CN103938890B - Keel construction support device - Google Patents

Keel construction support device Download PDF

Info

Publication number
CN103938890B
CN103938890B CN201410183013.7A CN201410183013A CN103938890B CN 103938890 B CN103938890 B CN 103938890B CN 201410183013 A CN201410183013 A CN 201410183013A CN 103938890 B CN103938890 B CN 103938890B
Authority
CN
China
Prior art keywords
supporting member
keel
head rod
connecting rod
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410183013.7A
Other languages
Chinese (zh)
Other versions
CN103938890A (en
Inventor
韩颖
王艳
葛少峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong No2 Construction Engineering Co
Original Assignee
Jinling Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinling Institute of Technology filed Critical Jinling Institute of Technology
Priority to CN201410183013.7A priority Critical patent/CN103938890B/en
Publication of CN103938890A publication Critical patent/CN103938890A/en
Application granted granted Critical
Publication of CN103938890B publication Critical patent/CN103938890B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of keel Construction Support device, comprise body.One end of described body is provided with the first otic placode, and is flexibly connected with one end of head rod by bearing pin; The other end of described head rod is flexibly connected the first supporting member; The other end of described body and one end of the second connecting rod are fixedly linked, and the other end of this second connecting rod is flexibly connected the second supporting member; When head rod and the second connecting rod in line time, described first supporting member and the second supporting member can be pressed on the inwall of keel.The present invention is reasonable in design, and structure is simple, easy to use, by the dexterous actions in similar joint, holds out against the pad in keel easily, and after keel have spliced, removes easily.And the present invention does not have scattered parts, easy to use and field control.

