CN103942613B - Method for grid and province two-stage real-time generation schedule coordinative optimization under generalized tie line mode - Google Patents

Method for grid and province two-stage real-time generation schedule coordinative optimization under generalized tie line mode Download PDF

Info

Publication number
CN103942613B
CN103942613B CN201410141490.7A CN201410141490A CN103942613B CN 103942613 B CN103942613 B CN 103942613B CN 201410141490 A CN201410141490 A CN 201410141490A CN 103942613 B CN103942613 B CN 103942613B
Authority
CN
China
Prior art keywords
province
broad sense
net
saving
tie line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410141490.7A
Other languages
Chinese (zh)
Other versions
CN103942613A (en
Inventor
张彦涛
任景
任冲
丁恰
曹斌
张振宇
马晓伟
段乃欣
范越
白兴忠
孙骁强
张磊
高宗和
戴则梅
涂孟夫
吴炳祥
朱敏健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nari Technology Co Ltd
Northwest China Grid Co Ltd
Original Assignee
Nari Technology Co Ltd
Northwest China Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nari Technology Co Ltd, Northwest China Grid Co Ltd filed Critical Nari Technology Co Ltd
Priority to CN201410141490.7A priority Critical patent/CN103942613B/en
Publication of CN103942613A publication Critical patent/CN103942613A/en
Application granted granted Critical
Publication of CN103942613B publication Critical patent/CN103942613B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The invention discloses a method for grid and province two-stage real-time generation schedule coordinative optimization under a generalized tie line mode. The method is characterized by comprising the following steps that firstly, province scheduling generalized tie line plans are obtained through calculation; secondly, a grid scheduling department issues all the province scheduling generalized tie line plans to corresponding province scheduling departments, and the grid scheduling department obtains a generalized tie line plan of each grid scheduling side directly under the province scheduling through calculation; thirdly, sensitivity information is calculated; fourthly, all kinds of information are read; fifthly, the generalized tie line soft constraint of the corresponding province is added, soft constraint cost is added to a conventional optimization object at the same time, then a province-stage power grid mathematic model is formed, the generalized tie line soft constraint of each grid scheduling side directly under the province scheduling is added, soft constraint cost is added to the conventional optimization target at the same time, then a first area power grid mathematic model is formed, the whole-grid grid scheduling side generalized tie line constraint is added on the basis of the first mathematic model, and a second area power grid mathematic model is formed; sixthly, optimization calculation is started. The method for grid and province two-stage real-time generation schedule coordinative optimization under the generalized tie line mode has the advantages that calculation intensity is low and adaptability is high and is suitable for popularization and application in China scheduling mechanisms of all scales.

