CN103968799A - 一种输电线路杆塔形变三维监测方法 - Google Patents

一种输电线路杆塔形变三维监测方法 Download PDF

Info

Publication number
CN103968799A
CN103968799A CN201410147010.8A CN201410147010A CN103968799A CN 103968799 A CN103968799 A CN 103968799A CN 201410147010 A CN201410147010 A CN 201410147010A CN 103968799 A CN103968799 A CN 103968799A
Authority
CN
China
Prior art keywords
tower
value
monitoring center
shaft tower
dimensional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410147010.8A
Other languages
English (en)
Other versions
CN103968799B (zh
Inventor
余雷
涂明
张焕青
刘晓华
张雪峰
周赞东
曾胜强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Wuhan NARI Ltd
Maintenance Branch of State Grid Hubei Electric Power Co Ltd
Original Assignee
Wuhan NARI Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan NARI Ltd filed Critical Wuhan NARI Ltd
Priority to CN201410147010.8A priority Critical patent/CN103968799B/zh
Publication of CN103968799A publication Critical patent/CN103968799A/zh
Application granted granted Critical
Publication of CN103968799B publication Critical patent/CN103968799B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)
  • Alarm Systems (AREA)
  • Emergency Alarm Devices (AREA)

Abstract

本发明涉及一种输电线路杆塔形变三维监测方法,利用分布在杆塔上的拉力传感器采集杆塔的拉力数据,并以此来分析杆塔形变,并通过三维立体画面的展现杆塔的受力情况,实现对杆塔形变,外力破坏等情况的远程、实时、动态监测。在达到最大载荷之前发出报警,及时通知管理部门采取措施,有助于实现输电线路的状态检修。

Description

一种输电线路杆塔形变三维监测方法
技术领域
本发明属于电力系统运行领域,涉及一种利用拉力传感器的三维监测输电线路杆塔形变方法。
背景技术
输电线路广泛分布在偏远地区,导线架设于高山、峡谷、树林、河流等复杂地形,常年受大自然的环境影响,特别是在冬季输电线路的杆塔容易受覆冰等外力影响产生形变,从而引起倒塔等严重事故。同时输电线路还有受人类生产、生活的影响,如公用事业基础建设中的输电线路走廊附近土方开挖,塔材被盗等,危及到线路的安全运行。
有鉴于此,本发明提供一种输电线路杆塔形变三维监测方法,以满足实际应用需要。
发明内容
本发明的目的是:克服现有技术的不足,提供一种输电线路杆塔形变三维监测方法,利用分布在杆塔上的拉力传感器采集杆塔的拉力数据,并以此来分析杆塔形变,并通过三维立体画面的展现杆塔的受力情况,实现对杆塔形变,外力破坏等情况的远程、实时、动态监测,在达到最大载荷之前发出报警,及时通知管理部门采取措施,有助于提前做出抢修预案。
为实现上述目的,本发明采用的技术方案是:一种输电线路杆塔形变三维监测方法,其特征在于,采用多个拉力传感器、多个无线发射器及监测中心系统实现,所述拉力传感器分布在杆塔上多个位置,用于采集杆塔上不同位置的受力数据;所述无线发射器安装在杆塔顶部,用于将拉力传感器所采集到的数据以及传感器编号转换成无线信号通过无线网络发送到监测中心系统;所述监测中心系统接收到无线信号后,将拉力值进行计算处理得到该处塔材的载荷值并在杆塔三维模型上实时显示出来,所述监测方法包括如下步骤:
1)根据实际杆塔图纸尺寸数据在监测中心系统中搭建杆塔的三维模型;
2)利用安装在杆塔顶部的无线发射器将分布在杆塔上拉力传感器采集到的杆塔各点的受力情况,传感器编号通过无线网络传回监测中心系统;
3)监测中心系统将拉力值通过计算处理得到该处塔材载荷值,与该位置警戒值比较,若当前载荷值小于警戒值,则返回第2步;若当前载荷值超过警戒值,则系统在三维画面上,对该传感器点对应受力塔材成黄色,并用标签标识受力方向以及数值;
4)监测中心系统将当前载荷值与该监测位置安全值相比较,若当前值小于安全值,则返回第2步;若当前载荷值超过安全值,则系统在三维画面上,对该传感器点对应受力塔材标成红色,用标签标识受力方向以及数值,并发出报警信号。
如上所述的输电线路杆塔形变三维监测方法,其特征在于,所述监测中心系统包含有以下功能:通过无线网络接收拉力数据并计算塔材的载荷值;建立已安装拉力传感器的杆塔的三维模型,并对安装点进行受力分析;对当前载荷值与受力分析值进行比较判断,若发生危险发出报警信号。
本发明的有益效果是:1、本发明能采集输电线路杆塔的受力情况,通过无线网络将采集到的数据发送到监测中心服务器上,实现输电线路杆塔受力情况的远程实时在线监测;
2、本发明将输电线路杆塔的受力情况实时地反映在三维画面上,并与设计值进行对比,判断是否杆塔状态是否安全;
3、本发明可动态监测杆塔的形变,覆冰载荷过大等情况,并可在杆塔载荷过大时提前发出预警,通知检修人员做好检修预案。
附图说明
图1为本发明的实施方法示意图。
图2为本发明的监测方法流程图。
具体实施方式
为了更好地理解本发明,下面结合实施例进一步阐明本发明的内容,但本发明的内容不仅仅局限于下面的实施例。本领域技术人员可以对本发明作各种改动或修改,这些等价形式同样在本申请所列权利要求书限定范围之内。
附图中的符号说明:1—拉力传感器,2—无线发射器,3—监测中心系统。
如图1所示,本发明由拉力传感传感器1、无线发射器2、监测中心系统3组成。
结合图1、图2所示,本发明的工作过程是:
1、首先,监测中心系统利用三维建模技术,根据实际杆塔图纸尺寸数据在监测中心系统中搭建杆塔的三维模型,模型初始颜色为白色,并标识出各监测点位置设计承受载荷值。
2、杆塔在运行过程中由于受环境影响,特别是覆冰时期,或者塔材被盗等环境因素的影响,杆塔受力情况会发生变化,分布在杆塔上的多个拉力传感器将采集杆塔各点的实时拉力数据值。
3、无线发射器利用无线网络将各位拉力传感器传感器采集到的杆塔各点的拉力数据值传回监测中心系统。
4、监测中心系统将拉力值通过计算处理得到该处塔材载荷值。
5、监测中心系统将该处塔材载荷值,若当前载荷值超过警戒值,则系统在三维画面上,对该传感器点对应受力塔材成黄色,并用标签标识受力方向以及数值。
6、监测中心系统将当前载荷值与该监测位置安全值相比较,若当前值小于安全值,则返回第2步。若当前载荷值超过安全值,则系统在三维画面上,对该传感器点对应受力塔材标成红色,用标签标识受力方向以及数值,并发出报警信号。
以上所述仅为本发明的优选实施例而已,并不用于限制本发明。本说明书中未作详细描述的内容属于本领域专业技术人员公知的现有技术。

