Summary of the invention
Given this, be necessary to provide a kind of structure comparatively simple and can improve the stone material dry suspending installation system of efficiency of construction.
A kind of stone material dry suspending installation system, for stone plate is arranged on to building structure, described stone material dry suspending installation system comprises:
Coupling assembling, comprises connector, and described connector comprises the kink that U-shaped body and two support arms by described U-shaped body are oppositely bent to form, and the bottom of described U-shaped body offers installing hole, and described kink is for being fixedly connected with described building structure; And
Fixture, for being fixedly connected with described stone plate, and described fixture is arranged in described installing hole, and is fixedly connected with the bottom of described U-shaped body.
Therein in an embodiment, described fixture comprises thread rod part, described thread rod part is arranged in described installing hole, described coupling assembling also comprises the first hold-down nut and the second hold-down nut that are sheathed on described thread rod part and are screwed with described thread rod part, and described the first hold-down nut and described the second hold-down nut connect with the relative both sides of the bottom of described U-shaped body respectively.
Therein in an embodiment, described coupling assembling also comprises on the bottom that is arranged at described U-shaped body, and with described U-shaped body by integral forming, and the stationary magazine creel being communicated with described installing hole, on the sidewall of described stationary magazine creel, offer multiple circumferential spaced screws along described stationary magazine creel, described thread rod part is arranged in described installing hole and described stationary magazine creel, use multiple screws to be arranged in respectively described multiple screw, and with described multiple screwhole spiro bondings, the end face that described multiple screw is contained in one end of described stationary magazine creel all connects with described thread rod part, the bottom of described the first hold-down nut and described U-shaped body connects away from a side of described stationary magazine creel, described the second hold-down nut and described stationary magazine creel connect away from the end face of one end of the bottom of described U-shaped body.
In an embodiment, the edge of opening of one end of described stationary magazine creel is provided with flange therein, and the other end is fixedly connected with the bottom of described U-shaped body, and described the second hold-down nut and described flange connect.
In an embodiment, the bottom of described U-shaped body is also provided with multiple reinforcing ribs that are fixedly connected with the external surface of described stationary magazine creel therein.
Therein in an embodiment, described fixture also comprises the holding section that is arranged at one end of described thread rod part and is fixedly connected with described thread rod part, and the width of described holding section is greater than the width of described thread rod part, on described stone plate, offer the draw-in groove fastening with described holding section.
Therein in an embodiment, on described kink, offer pilot hole, described stone material dry suspending installation system also comprises threaded fastener, be contained in described building structure described threaded fastener partial fixing, the part that described threaded fastener stretches out described building structure is arranged in described pilot hole, and is fixedly connected with described kink.
Therein in an embodiment, described threaded fastener is double-screw bolt, described stone material dry suspending installation system also comprises the elastic component and the adjusting nut that are sheathed on described threaded fastener, described elastic component and described adjusting nut lay respectively at the relative both sides of described kink, the two ends of described elastic component connect with described building structure and described kink respectively, described adjusting nut and described threaded fastener threaded engagement, rotate described adjusting nut to regulate the distance of described kink and described building structure.
In an embodiment, also comprise two packing rings that are sheathed on described threaded fastener therein, one of them packing ring is held between described elastic component and described building structure, and another packing ring is held between described elastic component and described kink.
In an embodiment, the bottom of described U-shaped body is provided with the first armpit angle being fixedly connected with the support arm of described U-shaped body therein; The support arm of described U-shaped body is provided with the second armpit angle being fixedly connected with described kink.
Above-mentioned stone material dry suspending installation system has following advantage at least:
(1) kink of the connector of above-mentioned stone material dry suspending installation system and building structure are fixed, fixture is fixedly connected with stone plate and connector, thereby stone plate is fixed in building structure, a connector has substituted suspension member, steel joist and three elements of fastener in conventional mounting system, reduce and in work progress, needed field erected element, simplify the structure of stone material dry suspending installation system, and be conducive to improve efficiency of construction.
(2) connector of the coupling assembling of above-mentioned stone material dry suspending installation system comprises the kink that U-shaped body and two support arms by U-shaped body are oppositely bent to form, it is U-shaped body and the kink structure that is formed in one, further reduce in work progress and needed field erected element, be more conducive to improve efficiency of construction.
