CN103938867B - A kind of flooring and toilet or the junction construction method and device used of balcony - Google Patents

A kind of flooring and toilet or the junction construction method and device used of balcony Download PDF

Info

Publication number
CN103938867B
CN103938867B CN201410180056.XA CN201410180056A CN103938867B CN 103938867 B CN103938867 B CN 103938867B CN 201410180056 A CN201410180056 A CN 201410180056A CN 103938867 B CN103938867 B CN 103938867B
Authority
CN
China
Prior art keywords
steel pipe
toilet
hollow steel
balcony
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410180056.XA
Other languages
Chinese (zh)
Other versions
CN103938867A (en
Inventor
钱爱军
计培春
马国强
姚张鹏
李元庭
潘敏
姜建波
鲍黎
夏寅明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Hong Chao Construction Group Co Ltd
Original Assignee
Zhejiang Hong Chao Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Hong Chao Construction Group Co Ltd filed Critical Zhejiang Hong Chao Construction Group Co Ltd
Priority to CN201410180056.XA priority Critical patent/CN103938867B/en
Publication of CN103938867A publication Critical patent/CN103938867A/en
Application granted granted Critical
Publication of CN103938867B publication Critical patent/CN103938867B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of flooring and toilet or the junction construction method and device used of balcony, belong to technical field of building construction.Its step is as follows:Assembling reinforcement skeleton, framework of steel reinforcement set split heads and reinforcement supporting member is reinforced;Place cut-off assembling support for shuttering;Concrete cast template is loaded onto, and is sealed off the area;Cast concrete;Maintenance, form removal.Flooring of the invention is good with toilet or balcony junction quality, and its construction quality qualification rate reaches more than 98.9%, greatly reduces maintenance probability and cost;The method that the present invention has drawn control balcony and toilet difference of height, not only solve the excessive phenomenon of water for preventing toilet, balcony, again for later stage decorations are laid a good foundation, by owner, management, Quality Supervision Station favorable comment, be enterprise invited society prestige;Present invention, avoiding the later stage repairing of balcony and toilet concrete structure, labour cost, fee of material are reduced, the finishing in later stage and hydropower installation is eliminated chiseler's expense.

