CN103952955A - Method for treating gap of track slab of rapid transit railway CRTSII type slab ballastless track - Google Patents

Method for treating gap of track slab of rapid transit railway CRTSII type slab ballastless track Download PDF

Info

Publication number
CN103952955A
CN103952955A CN201410201783.XA CN201410201783A CN103952955A CN 103952955 A CN103952955 A CN 103952955A CN 201410201783 A CN201410201783 A CN 201410201783A CN 103952955 A CN103952955 A CN 103952955A
Authority
CN
China
Prior art keywords
track plates
track
gap
plates
slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410201783.XA
Other languages
Chinese (zh)
Other versions
CN103952955B (en
Inventor
鲁璐
韩俊
王辅圣
严来章
王伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 24th Bureau Group Co Ltd
Anhui Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd
Original Assignee
China Railway 24th Bureau Group Co Ltd
Anhui Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 24th Bureau Group Co Ltd, Anhui Engineering Co Ltd of China Railway 24th Bureau Group Co Ltd filed Critical China Railway 24th Bureau Group Co Ltd
Priority to CN201410201783.XA priority Critical patent/CN103952955B/en
Publication of CN103952955A publication Critical patent/CN103952955A/en
Application granted granted Critical
Publication of CN103952955B publication Critical patent/CN103952955B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a method for treating a gap of a track slab of a rapid transit railway CRTSII type slab ballastless track. The method is characterized in that determination and treatment are carried out as follows: the track slab is changed into a gapped track slab due to one side gap or a transverse run-through gap, and the length of the upwards cambered part of the gapped track slab is not smaller than 2mm; the gapped track slab is used as a central track slab, seven track slabs are respectively arranged on the symmetrical two sides of the central track slab as anchoring track slabs, the track slabs which are adjacent to the gapped track slab are the first track slabs, and the second to seventh track slabs are sequentially arranged from the first track slabs to the two sides; the second to seventh track slabs are anchored through inserting steel bars; then, wide joint unlocking is realized through chiseling wide joint concrete between the gapped track slab and the first track slabs so as to eliminate the gap, and wide joint concrete is poured again; finally, the first track slabs on the two sides are anchored through inserting steel bars. The method disclosed by the invention can effectively eliminate the gap and provide safety guarantee for the running of rapid transit railway. The construction, organization and operation of the method are convenient and quick.