Description

Broad sense contact ray mode off line province two-stage real-time generation schedule coordination optimizing method
Technical field
The present invention relates to a kind of generation schedule coordination optimizing method is and in particular to a kind of broad sense gets in touch with the off line province of ray mode two Level real-time generation schedule coordination optimizing method, the invention belongs to dispatching automation of electric power systems technical field.
Background technology
Currently, iterative method and enforcement are built with intelligent grid, according to the prediction of next day need for electricity it is considered to system balancing The various constraintss such as constraint, unit operation constraint, operation of power networks constraint, optimize establishment 96 points of Unit Combination plans of next day and go out The practical function degree of generation schedule a few days ago of power plan steps up.A few days ago operation plan support energy-saving distribution, electricity market, Three 3 kinds of scheduling methods of public scheduling, on the premise of load prediction data possesses, generation schedule function can be used in establishment time a few days ago The Unit Combination plan of day to following many days and the plan of exerting oneself, the period interval of generation schedule is 15 minutes a few days ago, daily start-stop Time is 00:15~next day 00:00.Generation schedule can be planned and unit output plan in the combination of automatic computing engine group a few days ago, Consider transmission cross-section security constraint in planning, specify transmission of electricity element security constraint, ground state security constraint and n-1 safety about Bundle, supports generation schedule a few days ago is carried out ground state trend check and n-1 Security Checking.
Plan in practical implementation a few days ago, because system loading prediction a few days ago and new forms of energy prediction a few days ago are deposited with actual In relatively large deviation, lead to the plan of a few days ago exerting oneself significantly to adjust, adjust to AGC unit and bring immense pressure, also reduce simultaneously Power grid security index.For solving this problem, real-time generation schedule establishment is brought into schedule, and real-time generation schedule programmed function is according to New power system operating mode change, operating states of the units change, super short period load requirement forecasting, the prediction of ultra-short term new forms of energy, real When cross-section limitation and being planned by electricity, with reference to generation schedule a few days ago, work out the unit generation plan of following multiple periods.Real-Time Scheduling Energy-saving distribution, electricity market, three 3 kinds of scheduling methods of public scheduling are supported in plan, and the period interval of real-time generation schedule is 5 minutes (Or 15 minutes), the time range of planning is following 1 to a few hours, and the initial time period of calculating is that 15 minutes futures are corresponding Period.Such as current time is 10:15 points, then the real-time generation schedule time range worked out includes 10:30 points~11:30 points, Plan in every 5 minutes is exerted oneself.Can the plan of exerting oneself of automatic computing engine group, but Unit Combination state is not adjusted, that is, only Including Unit Economic scheduling feature, do not include Unit Combination function, planning considers transmission cross-section security constraint, specifies Transmission of electricity element security constraint.
Planning basic data accuracy height in real time, ultra-short term prediction data and real data deviation very little, meter of exerting oneself Draw implementation rate increase substantially, while being that AGC eases off the pressure, more can the operation of power networks of accurate evaluation future 1 to a few hours peace Quan Xing.
However, there is deficiency as follows in prior art:Each province's electricity consumption, by saving key pipe unit and the offer of net key pipe unit, saves Adjust real-time planning and the net real-time planning of tune to be two autonomous systems, province adjusts real-time planning function layout to save and adjusts again Adjust pipe unit, real-time planning function layout net key pipe unit adjusted by net, net saves adjusts real-time planning function independently Arrange each self-regulated pipe unit plan, jointly meet provincial need for electricity, how net realizes the coordination of real-time planning between saving, such as What adjustment saves key pipe unit and exerts oneself plan and save straightening and belong to net key pipe unit output plan it is ensured that net saves to adjust counts in real time a few days ago Draw coordinated operation, prior art can not solve this problem.
Content of the invention
For solving the deficiencies in the prior art, it is an object of the invention to provide a kind of broad sense contact ray mode off line province two-stage Real-time generation schedule coordination optimizing method, can solve the problem that to lack effectively adjustment in prior art and save key pipe unit and exerts oneself meter a few days ago Draw and save straightening and belong to net key pipe unit output plan it is ensured that net saves the technical problem adjusting real-time plan coordination to run.
In order to realize above-mentioned target, the present invention adopts the following technical scheme that:
Broad sense contact ray mode off line province two-stage real-time generation schedule coordination optimizing method is it is characterised in that include as follows Step:
Step one:According to saving system loading prediction a few days ago, province, new forms of energy are predicted a few days ago, thermal power output always adds, saves a few days ago for province A few days ago water power exert oneself total plus, save straightening belong to net straightening adjust thermal power output always to add, saves straightening and belongs to net straightening water transfer electricity and exert oneself total plus, province Key pipe unit installed capacity and province's straightening belong to net key pipe unit installed capacity, are calculated province and adjust broad sense tie line plan;
Step 2:Net tune issues each province and adjusts broad sense tie line plan to saving tune, and net is adjusted and adjusted geographical contact according to each province simultaneously Line plan and province adjust broad sense interconnection, are calculated each province's straightening genus net and adjust side broad sense tie line plan;