Detailed description of the invention
For the ease of understanding the present invention, below with reference to relevant drawings, the present invention is described more fully.In accompanying drawing, provide preferred embodiment of the present invention.But the present invention can realize in many different forms, be not limited to embodiment described herein.On the contrary, providing the object of these embodiment is to make to the understanding of disclosure of the present invention more thoroughly comprehensively.
It should be noted that, when element is called as " being fixed on " another element, it can be directly on another element or also can have an element placed in the middle.When an element is considered to " connection " another element, it can be directly connected to another element or may have centering elements simultaneously.Term as used herein " vertical ", " level ", " left side ", " right side " and similar statement are just for illustrative purposes.
Unless otherwise defined, all technology that use are herein identical with the implication that belongs to the common understanding of those skilled in the art of the present invention with scientific terminology.The term using in manual of the present invention herein, just in order to describe the object of specific embodiment, is not intended to be restriction the present invention.
As shown in Figures 1 and 2, the stone material dry suspending installation system 10 of an embodiment, for stone plate 20 is arranged on to building structure 30, plays a part the external surface of decorative architecture structure 30.Wherein, stone plate 20 is roughly flat stone material.The material of stone plate 20 can be lithotome or artificial stone etc.Lithotome can be marble, granite etc.Building structure 30 can be the metope of building etc.Stone material dry suspending installation system 10 comprises coupling assembling 200 and fixture 300.
See also Fig. 3, coupling assembling 200 is the connection bridge of stone plate 20 and building structure 30.Coupling assembling 200 comprises connector 210.Wherein, the material of connector 210 is steel.Connector 210 comprises the kink 214 that U-shaped body 212 and two support arms by U-shaped body 212 are oppositely bent to form.Be U-shaped body 212 and kink 214 structure that is formed in one, thereby reduced the element that will install in installation process.
See also Fig. 4, the bottom of U-shaped body 212 offers installing hole 2122.Further, the bottom of U-shaped body 212 is provided with the first armpit angle 2124 being fixedly connected with the support arm of U-shaped body 212, thereby increases the strength and stiffness of the bottom of U-shaped body 212 and the junction of support arm.
Kink 214 is for being fixedly connected with building structure 30.Concrete, on kink 214, offer pilot hole 2142.Stone material dry suspending installation system 10 also comprises threaded fastener 400.Be contained in building structure 30, the part that threaded fastener 400 stretches out building structure 30 is arranged in pilot hole 2142 threaded fastener 400 partial fixings, and is fixedly connected with kink 214.
More specifically, threaded fastener 400 is double-screw bolt.Stone material dry suspending installation system 10 also comprises the elastic component 500 and the adjusting nut 600 that are sheathed on threaded fastener 400.Elastic component 500 and adjusting nut 600 lay respectively at the relative both sides of kink 214, the two ends of elastic component 500 connect with building structure 30 and kink 214 respectively, adjusting nut 600 and threaded fastener 400 threaded engagement, rotation adjusting nut 600 is to regulate the distance of kink 214 and building structure 30, thereby play the effect that regulates stone plate 20 and the distance of building structure 30, make the decorative cover that formed by multiple stone plates 20 more smooth.
In the present embodiment, elastic component 500 is spring.Be appreciated that elastic component 500 can also be resilient sleeve.
Particularly, be also provided with packing ring (figure is mark not) between adjusting nut 600 and kink 214, this gasket sleeve is located on threaded fastener 400.
Further, stone material dry suspending installation system 10 also comprises that 700, one packing rings 700 of two packing rings that are sheathed on threaded fastener 400 are held between elastic component 500 and building structure 30, and another packing ring 700 is held between elastic component 500 and kink 214.The two ends that are elastic component 500 connect with two packing rings 700 respectively.
Be appreciated that elastic component 500 and adjusting nut 600 can omit, stone plate 20 can not regulate with the distance of building structure 30, and now, threaded fastener 400 can be bolt.
Further, the support arm of U-shaped body 212 is provided with the second armpit angle 2126 being fixedly connected with kink 214, thereby increases the strength and stiffness of the junction of U-shaped body 212 and kink 214.
Fixture 300 is for being fixedly connected with stone plate 20, and fixture 300 is arranged in installing hole 2122, and is fixedly connected with the bottom of U-shaped body 212.
Concrete, fixture 300 comprises thread rod part 310, thread rod part 310 is arranged in installing hole 2122, coupling assembling 200 also comprises that the first hold-down nut 800 of being sheathed on thread rod part 310 and be screwed with thread rod part 310 and the second hold-down nut 900, the first hold-down nuts 800 and the second hold-down nut 900 connect with the relative both sides of the bottom of U-shaped body 212 respectively.
Further, coupling assembling 200 also comprises on the bottom that is arranged at U-shaped body 212 and stationary magazine creel 220 one-body molded with U-shaped body 212 and that be communicated with installing hole 2122.On the sidewall of stationary magazine creel 220, offer multiple circumferential spaced screws 222 along stationary magazine creel 220, thread rod part 310 is arranged in installing hole 2122 and stationary magazine creel 220, use multiple screws 40 to be arranged in respectively multiple screws 222, and be screwed with multiple screws 222 respectively, the end face that multiple screws 40 are contained in one end of stationary magazine creel 220 all connects with thread rod part 310, the first hold-down nut 800 connects away from a side of stationary magazine creel 220 with the bottom of U-shaped body 212, the second hold-down nut 900 connects away from the end face of one end of the bottom of U-shaped body 212 with stationary magazine creel 220.By using multiple screws 40 to connect with thread rod part 310, can prevent that fixture 300 from rocking, fixture 300 is more stably fixed on the U-shaped body 212 of connector 210.
Specifically, in illustrated embodiment, screw 222 is four, and screw 40 corresponds to four, and the axis of adjacent two screws 40 is mutually vertical.Be appreciated that screw 222 can also be two, now, screw 40 corresponds to two, and the dead in line of two screws 40; Or screw 222 can also be three, now, screw 40 corresponds to three, and the angle of the axis of adjacent two screws 40 is 120 degree; Or screw 222 also can be five or more, now, screw 400 corresponds to five or more.
Further, the edge of opening of one end of stationary magazine creel 220 is provided with flange 224, and the other end is fixedly connected with the bottom of U-shaped body 212, and the second hold-down nut 900 connects with flange 224.Flange 224 is set on stationary magazine creel 220, and this flange 224 is just equivalent to the effect of packing ring, can omit herein packing ring, thereby less part has been simplified installation.
Particularly, be provided with packing ring (figure is mark not) between the first hold-down nut 800 and the bottom of U-shaped body 212, this gasket sleeve is located on thread rod part 310.
Further, the bottom of U-shaped body 212 is also provided with multiple reinforcing ribs 2128 that are fixedly connected with the external surface of stationary magazine creel 220, thereby strengthens the strength and stiffness of the junction of the bottom of stationary magazine creel 220 and U-shaped body 212.
Further, fixture 300 also comprises the holding section 320 that is arranged at one end of thread rod part 310 and is fixedly connected with thread rod part 310, and the width of holding section 320 is greater than the width of thread rod part, on stone plate 20, offer the draw-in groove 22 fastening with holding section 320.Specifically, in illustrated embodiment, holding section 320 is T font, and draw-in groove 22 corresponds to T font.Be appreciated that holding section 320 can also be L font, now, on stone plate 20, correspondence offers L-type draw-in groove.
See also Fig. 5, coupling assembling 200 can be multiple, and fixture 300 corresponds to multiple, and multiple fixture 300 is fixedly connected with multiple coupling assemblings 200 respectively with a stone plate 20.
Above-mentioned stone material dry suspending installation system 10 has following advantage at least:
(1) kink 214 of the connector 210 of above-mentioned stone material dry suspending installation system 10 is fixing with building structure 30, fixture 300 is fixedly connected with stone plate 20 and connector 210, thereby stone plate 20 is fixed in building structure 30, a connector 210 has substituted suspension member, steel joist and three elements of fastener in conventional mounting system, reduce required field erected element in work progress, simplify the structure of stone material dry suspending installation system 10, and be conducive to improve efficiency of construction.
(2) connector 210 of the coupling assembling 200 of above-mentioned stone material dry suspending installation system 10 comprises the kink 214 that U-shaped body 212 and two support arms by U-shaped body 212 are oppositely bent to form, it is U-shaped body 212 and kink 214 structure that is formed in one, further reduce in work progress and needed field erected element, be more conducive to improve efficiency of construction.
The above embodiment has only expressed several embodiment of the present invention, and it describes comparatively concrete and detailed, but can not therefore be interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that for the person of ordinary skill of the art, without departing from the inventive concept of the premise, can also make some distortion and improvement, these all belong to protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be as the criterion with claims.