Description

A kind of high ferro CRTS II plate-type ballastless track boards gap regulation method
Technical field
The present invention relates to the technical field of ballastless track of high-speed railway line maintenance, more particularly relate to high ferro CRTS II plate-type ballastless track boards gap regulation method.
Background technology
High-speed railway refers to that the speed of service reaches 200 kilometers/hour of above railways, being by the infrastructure that is suitable for high-speed cruising, fixed equipment, mobile device, improving and the safe-guard system of science and the bulky systems engineering that Transportation Organization method combines, is the comprehensive integration of contemporary new and high technology.
When high-speed railway puts into effect, the maintenance problem of ballastless track of high-speed railway circuit is following, the most general problem is the impact because of factors such as being expanded with heat and contract with cold at present, cause high-speed railway at the CRTS in some locations II plate-type ballastless track boards generation arching phenomenon, as shown in Figure 1, between track plates 1 and mortar bed 3, there is gap 2.Track plates arch amount is that gap gap can reach 9mm, causes the elevation of rail in 10m to change and reaches 2mm~6mm, once occur that this situation can serious threat traffic safety.
At present, process the technology of this gap and change exactly track plates, but the implementation cost of this technology is huge, long construction period causes the time of impact driving long, and after having changed, will carry out to train the speed limit of certain hour.
Summary of the invention
The present invention is for avoiding the existing weak point of above-mentioned prior art, a kind of high ferro CRTS II plate-type ballastless track boards gap regulation method is provided, to can effectively contain the further expansion of gap, strengthen the stability of track, guarantee being perfectly safe of train operation.
The present invention is that technical solution problem adopts following technical scheme:
The feature of high ferro CRTS II plate-type ballastless track boards gap regulation method of the present invention is to carry out as follows:
Step 1: measure the gap situation that track plates produces, determine that treatment conditions are: track plates is rendered as gap track plates because of one-sided gap or lateral direction penetrating gap, and the arch amount of described gap track plates is not less than 2mm;
Step 2: track plates centered by gap track plates, it is as anchor rail plate that respectively there are seven track plates the symmetrical both sides that are set in described central track guidance tape, anchor rail plate adjacent with gap track plates in described seven track plates is the first track plates, is followed successively by the second track plates, the 3rd track plates, the 4th track plates, the 5th track plates, the 6th track plates and the 7th track plates from the first track plates towards both sides; Utilize anchor rib to be fixed in the mode of bar planting anchoring for described the second track plates, the 3rd track plates, the 4th track plates, the 5th track plates, the 6th track plates and the 7th track plates;
Step 3: the wide joint concrete cutting between described gap track plates and the first track plates realizes wide seam release, make gap track plates obtain destressing, and make gap track plates eliminate gap under the effect of gravity, then again build the wide joint concrete between gap track plates and the first track plates;
Step 4: utilize anchor rib to implement to fix in the mode of bar planting anchoring for both sides the first track plates, complete mending course.
The feature of high ferro CRTS II plate-type ballastless track boards gap regulation method of the present invention is also:
The anchor point of described anchor rib is to be in track transversal centerline, and is 20.5 ± 3cm apart from the distance of the intersection point of track transversal centerline and track plates longitudinal centre line, is longitudinally two row.
The feature of high ferro CRTS II plate-type ballastless track boards gap regulation method of the present invention is also:
Anchor point on described the first track plates be in near gap track plates at one end on the correspondence position of the the the 1st, the 3rd, the 5th, the 7th and the 9th track towards the direction away from gap track plates.