Claims (2)

1.一种输电线路杆塔形变三维监测方法,其特征在于,采用多个拉力传感器、多个无线发射器及监测中心系统实现,所述拉力传感器分布在杆塔上多个位置,用于采集杆塔上不同位置的受力数据;所述无线发射器安装在杆塔顶部,用于将拉力传感器所采集到的数据以及传感器编号转换成无线信号通过无线网络发送到监测中心系统;所述监测中心系统接收到无线信号后,将拉力值进行计算处理得到该处塔材的载荷值并在杆塔三维模型上实时显示出来,所述监测方法包括如下步骤:
1)根据实际杆塔图纸尺寸数据在监测中心系统中搭建杆塔的三维模型;
2)利用安装在杆塔顶部的无线发射器将分布在杆塔上拉力传感器采集到的杆塔各点的受力情况,传感器编号通过无线网络传回监测中心系统;
3)监测中心系统将拉力值通过计算处理得到该处塔材载荷值,与该位置警戒值比较,若当前载荷值小于警戒值,则返回第2步;若当前载荷值超过警戒值,则系统在三维画面上,对该传感器点对应受力塔材成黄色,并用标签标识受力方向以及数值;
4)监测中心系统将当前载荷值与该监测位置安全值相比较,若当前值小于安全值,则返回第2步;若当前载荷值超过安全值,则系统在三维画面上,对该传感器点对应受力塔材标成红色,用标签标识受力方向以及数值,并发出报警信号。
2.根据权利要求1所述的输电线路杆塔形变三维监测方法,其特征在于,所述监测中心系统包含有以下功能:通过无线网络接收拉力数据并计算塔材的载荷值;建立已安装拉力传感器的杆塔的三维模型,并对安装点进行受力分析;对当前载荷值与受力分析值进行比较判断,若发生危险发出报警信号。
CN201410147010.8A 2014-04-14 2014-04-14 一种输电线路杆塔形变三维监测方法 Active CN103968799B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410147010.8A CN103968799B (zh) 2014-04-14 2014-04-14 一种输电线路杆塔形变三维监测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410147010.8A CN103968799B (zh) 2014-04-14 2014-04-14 一种输电线路杆塔形变三维监测方法

Publications (2)