Description

A kind of flooring and toilet or the junction construction method and device used of balcony
Technical field
The invention belongs to technical field of building construction, and in particular to a kind of constructing operation is convenient, can effectively improve junction The flooring of construction quality and toilet or the junction construction method and device used of balcony.
Background technology
At present, the problems such as easily there is leak between flooring and toilet or balcony in building a building etc., particularly always House the inside, this phenomenon especially severe.750 points of relevant technical staff's random inspection, qualification rate is 86.9%, by examining Examine discovery and drainage occur, influenceing the principal element of the concrete solid quality has:Difference of height not substantially, surface irregularity, Reveal at difference of height and occur bending etc. at muscle, difference of height.Balcony, toilet difference of height control it is bad, the multidirectional stream of water can be caused Dynamic, such as current flow backward to parlor and bedroom, once seepy question occurs, rehabilitation cost is high, and repair rate is also high, and has been difficult to It is complete to repair, bring many inconvenience to user and unit in charge of construction.
The content of the invention
For the above-mentioned problems in the prior art, it is an object of the invention to provide a kind of constructing operation convenience, energy Effectively improve the flooring and toilet or the junction construction method and device used of balcony of junction construction quality.
A kind of described flooring and toilet or the junction construction method of balcony, it is characterised in that comprise the following steps:
1)Assembling reinforcement skeleton;
2)By design drawing, flooring and toilet or the separator bar of balcony are marked on framework of steel reinforcement, in toilet or sun Platform periphery separates line position and framework of steel reinforcement is reinforced, and split heads and reinforcement supporting member are set between reinforcing bar surface layer and bottom;
3)Cut-off assembling support for shuttering is placed on the framework of steel reinforcement after reinforcing;
4)Concrete cast template is loaded onto, and is sealed off the area, forbid workman pour smash before trample;
5)Cast concrete:Routinely pouring procedure cast, when toilet or balcony is constructed, accomplish it is floating in place, it is high Low difference is corresponding with layout design;
6)Maintenance, form removal.
A kind of described flooring and toilet or the junction construction method of balcony, it is characterised in that step 2)Described in Split heads includes two U-shaped reinforcing bars and for connecting two bar dowels of U-shaped reinforcing bar, and described U-shaped reinforcing bar grows 40 lis using Ф 10 The reinforcing bar of rice is obtained, and each curved 90 degree of reinforcing bar both sides form U-shaped reinforcing bar, and three edge lengths of U-shaped reinforcing bar are respectively 15 centimetres, 10 lis Rice, 15 centimetres, bar dowel is that Ф 10 grows 10 centimetres of reinforcing bar.
A kind of described flooring and toilet or the junction construction method of balcony, it is characterised in that two described single u-shaped Reinforcing bar is respectively welded and is fixed on the surface layer of framework of steel reinforcement and bottom, and two single u-shaped reinforcing bars grow 10 centimetres of bar dowel by Ф 10 It is welded to connect.
A kind of described flooring and toilet or the junction construction method of balcony, it is characterised in that described adjacent split heads Spacing is 1-1.2m.
A kind of described flooring and toilet or the junction construction method of balcony, it is characterised in that step 2)Described in Reinforcement supporting member is obtained at a right angle using the reinforcing bar electric welding of Ф 12, and described reinforcement supporting member is another while be welded on reinforcing bar While being welded on base plate, adjacent reinforcement supporting member spacing is 1m.
A kind of described flooring and toilet or the junction construction method of balcony, it is characterised in that described reinforcement support Toilet thickness low 0.5cm of the part height than layout design.
Cut-off assembling support for shuttering used by the junction construction method of described flooring and toilet or balcony, including by The quadra body that two hollow steel pipes I and two hollow steel pipes II constitute by an active connection, it is characterised in that described is square One group of reinforcement steel pipe is respectively provided with frame body corner, described reinforcement steel pipe two ends are separately positioned on the sky that termination is connected On heart steel pipe I and hollow steel pipe II, described hollow steel pipe I is the side long of quadra body, and hollow steel pipe II is square box The short side of frame body, the clear width of hollow steel pipe I sets one group of connection sheet, and two skies are inserted in the two ends termination of hollow steel pipe II respectively Corresponding connection sheet is connected with hollow steel pipe I on heart steel pipe I.
Cut-off assembling support for shuttering used by the junction construction method of described flooring and toilet or balcony, its feature It is that described connection sheet welding is arranged on the inside of hollow steel pipe I, the distance between two neighboring connection sheet is 30-60cm.
Cut-off assembling support for shuttering used by the junction construction method of described flooring and toilet or balcony, its feature It is that latch is set on described reinforcement steel pipe, hollow steel pipe I is respectively arranged to install and inserts with the upper surface of hollow steel pipe II The spliced eye of pin, described latch size is matched with spliced eye.
Cut-off assembling support for shuttering used by the junction construction method of described flooring and toilet or balcony, its feature It is that the reinforcement steel pipe set on each angle of described quadra body is at least one.
By using above-mentioned technology, compared with prior art, the present invention has the advantages that:
1)Compactness in order to improve junction of the invention, it is to avoid there are the phenomenons such as pitted skin on surface, is set on framework of steel reinforcement Split heads and reinforcement supporting member, and the size and structure of split heads and reinforcement supporting member are defined, the support force of framework of steel reinforcement is improved, make On framework of steel reinforcement, framework of steel reinforcement is not deformed the cut-off assembling good frame of support for shuttering energy, so as to be avoided that underbraced Problem, improves the convenience and construction quality of construction;
2)The present invention in order to avoid framework of steel reinforcement sink, tie with reinforcing bar well after, closed management is carried out to scene, Operator tramples before preventing casting and compacting of concrete;
3)The present invention pour into a mould concrete when, by there is experience concreter to be constructed, accomplish it is floating in place, difference of height with Layout design is corresponding, improves the flatness on its surface;
5)The present invention problem difficult in order to solve fixed support for shuttering form removal of the prior art, using adjustable size Assembling support for shuttering replace traditional fixed support for shuttering, and assembling support for shuttering corner set strengthen steel pipe, strengthen steel Latch is housed, the spliced eye set with relevant position on hollow steel pipe I and hollow steel pipe II is connected, and it can avoid defending on pipe The obvious difference of height occurred with indoor terrace junction between life, therefore concrete is avoided the occurrence of without voids and pits, easy construction, and And it is a kind of fabricated construction, convenient disassembly occupies little space, is easy to carry, and high recycling rate, improves economy Benefit;
6)The present invention is by using above-mentioned construction method, easy to operate, short time limit, and constructing the flooring and health that obtain Between or balcony junction quality it is good, its construction quality qualification rate greatly reduces maintenance from more than current 86.9% to 98.9% Probability and cost;Technically, the method that the present invention has drawn control balcony and toilet difference of height, not only solving prevents The excessive phenomenon of water of toilet, balcony, and for later stage decorations are laid a good foundation, by owner, management, Quality Supervision Station Favorable comment, is that social prestige has been invited by enterprise;Economically see, after balcony and toilet concrete structure Phase repairs, and reduces labour cost, fee of material, the finishing in later stage and hydropower installation is eliminated chiseler's expense.
Brief description of the drawings
Fig. 1 is the structural representation that cut-off of the invention assembles support for shuttering.
Fig. 2 is the hollow steel pipe I and the overlooking the structure diagram of hollow steel pipe II of cut-off assembling support for shuttering of the invention;
Fig. 3 is the hollow steel pipe I and the main structure diagram of hollow steel pipe II that cut-off of the invention assembles support for shuttering;
Fig. 4 is the reinforcement steel-tube construction schematic diagram that cut-off of the invention assembles support for shuttering.
In figure:1- latches, 2- hollow steel pipes I, 3- hollow steel pipes II, 4- connection sheets, 5- strengthens steel pipe, 6- spliced eyes.
Specific embodiment
Below in conjunction with Figure of description, the invention will be further described:
As illustrated, a kind of flooring of the invention and toilet or the junction construction method of balcony, comprise the following steps:
1)By design drawing, assembling reinforcement skeleton;
2)By design drawing, flooring and toilet or the separator bar of balcony are marked on framework of steel reinforcement, in toilet or sun The periphery of platform, i.e. separator bar peripheral location is reinforced to framework of steel reinforcement, split heads is set between reinforcing bar surface layer and bottom and is added Strong support member, described split heads includes two U-shaped reinforcing bars and for connecting two bar dowels of U-shaped reinforcing bar, described U-shaped reinforcing bar The reinforcing bar for growing 40 centimetres using Ф 10 is obtained, and each curved 90 degree of reinforcing bar both sides form U-shaped reinforcing bar, the three edge lengths difference of U-shaped reinforcing bar It it is 15 centimetres, 10 centimetres, 15 centimetres, bar dowel is the reinforcing bar that Ф 10 grows 10 centimetres, two single u-shaped reinforcing bars are respectively welded and are fixed on steel On the surface layer and bottom of muscles and bones frame, two single u-shaped reinforcing bars are welded to connect by the bar dowel that Ф 10 grows 10 centimetres, adjacent split heads spacing It is 1-1.2m;Described reinforcement supporting member is obtained at a right angle using the reinforcing bar electric welding of Ф 12, and described reinforcement supporting member is while weldering It is connected on reinforcing bar, another side is welded on base plate, adjacent reinforcement supporting member spacing is 1m, and reinforcement supporting member highly compares drawing The low 0.5cm of toilet thickness of design;
3)Cut-off assembling support for shuttering is placed on the framework of steel reinforcement after reinforcing fixed;
4)Concrete cast template is loaded onto, and is sealed off the area, forbid workman pour smash before trample;
5)Cast concrete:Routinely pouring procedure cast, when toilet or balcony is constructed, accomplish it is floating in place, it is high Low difference is corresponding with layout design;
6)Maintenance, form removal.
As Figure 1-4, the assembling support for shuttering of the cut-off used by the present invention, it is included by two hollow steel pipes I 2 and two The quadra body that hollow steel pipe II 3 constitutes by an active connection, can according to actual needs, by adjusting hollow steel pipe I 2 and hollow The link position of steel pipe II 3, changes the length of quadra body, and one group is respectively provided with described quadra body corner Strengthen steel pipe 5, described reinforcement steel pipe 5 two ends are separately positioned on hollow steel pipe I 2 and hollow steel pipe II 3 that termination is connected, Described hollow steel pipe I 2 and hollow steel pipe II 3 is rectangular steel tube.
As Figure 2-3, hollow steel pipe of the invention I 2 and the activity socket connection of hollow steel pipe II 3, wherein hollow steel pipe I 2 is the side long of quadra body, and hollow steel pipe II 3 is the short side of quadra body, and short side typically is set into toilet Or the side that balcony is fixed, one group of connection sheet 4 is set in the welding of the clear width of hollow steel pipe I 2, between two neighboring connection sheet 4 Distance is 30-60cm, therefore, if it is desirable to zoom in or out quadra body, by the termination of hollow steel pipe II 3 outwards or inwards It is adjusted in corresponding connection sheet 4, insertion connection sheet 4 is connected with hollow steel pipe I 2;Hollow steel pipe II 3 is with hollow steel pipe I 2 Assembled is connected, and is easy to dismounting, easy to adjust.
As Figure 2-3, hollow steel pipe of the invention I 2 and the upper surface of hollow steel pipe II 3 are respectively separated one group of grafting of setting Hole 6, spliced eye 6 can penetrate hollow steel pipe I 2 and hollow steel pipe II 3, it is also possible to not penetrate;As shown in figure 4, strengthening steel pipe 5 Two ends set latch 1, and the size of latch 1 is matched with spliced eye 6, strengthen steel pipe 5 and insert hollow steel pipe I 2 and hollow steel by latch 1 On the spliced eye 6 of pipe II 3, it is connected with hollow steel pipe I 2 and hollow steel pipe II 3, in order to improve the carrying energy that assembled separates template Power, the reinforcement steel pipe 5 set on each angle of quadra body of the invention is at least one, and the present invention is preferably two, Two be arranged in parallel.
If desired for the toilet that a size is 4500mm × 3000mm is built, using cut-off template of the invention, with each , it is necessary to the cut-off board size for making is respectively as a example by two reinforcement steel pipes on angle:Hollow steel pipe I 2 is at least 4500mm, hollow steel Pipe II 3 is 3000mm, and the length selected in the present invention is 4500mm, and hollow steel pipe II 3 is plugged on the most termination of hollow steel pipe I 2 Connection sheet 4 on, one group of spliced eye 6 is respectively provided with the two ends of hollow steel pipe I 2 and hollow steel pipe II 3, since steel tube head Meter, distance is 200 mm between first spliced eye 6 and termination, and second spliced eye 6 is with the distance of first spliced eye 6 800mm, it is 715 mm that first is strengthened the length of steel pipe 5, and it is 1500 mm that second is strengthened length of steel pipe.
Its installation steps is as follows:According to the drawing for designing, the making of entity is carried out, according to the hollow steel pipe I of diagram 2nd, the rod member of hollow steel pipe II 3 be processed with making, first hollow steel pipe I 2 and hollow steel pipe II 3 are overlapped, then parallel Reinforcement steel pipe 5 be placed on hollow steel pipe I 2 and hollow steel pipe II 3, using latch 1 and spliced eye be effectively connected, most Pouring for concrete is carried out afterwards to smash and conserve, when concrete curing to final set, starts to remove the cut-off formwork structure, first remove and add Strong steel pipe 5, removes hollow steel pipe I 2, hollow steel pipe II 3 afterwards, recycles and reuses.
Assembled cut-off formwork structure can avoid the obvious difference of height occurred in toilet and indoor terrace junction Problem, the concrete for obtaining without voids and pits, and convenient disassembly, be easy to carry, economic benefit it is obvious.
The present invention by use above-mentioned technology, flooring is constructed with toilet or balcony junction, solve leak, The problems such as there is pitted skin on surface, and the junction target inspection that the present invention is obtained, check totally 250 points of points, and qualification rate 97.6% reaches Moving target is arrived, after implementing construction method of the invention, concrete of basement construction quality qualification rate is from before activity 86.9% to after activity 98.9%, greatly reduce maintenance probability.
Technical benefits of the invention:By the construction method, technical staff is set to have grasped control balcony or toilet and building The method that there is difference of height between face, not only solves the excessive phenomenon of water for preventing toilet, balcony, and be later stage decorations Lay a good foundation, by owner, management, Quality Supervision Station favorable comment, be enterprise invited society prestige.
Economic benefit of the invention:The later stage repairing of balcony and toilet concrete structure is avoided, labour cost is reduced And fee of material;And the finishing in later stage and hydropower installation is eliminated chiseler's expense.

Claims (2)

1. a kind of flooring cut-off working with the junction of toilet or balcony is used and assembles support for shuttering, including by two hollow steels Pipe I(2)With two hollow steel pipes II(3)The quadra body for constituting by an active connection, it is characterised in that described quadra One group of reinforcement steel pipe is respectively provided with body corner(5), described reinforcement steel pipe(5)Two ends are separately positioned on what termination was connected Hollow steel pipe I(2)With hollow steel pipe II(3)On, described hollow steel pipe I(2)It is the side long of quadra body, hollow steel pipe Ⅱ(3)It is the short side of quadra body, hollow steel pipe I(2)Clear width sets at least 6 connection sheets(4), hollow steel pipe II (3)Two hollow steel pipes I are inserted respectively in two ends termination(2)Upper corresponding connection sheet(4)With hollow steel pipe I(2)Connection, it is described Connection sheet(4)Welding is arranged on hollow steel pipe I(2)Inner side, two neighboring connection sheet(4)The distance between be 30-60cm, it is described Reinforcement steel pipe(5)Upper setting latch(1), hollow steel pipe I(2)With hollow steel pipe II(3)Upper surface be respectively arranged to peace Plug pin(1)Spliced eye(6), described latch(1)Size and spliced eye(6)Matching.
2. flooring according to claim 1 cut-off working with the junction of toilet or balcony is used and assembles support for shuttering, It is characterized in that the reinforcement steel pipe set on each angle of described quadra body(5)At least one.
CN201410180056.XA 2014-04-30 2014-04-30 A kind of flooring and toilet or the junction construction method and device used of balcony Expired - Fee Related CN103938867B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410180056.XA CN103938867B (en) 2014-04-30 2014-04-30 A kind of flooring and toilet or the junction construction method and device used of balcony

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410180056.XA CN103938867B (en) 2014-04-30 2014-04-30 A kind of flooring and toilet or the junction construction method and device used of balcony

Publications (2)

Publication Number Publication Date
CN103938867A CN103938867A (en) 2014-07-23
CN103938867B true CN103938867B (en) 2017-07-04

Family

ID=51186717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410180056.XA Expired - Fee Related CN103938867B (en) 2014-04-30 2014-04-30 A kind of flooring and toilet or the junction construction method and device used of balcony

Country Status (1)

Country Link
CN (1) CN103938867B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208753B (en) * 2018-09-10 2023-11-21 中国建筑第四工程局有限公司 Novel device for limiting displacement of assembled balcony and construction method thereof
CN110469107A (en) * 2019-07-12 2019-11-19 中国华冶科工集团有限公司 The construction of toilet root shaper and construction method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203867175U (en) * 2014-04-30 2014-10-08 浙江宏超建设有限公司 Adjustable partition assembling support formwork

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07279410A (en) * 1994-04-15 1995-10-27 Taisei Corp Assembling method of floor-section stepped form
CN102677896B (en) * 2012-05-23 2014-09-17 中天建设集团有限公司 Bathroom settlement plate shaping mould and construction method
CN202731295U (en) * 2012-09-05 2013-02-13 中建七局第二建筑有限公司 Subsided frame template
CN103015708A (en) * 2012-12-05 2013-04-03 中天建设集团有限公司 Sized lowering plate supporting die frame body

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203867175U (en) * 2014-04-30 2014-10-08 浙江宏超建设有限公司 Adjustable partition assembling support formwork

Also Published As

Publication number Publication date
CN103938867A (en) 2014-07-23

Similar Documents

Publication Publication Date Title
CN103290967B (en) A kind of multi-ribbed hollow composite floor slab and manufacture method
CN103696359B (en) A kind of prefabricated and cast-in-place bridge pier body structure of combining and construction method
CN111608207A (en) Turnover post-cast strip support-changing force transmission device and construction method thereof
CN104631512A (en) Post-cast strip beam and slab construction method adopting formwork hanging method
CN207616844U (en) Foundation platform precast concrete side form and molding machine
CN105625566B (en) Assembly concrete orthogonal-diagonal lattice space lattice box structure tube-in-tube structure
CN211517947U (en) Bridge case roof beam is prefabricated with shaped steel pedestal
CN107605177A (en) The construction method of efficient precast floor slab and its independent support frame
CN104175398B (en) Make the mold and method of prefabricated case beam framework of steel reinforcement
CN206298900U (en) A kind of diaphram wall built-in type steel encloses purlin plug system
CN107516866A (en) A kind of Prefabricated cable duct
CN110965474A (en) Construction method of cable tower cross beam
CN103821180A (en) Double-water stop structure for concrete expansion joint and manufacturing and construction method for double-water stop structure
CN207829012U (en) A kind of foundation pit support post is constructed with basement bottom board connecting node
CN103938867B (en) A kind of flooring and toilet or the junction construction method and device used of balcony
CN100547174C (en) The prefab form and the construction technology thereof of concrete flow passage gradual change fillet segment top board construction
CN104972550A (en) Multilateral mould of site precast concrete pile and manufacturing method of precast concrete pile
CN110792028B (en) Construction method of cable-stayed bridge without back cables
CN206722216U (en) A kind of prefabricated girder of laminated floor slab
CN210315253U (en) Novel aquatic tie beam bracket device
CN105442737B (en) A kind of complex heat-preservation floorboard and its construction method
CN107012985A (en) A kind of prefabricated girder and the laminated floor slab construction technology containing the prefabricated girder
CN210263131U (en) Assembled is from stagnant water underground pipe gallery structure
CN206840385U (en) A kind of prefab-form splicing frock of large volume tongue and groove box culvert
CN109555252A (en) The floor and shear wall structure of overhanging rectangle muscle and connection method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 310023, 128, Xihu District, Hangzhou, Zhejiang

Applicant after: Zhejiang Hong Chao construction group Co., Ltd

Address before: 310023, Zhejiang, Hangzhou, Xihu District, leaving 128 street, 5 floor

Applicant before: ZHEJIANG HONGCHAO CONSTRUCTION CO., LTD.

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Qian Aijun

Inventor after: Ji Peichun

Inventor after: Ma Guoqiang

Inventor after: Yao Zhangpeng

Inventor after: Li Yuanting

Inventor after: Pan Min

Inventor after: Jiang Jianbo

Inventor after: Bao Li

Inventor after: Xia Yinming

Inventor before: Ji Peichun

Inventor before: Zheng Jianxin

Inventor before: Li Yuanting

Inventor before: Pan Min

Inventor before: Jiang Jianbo

Inventor before: Shi Baoquan

Inventor before: Yao Zhangpeng

Inventor before: Bao Li

Inventor before: Xia Yinming

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170704