Anchor point on described the second track plates be in near gap track plates at one end on the correspondence position of the the the the 1st, the 2nd, the 4th, the 5th, the 7th, the 9th and the 10th track towards the direction away from gap track plates;
Anchor point on described the 3rd track plates be in near gap track plates at one end on the correspondence position of the the the 2nd, the 4th, the 6th, the 8th and the 10th track towards the direction away from gap track plates;
Anchor point on described the 4th track plates to the seven track plates be in near gap track plates at one end on the correspondence position of the the 2nd, the 4th, the 7th and the 9th track towards the direction away from gap track plates.
The feature of high ferro CRTS II plate-type ballastless track boards gap regulation method of the present invention is also:
The method of described bar planting anchoring is: utilize rig to form straight down from the surface of anchor rail plate the boring that diameter is 390mm for 35mm, the degree of depth in anchor point position; Adopt the reinforcing bar of HRB500, Φ 28, and to get the length of determining reinforcing bar be 350mm; The degree of depth according to (4) implantation 160mm in base is implanted reinforcing bar in described boring, and fills anchoring adhesive and realize bar planting anchoring.
Wide seam release in described step 3, to carry out tensioning lock release after the wide joint concrete cutting between described gap track plates and the first track plates, make gap track plates obtain destressing, and making gap track plates eliminate gap under the effect of gravity, the elevation variation of eliminating in the rail level 10m after gap is not more than 1mm.
Compared with the prior art, beneficial effect of the present invention is embodied in:
1, the present invention, for implementing anchoring with the adjoining track plates of gap track plates, has effectively suppressed track plates due to the transverse shifting that stress occurs, and has contained the further expansion of gap, for the operation of high ferro provides safety guarantee simultaneously.
2, first the present invention implements wide seam for the first track plates of gap track plates and both sides and cuts release, has discharged produce the stress of gap track plates completely, and utilized gravity that gap track plates is recovered voluntarily, can eliminate track plates gap effective and rapidly.
3, the inventive method construction is convenient, because the regulation of track plates gap need to be carried out in railway blocks main points, can not affect the existing state of circuit when the inventive method construction, if one is blocked point and can not complete, can decompose in multiple blockade points and complete.
4, the inventive method can reduce the regulation cost of track plates gap significantly; And, do not need train to carry out speed limit completing after gap regulation construction, can not impact railway transportation.
Brief description of the drawings
Fig. 1 is gap vertical section schematic diagram of the present invention;
Fig. 2 is middle orbit board plane schematic diagram of the present invention;
Fig. 3 is anchor point distribution schematic diagram on the second track plates in the present invention;
Fig. 4 is anchor point distribution schematic diagram on the 3rd track plates in the present invention;
Fig. 5 is anchor point distribution schematic diagram on the 4th to the 7th track plates in the present invention;
Fig. 6 is anchor point distribution schematic diagram on the first track plates in the present invention;
Fig. 7 is anchor type schematic diagram in the present invention;
Fig. 8 is wide seam schematic diagram in the present invention.
Number in the figure: 1 track plates, 2 gaps, 3 mortar beds, 4 bed plates, 5 gap track plates, 6 first track plates, 7 second track plates, 8 the 3rd track plates, 9 the 4th track plates, 10 the 5th track plates, 11 the 6th track plates, 12 the 7th track plates, 13 tracks, 14 anchor points, 15 bar plantings, 16 wide joint concrete.
Detailed description of the invention
In the present embodiment, high ferro CRTS II plate-type ballastless track boards gap regulation method carries out as follows:
The first step: as shown in Figure 1, measure gap 2 situations that track plates produces, determine that treatment conditions are: track plates 1 is rendered as gap track plates because of one-sided gap or lateral direction penetrating gap, and the arch amount of gap track plates is not less than 2mm; The arch amount of gap track plates is also not more than 9mm under normal circumstances.The arch amount that is gap track plates is 2-9mm.
Second step: as shown in Figure 2, track plates centered by gap track plates 5, it is as anchor rail plate that respectively there are seven track plates the symmetrical both sides that are set in central track guidance tape, anchor rail plate adjacent with gap track plates 5 in seven track plates is the first track plates 6, is followed successively by the second track plates 7, the 3rd track plates 8, the 4th track plates 9, the 5th track plates 10, the 6th track plates 11 and the 7th track plates 12 from the first track plates towards both sides; Utilize anchor rib to be fixed in the mode of bar planting anchoring for the second track plates 7, the 3rd track plates 8, the 4th track plates 9, the 5th track plates 10, the 6th track plates 11 and the 7th track plates 12.
As shown in Figure 7, in the present embodiment, the method for bar planting anchoring is: utilize rig in anchor point position from the surface of anchor rail plate to be not more than deviation penetrating orbit plate 1 and the mortar bed 3 go deep in bed plate 4 successively straight down of 1 °, formation diameter is the boring that 35mm, the degree of depth are 390mm; Boring should adopt shockproof rig and drill bit, and the design attitude in bar planting 15 before boring uses the reinforcement placement situation in radar or miscellaneous equipment detection track plate and bed plate, in boring, must not interrupt structure reinforcing bars.Adopt the reinforcing bar of HRB500, Φ 28, and to get the length of determining reinforcing bar be 350mm ± 5mm; In boring, implant reinforcing bar according to the degree of depth that is implanted into 160mm to base 4, and fill anchoring adhesive and realize the anchoring of bar planting 15, require the hole anchoring adhesive at reinforcing bar top to seal, anchoring adhesive end face is not less than track plates end face, also must not overflow and avoid polluting track plates.In the present embodiment, anchoring adhesive adopts sharp the HIT-RE500 adhesive of happiness, its nontoxic pollution-free and have good anticorrosive and ageing-resistant performance.
The 3rd step: the wide joint concrete cutting between gap track plates 5 and the first track plates 6 realizes wide seam release, make gap track plates 5 obtain destressing, and make gap track plates 5 eliminate gap under the effect of gravity, then again build the wide joint concrete 16 between gap track plates 5 and the first track plates 6.
In concrete enforcement, as shown in Figure 8, wide seam release refers to after the wide joint concrete cutting between gap track plates 5 and the first track plates 6 carries out tensioning lock release, make gap track plates obtain destressing, and making gap track plates eliminate gap under the effect of gravity, the elevation variation of eliminating in the rail level 10m after gap is not more than 1mm.
The 4th step: utilize anchor rib to implement to fix in the mode of bar planting anchoring for both sides the first track plates 6, complete mending course.
In concrete enforcement, the anchor point 14 of anchor rib is to be in the transversal centerline of track 13, and is 20.5 ± 3cm apart from the distance of the transversal centerline of track 13 and the intersection point of track plates 1 longitudinal centre line, is longitudinally two row; In the present embodiment, arrange:
As shown in Figure 6, the each anchor point 14 on the first track plates 6 is to be in near 5 of gap track plates at one end on the correspondence position of (being left end shown in Fig. 6) the 1st, the 3rd, the 5th, the 7th and the 9th track 13 towards the direction away from gap track plates.
As shown in Figure 3, the each anchor point 14 on the second track plates 7 is to be in near gap track plates institute at one end on the correspondence position of (being left end shown in Fig. 3) track 13 of the 1st, the 2nd, the 4th, the 5th, the 6th, the 7th, the 9th and the 10th towards the direction away from gap track plates.
As shown in Figure 4, the each anchor point on the 3rd track plates 8 is to be in near gap track plates institute at one end on the correspondence position of (being left end shown in Fig. 4) the 2nd, the 4th, the 6th, the 8th and the 10th track 13 towards the direction away from gap track plates.
As shown in Figure 5, the each anchor point on the 4th track plates 9 is to be in near gap track plates institute at one end on the correspondence position of (being left end shown in Fig. 5) the 2nd, the 4th, the 7th and the 9th track 13 towards the direction away from gap track plates; The distribution form of the each anchor point on the 5th track plates 10, the 6th track plates 11 and the 7th track plates 12 is identical with the 4th track plates 9 shown in Fig. 5.

