CN101191376A - Dry hanging device for stone or ceramic tile and assembling method thereof - Google Patents
Dry hanging device for stone or ceramic tile and assembling method thereof Download PDFInfo
- Publication number
- CN101191376A CN101191376A CNA2006101352427A CN200610135242A CN101191376A CN 101191376 A CN101191376 A CN 101191376A CN A2006101352427 A CNA2006101352427 A CN A2006101352427A CN 200610135242 A CN200610135242 A CN 200610135242A CN 101191376 A CN101191376 A CN 101191376A
- Authority
- CN
- China
- Prior art keywords
- ceramic tile
- tiltedly
- splay configuration
- stone material
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Finishing Walls (AREA)
Abstract
The invention discloses a dry-hanging device of a stone or a ceramic tile and assembly method thereof, wherein, the drying-hanging device comprises oblique hooking components and a stone or a ceramic tile. The invention has the characteristics that: two oblique hooking components are spliced with each other at the long edges in the direction of external angles and fixed into a dry-hanging component with a V-shaped end as the front end and a fixed end as the back end; the back of the stone or the ceramic tile is cut into a V-shaped groove which can contain the V-shaped end inside, the V-shaped end and the V-shaped groove of the back of the stone or the ceramic tile are correspondingly connected. The assembly method includes the following steps: the back of the stone or the ceramic tile is cut into the V-shaped groove firstly, and an oblique hook of the front end of one oblique hooking component is inserted into the V-shaped groove, and an oblique hook of the front end of the other oblique hooking component is inserted into the V-shaped groove, and the back ends of the two oblique hooking components are fixedly superposed or are fixedly superposed with a connecting fixed piece. The formed dry-hanging device is fixed on a wall surface through the fixed end or the connecting fixed piece, thereby forming structures of various models as vertical hanging, top hanging, suspended hanging, etc. The invention has the advantages of simple construction, convenient use, firm hanging, etc.
Description
Affiliated technical field:
The present invention relates to the dry hanging device and the assembly method thereof of a kind of stone material or ceramic tile.
Background technology:
Formula or monomer are two to be colluded original dry hanging article for the monomer list colludes, and is difficult to use at the middle part of stone material or ceramic tile fixing and perps to be fixed, and the sheet material perps of Xuan Guaing is fixing for a long time can be toward downslide, and seismic force is little, proportion of goods damageds height.
Summary of the invention:
The object of the present invention is to provide the dry hanging device and the assembly method thereof of a kind of well-set stone material or ceramic tile.
The object of the present invention is achieved like this, the dry hanging device of described stone material or ceramic tile, comprise and tiltedly collude member and stone material or ceramic tile, its design feature be it is characterized in that by two tiltedly collude member outside the angular direction long limit mutually and to connect and be fixed into front end be that splay configuration end, rear end are the cladding member of fixed end; The described stone material or the ceramic tile back side are cut or are cut and is sawn into or makes be complementary and the splay configuration groove that the splay configuration end can be placed in one with cladding member splay configuration end, and the splay configuration end of cladding member matches with the splay configuration groove at the stone material or the ceramic tile back side and is connected.Purpose of the present invention also can be achieved through the following technical solutions, the dry hanging device of described stone material or ceramic tile, and its characteristics are fixed end or hook fixed end or U type fixed end or the double-U-shaped fixed end that the fixed end of described rear end adopts yi word pattern.
The assembly method of the dry hanging device of stone material of the present invention or ceramic tile, it is characterized in that comprising the steps: cutting at the back side of stone material or ceramic tile earlier being sawn into the splay configuration groove, tiltedly colluding of the front end coupling splay configuration angle of the v-groove of tiltedly colluding member is inserted in the splay configuration groove, another tiltedly being colluded tiltedly the colluding of the front end coupling splay configuration angle of the v-groove of member inserts in the splay configuration groove, make tiltedly colluding thereby can closely inject in the splay configuration groove of the coupling splay configuration angle of the v-groove owing to tiltedly collude the front end of member, fixing superimposed two rear ends of tiltedly colluding member by bolt or screw.The stone material that has assembled like this or the dry hanging device of ceramic tile directly insert in the hole of beam body or body of wall or wall end face fixing by fixed end, can form uprightly hang, various modeling structures that the top hung and hung on body of wall.
