large realistic meaning when the egg head of commercial meat bird is increasing.
Be only preferred embodiment of the present invention in sum, be not used for limiting practical range of the present invention.Namely all equivalences done according to the content of the present patent application the scope of the claims change and modify, and all should belong to technology category of the present invention.

Claims (10)

1. a tunnel type hatching equipment, comprise ground, be oppositely arranged on described ground left wall and right wall, be arranged on Qianmen and the back door at described left wall and right wall two ends, lid is located at the ceiling at described left wall and right wall top, and be laid on four guide rails of described floor surface, described ground, ceiling, left wall, right wall, Qianmen and back door surround incubation space, the ground of described incubation space is provided with incubated egg car parking stall, first stirring blower fan is installed in described incubation space, the ceiling at described incubation space top offers air inlet and air outlet, it is characterized in that: also comprise partition door, the first temperature control system, the second temperature control system and the second stirring blower fan, incubation space barrier is the first incubation space and the second incubation space by described partition door, offers the Inner eycle air port communicated with described second incubation space in described first incubation space, described air inlet and air outlet are opened in described second incubation space, described first stirring blower fan, the first temperature control system are arranged in described first incubation space, described second stirring blower fan, the second temperature control system are arranged in described second incubation space.
2. tunnel type hatching equipment according to claim 1, is characterized in that: the left end of described partition door connects the inwall of described left wall, and right-hand member connects the inwall of described right wall.
3. tunnel type hatching equipment according to claim 2, is characterized in that: described partition door is sliding door.
4. tunnel type hatching equipment according to claim 2, is characterized in that: described first stirs assembling inside the Qianmen of the first incubation space, and described first temperature control system installs the first incubation space partition door place.
5. tunnel type hatching equipment according to claim 4, is characterized in that: described second stirs assembling at the partition door place of the second incubation space, and described second temperature control system is arranged on the back door of the second incubation space.
6. the tunnel type hatching equipment according to any one of claim 1 to 5, it is characterized in that: the first heater that described first temperature control system comprises the first temp probe and connects with it, described first temp probe is arranged on the outside of described partition door, and described first heater is arranged on described first and stirs blower fan place; The secondary heating mechanism that described second temperature control system comprises the second temp probe and connects with it, described second temp probe is arranged on inside described back door, and described secondary heating mechanism is arranged on described second and stirs blower fan place.
7. the tunnel type hatching equipment according to any one of claim 1 to 5, is characterized in that: described first stirs blower fan is provided with at least one fan with row, and described second stirs blower fan is provided with at least one fan with row.
8. tunnel type hatching equipment according to claim 7, it is characterized in that: described incubated egg car parking stall is six groups, be respectively 0 parking stall, 1 parking stall, 2 parking stalls, 3 parking stalls, 4 parking stalls and 5 parking stalls from left to right, wherein said 0 parking stall is in described first incubation space, and described 1 parking stall, 2 parking stalls, 3 parking stalls, 4 parking stalls and 5 parking stalls are in described second incubation space.
9. tunnel type hatching equipment according to claim 8, is characterized in that: often organize incubated egg car parking stall and can place two egg cars.
10. tunnel type hatching equipment according to claim 9, is characterized in that: described Qianmen or back door are two fan door bodies, and described two fan door body symmetries are arranged on described left wall and right wall.
CN201410235297.XA 2014-05-29 2014-05-29 A kind of tunnel type hatching equipment Active CN103988793B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410235297.XA CN103988793B (en) 2014-05-29 2014-05-29 A kind of tunnel type hatching equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410235297.XA CN103988793B (en) 2014-05-29 2014-05-29 A kind of tunnel type hatching equipment

Publications (2)

Publication Number Publication Date
CN103988793A CN103988793A (en) 2014-08-20
CN103988793B true CN103988793B (en) 2015-09-16