Step 3:Obtain up-to-date electrical network physical model and real-time mode data, start Calculation of Sensitivity, obtain monitoring element Sensitivity information to unit;
Step 4:Read the prediction of ultra-short term system loading, the prediction of ultra-short term new forms of energy, ad hoc inspection and repair plan, real-time section Limit, compressor emergency shutdown information, tie line plan, unit is adjustable exerts oneself, Unit Economic parameter information, unit reference plan, save and adjust Broad sense tie line plan, province's straightening belong to net and adjust side broad sense tie line plan, sensitivity information;
Step 5:Electric network model according to actual electric network and the data of described step 4 reading, adjust side for saving, normal On the basis of rule Optimized model, add this province broad sense interconnection soft-constraint, add soft-constraint simultaneously in optimization routine target and become This, form the provincial power network mathematical model of multiple-objection optimization;Side is adjusted for net, first on the basis of optimization routine model, adds Plus each province adjusts side broad sense interconnection soft-constraint directly under net, add soft-constraint cost in optimization routine target simultaneously, form many mesh The regional power grid mathematical model one that mark optimizes, then, adds the whole network net on the basis of mathematical model one and adjusts side broad sense interconnection about Bundle, forms the regional power grid mathematical model two of multiple-objection optimization;
Step 6:Adjust side saving, solve provincial power network mathematical model output result information;In net commissioning, solve successively Regional power grid mathematical model one and mathematical model two, and output result information.
Aforesaid broad sense contact ray mode off line province two-stage real-time generation schedule coordination optimizing method is it is characterised in that institute State broad sense interconnection to be defined as:
Wherein,
M is the sequence number of province, and t is the moment,Predict in the ultra-short term system loading of moment t for saving m,Adjust side ultra-short term new forms of energy prediction for saving m in the province of moment t,Side is adjusted to surpass for saving m in the net of moment t Short-term new forms of energy are predicted,For saving province's key pipe unit installed capacity of m,For province m directly under net key pipe unit Installed capacity,For save m moment t province's key pipe fired power generating unit exert oneself total plus,For saving province's straightening in moment t for the m Genus net key pipe fired power generating unit is exerted oneself and is always added,For save m moment t province's key pipe Hydropower Unit exert oneself total plus,For Save m and exert oneself directly under net key pipe Hydropower Unit in moment t and always add,Adjust side broad sense contact for saving m in the province of moment t Line plan,Adjust side broad sense tie line plan for saving m in the net of moment t.
Aforesaid broad sense contact ray mode off line province two-stage real-time generation schedule coordination optimizing method is it is characterised in that institute State in step 2,Wherein:tiePm,tAdjust geographical interconnection meter for saving m in the province of moment t Draw.
Aforesaid broad sense contact ray mode off line province two-stage real-time generation schedule coordination optimizing method is it is characterised in that institute State in step 5, described provincial power network mathematical model considers that broad sense interconnection is constrained to:
Wherein,
For saving m moment t broad sense interconnection soft-constraint slack variable;
Aforesaid broad sense contact ray mode off line province two-stage real-time generation schedule coordination optimizing method is it is characterised in that institute State in step 5, described regional power grid mathematical model one considers that broad sense interconnection is constrained to:
Aforesaid broad sense contact ray mode off line province two-stage real-time generation schedule coordination optimizing method is it is characterised in that institute State in step 5, described regional power grid mathematical model two considers that the whole network broad sense interconnection is constrained to:
The invention has benefit that:The present invention is superimposed broad sense interconnection soft-constraint cost minimization with optimization routine target For target, consider all kinds of operation of power networks constraints it is considered to net province tune broad sense interconnection soft-constraint is put down it is ensured that netting the plan in real time that saves Row runs, and while not interfereing with each other, jointly meets each province's adjusting system need for electricity, is favorably improved the intelligence of real-time power generation dispatching Change level and decision-making capability.Meanwhile, the present invention has calculating low intensity, adaptable feature, is suitable for scales various in China Scheduling institution popularization and application.
Brief description
Fig. 1 is the structural representation being preferable to carry out of the present invention.
Specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is made with specific introduction.
With reference to shown in Fig. 1, broad sense of the present invention gets in touch with ray mode off line province two-stage real-time generation schedule coordination optimizing method, is Distinguish net save key pipe unit responsibility so that net save adjust real-time plan coordination to run it is proposed that save adjust broad sense tie line plan and Save straightening and belong to the definition that side broad sense tie line plan adjusted by net, as long as the plan in real time of regional power grid and provincial power network meets each simultaneously Broad sense interconnection constrains, and adjusts real-time plan coordination to run it is ensured that net saves.Save in net and adjust in real-time planning procedure, need The prediction of ultra-short term system loading, ultra-short term wind power prediction, real-time cross-section limitation, ad hoc inspection and repair plan, unit reference plan, reality When the geographical information such as tie line plan and broad sense tie line plan, increase net and save and adjust broad sense interconnection soft-constraint, consider machine Group runs constraint, system balancing constraint, Network Security Constraints and practical constraint, changes optimization routine target, on this basis Analysis net saves adjusts real-time planning coordinated operation situation.Specifically include following steps:
Step one:According to saving system loading prediction a few days ago, province, new forms of energy are predicted a few days ago, thermal power output always adds, saves a few days ago for province A few days ago water power exert oneself total plus, save straightening belong to net straightening adjust thermal power output always to add, saves straightening and belongs to net straightening water transfer electricity and exert oneself total plus, province Key pipe unit installed capacity and province's straightening belong to net key pipe unit installed capacity, and net is adjusted and is calculated province's tune according to these data Broad sense tie line plan;
Broad sense interconnection is defined as:
Wherein,
M is the sequence number of province, and t is the moment,Predict in the ultra-short term system loading of moment t for saving m,Adjust side ultra-short term new forms of energy prediction for saving m in the province of moment t,Side is adjusted to surpass for saving m in the net of moment t Short-term new forms of energy are predicted,For saving province's key pipe unit installed capacity of m,For province m directly under net key pipe unit Installed capacity,For save m moment t province's key pipe fired power generating unit exert oneself total plus,For saving province's straightening in moment t for the m Genus net key pipe fired power generating unit is exerted oneself and is always added,For save m moment t province's key pipe Hydropower Unit exert oneself total plus,For Save m and exert oneself directly under net key pipe Hydropower Unit in moment t and always add,Adjust side broad sense contact for saving m in the province of moment t Line plan,Adjust side broad sense tie line plan for saving m in the net of moment t.
Step 2:Net tune issues each province and adjusts broad sense tie line plan to saving tune, and net is adjusted and adjusted geographical contact according to each province simultaneously Line plan and province adjust broad sense interconnection, are calculated each province's straightening genus net and adjust side broad sense tie line plan;
According to broad sense tie line plan definition it is easy to see that:
Derived as drawn a conclusion according to above-mentioned equation:
Wherein:tiePm,tFor saving m moment t geography tie line plan.This equation discloses province and adjusts side broad sense tie line plan And save the relation that straightening belongs between the broad sense tie line plan of net tune side, adjust side broad sense tie line plan or geographical interconnection when saving When plan changes, save straightening genus net and adjust side broad sense tie line plan that respective change occurs.
Step 3:Obtain up-to-date electrical network physical model and real-time mode data, start Calculation of Sensitivity, obtain unit to prison Sensitivity information depending on element;In this step, the concrete acquisition process of sensitivity information, is prior art, and the present invention is simultaneously not added with To further illustrate.
Step 4:Read the prediction of ultra-short term system loading, the prediction of ultra-short term new forms of energy, ad hoc inspection and repair plan, real-time section Limit, compressor emergency shutdown information, tie line plan, unit is adjustable exerts oneself, Unit Economic parameter information, unit reference plan, save and adjust Broad sense tie line plan, province's straightening belong to net and adjust side broad sense tie line plan, sensitivity information;Here so-called province adjusts broad sense contact Line plan is obtained and used for saving to adjust by step one, saves straightening genus net and adjusts side broad sense tie line plan to be obtained by step 2 and supply net Adjust and use, sensitivity information is obtained by step 3.
Step 5:Electric network model according to actual electric network and the data of described step 4 reading, adjust side for saving, normal On the basis of rule Optimized model, add this province broad sense interconnection soft-constraint, add soft-constraint simultaneously in optimization routine target and become This, form the provincial power network mathematical model of multiple-objection optimization;Side is adjusted for net, first on the basis of optimization routine model, adds Plus each province adjusts side broad sense interconnection soft-constraint directly under net, add soft-constraint cost in optimization routine target simultaneously, form many mesh The regional power grid mathematical model one that mark optimizes, then, adds the whole network net on the basis of mathematical model two and adjusts side broad sense interconnection about Bundle, forms the regional power grid mathematical model two of multiple-objection optimization.
Optimization routine model is generally:
Under three public scheduling methods, optimization aim is that all unit outputs are minimum with the deviation of original plan:
Under energy-saving distribution pattern, optimization aim is that the generating energy consumption of all units is minimum:
Constraints:
pi,t=Pi,t
ui,t=Ui,t
Wherein, I is the conventional energy resource unit number participating in system dispatching, and T is hop count when contained by system dispatching cycle, STi,t For the starting fluid cost in t for the conventional power unit i;W is the intermittent energy unit number participating in scheduling, pw,tFor intermittent energy Unit w exerting oneself in t, pi,tFor conventional power unit i exerting oneself in t,For conventional power unit i initially exerting oneself in t,For the deviation perunit dimension in t for the unit i,For the cost function of unit output deviation, C (pi,t) it is the energy consumption in t for the unit i,For system loading predicted value during t;For intermittent energy unit w in t Power prediction value;pi,minWith pi,maxIt is respectively exert oneself lower limit and the upper limit of conventional power unit i, ui,tFor 0/1 amount, represent unit start-stop State;ΔiFor unit i per period can load increase and decrease maximum;WithIt is respectively the rise that conventional power unit i provides in t Spinning reserve and downward spinning reserve,WithRise spinning reserve demand during system t of being respectively and downward rotation are standby Use demand;Pi,tFor conventional power unit i in t firm output setting value;WithThe minimum being respectively unit i is opened Machine time and minimum downtime;WithIt is respectively continuous start before the t period for the unit i and downtime;Ui,t For conventional power unit i in t stationary state setting value;WithRepresent the trend bound of branch road ij, p respectivelyij,tFor branch road Ij is in the trend of t period.
On the basis of optimization routine model, net saves to adjust and adds respective broad sense interconnection constraint respectively, changes each self-optimizing mesh Mark, realizes net and saves coordination optimization.
Makeover process that province adjust side Optimized model is described below:
Provincial power network mathematical model is:
Optimized model adds this province broad sense interconnection soft-constraint:
Wherein:For saving m moment t broad sense interconnection soft-constraint slack variable.
Optimization aim is conventional target and the lax punishment cost of broad sense interconnection constraint is minimum:
Under energy-saving distribution pattern, conventional target is that all unit outputs are minimum with the deviation of original plan:
Under energy-saving distribution pattern, optimization aim is that the generating energy consumption of all units is minimum:
Wherein:FnFor conventional target,For saving m moment t broad sense interconnection soft-constraint slack variable unit punishment cost, M Adjust number for saving, for saving and adjusting side, M is 1.
Makeover process that net adjust side Optimized model is described below:
Regional power grid mathematical model one is:
Optimized model increases each province and adjusts side broad sense interconnection soft-constraint directly under net:
Optimization aim is conventional target and the lax punishment cost of broad sense interconnection constraint is minimum:
Under energy-saving distribution pattern, conventional target is that all unit outputs are minimum with the deviation of original plan:
Under energy-saving distribution pattern, optimization aim is that the generating energy consumption of all units is minimum:
Wherein:FnFor conventional target,For saving m moment t broad sense interconnection soft-constraint slack variable unit punishment cost, M Adjust number for saving.
Regional power grid mathematical model two is:
Increase the whole network net and adjust side broad sense interconnection constraint on the basis of regional power grid model one:
Optimization aim is identical with regional power grid model one.
The technical program saves to adjust in dispatching of power netwoks planning system in some nets and is applied, and application effect meets expection.Real Border application shows, the present invention can produce deviation in ultra-short term system loading and the prediction of ultra-short term new forms of energy with prediction data a few days ago When, net saves adjusts real-time planning function can effectively distribute deviation to each self-regulated pipe unit, jointly meets a following hour Or the need for electricity of a few hours adjusts real-time planning flow process coordinated operation so that net saves, and realize a plan lean, mitigates AGC is adjusted while pressure it is ensured that electric power netting safe running.
The net that this method is carried out under actual electric network data saves the research adjusting real-time planning coordinated operation and trial, touches Rope goes out net and saves the optimization method adjusted under broad sense interconnection coordinated dispatching mode.This method is with the superposition broad sense contact of optimization routine target Line soft-constraint cost minimization is target, considers all kinds of operation of power networks constraints and adjusts broad sense interconnection soft-constraint it is considered to net saves, protects Card net saves plan in real time and runs parallel, and while not interfereing with each other, jointly meets each province's adjusting system need for electricity, is favorably improved reality When the intelligent level of power generation dispatching and decision-making capability.Meanwhile, the method has calculating low intensity, adaptable feature, more Plus it is suitable for the scheduling institution popularization and application in the various scale of China.
Other content and concepts for specifically launching elaboration of the present invention, are prior art publicity, art technology Personnel are referred to prior art.
The method of the present invention has the characteristics that and function:
Save responsibility in output distribution for the key pipe unit for dividing net, propose the definition of broad sense tie line plan, a kind of Net saves the new concept adjusting divisions of responsibility.
Net is in harmonious proportion to save adjusts plan in real time to run parallel, and does not interfere with each other, complements each other simultaneously again, jointly meets each province's system and bear Lotus demand, net saves to be adjusted by each observing broad sense tie line plan, realizes real-time planning optimization establishment coordinated operation, meets electricity greatly Net increasingly becomes more meticulous the demand of safe operation.
Net saves to adjust to increase respectively to save straightening and belong to net and adjusts the constraint of side broad sense interconnection and save and adjust the constraint of broad sense interconnection to generate number Learn model to be analyzed, consider system balancing constraint, unit operation constraint, Network Security Constraints and practical constraint simultaneously, protect Card net saves while adjusting real-time plan coordination to run, and meets power grid security.
The invention has the beneficial effects as follows saving the deviation adjustment amount of two-stage each self-regulated pipe unit through considering net, formulate broad sense Interconnection adjustment modes, as long as net saves two-stage and strictly observes respective broad sense tie line plan it becomes possible to ensure that net saves two independences Real-time program planning system run parallel, jointly meet the demand of each province's electricity consumption, AGC unit can be mitigated simultaneously again and adjust pressure Power is so that power network safety operation.
The basic principles, principal features and advantages of the present invention have been shown and described above.The technical staff of the industry should Understand, the invention is not limited in any way for above-described embodiment, all obtained by the way of equivalent or equivalent transformation Technical scheme, all falls within protection scope of the present invention.

Claims (6)

1. broad sense contact ray mode off line province two-stage real-time generation schedule coordination optimizing method is it is characterised in that include following walking Suddenly:
Step one:According to saving system loading prediction a few days ago, province, new forms of energy are predicted a few days ago, thermal power output always adds, saves a few days ago a few days ago for province Water power exert oneself total plus, save straightening belong to net straightening adjust thermal power output always to add, saves straightening and belongs to net straightening water transfer electricity and exert oneself total plus, province's straightening Belong to net straightening adjust new forms of energy exert oneself total plus, save key pipe unit installed capacity and save straightening and belong to net key pipe unit installed capacity, It is calculated province and adjust broad sense tie line plan;
Step 2:Net tune issues each province and adjusts broad sense tie line plan to saving tune, and net is adjusted and adjusted geographical interconnection meter according to each province simultaneously Draw and save and adjust broad sense tie line plan, be calculated each province's straightening genus net and adjust side broad sense tie line plan;
Step 3:Obtain up-to-date electrical network physical model and real-time mode data, start Calculation of Sensitivity, obtain unit first to monitoring The sensitivity information of part;
Step 4:Read the prediction of ultra-short term system loading, the prediction of ultra-short term new forms of energy, ad hoc inspection and repair plan, real-time cross-section limitation, Compressor emergency shutdown information, tie line plan, unit are adjustable to exert oneself, Unit Economic parameter information, unit reference plan, save adjust broad sense connection Winding thread plan, province's straightening belong to net and adjust side broad sense tie line plan, sensitivity information;
Step 5:Electric network model according to actual electric network and the data of described step 4 reading, adjust side for saving, excellent in routine On the basis of changing model, add this province broad sense interconnection soft-constraint, add soft-constraint cost, shape simultaneously in optimization routine target Become the provincial power network mathematical model of multiple-objection optimization;For net adjust side, on the basis of optimization routine model, add each province directly under Side broad sense interconnection soft-constraint adjusted by net, adds soft-constraint cost simultaneously, form the area of multiple-objection optimization in optimization routine target Domain electrical network mathematical model one, then, adds the whole network net on the basis of mathematical model one and adjusts side broad sense interconnection soft-constraint, formed many The regional power grid mathematical model two of objective optimization;
Step 6:Adjust side saving, solve provincial power network mathematical model output result information;In net commissioning, domain successively Electrical network mathematical model one and mathematical model two, and output result information.
2. the broad sense contact off line province of ray mode according to claim 1 two-stage real-time generation schedule coordination optimizing method, its It is characterised by, described broad sense interconnection is defined as:
Wherein, m is the sequence number of province, and t is the moment,Predict in the ultra-short term system loading of moment t for saving m,Adjust side ultra-short term new forms of energy prediction for saving m in the province of moment t,Adjust side ultrashort for saving m in the net of moment t Phase new forms of energy are predicted,For saving province's key pipe unit installed capacity of m,For saving assembling directly under net key pipe machine of m Machine capacity,For save m moment t province's key pipe fired power generating unit exert oneself total plus,Belong in province's straightening of moment t for saving m Net key pipe fired power generating unit is exerted oneself and is always added,For save m moment t province's key pipe Hydropower Unit exert oneself total plus,For saving m Exert oneself directly under net key pipe Hydropower Unit in moment t and always add,Adjust side broad sense interconnection for saving m in the province of moment t Plan,Adjust side broad sense tie line plan for saving m in the net of moment t.
3. the broad sense contact off line province of ray mode according to claim 2 two-stage real-time generation schedule coordination optimizing method, its It is characterised by, in described step 2,Wherein:tiePm,tAdjust in the province of moment t for saving m Geographical tie line plan.
4. the broad sense contact off line province of ray mode according to claim 3 two-stage real-time generation schedule coordination optimizing method, its It is characterised by, in described step 5, described provincial power network mathematical model considers that this province broad sense interconnection soft-constraint is:
Wherein,For saving m moment t broad sense interconnection soft-constraint slack variable.
5. the broad sense contact off line province of ray mode according to claim 4 two-stage real-time generation schedule coordination optimizing method, its It is characterised by, in described step 5, described regional power grid mathematical model one considers that each province adjusts side broad sense interconnection soft about directly under net Shu Wei:
.
6. the broad sense contact off line province of ray mode according to claim 5 two-stage real-time generation schedule coordination optimizing method, its It is characterised by, in described step 5, described regional power grid mathematical model two considers that the whole network net tune side broad sense interconnection soft-constraint is:
.
CN201410141490.7A 2014-04-09 2014-04-09 Method for grid and province two-stage real-time generation schedule coordinative optimization under generalized tie line mode Active CN103942613B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410141490.7A CN103942613B (en) 2014-04-09 2014-04-09 Method for grid and province two-stage real-time generation schedule coordinative optimization under generalized tie line mode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410141490.7A CN103942613B (en) 2014-04-09 2014-04-09 Method for grid and province two-stage real-time generation schedule coordinative optimization under generalized tie line mode