The another kind of assembly method of the dry hanging device of stone material of the present invention or ceramic tile, it is characterized in that comprising the steps: cutting at the back side of stone material or ceramic tile earlier being sawn into the splay configuration groove, tiltedly colluding of the front end coupling splay configuration angle of the v-groove of tiltedly colluding member is inserted in the splay configuration groove, another tiltedly being colluded tiltedly the colluding of the front end coupling splay configuration angle of the v-groove of member inserts in the splay configuration groove, it is fixing superimposed by bolt or screw that two rear ends of tiltedly colluding member and other are connected and fixed part, and the rear end fixed end that fixedly is overlapped into and other are connected and fixed part.The stone material that has assembled like this or the dry hanging device of ceramic tile are connected and fixed part by fixed end and other and are fixed on beam body or body of wall or the wall end face, can form uprightly hang, various modeling structures that the top hung and hung on body of wall.
The present invention has following characteristics: the assembling of constructing is simple, easy to use, has solved the difficult problem of original upright extension, top extension and suspension, and the sheet material perps is fixed and can not had advantages such as cost is low, suspension is firm, seismic force is big, the proportion of goods damageds are little toward gliding.The present invention all can use for the reversal of the natural order of things of stone material or ceramic tile, oblique extension, facade extension, moulding lines extension etc.
Description of drawings:
Fig. 1 is that splay configuration end, rear end are the cladding element structure schematic diagram of yi word pattern fixed end for front end of the present invention.
Fig. 2 is that splay configuration end, rear end are another cladding element structure schematic diagram of yi word pattern fixed end for front end of the present invention.
Fig. 3 is that splay configuration end, rear end are the cladding element structure schematic diagram of U type fixed end for front end of the present invention.
Fig. 4 is that splay configuration end, rear end are the cladding element structure schematic diagram of double-U-shaped fixed end for front end of the present invention.
Fig. 5 is a kind of structural representation that tiltedly colludes member of the used accessory of the present invention.
Fig. 6 tiltedly colludes the structural representation of member for the another kind of the used accessory of the present invention.
Fig. 7 is that the splay configuration end is connected the structural representation that its fixed end of back directly is connected with the beam body with the splay configuration groove of stone material or ceramic tile for front end of the present invention.
Fig. 8 is that its fixed end was connected and fixed the structural representation that is connected with brick body wall behind the sheet after the splay configuration end was connected with the splay configuration groove of stone material or ceramic tile for front end of the present invention.
Fig. 9 is that its fixed end was connected and fixed the structural representation that is connected with the beam body behind the sheet after the splay configuration end was connected with the splay configuration groove of stone material or ceramic tile for front end of the present invention.
Figure 10 is that the splay configuration end is connected the structural representation that is connected with body of wall behind its fixed end connecting angle rod member of back with the splay configuration groove of stone material or ceramic tile for front end of the present invention.
Figure 11 is to push up the structural representation that extension is connected by expansible plug and wall end face the splay configuration end is connected the fixed end connecting angle of its yi word pattern of back with the splay configuration groove of stone material or ceramic tile after for front end of the present invention.
Figure 12 is that its fixed end was planted the structural representation that the glue nail is connected with the beam body by one kind after the splay configuration end was connected with the splay configuration groove of stone material or ceramic tile for front end of the present invention.
Figure 13 is that the splay configuration end is connected with the splay configuration groove of stone material or ceramic tile and plants glue by another behind the fixed end connecting angle of its yi word pattern of back and follow closely the structural representation that is connected with the beam body for front end of the present invention.
Figure 14 is the structural representation that is connected with the beam body by expansible plug behind its U type fixed end connecting angle after the splay configuration end is connected with the splay configuration groove of stone material or ceramic tile for front end of the present invention.
Figure 15 is the structural representation that is connected with the beam body by expansible plug behind its double-U-shaped fixed end connecting angle after the splay configuration end is connected with the splay configuration groove of stone material or ceramic tile for front end of the present invention.
Figure 16 is the stone material of institute of the present invention desire connection or the splay configuration groove structural representation of ceramic tile.
Among the figure: tiltedly collude member 1, splay configuration end 2, fixed end 3, bolt 4, stator 5, angle member 6, angle steel 7, expansible plug is planted glue nail 9 for 8, one kinds, splay configuration groove 10, stone material 11, another plantation glue nail 12, T type rod member 13.