Family

ID=51303338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410235297.XA Active CN103988793B (en) 2014-05-29 2014-05-29 A kind of tunnel type hatching equipment

Country Status (1)

Country Link
CN (1) CN103988793B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105145408A (en) * 2015-07-03 2015-12-16 安徽瑞格电子科技有限公司 Intelligent automatic error correcting control tunnel type hatching equipment
CN104920272A (en) * 2015-07-03 2015-09-23 安徽瑞格电子科技有限公司 Intelligent zone control roadway type hatch equipment
CN107318769B (en) * 2017-07-17 2019-07-05 青岛兴仪电子设备有限责任公司 A kind of new process improving duck's egg hatching achievement in the hatch machine of tunnel
CN110679513A (en) * 2019-10-22 2020-01-14 山东和康源生物育种股份有限公司 Hatching egg hatching device and method

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2148896A5 (en) * 1971-08-09 1973-03-23 Bekoto Sa
FR2236413B1 (en) * 1973-07-12 1976-06-18 Bekoto Sa
CN2717214Y (en) * 2004-06-08 2005-08-17 缪培成 Improved tunnel type airflow circulating control mechanism for incubator
CN2759165Y (en) * 2004-12-24 2006-02-22 广东温氏食品集团有限公司 Heating system unit of gallery-used hatch machine
CN101658145A (en) * 2008-08-25 2010-03-03 青岛兴仪电子设备有限责任公司 Laneway type incubator with independent left and right laneway temperature control
CN101352151A (en) * 2008-09-09 2009-01-28 上海石井畜牧设备有限公司 Hatching machine and working method of hatching machine
CN201393464Y (en) * 2009-04-30 2010-02-03 刘桂生 Large-scale incubation machine
CN101986832B (en) * 2009-08-06 2012-10-10 青岛保税区依爱电子有限责任公司 Box type incubator with large egg capacity
CN102187823B (en) * 2011-06-13 2013-10-09 安徽瑞格电子科技有限公司 Poultry hatching equipment
CN202197665U (en) * 2011-08-02 2012-04-25 上海石井畜牧设备有限公司 Automatic incubator
CN203860224U (en) * 2014-05-29 2014-10-08 安徽瑞格电子科技有限公司 Tunnel type hatch equipment

Also Published As

Publication number Publication date
CN103988793A (en) 2014-08-20

Similar Documents

Publication Publication Date Title
CN103988793B (en) A kind of tunnel type hatching equipment
CN203860224U (en) Tunnel type hatch equipment
CN103960159B (en) A kind of hen house
CN202907625U (en) Incubation device
CN103478016B (en) Hatching egg machine
CN104920272A (en) Intelligent zone control roadway type hatch equipment
CN205176998U (en) Vending machine
CN205005716U (en) Intelligence subregion control tunnel formula incubation device
CN101986832B (en) Box type incubator with large egg capacity
CN205005712U (en) Intelligence tunnel formula incubation device
CN204132159U (en) Vertical temperature control thermal cycle laying hens in brooding house
CN208047740U (en) Intelligent double loop hatch machine
CN203985460U (en) A kind of automatic environmental control pig house
CN203775880U (en) Cultivation box
CN204907526U (en) Automatic control tunnel formula incubation device that rectifies of intelligence
CN202514489U (en) Structurally improved steam smoking and baking oven
CN202489065U (en) Nuisance-free kilogram special-breeding hen house
CN107926760A (en) Intelligent double loop hatch machine
CN203313832U (en) Two-unit big-span united pigsty ventilation device
CN204790622U (en) Temperature subregion control system in chicken coop
CN102696489A (en) Heating and ventilation system for chicken house
CN203482746U (en) Incubator
CN105145404A (en) Ground-heating ventilating method and system for indoor chicken breeding
CN107432256A (en) A kind of poultry egg embryo activation equipment and method
CN105766693A (en) Cage aviary equipment and ventilation-cooling regulation method for cage aviary

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant