CN103939885A - 一种用于脱硝设备全程投运的给水置换式省煤器系统 - Google Patents

一种用于脱硝设备全程投运的给水置换式省煤器系统 Download PDF

Info

Publication number
CN103939885A
CN103939885A CN201410120365.8A CN201410120365A CN103939885A CN 103939885 A CN103939885 A CN 103939885A CN 201410120365 A CN201410120365 A CN 201410120365A CN 103939885 A CN103939885 A CN 103939885A
Authority
CN
China
Prior art keywords
bypass
feedwater
denitration device
article
stop valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410120365.8A
Other languages
English (en)
Other versions
CN103939885B (zh
Inventor
丁士发
刘进
陶丽
崇培安
陈朝松
张妮乐
杨凯旋
陈端雨
施鸿飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Shangfayuan Power Generation Complete Equipment Engineering Co ltd
Shanghai Power Equipment Research Institute Co Ltd
Original Assignee
Power Equipment Engineering Co Ltd Of Shanghai Power Equipment Research Institute
Shanghai Power Equipment Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Power Equipment Engineering Co Ltd Of Shanghai Power Equipment Research Institute, Shanghai Power Equipment Research Institute Co Ltd filed Critical Power Equipment Engineering Co Ltd Of Shanghai Power Equipment Research Institute
Priority to CN201410120365.8A priority Critical patent/CN103939885B/zh
Publication of CN103939885A publication Critical patent/CN103939885A/zh
Application granted granted Critical
Publication of CN103939885B publication Critical patent/CN103939885B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)
  • Chimneys And Flues (AREA)

Abstract

本发明提供了一种用于脱硝设备全程投运的给水置换式省煤器系统,其特征在于,包括第一条旁路、第二条旁路和第三条旁路,第一条旁路和第二条旁路设于下降管和给水管路之间,第一条旁路上沿从下降管到给水管道的方向依次设有容器罐、截止阀、循环泵,流量调节阀、截止阀、止回阀,第二条旁路从给水管道到下降管的方向依次设有截止阀、流量调节阀、止回阀,第三条旁路的一端于第一条旁路上位于流量调节阀和截止阀之间的位置,第三条旁路的另一端连接下降管,第三条旁路上设有截止阀,给水管路中在第一条旁路和第二条旁路之间设有流量调节阀。本发明在高负荷下不牺牲锅炉的经济性,低负荷下可以大幅度提高脱硝设备入口烟气温度,适用于低负荷下脱硝设备入口烟气温度最多欠40℃的锅炉。

Description

一种用于脱硝设备全程投运的给水置换式省煤器系统
技术领域
本发明涉及一种用于脱硝设备全程投运的给水置换式省煤器系统,用于对电站锅炉脱硝设备入口烟气温度在不同负荷下的调节,从而满足电站锅炉全工况脱硝系统的投运,属于锅炉技术领域。
背景技术
随着环保指标的提高,降低锅炉机组NOX排放量,要求锅炉机组稳定运行全负荷段都要投运脱硝设备,并且目前火力发电带负荷率不高大形势下,更要求锅炉低负荷阶段投用脱硝设备以降低环境污染。
目前国内大机组多数的脱硝系统都采用SCR技术(选择性催化还原法),而由于脱硝设备系统过程中的反应催化剂对进入脱硝设备反应器的烟气温度要求在320℃到420℃之间,在这个温度之间,催化剂可以正常工作,反之,不能正常工作。有的锅炉在高负荷时省煤器出口烟温满足脱硝设备系统中催化剂的要求,脱硝设备系统可以正常运行,而在低负荷段时脱硝设备入口烟气温度较低,脱硝设备系统不能正常运行,因此不满足低负荷下脱硝的环保要求,本发明所涉及的给水置换式省煤器系统可以提高低负荷下脱硝设备入口烟气温度,保证脱硝设备系统在低负荷下可以正常运行,以适应锅炉全工况下脱硝要求。
如图1所示,为传统的省煤器以及脱硝设备系统正常运行的示意图,给水从给水管路D2进入省煤器进口集箱,再流经省煤器达到省煤器出口集箱P1,再到下降管D1去水冷壁下联箱。烟气从转向室流过低温再热器或低温过热器等(不同炉型具体对待),再流经省煤器后达到脱硝设备系统。高负荷下脱硝设备入口烟气温度可以满足脱硝设备反应器中催化剂的要求,低负荷下,在这个流程中,脱硝设备入口温度低于脱硝设备反应器中催化剂要求温度的下限,因此在高负荷下还按原来方式运行,低负荷增加给水再循环式脱硝设备入口烟气温度调节系统。本发明以在高负荷不降低锅炉效率为前提,低负荷下运行给水置换式省煤器系统调节省煤器吸热量,提高脱硝设备入口烟气温度,进而实现锅炉机组全负荷段脱硝设备的正常运行,降低环境污染,提高脱硝设备及尾部空气预热器的安全性。
发明内容
本发明的目的是提供一种能够对电站锅炉脱硝设备入口烟气温度进行调节的给水置换式省煤器系统,目的是为了在锅炉30%ECR负荷至100%BMCR负荷都能够满足脱硝设备系统正常运行的要求,实现全负荷段投运脱硝系统。
为了达到上述目的,本发明的技术方案是提供了一种用于脱硝设备全程投运的给水置换式省煤器系统,其特征在于,包括用于使下降管中的水流到给水管道中的第一条旁路以及用于使给水管道中的水流到下降管中的第二条旁路,第一条旁路和第二条旁路设于下降管和给水管路之间。
优选地,按照与给水管道的接口位置次序,第一条旁路在第二条旁路之后。
优选地,所述的第一条旁路上沿从下降管到给水管道的方向依次设有容器罐、第四截止阀、循环泵,第一流量调节阀、第一截止阀和第一止回阀,第二条旁路从给水管道到下降管的方向依次设有第二截止阀、第二流量调节阀和第二止回阀。
更优选地,所述的用于脱硝设备全程投运的给水置换式省煤器系统还包括第三条旁路,第三条旁路的一端连接于第一条旁路上位于第一流量调节阀和第一截止阀之间的位置,第三条旁路的另一端连接下降管,第三条旁路上设有第三截止阀,给水管路中在第一条旁路和第二条旁路之间设有第三流量调节阀。
本发明的原理是通过采用将省煤器之后的热水与省煤器之前的冷水混合来提高实际进入省煤器的水温,降低省煤器的吸热,提高省煤器出口的烟温。本发明在现有的省煤器系统的基础上,在给水管路和下降管之间增加第一个连通旁路,称为第一条旁路,在旁路中增加一个再循环泵,用于把下降管中低压温度较高的水打到给水管道中来,与温度相对较低的给水混合,提高进入省煤器的给水温度。在给水管路和下降管之间增加第二个连通旁路,称为第二条旁路,在旁路中增加截止阀、止回阀、和流量调节阀等,用于把温度较低的给水旁路流到下降管中去。按照与给水管道的接口位置次序,第一个旁路在第二个旁路之后,保证实际进入省煤器的给水温度足够高,减小省煤器的吸热量。以上两条旁路在低负荷下才工作,高负荷下不工作。而第一条旁路中有循环泵,循环泵不能适应启停,因此为了让循环泵在高负荷时不停运,在第一旁路中增加了一小的内循环旁路,称为第三条旁路,当负荷增加到一定程度,不需要第一个旁路和第二个旁路工作时,将第一个旁路和第二个旁路关闭,同时打开第三个旁路,避免循环泵的启停;另外在第一条旁路中增加了一个大容器罐(根据具体要求设计),避免在旁路中阀门之间切换导致流量不稳。增加大容器罐是为了让整个系统在运行中防止系统流量波动很大。本发明附加许多阀门,用于控住旁路的工作。
与现有技术相比,本发明的有益效果是:
1、本发明通过运行给水置换式省煤器系统提高实际进入省煤器的给水温度,通过第一条旁路和第二条旁路配合使用,使实际进入省煤器的流量跟没有运用这套系统一样,保证省煤器的安全。
2、本发明只需要增加两条主要旁路,一条小回路,一个循环泵,一个压力容器罐,若干阀门。系统简单,安全,可靠。对锅炉主体运行不产生大的影响,现场施工方便。
3、本发明用循环泵把温度较高的省煤器出口水打到给水管路与温度较低的水混合,使实际进入省煤器的给水温度可以提高50℃,可以大大减少省煤器的吸热量,提高脱硝设备入口烟气温度最多可达30℃。效果明显,具有优异性。
4、本发明可以通过采用给水置换式省煤器系统控制实际进入锅炉省煤器的给水温度,改变省煤器的吸热量,进而改变脱硝设备入口的烟气温度。在高负荷下不牺牲锅炉的经济性,低负荷下可以大幅度提高脱硝设备入口烟气温度,适用于低负荷下脱硝设备入口烟气温度最多欠40℃的锅炉。为锅炉在低负荷下,脱硝设备脱硝系统能安全运行提供了保证。
附图说明
图1为传统的省煤器以及脱硝设备系统正常运行的示意图;
图2为用于脱硝设备全程投运的给水置换式省煤器系统结构示意图;
图3为用于脱硝设备全程投运的给水置换式省煤器系统局部示意图。(图中D1表示下降管,D2表示给水管路,D3表示第一条旁路,D4表示第二条旁路,D5第三条旁路,V表示容器罐,V1表示第二止回阀,V2表示第二流量调节阀,V3表示第二截止阀,V4表示第三流量调节阀,V5表示第三截止阀,V6表示第四截止阀,V7表示第一流量调节阀,V8表示第一截止阀,V9表示第一止回阀,M表示循环泵)
具体实施方式
为使本发明更明显易懂,兹以一优选实施例,并配合附图作详细说明如下。
实施例
以上海锅炉厂生产的某电厂600MW超临界锅炉为对象,本实施例提供了一种用于脱硝设备全程投运的给水置换式省煤器系统,如图2所示,包括用于使下降管D1中的水流到给水管道D2中的第一条旁路D3、用于使给水管道D2中的水流到下降管D1中的第二条旁路D4、以及第三条旁路S3,第一条旁路D3和第二条旁路D4设于下降管D1和给水管路D2之间,按照与给水管道D2的接口位置次序,第一条旁路D3在第二条旁路D4之后。如图3所示,第一条旁路D3上沿从下降管D1到给水管道D2的方向依次设有容器罐V、第四截止阀V6、循环泵M,第一流量调节阀V7、第一截止阀V8、第一止回阀V9,第二条旁路从给水管道D4到下降管D1的方向依次设有第二截止阀V3、第二流量调节阀V2、第二止回阀V1,第三条旁路D5的一端连接于第一条旁路上位于第一流量调节阀V7和第一截止阀V8之间的位置,第三条旁路D5的另一端连接下降管D1,第三条旁路D5上设有第三截止阀V5,给水管路D2中在第一条旁路D3和第二条旁路D4之间设有第三流量调节阀V4。
上述的用于脱硝设备全程投运的给水置换式省煤器系统的使用方法如下:
步骤1、该厂在250MW负荷下,脱硝设备入口烟气温度在270℃,远远低于脱硝设备反应器催化剂300℃的要求,通过热力计算得出在250MW下,要使得脱硝设备入口烟气温度达到300℃,需要循环泵M的流量为360t/h,选用最大流量500t/h的循环泵。在400MW负荷以上,第一条旁路D3和第二条旁路D4关闭,第三条旁路D5打开,即第一截止阀V8和第二截止阀V3关闭,第三截止阀V5,第四截止阀V6打开,循环泵M以其最大流量的35%,即150t/h,在第三条旁路D5中运行;
步骤2、当负荷降低时,脱硝设备入口烟气温度不断降低,通过监测脱硝设备入口烟气温度,从而控制实际进入省煤器的给水温度,调节循环泵M的流量,以保证脱硝设备入口烟气温度在300℃以上。在负荷小于400MW时,第一条旁路D3和第二条旁路D4打开,第三条旁路D5关闭,即第三截止阀V5关闭,第一截止阀V8、第二截止阀V3、第四截止阀V6打开,循环泵M把一定流量(根据负荷通过热力计算来计算,如负荷为300MW时的流量364t/h)温度高的水从下降管D1中打到温度低的给水管道D2中,实际进入省煤器的给水温度是第一条旁路D3和给水管路D2混合后的温度,当脱硝设备入口烟气温度达不到要求时,就提高循环泵M的循环流量,实际进入省煤器的给水温度升高。
步骤3、通过控制第二流量调节阀V2、第三流量调节阀V4、第一流量调节阀V7,来实现第一条旁路D3中的流量和第二条旁路D4中的流量相等,如负荷为300MW时,第一条旁路D3中流量为364t/h,第二条旁路D4中流量也为364t/h,保证进入省煤器的流量跟没有增加这套系统时是一样的。
步骤4、这样就可以实现在低负荷下调节省煤器出口烟温达到需要值,在高负荷下不影响锅炉的经济性,满足机组脱销设备全程投运的要求。

Claims (4)

1.一种用于脱硝设备全程投运的给水置换式省煤器系统,其特征在于,包括用于使下降管(D1)中的水流到给水管道(D2)中的第一条旁路(D3)以及用于使给水管道(D2)中的水流到下降管(D1)中的第二条旁路(D4),第一条旁路(D3)和第二条旁路(D4)设于下降管(D1)和给水管路(D2)之间。
2.如权利要求1所述的用于脱硝设备全程投运的给水置换式省煤器系统,其特征在于,按照与给水管道(D2)的接口位置次序,第一条旁路(D3)在第二条旁路(D4)之后。
3.如权利要求1所述的用于脱硝设备全程投运的给水置换式省煤器系统,其特征在于,所述的第一条旁路(D3)上沿从下降管(D1)到给水管道(D2)的方向依次设有容器罐(V)、第四截止阀(V6)、循环泵(M),第一流量调节阀(V7)、第一截止阀(V8)和第一止回阀(V9),第二条旁路从给水管道(D4)到下降管(D1)的方向依次设有第二截止阀(V3)、第二流量调节阀(V2)和第二止回阀(V1)。
4.如权利要求3所述的用于脱硝设备全程投运的给水置换式省煤器系统,其特征在于,还包括第三条旁路(D5),第三条旁路(D5)的一端连接于第一条旁路上位于第一流量调节阀(V7)和第一截止阀(V8)之间的位置,第三条旁路(D5)的另一端连接下降管(D1),第三条旁路(D5)上设有第三截止阀(V5),给水管路(D2)中在第一条旁路(D3)和第二条旁路(D4)之间设有第三流量调节阀(V4)。
CN201410120365.8A 2014-03-28 2014-03-28 一种用于脱硝设备全程投运的给水置换式省煤器系统 Active CN103939885B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410120365.8A CN103939885B (zh) 2014-03-28 2014-03-28 一种用于脱硝设备全程投运的给水置换式省煤器系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410120365.8A CN103939885B (zh) 2014-03-28 2014-03-28 一种用于脱硝设备全程投运的给水置换式省煤器系统

Publications (2)

Publication Number Publication Date
CN103939885A true CN103939885A (zh) 2014-07-23
CN103939885B CN103939885B (zh) 2016-03-09

Family

ID=51187666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410120365.8A Active CN103939885B (zh) 2014-03-28 2014-03-28 一种用于脱硝设备全程投运的给水置换式省煤器系统

Country Status (1)

Country Link
CN (1) CN103939885B (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104406155A (zh) * 2014-11-27 2015-03-11 哈尔滨锅炉厂有限责任公司 用于提高省煤器水温的连接管
CN104595884A (zh) * 2015-01-29 2015-05-06 上海上电电力工程有限公司 用于强迫循环汽包锅炉维持scr正常运行的烟气升温系统
CN104613457A (zh) * 2015-01-29 2015-05-13 上海上电电力工程有限公司 用于直流和自然循环锅炉维持scr正常运行的烟气升温系统
CN104879743A (zh) * 2015-05-22 2015-09-02 中国神华能源股份有限公司 锅炉热力系统和锅炉
CN105526577A (zh) * 2015-12-22 2016-04-27 东方菱日锅炉有限公司 可稳定调控的低低温省煤器系统
CN106287651A (zh) * 2016-08-16 2017-01-04 宁夏清远顺合环保科技有限公司 一种锅炉的scr入口烟温动态控制系统及方法
CN106765039A (zh) * 2016-12-27 2017-05-31 宁夏清远顺合环保科技有限公司 一种scr入口烟气水侧提温系统及方法
CN107250666A (zh) * 2015-02-10 2017-10-13 三菱重工业株式会社 锅炉给水系统及具备该锅炉给水系统的锅炉、锅炉给水方法
CN108844058A (zh) * 2018-08-16 2018-11-20 杭州华电能源工程有限公司 一种适用于亚临界汽包炉发电机组的省煤器热水再循环系统及其工作方法
CN109681889A (zh) * 2019-01-25 2019-04-26 浙江伟明环保股份有限公司 一种垃圾焚烧锅炉排烟温度调控系统及运行方法
CN110227345A (zh) * 2019-06-27 2019-09-13 国网吉林省电力有限公司电力科学研究院 一种适用于亚临界火电机组的宽负荷脱硝系统及控制方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1447062A (zh) * 2002-02-27 2003-10-08 巴布考克及威尔考克斯公司 为了最佳scr操作控制烟道气排气温度的系统
US20070261646A1 (en) * 2006-05-09 2007-11-15 Albrecht Melvin J Multiple pass economizer and method for SCR temperature control
CN102913896A (zh) * 2012-11-20 2013-02-06 上海锅炉厂有限公司 一种电站锅炉省煤器
CN102937295A (zh) * 2012-11-20 2013-02-20 上海锅炉厂有限公司 一种适用脱硝设备负全程负荷投运的锅炉省煤器布置方式
CN103335301A (zh) * 2013-05-17 2013-10-02 西安交通大学 一种火电机组低负荷给水加热系统
CN103343953A (zh) * 2013-04-15 2013-10-09 上海上电电力工程有限公司 带有烟气升温系统的强迫循环汽包锅炉
CN103343959A (zh) * 2013-04-15 2013-10-09 上海上电电力工程有限公司 带有烟气升温系统的自然循环汽包锅炉
JP2013234791A (ja) * 2012-05-09 2013-11-21 Miura Co Ltd 給水加温システム

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1447062A (zh) * 2002-02-27 2003-10-08 巴布考克及威尔考克斯公司 为了最佳scr操作控制烟道气排气温度的系统
US20070261646A1 (en) * 2006-05-09 2007-11-15 Albrecht Melvin J Multiple pass economizer and method for SCR temperature control
JP2013234791A (ja) * 2012-05-09 2013-11-21 Miura Co Ltd 給水加温システム
CN102913896A (zh) * 2012-11-20 2013-02-06 上海锅炉厂有限公司 一种电站锅炉省煤器
CN102937295A (zh) * 2012-11-20 2013-02-20 上海锅炉厂有限公司 一种适用脱硝设备负全程负荷投运的锅炉省煤器布置方式
CN103343953A (zh) * 2013-04-15 2013-10-09 上海上电电力工程有限公司 带有烟气升温系统的强迫循环汽包锅炉
CN103343959A (zh) * 2013-04-15 2013-10-09 上海上电电力工程有限公司 带有烟气升温系统的自然循环汽包锅炉
CN103335301A (zh) * 2013-05-17 2013-10-02 西安交通大学 一种火电机组低负荷给水加热系统

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104406155A (zh) * 2014-11-27 2015-03-11 哈尔滨锅炉厂有限责任公司 用于提高省煤器水温的连接管
CN104595884A (zh) * 2015-01-29 2015-05-06 上海上电电力工程有限公司 用于强迫循环汽包锅炉维持scr正常运行的烟气升温系统
CN104613457A (zh) * 2015-01-29 2015-05-13 上海上电电力工程有限公司 用于直流和自然循环锅炉维持scr正常运行的烟气升温系统
CN107250666A (zh) * 2015-02-10 2017-10-13 三菱重工业株式会社 锅炉给水系统及具备该锅炉给水系统的锅炉、锅炉给水方法
CN107250666B (zh) * 2015-02-10 2019-06-28 三菱重工业株式会社 锅炉给水系统及具备该锅炉给水系统的锅炉、锅炉给水方法
CN104879743A (zh) * 2015-05-22 2015-09-02 中国神华能源股份有限公司 锅炉热力系统和锅炉
CN105526577A (zh) * 2015-12-22 2016-04-27 东方菱日锅炉有限公司 可稳定调控的低低温省煤器系统
CN105526577B (zh) * 2015-12-22 2018-05-15 东方菱日锅炉有限公司 可稳定调控的低低温省煤器系统
CN106287651B (zh) * 2016-08-16 2018-07-24 北京清远顺合环保科技有限公司 一种锅炉的scr入口烟温动态控制系统及方法
CN106287651A (zh) * 2016-08-16 2017-01-04 宁夏清远顺合环保科技有限公司 一种锅炉的scr入口烟温动态控制系统及方法
CN106765039A (zh) * 2016-12-27 2017-05-31 宁夏清远顺合环保科技有限公司 一种scr入口烟气水侧提温系统及方法
CN108844058A (zh) * 2018-08-16 2018-11-20 杭州华电能源工程有限公司 一种适用于亚临界汽包炉发电机组的省煤器热水再循环系统及其工作方法
CN108844058B (zh) * 2018-08-16 2024-05-17 杭州华电能源工程有限公司 一种适用于亚临界汽包炉发电机组的省煤器热水再循环系统及其工作方法
CN109681889A (zh) * 2019-01-25 2019-04-26 浙江伟明环保股份有限公司 一种垃圾焚烧锅炉排烟温度调控系统及运行方法
CN110227345A (zh) * 2019-06-27 2019-09-13 国网吉林省电力有限公司电力科学研究院 一种适用于亚临界火电机组的宽负荷脱硝系统及控制方法
CN110227345B (zh) * 2019-06-27 2023-12-29 国网吉林省电力有限公司电力科学研究院 一种适用于亚临界火电机组的宽负荷脱硝系统及控制方法

Also Published As

Publication number Publication date
CN103939885B (zh) 2016-03-09

Similar Documents

Publication Publication Date Title
CN103939885B (zh) 一种用于脱硝设备全程投运的给水置换式省煤器系统
US10960353B2 (en) All-condition auxiliary denitration system and operation method thereof
CN104028104B (zh) 设有省煤器再循环系统的脱硝装置及发电机组
CN111649349A (zh) 一种用于锅炉深度调峰的全负荷脱硝系统及其操作方法
CN103953913A (zh) 一种用于脱硝设备全程投运的换热可调式省煤器系统
CN105222114B (zh) 省煤器分段锅炉全负荷低nox装置及改造方法
CN103343959A (zh) 带有烟气升温系统的自然循环汽包锅炉
CN206361703U (zh) 一种满足全负荷脱硝的scr入口烟气提温系统
CN104595884A (zh) 用于强迫循环汽包锅炉维持scr正常运行的烟气升温系统
CN203364109U (zh) 锅炉的scr调温系统
CN106051737B (zh) 一种可调式给水回热系统及控制方法
CN203731456U (zh) 一种火力发电机组用锅炉烟气温升装置
CN106765039B (zh) 一种scr入口烟气水侧提温系统及方法
CN102620278A (zh) 锅炉给水流量的控制方法及装置
CN202675253U (zh) 火电机组锅炉烟气余热利用的装置
CN212511221U (zh) 一种用于锅炉深度调峰的全负荷脱硝装置
CN102705864B (zh) 火电机组锅炉烟气余热利用的方法及其装置
CN215411832U (zh) 超临界电站锅炉全负荷脱硝的复合热水再循环系统
CN105889899A (zh) 一种适用于scr低负荷下投运的过热汽温调节系统及方法
JP2020121267A (ja) 排ガス処理装置
CN111306526B (zh) 一种燃煤汽包锅炉辅助系统疏水母管制回收及排放装置
CN103196133A (zh) 一种带有烟气升温系统的强迫循环汽包锅炉
CN208473941U (zh) 一种供热降温设备
CN110227345B (zh) 一种适用于亚临界火电机组的宽负荷脱硝系统及控制方法
CN108443861B (zh) 一种消除闭式冷凝水回收系统背压的节能装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 200240 Shanghai city Minhang District Jianchuan Road No. 1115

Patentee after: SHANGHAI POWER EQUIPMENT Research Institute

Patentee after: Shanghai Shangfayuan Power Generation Complete Equipment Engineering Co.,Ltd.

Address before: 200240 Shanghai city Minhang District Jianchuan Road No. 1115

Patentee before: SHANGHAI POWER EQUIPMENT Research Institute

Patentee before: Shanghai Shangfayuan Power Generation Complete Equipment Engineering Co.,Ltd.