The specific embodiment:
Below in conjunction with drawings and Examples structure of the present invention and operating principle and the course of work are elaborated:
As Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, Fig. 9, Figure 10, Figure 11, Figure 12, Figure 13, Figure 14, Figure 15 and shown in Figure 16, the present invention includes and tiltedly collude member 1, the front end that tiltedly colludes member 1 is shaped as tiltedly and colludes, the rear end is various shapes, the rear end is as long as fixedly object such as wall or beam is all right, the rear end can be adopted as the various structures of inverted U of the strip of Fig. 5 or Fig. 6 or the like and all can, its design feature for by two tiltedly collude member 1 outside the angular direction long limit phase and to connect and be fixed into front end be splay configuration end 2, the rear end is the cladding member of fixed end 3, i.e. tiltedly colluding end and being connected into splay configuration end 2 and rear end and connecing and fixedly be cladding member of the present invention two front ends that tiltedly collude member 1, the described stone material or the ceramic tile back side are cut or are cut and is sawn into or makes be complementary and the splay configuration groove 10 that the splay configuration end can be placed in one with cladding member splay configuration end, and the splay configuration end 2 of cladding member matches with the splay configuration groove 10 at the stone material or the ceramic tile back side and is connected.Described rear end and to connect best mode be to adopt superimposed fixed end, general fixing superimposed by bolt 4 or screw, the fixed end 3 of rear end can be that the fixed end of yi word pattern sees that Fig. 1 and Fig. 2 or hook fixed end or U type fixed end see that Fig. 3 or double-U-shaped fixed end see Fig. 4; The fixed end 3 of rear end can connect several parts that are connected and fixed, as be connected and fixed sheet 5, angle member 6, angle steel 7, expansible plug 8, one kind and plant glue nail 9, another plantation glue nail 12, T type rod member 13 or the like, see Fig. 8, Fig. 9, Figure 10, Figure 11, Figure 12, Figure 13, Figure 14, Figure 15 for details; When specifically installing and using, cut at the back side of stone material 11 or ceramic tile earlier and be sawn into the splay configuration groove 10 that is complementary with cladding member splay configuration end of the present invention, a front end that tiltedly colludes member is tiltedly colluded in the insertion splay configuration groove 10, the front end that another tiltedly colludes member tiltedly colludes with in the same manner insertion splay configuration groove 10, fixing superimposed by bolt 4 or screw two rear ends of tiltedly colluding member, the fixed end of rear end directly inserts in the hole of beam body and fixedly sees Fig. 7 then; Perhaps two rear ends of tiltedly colluding after member merges being connected and fixed part with other fixedlys connected by bolt 4 or screw; The fixed end 3 and the various part syndetons that are connected and fixed of the rear end of cladding member of the present invention see Fig. 8, Fig. 9, Figure 10, Figure 11, Figure 12, Figure 13, Figure 14, Figure 15 for details.Certainly of the present inventionly be connected and fixed that part not only is subject among the embodiment to be exemplified.
The assembly method of the dry hanging device of stone material of the present invention or ceramic tile, comprise the steps: to cut at the back side of stone material 11 or ceramic tile earlier to be sawn into splay configuration groove 10, tiltedly colluding of front end coupling splay configuration groove 10 angles of tiltedly colluding member is inserted in the splay configuration groove 10, another tiltedly colludes tiltedly the colluding with the same manner of front end coupling splay configuration groove 10 angles of member and inserts in the splay configuration groove 10, make tiltedly colluding of the coupling splay configuration angle of the v-groove thereby can closely inject difficult drop-off in the splay configuration groove owing to tiltedly collude the front end of member, fixing superimposed two rear ends of tiltedly colluding member by bolt 4 or screw.The stone material that has assembled like this or the dry hanging device of ceramic tile directly insert in the hole of beam body or body of wall or wall end face fixing by fixed end, can form uprightly hang, various modeling structures that the top hung and hung on body of wall.