Claims (5)

1. a high ferro CRTS II plate-type ballastless track boards gap regulation method, is characterized in that carrying out as follows:
Step 1: measure the gap situation that track plates produces, determine that treatment conditions are: track plates is rendered as gap track plates because of one-sided gap or lateral direction penetrating gap, and the arch amount of described gap track plates is not less than 2mm;
Step 2: track plates centered by gap track plates, it is as anchor rail plate that respectively there are seven track plates the symmetrical both sides that are set in described central track guidance tape, anchor rail plate adjacent with gap track plates in described seven track plates is the first track plates, is followed successively by the second track plates, the 3rd track plates, the 4th track plates, the 5th track plates, the 6th track plates and the 7th track plates from the first track plates towards both sides; Utilize anchor rib to be fixed in the mode of bar planting anchoring for described the second track plates, the 3rd track plates, the 4th track plates, the 5th track plates, the 6th track plates and the 7th track plates;
Step 3: the wide joint concrete cutting between described gap track plates and the first track plates realizes wide seam release, make gap track plates obtain destressing, and make gap track plates eliminate gap under the effect of gravity, then again build the wide joint concrete between gap track plates and the first track plates;
Step 4: utilize anchor rib to implement to fix in the mode of bar planting anchoring for both sides the first track plates, complete mending course.
2. high ferro CRTS II plate-type ballastless track boards gap regulation method according to claim 1, it is characterized in that: the anchor point of described anchor rib is to be in track transversal centerline, and the distance apart from the intersection point of track transversal centerline and track plates longitudinal centre line is 20.5 ± 3cm, is longitudinally two row.
3. high ferro CRTS II plate-type ballastless track boards gap regulation method according to claim 2, is characterized in that:
Anchor point on described the first track plates be in near gap track plates at one end on the correspondence position of the the the 1st, the 3rd, the 5th, the 7th and the 9th track towards the direction away from gap track plates.
Anchor point on described the second track plates be in near gap track plates at one end on the correspondence position of the the the the 1st, the 2nd, the 4th, the 5th, the 7th, the 9th and the 10th track towards the direction away from gap track plates;
Anchor point on described the 3rd track plates be in near gap track plates at one end on the correspondence position of the the the 2nd, the 4th, the 6th, the 8th and the 10th track towards the direction away from gap track plates;
Anchor point on described the 4th track plates to the seven track plates be in near gap track plates at one end on the correspondence position of the the 2nd, the 4th, the 7th and the 9th track towards the direction away from gap track plates.
4. high ferro CRTS II plate-type ballastless track boards gap regulation method according to claim 1, is characterized in that the method for described bar planting anchoring is: utilize rig to form straight down from the surface of anchor rail plate the boring that diameter is 390mm for 35mm, the degree of depth in anchor point position; Adopt the reinforcing bar of HRB500, Φ 28, and to get the length of determining reinforcing bar be 350mm; The degree of depth according to (4) implantation 160mm in base is implanted reinforcing bar in described boring, and fills anchoring adhesive and realize bar planting anchoring.
5. high ferro CRTS II plate-type ballastless track boards gap regulation method according to claim 1, it is characterized in that: the wide seam release in described step 3, to carry out tensioning lock release after the wide joint concrete cutting between described gap track plates and the first track plates, make gap track plates obtain destressing, and making gap track plates eliminate gap under the effect of gravity, the elevation variation of eliminating in the rail level 10m after gap is not more than 1mm.
CN201410201783.XA 2014-05-13 2014-05-13 A kind of high ferro CRTS II plate-type ballastless track boards gap regulation method Expired - Fee Related CN103952955B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410201783.XA CN103952955B (en) 2014-05-13 2014-05-13 A kind of high ferro CRTS II plate-type ballastless track boards gap regulation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410201783.XA CN103952955B (en) 2014-05-13 2014-05-13 A kind of high ferro CRTS II plate-type ballastless track boards gap regulation method

Publications (2)

Publication Number Publication Date
CN103952955A true CN103952955A (en) 2014-07-30
CN103952955B CN103952955B (en) 2016-07-06

Family

ID=51330293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410201783.XA Expired - Fee Related CN103952955B (en) 2014-05-13 2014-05-13 A kind of high ferro CRTS II plate-type ballastless track boards gap regulation method

Country Status (1)

Country Link
CN (1) CN103952955B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104404844A (en) * 2014-11-18 2015-03-11 中国铁道科学研究院铁道建筑研究所 Method for repairing and reinforcing open joint of filling layer of slab ballastless track
CN105484110A (en) * 2015-11-24 2016-04-13 北京瑞威铁科高铁工程有限公司 Renovating method for gaps and mud spillover between CRTSI template type ballastless track base plate and surface layer of roadbed of high-speed railway

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19755602A1 (en) * 1996-12-18 1998-06-25 Heitkamp Gmbh Bau Surface for a high speed railway track
CN201506941U (en) * 2009-08-27 2010-06-16 周立新 Unit-type track plate longitudinal connecting structure of rear expansion way plate-type ballastless track
CN103590288A (en) * 2013-11-25 2014-02-19 中铁第四勘察设计院集团有限公司 Field maintenance method for CRTSII slab-track track boards

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19755602A1 (en) * 1996-12-18 1998-06-25 Heitkamp Gmbh Bau Surface for a high speed railway track
CN201506941U (en) * 2009-08-27 2010-06-16 周立新 Unit-type track plate longitudinal connecting structure of rear expansion way plate-type ballastless track
CN103590288A (en) * 2013-11-25 2014-02-19 中铁第四勘察设计院集团有限公司 Field maintenance method for CRTSII slab-track track boards

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
杨建锋等: "CRTSⅡ型板式无砟轨道轨道板胀板整治施工方法"", 《上海铁道科技》 *
杨建锋等: "CRTSⅡ型板式无砟轨道轨道板胀板整治施工方法"", 《上海铁道科技》, no. 3, 25 December 2013 (2013-12-25) *
杨明华: "桥上纵连板式无砟轨道结构的温度翘曲变形及整治", 《中国铁路》 *
田卫东: "高速铁路CRTS_型板式无砟轨道维修技术探索", 《铁道勘察 》 *
车科锋: "京石客专建设过程中由于低温施工引起的CRTSⅡ型板式无砟轨道CA砂浆离缝的处理方法", 《城市建设理论研究(电子版)》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104404844A (en) * 2014-11-18 2015-03-11 中国铁道科学研究院铁道建筑研究所 Method for repairing and reinforcing open joint of filling layer of slab ballastless track
CN105484110A (en) * 2015-11-24 2016-04-13 北京瑞威铁科高铁工程有限公司 Renovating method for gaps and mud spillover between CRTSI template type ballastless track base plate and surface layer of roadbed of high-speed railway
CN105484110B (en) * 2015-11-24 2020-06-19 北京瑞威铁科高铁工程有限公司 Method for treating slurry leakage of gap between base plate of CRTSI type plate ballastless track of high-speed railway and surface layer of roadbed

Also Published As

Publication number Publication date
CN103952955B (en) 2016-07-06

Similar Documents

Publication Publication Date Title
CN103952952B (en) High ferro CRTS II plate-type ballastless track boards gap regulation method
US9045865B2 (en) Polymer grouting method for uplifting ballastless track of high-speed rail
CN106012697B (en) Ballastless track roadbed high polymer grouting lifting method
CN103821039A (en) Correcting method for high speed railway ballastless track subgrade in soft soil area
CN103452018B (en) Track gauge correction method for double-block type ballastless track construction
WO2017185905A1 (en) Ribbed column distributed turnout foundation structure for low-set mid-to-low speed magnetic levitation line
CN207419555U (en) A kind of high ferro bridge pier roadbed isolation error-correction structure for protecting periphery existing building
CN104404844A (en) Method for repairing and reinforcing open joint of filling layer of slab ballastless track
CN105350988B (en) Tunnel Base reinforcement means
CN201506941U (en) Unit-type track plate longitudinal connecting structure of rear expansion way plate-type ballastless track
CN103590288A (en) Field maintenance method for CRTSII slab-track track boards
CN106436492A (en) Maintaining method of base plates of CRTS II-shaped plate type ballastless tracks
CN102587229A (en) Joint for track panel and manufacturing and installing method
CN103215863A (en) High polymer grouting method for lifting ballastless track of high speed railway
CN105780830A (en) Correction system and method for ballastless track bridge of high speed railway run in soft soil area
CN113089394A (en) Mechanical lifting and grouting reinforcement rapid repairing method for supporting layer of double-block ballastless track
CN103952955B (en) A kind of high ferro CRTS II plate-type ballastless track boards gap regulation method
CN103821040B (en) For the error-correction structure of soft clay area operation ballastless track of high-speed railway roadbed
CN204112169U (en) City rail system
CN205591267U (en) A rectifying system for soft soil area operation high -speed railway ballastless track bridge
CN203440722U (en) Gauge correction device for double-block type ballastless track construction
CN109355986A (en) A kind of non-fragment orbit sedimentation regulation method based on rope saw cut
CN204174481U (en) Soft clay area modern tram abutment rebound structure
CN104652299A (en) Electrified railway existing bridge and culvert whole-hole moving-out construction method
CN110984257A (en) Deviation rectifying method for cross-city-district rail transit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160706