Publications (2)

Publication Number Publication Date
CN103942613A CN103942613A (en) 2014-07-23
CN103942613B true CN103942613B (en) 2017-02-15

Family

ID=51190275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410141490.7A Active CN103942613B (en) 2014-04-09 2014-04-09 Method for grid and province two-stage real-time generation schedule coordinative optimization under generalized tie line mode

Country Status (1)

Country Link
CN (1) CN103942613B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104299054A (en) * 2014-10-15 2015-01-21 国电南瑞科技股份有限公司 Power generation schedule optimization method taking hydroelectric generating set vibration area into account
CN104299055B (en) * 2014-10-15 2017-08-29 国电南瑞科技股份有限公司 It is a kind of to suppress the generation schedule optimization method that unit is reversely adjusted in power plant
CN104300535B (en) * 2014-10-17 2016-09-07 华中电网有限公司 A kind of coordination optimization dispatching method the most standby in net after high-power vacancy accident
WO2016074187A1 (en) * 2014-11-13 2016-05-19 The University Of Hong Kong Fast generation adjustment algorithm for energy management system
CN104537471B (en) * 2014-12-17 2017-12-01 国电南瑞科技股份有限公司 The coordination preparation method of full-service pattern teaching notes in a kind of scheduling training system
CN105186506B (en) * 2015-09-29 2019-02-05 中国电力科学研究院 A kind of regional power grid Real-Time Scheduling Plan rescheduling method
CN106786533B (en) * 2016-12-26 2019-09-06 国网山东省电力公司泰安供电公司 The acquisition methods and device of electric dispatching plan data
CN106886835A (en) * 2017-02-15 2017-06-23 国电南瑞科技股份有限公司 The off line province's two-stage real-time deal prediction coordination optimizing method of broad sense contact ray mode
CN107959285B (en) * 2017-10-20 2021-05-04 中国南方电网有限责任公司 Optimization method, system and device for day-ahead power generation and transmission plan among regions
CN109558628B (en) * 2018-10-17 2021-12-03 中国电力科学研究院有限公司 Method and system for coordinated optimization of real-time power generation plan
CN109829576B (en) * 2019-01-17 2023-01-24 国家电网有限公司 Headquarter and branch integrated multi-level scheduling optimization method
CN110363335B (en) * 2019-06-21 2021-11-23 国电南瑞科技股份有限公司 Real-time power generation plan optimization method considering linkage adjustment of Shaanxi cascade section quota

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103150686A (en) * 2013-02-06 2013-06-12 中国电力科学研究院 Network and province integrated plan establishment method based on distributed preprocessing and hierarchical coordination