Another assembly method of the dry hanging device of stone material of the present invention or ceramic tile, comprise the steps: to cut at the back side of stone material 11 or ceramic tile earlier to be sawn into splay configuration groove 10, tiltedly colluding of front end coupling splay configuration groove 10 angles of tiltedly colluding member is inserted in the splay configuration groove 10, another tiltedly colludes tiltedly the colluding with the same manner of front end coupling splay configuration groove 10 angles of member and inserts in the splay configuration groove 10, because the front end that tiltedly colludes member is made tiltedly colluding of the coupling splay configuration angle of the v-groove thereby can closely be injected difficult drop-off in the splay configuration groove, two rear ends of tiltedly colluding member are connected and fixed with other part passes through bolt 4 or screw is fixed superimposed.The stone material that has assembled like this or the dry hanging device of ceramic tile are connected and fixed part by fixed end and other and are fixed on beam body or body of wall or the wall end face, can form uprightly hang, various modeling structures that the top hung and hung on body of wall.
Claims (4)
1. the dry hanging device of stone material or ceramic tile, comprise and tiltedly collude member (1) and stone material or ceramic tile, it is characterized in that by two tiltedly collude member (1) outside the angular direction long limit mutually and to connect and be fixed into front end be that splay configuration end (2), rear end are the cladding member of fixed end (3); The described stone material or the ceramic tile back side are cut or are cut and is sawn into or makes be complementary and the splay configuration groove (10) that the splay configuration end can be placed in one with cladding member splay configuration end, and the splay configuration end of cladding member matches with the splay configuration groove (10) at the stone material or the ceramic tile back side and is connected.
2. the dry hanging device of stone material according to claim 1 or ceramic tile, the fixed end (3) that it is characterized in that described rear end adopts fixed end or hook fixed end or the U type fixed end or the double-U-shaped fixed end of yi word pattern.
3. the assembly method of the dry hanging device of described stone material of claim 1 or ceramic tile, it is characterized in that comprising the steps: cutting at the back side of stone material (11) or ceramic tile earlier being sawn into splay configuration groove (10), tiltedly colluding of front end coupling splay configuration groove (10) angle of tiltedly colluding member is inserted in the splay configuration groove (10), another is tiltedly colluded tiltedly the colluding of front end coupling splay configuration groove (10) angle of member and insert in the splay configuration groove (10), fixing superimposed two rear ends of tiltedly colluding member by bolt (4) or screw.
4. the assembly method of the dry hanging device of described stone material of claim 1 or ceramic tile, it is characterized in that comprising the steps: cutting at the back side of stone material (11) or ceramic tile earlier being sawn into splay configuration groove (10), tiltedly colluding of front end coupling splay configuration groove (10) angle of tiltedly colluding member is inserted in the splay configuration groove (10), another is tiltedly colluded tiltedly the colluding of front end coupling splay configuration groove (10) angle of member and insert in the splay configuration groove (10), two rear ends of tiltedly colluding member are connected and fixed with other part passes through bolt (4) or screw is fixed superimposed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2006101352427A CN101191376A (en) | 2006-11-24 | 2006-11-24 | Dry hanging device for stone or ceramic tile and assembling method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2006101352427A CN101191376A (en) | 2006-11-24 | 2006-11-24 | Dry hanging device for stone or ceramic tile and assembling method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101191376A true CN101191376A (en) | 2008-06-04 |
Family
ID=39486564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2006101352427A Pending CN101191376A (en) | 2006-11-24 | 2006-11-24 | Dry hanging device for stone or ceramic tile and assembling method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101191376A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102203360A (en) * | 2008-11-06 | 2011-09-28 | 株式会社Act | Anchor fitting for mounting exterior plate to building framework |
CN102644365A (en) * | 2012-05-08 | 2012-08-22 | 方金福 | Structure and use method of wall installation decorative panel |
CN103031935A (en) * | 2012-12-31 | 2013-04-10 | 环球石材(东莞)有限公司 | Inserting sheet type mounting piece |
CN103343604A (en) * | 2013-07-22 | 2013-10-09 | 一禾科技发展(上海)有限公司 | Wall brick installation structure and wall brick installation method |
CN103469990A (en) * | 2013-09-16 | 2013-12-25 | 周述文 | Swinging type combined dry hanging piece for stone installation and installation method thereof |
CN103938828A (en) * | 2014-04-30 | 2014-07-23 | 深圳市华南装饰设计工程有限公司 | Stone dry hanging installation system |
CN105756317A (en) * | 2014-04-10 | 2016-07-13 | 吴雄鹏 | Wet hanging method for wet-hung stones or tiles |
CN106760295A (en) * | 2016-11-16 | 2017-05-31 | 东易日盛家居装饰集团股份有限公司 | Assembled ceramic tile metope and its construction method |
-
2006
- 2006-11-24 CN CNA2006101352427A patent/CN101191376A/en active Pending
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102203360B (en) * | 2008-11-06 | 2013-08-14 | 株式会社Act | Anchor fitting for mounting exterior plate to building framework |
CN102203360A (en) * | 2008-11-06 | 2011-09-28 | 株式会社Act | Anchor fitting for mounting exterior plate to building framework |
CN102644365A (en) * | 2012-05-08 | 2012-08-22 | 方金福 | Structure and use method of wall installation decorative panel |
CN103031935B (en) * | 2012-12-31 | 2015-08-26 | 环球石材(东莞)股份有限公司 | Blade inserting installed part |
CN103031935A (en) * | 2012-12-31 | 2013-04-10 | 环球石材(东莞)有限公司 | Inserting sheet type mounting piece |
CN103343604B (en) * | 2013-07-22 | 2016-06-01 | 一禾科技发展(上海)有限公司 | Wall brick is installed structure and is installed the method for wall brick |
WO2015010496A1 (en) * | 2013-07-22 | 2015-01-29 | Xie Xiaobin | Wall brick installation structure and wall brick installation method |
CN103343604A (en) * | 2013-07-22 | 2013-10-09 | 一禾科技发展(上海)有限公司 | Wall brick installation structure and wall brick installation method |
CN103469990A (en) * | 2013-09-16 | 2013-12-25 | 周述文 | Swinging type combined dry hanging piece for stone installation and installation method thereof |
CN103469990B (en) * | 2013-09-16 | 2016-06-22 | 周述文 | Stone material installs swing type combination dry hanging article and installation method thereof |
CN105756317A (en) * | 2014-04-10 | 2016-07-13 | 吴雄鹏 | Wet hanging method for wet-hung stones or tiles |
CN105756317B (en) * | 2014-04-10 | 2018-01-23 | 吴雄鹏 | One kind is used for wet extension stone material or the wet hanging method of ceramic tile |
CN103938828A (en) * | 2014-04-30 | 2014-07-23 | 深圳市华南装饰设计工程有限公司 | Stone dry hanging installation system |
CN106760295A (en) * | 2016-11-16 | 2017-05-31 | 东易日盛家居装饰集团股份有限公司 | Assembled ceramic tile metope and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101191376A (en) | Dry hanging device for stone or ceramic tile and assembling method thereof | |
CN204282729U (en) | A kind of dried hanging hang structure of wooden facing | |
CN101748868A (en) | Stone material or ceramic-based dovetail plug arranging device and arranging method | |
WO2008142626A3 (en) | Modular frame for paintings | |
CN203256945U (en) | Slotted stone hanging system | |
CN200949296Y (en) | Stone or ceramic tile splayed groove installation device | |
CN110056150A (en) | A kind of hanging structure of assembled wallboard | |
CN201428212Y (en) | Improved dry-hang device | |
CN201314103Y (en) | Mounting device for dovetail pin of stone or vitrolite | |
CN201343843Y (en) | Installation device of splay combination accessory of architectural panel | |
CN216787444U (en) | Steel construction building crossbeam connecting piece | |
CN113700178A (en) | PVC skeleton partition wall structure of pre-buried design of water and electricity pipeline | |
CN203867112U (en) | Dry-hanging wall tile structure | |
US20110237155A1 (en) | Toy House with Cube Joint | |
CN203514668U (en) | Handrail connection device | |
CN208586845U (en) | A kind of ceramic tile | |
CN206337817U (en) | New Type Architecture Mode fixing device | |
CN211037512U (en) | Assembled structure for installing veneer | |
CN208981701U (en) | A kind of mounting structure of building outer laying and hanging ornamental prefabricated component and building body | |
CN215564089U (en) | Fishbone type clamping piece for mounting assembly type wallboard | |
CN215051714U (en) | Novel litchi face natural forming pc brick convenient to concatenation | |
CN204107060U (en) | A kind of 3D builds conduit assembly | |
CN203867131U (en) | Wall dry-hanging tile structure | |
CN211022095U (en) | Wall panel hanging device | |
CN211873673U (en) | Wallboard fast-assembling spare |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20080604 |