Description

Keel Construction Support device
Technical field
The present invention relates to a kind of building operations instrument, especially a kind of instrument for keel construction, a kind of keel Construction Support device specifically.
Background technology
At present, country has formulated the relevant power saving regulations of building, and therefore building mostly must install certain exterior wall heat-preserving system, to meet power conservation requirement.Conventional exterior wall heat-preserving system mostly comprises composite insulation boards and lightgage steel joist, and wherein lightgage steel joist and base course wall link, or on direct concreting.Because putting position is different, and place, job site limit, and makes the impossible endless of the length of lightgage steel joist, therefore often needs lightgage steel joist to splice.During splicing, by two joint Keel butt joints, and external surface in junction and inner surface arrange U-shaped connector and pad respectively, then, above-mentioned connector, keel and pad are tightened together with screw.Because the two ends often saving keel are equipped with half elliptic installing hole, and its edge inwardly protruding, make to be difficult to support pad from keel inside, had a strong impact on efficiency and the quality of construction.
Summary of the invention
The object of this invention is to provide a kind of keel Construction Support device, by similar joint action, when efficiently solving keel splicing, to the support problem of pad.
Technical scheme of the present invention is:
A kind of keel Construction Support device, comprises body.One end of described body is provided with the first otic placode, and is flexibly connected with one end of head rod by bearing pin; The other end of described head rod is flexibly connected the first supporting member; The other end of described body and one end of the second connecting rod are fixedly linked, and the other end of this second connecting rod is flexibly connected the second supporting member; When head rod and the second connecting rod in line time, described first supporting member and the second supporting member can be pressed on the inwall of keel.
Further, described body side is provided with fixed head, and one side closed also by the first otic placode of this fixed head, head rod can not be rotated further to the outside of this fixed head.
Further, described fixed head is also provided with through lock hole, can penetrate stop pin in this lock hole, and makes this stop pin be stuck between body and head rod, makes head rod be obstructed and can not rotate.
Further, described first supporting member is provided with the second otic placode, and described second supporting member is provided with third ear plate; Described head rod and the second connecting rod are movably connected on described second otic placode and described third ear plate respectively by bearing pin.
Further, the end of described first supporting member and the second supporting member be equipped with the installing hole on keel and on the boss that adapts of flange and groove, boss can be embedded in described installing hole, and groove is stuck on the flange of installing hole.
Beneficial effect of the present invention:
The present invention is reasonable in design, and structure is simple, easy to use, by the dexterous actions in similar joint, holds out against the pad in keel easily, and after keel have spliced, removes easily.And the present invention does not have scattered parts, easy to use and field control.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Fig. 2 is the schematic diagram of the present invention when shrinking.
Fig. 3 be the present invention actual use time schematic diagram.
Wherein: 1-first supporting member; 2-second otic placode; 3-first otic placode; 4-body; 5-second supporting member; 6-boss; 7-groove; 8-second connecting rod; 9-lock hole; 10-fixed head; 11-head rod; 12-keel; 13-junction plate; 14-third ear plate.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is further illustrated.
As shown in Figures 1 to 3, be an embodiment of keel Construction Support device of the present invention, comprise body 4.One end of described body 4 is provided with the first otic placode 3, and by bearing pin, this first otic placode 3 is flexibly connected with one end of head rod 11.The other end of described head rod 11 is flexibly connected the first supporting member 1.The other end of described body 4 and one end of the second connecting rod 8 are fixedly linked, and are flexibly connected the second supporting member 5 at the other end of this second connecting rod 8.When described head rod 11 and the second connecting rod 8 in line time, the distance between two supporting member end faces, slightly larger than the distance between keel 12 inner surface, makes supporting member under the deforming force of bearing pin, can be pressed on keel.The side of described body 4 is also provided with fixed head 10, and one side closed by the first otic placode 2 of this fixed head 10, head rod can be stoped to be rotated further to the outside of this fixed head 10.And, this fixed head 10 is also provided with through lock hole 9, stop pin can be inserted wherein.Described stop pin is wedge shape, and described lock hole 9 is rectangle, when stop pin is through after lock hole 9, may be stuck between body 4 and head rod 11, makes head rod 11 be obstructed and can not rotate.Described first supporting member 1 and the second supporting member 5 are respectively equipped with the second otic placode 2 and third ear plate 14, and by bearing pin, head rod 11 and the second connecting rod 8 are connected on described second otic placode 2 and third ear plate 14, and make them can rotate around bearing pin.The end of described first supporting member 1 and the second supporting member 5 is equipped with boss 6 and groove 7, and adapts with the shape of the installing hole on keel and flange thereof, boss 6 can be embedded in installing hole, and groove 7 is stuck on flange.
During use, first rotate head rod 11, two supporting members are drawn close mutually, as shown in Figure 2, shorten distance therebetween, so that put it in keel 12.Then, after the boss of each supporting member overlaps Upper gasket, insert the installing hole of keel 12 both sides, and push hard pressure fixed head 10, make head rod 11 and the second connecting rod 8 gradually in line, and two supporting members are pressed on keel 12 the most at last, as shown in Figure 3.Finally, stop pin being inserted in lock hole 9, and block head rod 11, make it not rotate, ensureing when constructing, can not accidental release.Like this, just can use screw-driving keel 12 and pad junction plate 13 from outside, greatly facilitate constructing operation.After construction terminates, extract stop pin, then, the direction to fixed head 10 pushes the first otic placode, and supporting member can be made to get loose, and then is taken out from keel 12 inside by this device.
The part that the present invention does not relate to prior art that maybe can adopt all same as the prior art is realized.

Claims (3)

1. a keel Construction Support device, comprises body (4), it is characterized in that one end of described body (4) is provided with the first otic placode (3), and is flexibly connected by bearing pin one end with head rod (11); The other end of described head rod (11) is flexibly connected the first supporting member (1); The other end of described body (4) and one end of the second connecting rod (8) are fixedly linked, and the other end of this second connecting rod (8) is flexibly connected the second supporting member (5); When head rod (11) and the second connecting rod (8) in line time, described first supporting member (1) and the second supporting member (5) can be pressed on the inwall of keel (12); Described first supporting member (1) is provided with the second otic placode (2), and described second supporting member (5) is provided with third ear plate (14); Described head rod (11) and the second connecting rod (8) are movably connected on described second otic placode (2) and described third ear plate (14) respectively by bearing pin; The end of described first supporting member (1) and the second supporting member (5) is equipped with the boss (6) and groove (7) that adapt with the installing hole on keel (12) and flange thereof, boss (6) can be embedded in described installing hole, and groove (7) is stuck on the flange of installing hole.
2. keel Construction Support device according to claim 1, it is characterized in that described body (4) side is provided with fixed head (10), and one side closed also by the first otic placode (3) of this fixed head (10), head rod (11) can not be rotated further to the outside of this fixed head (10).
3. keel Construction Support device according to claim 2, it is characterized in that described fixed head (10) is also provided with through lock hole (9), stop pin can be penetrated in this lock hole (9), and this stop pin is stuck between body (4) and head rod (11), make head rod (11) be obstructed and can not rotate.
CN201410183013.7A 2014-05-04 2014-05-04 Keel construction support device Active CN103938890B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410183013.7A CN103938890B (en) 2014-05-04 2014-05-04 Keel construction support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410183013.7A CN103938890B (en) 2014-05-04 2014-05-04 Keel construction support device

Publications (2)

Publication Number Publication Date
CN103938890A CN103938890A (en) 2014-07-23
CN103938890B true CN103938890B (en) 2015-12-09

Family

ID=51186740

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410183013.7A Active CN103938890B (en) 2014-05-04 2014-05-04 Keel construction support device

Country Status (1)

Country Link
CN (1) CN103938890B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL9300044A (en) * 1993-01-11 1994-08-01 Hein Douwinus Voskamp Universal support construction.
CN102561655A (en) * 2012-01-12 2012-07-11 上海热丽电热材料有限公司 Special keel without staple bolts for electric heating floors and mounting method of special keel
CN102635182A (en) * 2012-04-24 2012-08-15 无锡金城幕墙装饰工程有限公司 Detachable glass curtain wall keel system
CN102943537B (en) * 2012-12-04 2014-09-17 北京门窗发展有限公司 Novel external wall insulation decoration system
CN203050148U (en) * 2013-02-04 2013-07-10 焦作建工集团有限公司 Template supporting head capable of being easily disassembled and applied to various template keels
CN203808554U (en) * 2014-05-04 2014-09-03 金陵科技学院 Keel construction supporting device

Also Published As

Publication number Publication date
CN103938890A (en) 2014-07-23

Similar Documents

Publication Publication Date Title
CN104500095B (en) Class rectangular shield duct piece connector structure
CN103912288A (en) High-bearing-capacity segment joint structure
CN201358581Y (en) Template dorsal bar and building template
CN204456877U (en) For the split bolt syndeton of construction formwork
CN104209734A (en) Spring ring assembly fixture and spring ring installation equipment using same
CN103938890B (en) Keel construction support device
CN106013763A (en) Flat iron fastener type external scaffold wall connecting piece
CN203808554U (en) Keel construction supporting device
CN204252623U (en) A kind of easy-to-mount bracing wire sheath
CN205000643U (en) Wall stagnant water bolt is worn to waterproof concrete shear force wall
CN203796280U (en) Segment joint structure high in bearing capacity
CN204081087U (en) A kind of reinforced concrete column and reinforcing steel bar connecting device
CN204587289U (en) The stripping assembly of ship stern tubular shaft
CN204645422U (en) Building operations bar splice syndeton
CN203285057U (en) Template concrete shear key
CN210361882U (en) Concrete pole steel mould
CN204252171U (en) The rubber fastening band at basement shrinkage joint installs fixing special tool
CN207296395U (en) A kind of fixture of cylindrical concrete formwork
CN201952156U (en) Front-clamping prestressing hydraulic jack
CN105370028A (en) Connecting buckle for scaffold installation
CN213809368U (en) Concrete pump hose detachable rubber tube joint
CN205136255U (en) Nonrust steel pipe coupling assembling
CN204112727U (en) Built-in connection obtuse angle mould and tiltedly door opening wedge angle door opening template system
CN204024048U (en) A kind of combination steel form
CN219864041U (en) Concrete cylinder outside fixed bolster

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201221

Address after: No. 54, group 6, Qianjin village, Baima Town, Gaogang District, Taizhou City, Jiangsu Province

Patentee after: Wang Yajun

Address before: No. 99 Jiangning Road, Nanjing District hirokage 211169 cities in Jiangsu Province

Patentee before: JINLING INSTITUTE OF TECHNOLOGY

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230926

Address after: 515000 No. 54, Zhongshan Road, Guangdong, Shantou

Patentee after: GUANGDONG NO.2 CONSTRUCTION ENGINEERING CO.

Address before: No. 54, group 6, Qianjin village, Baima Town, Gaogang District, Taizhou City, Jiangsu Province

Patentee before: Wang Yajun