CN103956768B - 一种光伏并网逆变器故障穿越控制方法 - Google Patents
一种光伏并网逆变器故障穿越控制方法 Download PDFInfo
- Publication number
- CN103956768B CN103956768B CN201410131069.8A CN201410131069A CN103956768B CN 103956768 B CN103956768 B CN 103956768B CN 201410131069 A CN201410131069 A CN 201410131069A CN 103956768 B CN103956768 B CN 103956768B
- Authority
- CN
- China
- Prior art keywords
- current
- peak
- combining inverter
- photovoltaic combining
- fault traversing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
Abstract
本发明公开了一种光伏并网逆变器故障穿越控制方法。该方法利用有功和无功参考电流、电压正负序分量以及调节系数生成并网参考电流;采用PR调节器和SVPWM调制模块生成开关管驱动信号。本发明可以实现光伏并网逆变器故障穿越时有功电流和无功电流协调控制,同时并网电流始终保持在安全工作区,避免过流问题的产生,保证光伏并网逆变器实现有效的故障穿越和抑制输出过电流。
Description
技术领域
本发明涉及电力电子领域中光伏并网逆变器的控制方法,尤其涉及一种光伏并网逆变器故障穿越控制方法。
背景技术
近年来光伏并网发电系统发展迅速,大量光伏并网逆变器接入电网,导致并网逆变器和电网之间的相互影响日益加剧。并网导则要求电网出现短时故障时并网逆变器必须保持不脱网运行,采用传统并网控制方法将引起并网逆变器在故障期间电流迅速增大,造成系统开关器件电流应力过大烧毁,导致故障穿越失败。因此研究高可靠性光伏并网逆变器故障穿越控制方法具有重要意义。
目前,国内外对光伏并网逆变器故障穿越控制已经开展了相关研究。在文献《Gridconvertersforphotovoltaicandwindpowersystem》中PedroRodriguez等人提出了一种故障穿越并网控制方法,通过限制功率输出最终限制并网逆变器电流峰值,但该方法计算过程非常复杂。在文献《Controlschemeforphotovoltaicthree-phaseinverterstominimizepeakcurrentsduringunbalancedgridvoltagesags》中推导出电网故障条件下并网逆变器电流峰值表达式,通过调节相关变量减小并网电流峰值,但该方法计算过程同样非常复杂,同时该方法推导过程中的一些理论假设和近似导致电流峰值无法准确估计和精确控制,引发并网逆变器存在过流而烧毁的风险。因此,亟需一种简单有效的控制方法保证光伏并网逆变器实现有效的故障穿越。
发明内容
为了解决上述问题,保证光伏并网逆变器实现有效的故障穿越,本发明提供一种光伏并网逆变器故障穿越方法。本发明所采用的技术方案如下:
一种光伏并网逆变器故障穿越控制方法,该方法包括如下步骤:
步骤1,通过电压霍尔传感器采样电网电压ea,eb,ec并通过Clarke变换得到静止坐标系下的电压eα,eβ,将其送入正负序解耦结构提取出电压正负序分量
步骤2,利用电网电压正序分量有功电流给定值和无功电流给定值求出功率电流计算值
步骤3,利用有功电流计算值无功电流计算值电压正负序分量和调节系数kp,kq生成静止坐标系下αβ轴的参考电流其静止坐标下αβ轴的参考电流为:
步骤4,将静止坐标下αβ轴的电流参考指令经过Clarke反变换得到abc坐标系下的三相电流参考再对三相电流参考进行峰值检测,得到三相电流参考峰值Ia(peak),Ib(peak),Ic(peak),经比较后求得最大电流参考峰值Imax(peak):
Imax(peak)=max(Ia(peak),Ib(peak),Ic(peak));
步骤5,将abc坐标系下的三相电流参考值分别除以最大电流参考峰值Imax(peak),然后乘以光伏并网逆变器额定电流得到限流后的三相电流参考值
步骤6,利用电流霍尔传感器采样光伏并网逆变器输出电流iabc,分别与限流后的三相电流参考值相减得到误差信号,再依次送入PR调节器和SVPWM调制模块,最后生成开关管的驱动信号S1~S6。
在步骤3中所述的参考电流生成方法为:
其中调节系数kp,kq变化范围为[-1,1]且满足kp+kq=0。
本发明的有益效果是:本发明提出的一种光伏并网逆变器故障穿越控制方法,可以实现光伏并网逆变器故障穿越时有功电流和无功电流协调控制,同时并网电流始终保持在安全工作区,避免过流问题的产生,保证光伏并网逆变器实现有效的故障穿越和抑制输出过电流。本发明的控制方案算法简单,易于工程实现。
附图说明
图1为本发明的一种光伏并网逆变器故障穿越控制方法原理图;
图2为本发明的光伏并网逆变器系统电网电压波形图;
图3为传统的光伏并网逆变器故障穿越控制的并网电流波形图;
图4为本发明的光伏并网逆变器故障穿越控制方法的并网电流波形图。
具体实施方式
下面结合附图对本发明的具体实施方式作进一步详细具体的说明。
一种光伏并网逆变器故障穿越控制方法,图1所示为本发明的一种光伏并网逆变器故障穿越控制方法原理图,该控制方法包括以下步骤:
步骤1,通过电压霍尔传感器采样电网电压ea,eb,ec并通过Clarke变换得到静止坐标系下的电压eα,eβ,具体变换过程为:
将静止坐标系下电压eα,eβ送入正负序解耦提取结构中得到其正负序解耦结构输入输出传递函数为:
其中ωc为正负序滤波器剪切频率,ω0为电网基波频率;
步骤2,利用电网电压正序分量有功电流给定值和无功电流给定值求出功率电流计算值
步骤3,利用有功电流计算值和无功电流计算值电压正负序分量和调节系数kp,kq生成静止坐标系下的αβ轴电流参考指令其静止坐标下αβ轴的参考电流应为:
步骤4,将静止坐标下αβ轴的电流参考指令经过Clarke反变换得到abc坐标系下的三相电流参考再对三相电流参考进行峰值检测,得到三相电流参考峰值Ia(peak),Ib(peak),Ic(peak),经比较后求得最大电流参考峰值Imax(peak),其中2/3变换过程为:
步骤5,将abc坐标系下的三相电流参考值分别除以最大电流参考峰值Imax(peak),然后乘以光伏并网逆变器额定电流得到限流后的三相电流参考值
步骤6,利用电流霍尔传感器采样光伏并网逆变器输出电流iabc,分别与限流后的三相电流参考值相减得到误差信号,再依次送入PR调节器和SVPWM调制模块,最后生成开关管的驱动信号S1~S6。其中所述PR调节器的传递函数为:
下面对本发明的有效性进行验证。
系统参数如下:光伏并网逆变器直流侧电压120V,电网相电压峰值50V,0.15s时刻发生电网故障,电压不平衡度为0.3,设定并网逆变器额定电流峰值为5A。仿真结果如图2~图4所示。图2为本发明的光伏并网逆变器系统电网电压波形图,图3为传统的光伏并网逆变器故障穿越控制的并网电流波形图,图4为本发明的光伏并网逆变器故障穿越控制方法的并网电流波形图。对比图3和图4可以看出,采用传统故障穿越控制将导致并网电流超出额定电流,将引发开关器件电流应力过大而烧毁,导致故障穿越失败。另一方面,采用本发明提出的方案可以使并网电流始终保持在额定电流以下工作,避免过流问题的产生,从而保证光伏并网逆变器实现有效的故障穿越。
Claims (3)
1.一种光伏并网逆变器故障穿越控制方法,其特征在于:该方法包括如下步骤:
步骤1,通过电压霍尔传感器采样电网电压ea,eb,ec并通过Clarke变换得到静止坐标系下的电压eα,eβ,将其送入正负序解耦结构提取出电压正负序分量
步骤2,利用电网电压正序分量有功电流给定值和无功电流给定值求出功率电流计算值
步骤3,利用有功电流计算值无功电流计算值电压正负序分量和调节系数kp,kq生成静止坐标系下的αβ轴电流参考指令其静止坐标下αβ轴的参考电流为:
步骤4,将静止坐标下αβ轴的参考电流经过Clarke反变换得到abc坐标系下的三相电流参考再对三相电流参考进行峰值检测,得到三相电流参考峰值Ia(peak),Ib(peak),Ic(peak),经比较后求得最大电流参考峰值Imax(peak):
Imax(peak)=max(Ia(peak),Ib(peak),Ic(peak));
步骤5,将abc坐标系下的三相电流参考值分别除以最大电流参考峰值Imax(peak),然后乘以光伏并网逆变器额定电流得到限流后的三相电流参考值
步骤6,利用电流霍尔传感器采样光伏并网逆变器输出电流iabc,分别与限流后的三相电流参考值相减得到误差信号,再依次送入PR调节器和SVPWM调制模块,最后生成开关管的驱动信号S1~S6。
2.根据权利要求1所述的一种光伏并网逆变器故障穿越控制方法,其特征在于:在步骤3中所述的电流参考指令生成方法为:
其中调节系数kp,kq变化范围为[-1,1]且满足kp+kq=0。
3.根据权利要求1所述的一种光伏并网逆变器故障穿越控制方法,其特征在于:在步骤6中所述PR调节器的传递函数为:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410131069.8A CN103956768B (zh) | 2014-04-01 | 2014-04-01 | 一种光伏并网逆变器故障穿越控制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410131069.8A CN103956768B (zh) | 2014-04-01 | 2014-04-01 | 一种光伏并网逆变器故障穿越控制方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103956768A CN103956768A (zh) | 2014-07-30 |
CN103956768B true CN103956768B (zh) | 2016-04-06 |
Family
ID=51334014
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410131069.8A Expired - Fee Related CN103956768B (zh) | 2014-04-01 | 2014-04-01 | 一种光伏并网逆变器故障穿越控制方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103956768B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104935006B (zh) * | 2015-06-15 | 2017-07-07 | 许继集团有限公司 | 一种高电压穿越控制方法 |
CN109546679B (zh) * | 2018-11-29 | 2023-11-03 | 东南大学 | 光伏中压直流汇集系统及中压侧双极短路故障穿越方法 |
CN109861287B (zh) * | 2019-03-08 | 2020-12-08 | 爱士惟新能源技术(江苏)有限公司 | 一种光伏逆变器的统一控制方法和系统 |
CN111969873B (zh) * | 2020-08-18 | 2022-05-13 | 常州索维尔电子科技有限公司 | 电压源型离网逆变器的控制方法 |
CN116780609A (zh) * | 2022-02-21 | 2023-09-19 | 金风科技股份有限公司 | 并网变换器系统的控制方法及装置 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2621046A1 (en) * | 2012-01-25 | 2013-07-31 | General Electric Company | System and method for reactive power regulation |
CN103683319A (zh) * | 2013-10-15 | 2014-03-26 | 中国东方电气集团有限公司 | 电网电压不平衡时基于滞环调制的并网逆变器控制方法 |
-
2014
- 2014-04-01 CN CN201410131069.8A patent/CN103956768B/zh not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2621046A1 (en) * | 2012-01-25 | 2013-07-31 | General Electric Company | System and method for reactive power regulation |
CN103683319A (zh) * | 2013-10-15 | 2014-03-26 | 中国东方电气集团有限公司 | 电网电压不平衡时基于滞环调制的并网逆变器控制方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103956768A (zh) | 2014-07-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103956768B (zh) | 一种光伏并网逆变器故障穿越控制方法 | |
CN103645404B (zh) | 一种微电网孤岛检测方法和检测系统 | |
CN104362667B (zh) | 一种双馈风电机组的高低电压穿越协同控制方法 | |
CN104113077B (zh) | 一种双馈异步风力发电机高电压穿越的协调控制方法 | |
CN104734191B (zh) | 一种基于无功电流注入的光伏并网逆变器低电压穿越方法 | |
CN102222937B (zh) | 一种光伏并网逆变器及其并网控制方法 | |
CN102946136B (zh) | 一种高压变频器工频向变频无扰切换电路及其切换方法 | |
CN103972904A (zh) | 一种光伏发电系统对称跌落低电压穿越无功控制方法 | |
CN111769591A (zh) | 基于双分裂变压器的多逆变器系统双模式组合控制方法 | |
CN101662217A (zh) | 高压直流输电系统换流器等值阻抗频率特性的求解方法 | |
CN103887818B (zh) | 一种适用于并网逆变器的低电压穿越控制方法 | |
CN103730906A (zh) | 一种抑制混合直流输电换相失败的协调控制方法 | |
CN105183999B (zh) | 含光伏电站的电力系统最大短路电流计算方法 | |
CN104809308A (zh) | 一种适用于非对称运行状态的换流器开关函数建模方法 | |
CN105305498B (zh) | 一种大功率光伏并网逆变器低电压穿越控制方法 | |
Dong et al. | Analysis of synchronverter self-synchronization dynamics to facilitate parameter tuning | |
CN113241748B (zh) | 电力电子变流器接入弱电网暂态过电压抑制方法及系统 | |
CN102780414B (zh) | 大功率并网逆变器抑制启动冲击电流的装置及其方法 | |
Guo et al. | Decoupled control of active and reactive power for a grid-connected doubly-fed induction generator | |
CN104682444A (zh) | 一种电网永磁直驱式风电系统变流器控制方法 | |
CN104319818A (zh) | 一种基于电网电压正序提取器的并网与独立双模式切换方法 | |
CN106998075A (zh) | 抑制晶闸管的12脉动逆变器后续换相失败的方法及系统 | |
CN108321845B (zh) | 一种逆变器自同步并网控制装置 | |
CN107994603B (zh) | 一种基于虚拟同步发电机故障穿越控制方法及系统 | |
CN103633913B (zh) | 基于反电流跟踪的双馈风机低电压穿越控制方法及系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160406 Termination date: 20200401 |
|
CF01 | Termination of patent right due to non-payment of annual fee |