Publication Number Publication Date
CN103968799A true CN103968799A (zh) 2014-08-06
CN103968799B CN103968799B (zh) 2016-08-17

Family

ID=51238596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410147010.8A Active CN103968799B (zh) 2014-04-14 2014-04-14 一种输电线路杆塔形变三维监测方法

Country Status (1)

Country Link
CN (1) CN103968799B (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106658542A (zh) * 2016-12-31 2017-05-10 杭州后博科技有限公司 一种基于受力模型的通信铁塔稳定性检测方法及系统
CN109118731A (zh) * 2018-08-01 2019-01-01 中国南方电网有限责任公司超高压输电公司贵阳局 输电线路覆冰雪监测预警方法及系统
CN110030977A (zh) * 2019-04-13 2019-07-19 国网吉林省电力有限公司经济技术研究院 一种输电铁塔图像识别装置及预警系统
CN111207717A (zh) * 2020-03-19 2020-05-29 国网河南省电力公司电力科学研究院 用于测量三维倾角的设备
CN111521124A (zh) * 2020-03-27 2020-08-11 武汉地大信息工程股份有限公司 基于影像无人机的铁塔形变检测的方法和系统
CN111811476A (zh) * 2020-08-06 2020-10-23 贵州电网有限责任公司 一种在线三维杆塔倾角及扭角监测系统及方法
CN112197688A (zh) * 2020-09-28 2021-01-08 广东电网有限责任公司 一种输配电塔架形变量预警方法及预警装置
CN112325839A (zh) * 2020-11-23 2021-02-05 李玉凤 一种输电铁塔塔材微形变在线监测装置
CN112781557A (zh) * 2020-12-23 2021-05-11 国网浙江省电力有限公司衢州供电公司 一种基于物联网的输电线路杆塔倾斜预警方法
CN114485362A (zh) * 2021-12-22 2022-05-13 迁安汇科复合材料有限公司 一种杆塔的检测设备及杆塔的检测方法
CN117804405A (zh) * 2024-02-28 2024-04-02 广州煜能电气有限公司 一种输电线路杆塔形变监测方法及系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102435355A (zh) * 2011-11-25 2012-05-02 天津市翔晟远电力设备实业有限公司 一种用于监测杆塔结构应力的系统及方法
CN102506806A (zh) * 2011-09-30 2012-06-20 中国电力科学研究院 一种输电杆塔真型试验应变计算方法
WO2013167128A1 (en) * 2012-05-11 2013-11-14 Scada International Aps Monitoring system and method
KR101353387B1 (ko) * 2013-07-30 2014-01-21 주식회사 지앤티네트웍스 변위센서를 이용한 통신 구조물 안전상태 감시 시스템

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102506806A (zh) * 2011-09-30 2012-06-20 中国电力科学研究院 一种输电杆塔真型试验应变计算方法
CN102435355A (zh) * 2011-11-25 2012-05-02 天津市翔晟远电力设备实业有限公司 一种用于监测杆塔结构应力的系统及方法
WO2013167128A1 (en) * 2012-05-11 2013-11-14 Scada International Aps Monitoring system and method
KR101353387B1 (ko) * 2013-07-30 2014-01-21 주식회사 지앤티네트웍스 변위센서를 이용한 통신 구조물 안전상태 감시 시스템

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨力生等: "高大杆塔变形的无线电测量技术", 《重庆大学学报》, vol. 34, no. 2, 28 February 2011 (2011-02-28), pages 19 - 25 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106658542B (zh) * 2016-12-31 2020-12-01 杭州后博科技有限公司 一种基于受力模型的通信铁塔稳定性检测方法及系统
CN106658542A (zh) * 2016-12-31 2017-05-10 杭州后博科技有限公司 一种基于受力模型的通信铁塔稳定性检测方法及系统
CN109118731A (zh) * 2018-08-01 2019-01-01 中国南方电网有限责任公司超高压输电公司贵阳局 输电线路覆冰雪监测预警方法及系统
CN109118731B (zh) * 2018-08-01 2020-11-03 中国南方电网有限责任公司超高压输电公司贵阳局 输电线路覆冰雪监测预警方法及系统
CN110030977A (zh) * 2019-04-13 2019-07-19 国网吉林省电力有限公司经济技术研究院 一种输电铁塔图像识别装置及预警系统
CN111207717A (zh) * 2020-03-19 2020-05-29 国网河南省电力公司电力科学研究院 用于测量三维倾角的设备
CN111521124A (zh) * 2020-03-27 2020-08-11 武汉地大信息工程股份有限公司 基于影像无人机的铁塔形变检测的方法和系统
CN111811476B (zh) * 2020-08-06 2023-08-25 贵州电网有限责任公司 一种在线三维杆塔倾角及扭角监测系统及方法
CN111811476A (zh) * 2020-08-06 2020-10-23 贵州电网有限责任公司 一种在线三维杆塔倾角及扭角监测系统及方法
CN112197688A (zh) * 2020-09-28 2021-01-08 广东电网有限责任公司 一种输配电塔架形变量预警方法及预警装置
CN112325839B (zh) * 2020-11-23 2022-04-26 上海圣享科技股份有限公司 一种输电铁塔塔材微形变在线监测装置
CN112325839A (zh) * 2020-11-23 2021-02-05 李玉凤 一种输电铁塔塔材微形变在线监测装置
CN112781557A (zh) * 2020-12-23 2021-05-11 国网浙江省电力有限公司衢州供电公司 一种基于物联网的输电线路杆塔倾斜预警方法
CN114485362A (zh) * 2021-12-22 2022-05-13 迁安汇科复合材料有限公司 一种杆塔的检测设备及杆塔的检测方法
CN114485362B (zh) * 2021-12-22 2022-08-12 迁安汇科复合材料有限公司 一种杆塔的检测设备及杆塔的检测方法
CN117804405A (zh) * 2024-02-28 2024-04-02 广州煜能电气有限公司 一种输电线路杆塔形变监测方法及系统
CN117804405B (zh) * 2024-02-28 2024-05-07 广州煜能电气有限公司 一种输电线路杆塔形变监测方法及系统

Also Published As

Publication number Publication date
CN103968799B (zh) 2016-08-17

Similar Documents

Publication Publication Date Title
CN103968799A (zh) 一种输电线路杆塔形变三维监测方法
CN102721373B (zh) 一种电气化铁路接触网覆冰在线监测系统
CN102930692B (zh) 一种路桥隧安全综合检测监控预警装置的安装和使用方法
CN104778517A (zh) 基于微气象与卫星遥感数据的微气象灾害预警方法及系统
CN102980612B (zh) 一种钢结构网架的三维虚拟现实健康监测方法
CN102681031A (zh) 基于物联网的电力铁塔环境气象监测系统
CN102353400A (zh) 架空输电线路覆冰状态监测方法及系统
CN104634318B (zh) 输电线路杆塔倾斜在线监测预警的方法
CN106157177A (zh) 一种基于小型雷达的输电线路降雪广域监测预警方法
CN103942912A (zh) 一种基于亮温值分析的输电线路山火精细化定位方法
CN204719531U (zh) 一种风电机组设备的故障监控预警系统
CN107153160B (zh) 一种风力发电机组全方位安全监控系统
CN206330611U (zh) 一种可远程实时监测铁塔安全的智能监控系统
CN111878324A (zh) 一种风电场塔筒涡激振动预警方法及预警系统
CN108318080A (zh) 一种采用Lora数据采集传输监测房屋变形和预警系统
CN104036627A (zh) 一种电力塔杆倾斜监测系统
CN202979029U (zh) 一种钢结构网架的三维虚拟现实健康监测系统
CN101976889A (zh) 变电站视频及环境监控站端系统
CN202928617U (zh) 输电线路导线覆冰及舞动在线监测单元
CN104867268A (zh) 一种判断输电线路下移动物超限的监控设备及方法
CN103033158A (zh) 基于位移传感器的输电导线三维监测系统及其监测方法
CN109596160A (zh) 一种用于监控输电塔状态的监控设备
CN104573192B (zh) 一种架空线路耐张塔等值覆冰厚度的在线监测方法
KR20070099713A (ko) 이동통신용 철탑의 위험감지와 태풍 예보 방법 및 그 장치
CN106949020B (zh) 一种高度集成风力发电机群安全监控系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160707

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: MAINTENANCE COMPANY, STATE GRID HUBEI ELECTRIC POWER CO., LTD.

Applicant after: State Grid Electric Power Research Insititute

Applicant after: Wuhan Nari Limited Liability Company of State Grid Electric Power Research Institute

Address before: 430074 Hubei Province, Wuhan city Hongshan District Luoyu Road No. 143

Applicant before: Wuhan Nari Limited Liability Company of State Grid Electric Power Research Institute

C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20161129

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: MAINTENANCE COMPANY, STATE GRID HUBEI ELECTRIC POWER CO., LTD.

Patentee after: Wuhan Nari Limited Liability Company of State Grid Electric Power Research Institute

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee before: State Grid Corporation of China

Patentee before: MAINTENANCE COMPANY, STATE GRID HUBEI ELECTRIC POWER CO., LTD.

Patentee before: State Grid Electric Power Research Insititute

Patentee before: Wuhan Nari Limited Liability Company of State Grid Electric Power Research Institute