CN203440722U - Gauge correction device for double-block type ballastless track construction - Google Patents

Gauge correction device for double-block type ballastless track construction Download PDF

Info

Publication number
CN203440722U
CN203440722U CN201320511022.5U CN201320511022U CN203440722U CN 203440722 U CN203440722 U CN 203440722U CN 201320511022 U CN201320511022 U CN 201320511022U CN 203440722 U CN203440722 U CN 203440722U
Authority
CN
China
Prior art keywords
gauge
wheel
rail
correcting
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320511022.5U
Other languages
Chinese (zh)
Inventor
苗永平
王新民
陈赛勇
张念
栾永平
朱永祥
谭敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Second Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of 17th Bureau of China's Railroad Group filed Critical Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Priority to CN201320511022.5U priority Critical patent/CN203440722U/en
Application granted granted Critical
Publication of CN203440722U publication Critical patent/CN203440722U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The utility model discloses a gauge correction device for double-block type ballastless track construction. The gauge correction device is characterized in that the gauge correction device comprises two main beams which are parallel to each other, two auxiliary beams which are perpendicular to the main beams and parallel to each other are connected close to two end potions of the two main beams, then, a #-shaped plane arrangement is formed, an expansion piece is arranged in the middle of each main beam, a front supporting walking wheel and a rear supporting walking wheel are arranged below each auxiliary beam, a pair of gauge correction wheels which are symmetrical about each auxiliary beam are arranged below and close to the corresponding main beam, the two wheels of each pair of gauge correction wheels are arranged on the two sides of a tool rail web respectively, and the supporting walking wheels are placed on a tool rail face.

Description

A kind of gauge means for correcting of double-blocked rail without ballast construction
Technical field
The utility model relates to high-speed railway slag-free rail construction technology, is specifically related to the gauge means for correcting in a kind of double-blocked rail without ballast construction.
Background technology
CRTS-I type double-blocked rail without ballast is in equipment Imported From German EMH Company radar 2000 technical foundation, in conjunction with China's national situation, through the domestic ballastless track system that innovation forms again, compares with the ballastless track of other form, has the advantages such as cost is low, work efficiency is high, good endurance.After Wuhan-Guangzhou passenger-dedicated line high-speed railway (design speed 350km/h) was formally open to the traffic in 2009, again at great Xi, Lanzhou and Xinjiang, Shanghai elder brother, the blue or green High-speed Passenger Dedicated Lines such as flourish, and the tunnel of growing up, station are applied to circuits such as hair lines.At present, CRTS-I type double-blocked rail without ballast has become one of main track form of China Express Railway.The core technology of CRTS-I type double-blocked rail without ballast system is: utilize tool track to fix prefabricated double-block type sleeper; Utilize three-dimensional control survey technology by the accurate space orientation of tool track; The cast-in-place railway roadbed board concrete of formwork erection is permanently affixed at double-block type sleeper in bed board, and then changes the long rail of paving formation gapless track, according to criterion of train running, circuit is carried out to later stage adjustment, opens operation after reaching the requirement of high ferro ride comfort.
At present, the construction technology of double-blocked rail without ballast is reaching its maturity aspect the control of the orbit parameters such as height, direction, all can meet design requirement and trueness error requirement.Have gauge parameter only and be subject to sleeper steel bar girder insufficient rigidity, the impact of the factors such as sleeper alignment error, the standard that has generally exceeded allowable error (± 1mm), have to rely on gauge strut to shore at a certain distance gauge, make it reach technical requirements, but this is only superficial phenomenon, adopt after gauge strut, in fact expanding by force after gauge, owing to shoring location gap large (every 3 sleepers are installed 1 gauge strut), cause sleeper track rail cant (standard is the 1:40 that slopes inwardly) to prolong line direction irregular variation occurs, the rail gradient that makes to lay after long rail is inhomogeneous, cause gauge suddenly big or suddenly small, rail level is distortion repeatedly, have a strong impact on safety and the comfort level of driving, height to track simultaneously, other parameter such as direction also has impact in various degree, must adjust fastener by a large amount of replacing, could meet the ride comfort requirement of high speed traveling.Therefore make fastener turnover rate conventionally up to more than 30%, engineering cost is high, simultaneously for being responsible for the reserved adjustment amount deposit wretched insufficiency of works department of circuit long-time maintenance after operation, totally unfavorable to the security of operation of high ferro and long-time maintenance.
Through a large amount of experimental studies, find, in work progress, gauge has an obvious Changing Pattern, i.e. the low impact of suspension truss rigidity is raised track after (section of track is built on stilts), and truss occurs lower rich, and tool track slopes inwardly, and gauge diminishes; Build after railway roadbed concrete, under the effect of chutable concrete buoyancy, the useful load acting on truss reduces, and under truss, the rich part that obtains is recovered; At concrete, possess after certain enabling capabilities, remove in time after section of track temporary supporting system, gauge thoroughly recovers.But being subject to the impact of man-made assembly section of track error, still there is irregular phenomenon in gauge.
Therefore, making full use of under the prerequisite of gauge Changing Pattern, while solving the man-made assembly section of track gauge irregular be the key of thoroughly improving double-blocked rail without ballast gauge parameter.
By the annexation of tool track and sleeper is studied to discovery, after sleeper is connected with tool track, between tool track and gauge block, gauge block and sleeper shoulder block, leave small gap (the about 0.2mm of width), each track place has 4 minim gaps (amounting to 0.7~0.8mm), the track at every sleepers two ends has the minim gap of 1.5mm left and right altogether, during the man-made assembly section of track, cannot guarantee the uniformity of each minim gap, sometimes tool track outwards pushes, cause outside minim gap closely connected, the corresponding increase of gauge, sometimes tool track inwardly pushes, cause inner side minim gap closely connected, gauge is corresponding to be reduced, the gauge inhomogeneities causing, with rich regular the dwindling after stack of gauge causing under truss, cause constructor to be difficult to judgement, if do not examined, usually cause error in judgement, when gauge is too small, for preventing that gauge from exceeding standard, blindly use strut expansion gauge, cause the change of sleeper rail cant, caused thus the irregularity of line direction, administer to later stage Track regularity and bring a lot of drawbacks, need to adopt the method for changing gauge block to adjust, result has strengthened workload, improved construction cost.
Summary of the invention
In view of double-blocked rail without ballast construction period is manually difficult to thoroughly eliminate sleeper alignment error, affect the conforming problem of gauge, the purpose of this utility model is to provide and a kind ofly can obviously improves construction precision, completely abolish gauge strut, and there is the means for correcting of the double-blocked rail without ballast gauge that work efficiency is high, cost is low.
For reaching above object, the utility model takes following technical scheme to be achieved:
A gauge means for correcting, it is characterized in that, comprise two girders that are parallel to each other, near the both ends of these two girders, be connected with two perpendicular to the auxiliary girder being parallel to each other of girder, form similar groined type layout; The middle part of every girder is provided with expansion bend, every auxiliary girder below is provided with back and front supporting travelling wheel, below near end of main beam, a pair of gauge correcting wheel that is symmetrical in auxiliary girder is all set, two wheels of every pair of gauge correcting wheel are placed in respectively tool track web of the rail both sides, support travelling wheel and are placed on tool track rail level.
In such scheme, described at a pair of gauge correcting wheel that is symmetrical in auxiliary girder near arranging below end of main beam, be that two wheel shafts that are symmetrical in auxiliary girder by being connected with end of main beam below are realized.
Described expansion bend is the extension sleeve with positive and negative screw thread bolt.
The advantage that adopts the utility model device to realize gauge correction is:
Whether 1, this device can be proofreaied and correct the alignment error between sleeper and tool track effectively, detect the original gauge of sleeper and meet design requirement, simple to operate, can realize standardized work, guarantee construction precision, reduce the later stage and change fastener quantity.
2, this device has improved gauge inspection and correction process that double-block type ballastless track sleeper is installed, the original loaded down with trivial details detection of the gauge by sleepers, correction operation is simplified, and can effectively prevents the gauge error that artificial erroneous judgement causes, and significantly improves work efficiency.
Accompanying drawing explanation
Below in conjunction with the drawings and the specific embodiments, the utility model is described in further detail.
Fig. 1 is the top view of the utility model device.
Fig. 2 is the elevation of the utility model device.
In Fig. 1, Fig. 2: 1. girder; 2. auxiliary girder; 3. extension sleeve; 3-1. extension sleeve adjustment hole; 4. support travelling wheel; 5. outer support is taken turns; 5-1. supports wheel shaft outward; 6. in, draw wheel; In 6-1., draw wheel shaft; 10. tool track
The specific embodiment
Referring to Fig. 1, Fig. 2, a kind of gauge means for correcting of ballastless track construction, comprises two girders 1, and the both ends near girder, are provided with two auxiliary girders that are parallel to each other 2, by the parallel connection of girder, form similar groined type layout; The middle part of every girder is provided with the length that expansion bend can regulate girder.Every auxiliary girder below is provided with back and front supporting travelling wheel 4 and is placed on tool track 10, below near end of main beam, by wheel shaft, a pair of gauge correcting wheel that is symmetrical in auxiliary girder is set, comprise be placed in tool track outside in draw wheel 6 and be placed in the outer support wheel 5 of tool track inner side.The extension sleeve 3 that expansion bend can be with positive and negative screw thread bolt forms,
It is the steel-pipe welding of rectangle that the major and minor beam of the utility model gauge means for correcting can adopt cross section.At girder 1 middle part, disconnect, broken end welds respectively round steel screw rod (left and right be respectively positive and negative screw thread), the female extension sleeve 3 of mounting strap.Road wheel 4 is installed below auxiliary girder 2.Near two holes that are symmetrical in auxiliary girder of drill with ferrule under girder 1 end steel pipe, penetrate respectively outer support wheel shaft 5-1, in draw wheel shaft 6-1 and girder steel-pipe welding firm, then support outside respectively wheel shaft, in draw on wheel shaft, install outer support wheel 5, in draw and take turns 6.
The know-why of this device is: utilize major and minor beam 1,2 groined types to arrange, enough plane stiffnesses are provided; Utilize extension sleeve 3 to regulate girder length, eliminate mismachining tolerance; Utilize the support travelling wheel 4 of installing under auxiliary girder, facilitate device to move on tool track 10; Utilize gauge to support the squeezing action of 5 pairs of tool tracks of wheel outward, outside pushing tow tool track when gauge is less than normal, expands gauge; Utilize the squeezing action of drawing 6 pairs of tool tracks of wheel in gauge, inside pushing tow tool track when gauge is bigger than normal, shrinks gauge; Utilize the rolling friction of correcting wheel and tool track, the resistance that reduces to move forward and backward; Utilize the correcting wheel compression tool rail web of the rail, force tool track inwardly or outwards to move horizontally, prevent that sleeper rail cant from changing; Space before and after utilizing between two groups of gauge correcting wheels, as the operating space of fastening rail clip screw spike.
Gauge bearing calibration in the utility model ballastless track construction, comprises the following steps:
The first step, utilizes the tool track of one group of section of track to determine the gauge precision of this device
Suitably loosen the fastener screw spike that connects sleeper and tool track on the section of track, then the section of track is raised track, from the initial end of tool track, insert this device, make all gauge correcting wheels (outer support wheel 5, in draw wheel 6) compaction tool rail web of the rail both sides, support travelling wheel 4 and be placed on tool track 10 rail levels, by gauge track forces (Special measuring scale), measure gauge, by extension sleeve 3, repeatedly adjust the length of girder 1, until make gauge reach standard gauge (1435mm), lock corresponding fastener screw spike; Again detect gauge errorless after, extension sleeve 3 is fixing, make the length of girder 1 constant.
Second step, gauge correction operation in construction
Before the section of track raises track, fastener screw spike needn't be tightened (guaranteeing that sleeper energy left and right trace is mobile), this device is inserted from the initial end of tool track 10, make all gauge correcting wheels (outer support wheel 5, in draw wheel 6) compaction tool rail 10 web of the rail both sides, support travelling wheel 4 and be placed on tool track 10 rail levels; Along tool track, vertically move this device, make sleeper between the correcting wheel of front and back, when gauge is less than design load (1435mm), gauge supports wheel 5 compression tool rails 10 outward and realizes gauge expansion; When gauge is greater than design load, inside draw wheel 6 compression tool rails 10 to realize gauge and shrink, then manually tighten fastener screw spike, the gauge relation of setting tool rail 10 and sleeper, completes the correction operation of this sleeper gauge.
The 3rd step, carries out the gauge correction operation of second step successively to all sleepers.When the original gauge severe overweight of sleeper, can be found in time, can directly change sleeper.

Claims (3)

1. a gauge means for correcting for double-blocked rail without ballast construction, is characterized in that, comprises two girders that are parallel to each other, and the both ends near these two girders, are connected with two perpendicular to the auxiliary girder being parallel to each other of girder, form similar groined type layout; The middle part of every girder is provided with expansion bend, every auxiliary girder below is provided with back and front supporting travelling wheel, below near end of main beam, a pair of gauge correcting wheel that is symmetrical in auxiliary girder is all set, two wheels of every pair of gauge correcting wheel are placed in respectively tool track web of the rail both sides, support travelling wheel and are placed on tool track rail level.
2. the gauge means for correcting that double-blocked rail without ballast as claimed in claim 1 is constructed, it is characterized in that, described at a pair of gauge correcting wheel that is symmetrical in auxiliary girder near arranging below end of main beam, be that two wheel shafts that are symmetrical in auxiliary girder by being connected with end of main beam below are realized.
3. the gauge means for correcting of double-blocked rail without ballast construction as claimed in claim 1, is characterized in that, described expansion bend is the extension sleeve with positive and negative screw thread bolt.
CN201320511022.5U 2013-08-20 2013-08-20 Gauge correction device for double-block type ballastless track construction Expired - Fee Related CN203440722U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320511022.5U CN203440722U (en) 2013-08-20 2013-08-20 Gauge correction device for double-block type ballastless track construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320511022.5U CN203440722U (en) 2013-08-20 2013-08-20 Gauge correction device for double-block type ballastless track construction

Publications (1)

Publication Number Publication Date
CN203440722U true CN203440722U (en) 2014-02-19

Family

ID=50091787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320511022.5U Expired - Fee Related CN203440722U (en) 2013-08-20 2013-08-20 Gauge correction device for double-block type ballastless track construction

Country Status (1)

Country Link
CN (1) CN203440722U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104404843A (en) * 2014-12-21 2015-03-11 苏州路云机电设备有限公司 Stud driver powered by internal combustion engine
CN104404845A (en) * 2014-12-21 2015-03-11 苏州路云机电设备有限公司 Squeezed edge grinding machine capable of traveling stably
CN109338833A (en) * 2018-10-16 2019-02-15 彭骋 A kind of high-speed railway rail gauge detection device
CN109781019A (en) * 2019-03-05 2019-05-21 安徽工业大学 A kind of rail gauge measuring apparatus and measurement method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104404843A (en) * 2014-12-21 2015-03-11 苏州路云机电设备有限公司 Stud driver powered by internal combustion engine
CN104404845A (en) * 2014-12-21 2015-03-11 苏州路云机电设备有限公司 Squeezed edge grinding machine capable of traveling stably
CN109338833A (en) * 2018-10-16 2019-02-15 彭骋 A kind of high-speed railway rail gauge detection device
CN109338833B (en) * 2018-10-16 2020-05-12 彭骋 High-speed rail track gauge detection device
CN109781019A (en) * 2019-03-05 2019-05-21 安徽工业大学 A kind of rail gauge measuring apparatus and measurement method

Similar Documents

Publication Publication Date Title
CN103452018B (en) Track gauge correction method for double-block type ballastless track construction
CN103434970B (en) A kind of fragment-free track slab lifting support
US9045865B2 (en) Polymer grouting method for uplifting ballastless track of high-speed rail
CN203440722U (en) Gauge correction device for double-block type ballastless track construction
CN106758590B (en) Construction temporary beam for replacing railway track under non-stop condition and construction method
CN102979041B (en) Soft overhead reinforcing jacking method for construction of span box bridge of jacking block of underpass turnout group of railway
CN206538637U (en) A kind of track strengthening device for existing railway
CN102926299A (en) Railway elevating and fixing device and railway bridge and culvert construction method adopting railway elevating and fixing device
CN103590288A (en) Field maintenance method for CRTSII slab-track track boards
CN103215863A (en) High polymer grouting method for lifting ballastless track of high speed railway
CN105908583B (en) System for replacing ballast track bed of tunnel with ballastless track under condition of uninterrupted driving
CN201321591Y (en) Gauge adjusting and positioning device
CN102912693A (en) Floating track bed precast slab and construction method for precast slab assembled floating track bed
CN107419655A (en) A kind of straddle-seat type single traffic rail beam girder falling retractor device
CN103397581A (en) Existing railway reinforcement construction method in jacking process of box body
CN206289476U (en) The construction beam of railroad track is changed under the conditions of for not stopping transport
CN105926382B (en) A kind of general solid concrete roabed of metro depot reserves grooved tracks construction method
CN102486015A (en) Strong-stability sleeper
CN105926381B (en) Method for replacing ballast track bed of tunnel with ballastless track under condition of uninterrupted driving
CN204174481U (en) Soft clay area modern tram abutment rebound structure
CN202705830U (en) Mutual-pull adjusting framed bent for double-block type ballastless track construction
CN207277171U (en) A kind of straddle-seat type single traffic rail beam girder falling telescopic device
CN203716004U (en) Special equipment sleeper for railway vehicle
CN102304882A (en) Line rail symmetric turnout No 4.5 in urban rail transit engineering
CN116590967A (en) Method for controlling pushing connection precision of magnetic levitation turnout in overhead section

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140219

Termination date: 20170820

CF01 Termination of patent right due to non-payment of annual fee