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103150686A (en) * 2013-02-06 2013-06-12 中国电力科学研究院 Network and province integrated plan establishment method based on distributed preprocessing and hierarchical coordination

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
实时发电计划模型及其应用;徐帆 等;《电力系统自动化》;20140325;第38卷(第6期);第117-122页 *

Also Published As

Publication number Publication date
CN103942613A (en) 2014-07-23

Similar Documents

Publication Publication Date Title
CN103942613B (en) Method for grid and province two-stage real-time generation schedule coordinative optimization under generalized tie line mode
CN107276127B (en) Consider the wind electricity digestion optimization method of the multi-area Interconnected Power System of interconnection electricity transaction plan
Nouri et al. Water withdrawal and consumption reduction for electrical energy generation systems
CN106532769A (en) Method for optimizing demand-side time-of-use power price based on photovoltaic grid-connected uncertainty
CN103414213B (en) A kind of electricity optimization collocation method of fabric of island-in-sea type micro-capacitance sensor
CN109103926A (en) Photovoltaic power generation based on more Radiation Characteristics year meteorology scenes receives capacity calculation method
CN103208085B (en) Analysis intelligence system for improving load rate and reducing maximum demand of power utilization of enterprises
CN105162149A (en) Fuzzy adaptive control based method for tracking output of power generation plan of light storage system
CN101858095A (en) Processing method and device for providing auxiliary dispatching data of water supply network
CN103886388A (en) Multi-cycle generation scheduling coordinated optimization and closed-loop control method
CN105140958A (en) Method for planning power distribution network comprising photovoltaic power supply
CN107153885A (en) Consider the real-time generation schedule optimization method of fired power generating unit depth peak regulation
CN103699941A (en) Method for making annual dispatching operation plan for power system
CN102522756B (en) Inductive reactive compensation method for power grid for avoiding voltage off-normal risks
CN103414206A (en) Water, fire and light combined optimization power generation scheduling optimization method considering security constraints
CN106228462A (en) A kind of many energy-storage systems Optimization Scheduling based on genetic algorithm
CN109726907A (en) Long-term output calculation method and system in a kind of GROUP OF HYDROPOWER STATIONS
WO2023083235A1 (en) Optimization method and system for performing prediction on power distribution network in distributed manner
CN105391093A (en) Optimal scheduling method for grid-connected operation of small hydropower station group
CN105226649B (en) One kind predicting improved provincial power network power generation dispatching optimization method based on bus load
CN113746105A (en) Optimal control method, device, equipment and storage medium for power demand response
CN103761680B (en) Grid and provincial dispatching method and system for AC/DC interconnected large power grid with wind farm
CN116644941B (en) Industrial energy planning system based on Internet of things
CN106340901B (en) A kind of optimal quantile power distribution network controllable resources configuration method based on the moment of inertia
CN201730136U (en) Processing device for supplying auxiliary scheduling data of water supply network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB02 Change of applicant information

Address after: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20

Applicant after: NARI Technology Development Co., Ltd.

Address before: 211106 Jiangning City, Nanjing Province, the integrity of the road No. 19,

Applicant before: NARI Technology Development Co., Ltd.

C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Zhang Yantao

Inventor after: Bai Xingzhong

Inventor after: Sun Xiaoqiang

Inventor after: Zhang Lei

Inventor after: Gao Zonghe

Inventor after: Dai Zemei

Inventor after: Tu Mengfu

Inventor after: Wu Bingxiang

Inventor after: Zhu Minjian

Inventor after: Ren Jing

Inventor after: Ren Chong

Inventor after: Ding Qia

Inventor after: Cao Bin

Inventor after: Zhang Zhenyu

Inventor after: Ma Xiaowei

Inventor after: Duan Naixin

Inventor after: Fan Yue

Inventor before: Zhang Yantao

Inventor before: Ding Qia

Inventor before: Cao Bin

Inventor before: Gao Zonghe

Inventor before: Dai Zemei

Inventor before: Tu Mengfu

Inventor before: Wu Bingxiang

Inventor before: Zhu Minjian

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160905

Address after: 211106 Jiangning City, Nanjing Province, the integrity of the road No. 19,

Applicant after: NARI Technology Development Co., Ltd.

Applicant after: Northwest China Grid Co., Ltd.

Address before: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20

Applicant before: NARI Technology Development Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant