CN103938627A - 一种荷载分散型锚索的张拉方法 - Google Patents

一种荷载分散型锚索的张拉方法 Download PDF

Info

Publication number
CN103938627A
CN103938627A CN201410190603.2A CN201410190603A CN103938627A CN 103938627 A CN103938627 A CN 103938627A CN 201410190603 A CN201410190603 A CN 201410190603A CN 103938627 A CN103938627 A CN 103938627A
Authority
CN
China
Prior art keywords
steel strand
unit
grouped element
stretching
minutes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410190603.2A
Other languages
English (en)
Other versions
CN103938627B (zh
Inventor
陈远洪
陈占
李小和
赵新益
邬强
刘庆辉
韦随庆
廖进星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Railway Planning Design And Research Institute Co ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201410190603.2A priority Critical patent/CN103938627B/zh
Publication of CN103938627A publication Critical patent/CN103938627A/zh
Application granted granted Critical
Publication of CN103938627B publication Critical patent/CN103938627B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种荷载分散型锚索的张拉方法,包括以下步骤:将每个单元锚索逐一进行预紧张拉;以分组单元钢绞线长度为标准,对最长至次短分组单元钢绞线依次进行补偿张拉;对所有钢绞线用不同的锚固力进行逐级整体张拉;对最长至最短分组单元钢绞线依顺次进行等荷张拉;按照步骤4的顺序对各分组单元钢绞线进行加强等荷张拉;判断锚索的预应力损失是否明显,如果损失明显转至步骤5,如果损失不明显整个张拉过程结束。本发明可广泛应用于荷载分散型锚索的张拉施工,社会效益及经济效益显著。

Description

一种荷载分散型锚索的张拉方法
技术领域
本发明涉及锚索的张拉施工技术领域,具体地指一种荷载分散型锚索的张拉方法。
背景技术
一般的铁路、公路高边边坡锚索为多级单元锚固段型式,束体被分散成数组单元固定在孔内不同深度处,不同单元钢绞线长度不相等,易造成部分单元应力超限或破坏,影响锚固效率,威胁锚固工程安全。
现有的荷载分散型锚索张拉方法主要包括以下几种:1.整体张拉方法产生的单元荷载差异太大;2.先分组补偿后整体张拉方法无法克服结构变形差导致的单元荷载较大不均;3.往复式张拉方法可满足荷载分散型锚索单元荷载均匀分布的目的,但该方法太过繁琐和耗时费力。
发明内容
本发明的目的是为了克服上述不足提供一种均匀受力和结构安全的荷载分散型锚索的张拉方法。
本发明包括以下步骤:
步骤1:按单根或偶数倍的钢绞线进行单元分组,将每个单元锚索逐一进行预紧张拉;
步骤2:以分组单元钢绞线长度为标准,对最长至次短分组单元钢绞线依次进行补偿张拉;
步骤3:对所有钢绞线用不同的锚固力进行逐级整体张拉;
步骤4:对最长至最短分组单元钢绞线依顺次进行等荷张拉;
步骤5:按照步骤4的顺序对各分组单元钢绞线进行加强等荷张拉;
步骤6:判断锚索的预应力损失是否明显,如果损失明显转至步骤5,如果损失不明显整个张拉过程结束。
本发明是在先分组补偿后整体张拉方法基础上的改进,通过增加等荷张拉,解决了先分组补偿后整体张拉方法无法克服结构变形差导致的单元荷载较大不均,从而达到锚索均匀受力,确保锚固工程安全可靠;避免往复式张拉方法施工过于繁琐和耗时费力,操作较为简单,节省了时间和施工费用;可广泛应用于荷载分散型锚索的张拉施工,社会效益及经济效益显著。
附图说明
图1为本发明荷载分散型锚索的张拉方法流程图。
具体实施方式
下面结合附图及实施例进一步说明本发明。
实施例:本发明提供了一种荷载分散型锚索的张拉方法,参照附图1所示,包括以下步骤:
(1)预紧张拉。张拉设备采用穿心式千斤顶和前卡式千斤顶即小千斤顶,张拉之前将穿心式千斤顶即大千斤顶与锚索中心对齐,并用前卡式千斤顶以10%的设计单元锚固力将每单元锚索逐一预拉调直,使各部位接触紧密。
(2)补偿张拉。按弹性变形协调理论计算各级单元理论伸长值及对应的补偿荷载ΔP1~ΔPn-1(n为单元数);在最长锚索单元钢绞线上安装工作夹片,用穿心式千斤顶对最长的分组单元钢绞线进行第一次补偿张拉至荷载ΔP1,稳压(油压表不再向下漂移,位移观测值不变)2分钟,测量并记录位移;在次长锚索单元钢绞线上安装工作夹片,用穿心式千斤顶对次长连同最长的分组单元钢绞线进行第二次补偿张拉至荷载ΔP2,稳压2分钟,测量并记录位移;依此类推,直到在次短锚索单元钢绞线上安装工作夹片,用穿心式千斤顶对次短至最长的分组单元钢绞线进行第n-1次补偿张拉至荷载ΔPn-1,稳压2分钟,测量并记录位移。
(3)逐级整体张拉。在最短锚索单元钢绞线上安装工作夹片,用穿心式千斤顶对所有钢绞线按40%、65%、90%要求的最大锚固力逐级整体张拉,每级荷载稳压2分钟,测量并记录位移。
(4)第一次等荷张拉:用前卡式千斤顶对最长的分组单元钢绞线张拉至要求的最大单元锚固力,稳压15分钟,测量并记录位移;用前卡式千斤顶对次长的分组单元钢绞线张拉至要求的最大单元锚固力,稳压15分钟,测量并记录位移;依此类推,直到用前卡式千斤顶对最短的分组单元钢绞线张拉至要求的最大单元锚固力,稳压15分钟,测量并记录位移。
(5)再次加强等荷张拉:进行同样顺序的加强等荷张拉循环,用前卡式千斤顶对最长的分组单元钢绞线加强张拉至最大单元锚固力,稳压2分钟后锁定,测量并记录位移;依次进行,直到用前卡式千斤顶对最短的分组单元钢绞线加强张拉至最大单元锚固力,稳压2分钟后锁定,测量并记录位移。
(6)锚索锁定48小时内,若发现明显的预应力损失现象,即预应力损失限值超过5%,按再次等荷张拉方法进行补偿等荷张拉。
本方法是以单根或若干根钢绞线为一组作为张拉的对象,锚索通常按偶数倍钢绞线进行单元分组,一般采用2根钢绞线锚索为一组单元,一般一样长的钢绞线为一组,用较小的张拉力对各单元钢绞线进行预拉调直。计算不同分组单元钢绞线应补偿的理论伸长值及对应的补偿荷载,首先对最长的分组单元钢绞线进行第一次补偿张拉,其次对次长连同最长的分组单元钢绞线进行第二次补偿张拉,依此类推,直到次短至最短的分组单元钢绞线进行最后一次补偿张拉。然后对所有分组单元钢绞线逐级整体张拉至90%的最大荷载。再对最长的分组单元钢绞线张拉至最大荷载,同样对次长的分组单元钢绞线张拉至最大荷载,依此类推,直到最短的分组单元钢绞线张拉至最大荷载;最后进行一次同样顺序的加强等荷张拉循环并锁定。该方法定名为先分组补偿后整体及等荷张拉方法。
本方法是在先分组补偿后整体张拉方法基础上的改进,已经用于石武客运专线铁路的高边坡防护,有效消除了锚固结构变形差对荷载不均的影响,实现锚索荷载均匀分布;同时该方法继承了先分组补偿后整体张拉方法较简单的特点,减少施工时间和降低施工费用。
上述实施例为本发明较佳的实施方式,但本发明的实施方式并不受上述实施例的限制,其他的任何未背离本发明的精神实质与原理下所作的改变、修饰、替代、组合、简化,均应为等效的置换方式,都包含在本发明的保护范围之内。

Claims (7)

1.一种荷载分散型锚索的张拉方法,包括以下步骤:
步骤1:按单根或偶数倍的钢绞线进行单元分组,将每个单元锚索逐一进行预紧张拉;
步骤2:以分组单元钢绞线长度为标准,对最长至次短分组单元钢绞线依次进行补偿张拉;
步骤3:对所有钢绞线用不同的锚固力进行逐级整体张拉;
步骤4:对最长至最短分组单元钢绞线依顺次进行等荷张拉;
步骤5:按照步骤4的顺序对各分组单元钢绞线进行加强等荷张拉;
步骤6:判断锚索的预应力损失是否明显,如果损失明显转至步骤5,如果损失不明显整个张拉过程结束。
2.根据权利要求1所述的荷载分散型锚索的张拉方法,其特征在于,所述步骤2中补偿张拉的过程为:先计算各单元理论伸长值及对应的补偿荷载ΔP1~ΔPn-1,其中n为单元数;在最长锚索单元钢绞线上安装工作夹片,用穿心式千斤顶对最长的分组单元钢绞线进行第一次补偿张拉至荷载ΔP1,稳压2分钟,测量并记录位移;在次长锚索单元钢绞线上安装工作夹片,用穿心式千斤顶对次长连同最长的分组单元钢绞线进行第二次补偿张拉至荷载ΔP2,稳压2分钟,测量并记录位移;依此类推,直到在次短锚索单元钢绞线上安装工作夹片,用穿心式千斤顶对次短至最长的分组单元钢绞线进行第n-1次补偿张拉至荷载ΔPn-1,稳压2分钟,测量并记录位移。
3.根据权利要求1或2所述的荷载分散型锚索的张拉方法,其特征在于:所述步骤3中不同的锚固力为:按钢绞线最大锚固力的40%、65%和90%的要求分为三级,然后用穿心式千斤顶对所有对钢绞线逐级整体张拉,每级荷载稳压2分钟,测量并记录位移。
4.根据权利要求1或2所述的荷载分散型锚索的张拉方法,其特征在于:所述步骤4中,首先用前卡式千斤顶对最长的分组单元钢绞线张拉至要求的最大单元锚固力,稳压15分钟,测量并记录位移;然后用前卡式千斤顶对次长的分组单元钢绞线张拉至要求的最大单元锚固力,稳压15分钟,测量并记录位移;依此类推,直到用前卡式千斤顶对最短的分组单元钢绞线张拉至要求的最大单元锚固力,稳压15分钟,测量并记录位移。
5.根据权利要求1或2所述的荷载分散型锚索的张拉方法,其特征在于:所述步骤5中,首先用前卡式千斤顶对最长的分组单元钢绞线加强张拉至最大单元锚固力,稳压2分钟后锁定,测量并记录位移;依次进行,直到用前卡式千斤顶对最短的分组单元钢绞线加强张拉至最大单元锚固力,稳压2分钟后锁定,测量并记录位移。
6.根据权利要求1或2所述的荷载分散型锚索的张拉方法,其特征在于:所述步骤1中,张拉设备采用穿心式千斤顶和前卡式千斤顶,张拉之前将穿心式千斤顶与锚索中心对齐,并用前卡式千斤顶以10%的设计单元锚固力将每单元锚索逐一预拉调直,使各部位接触紧密。
7.根据权利要求1或2所述的荷载分散型锚索的张拉方法,其特征在于:所述步骤6中,锚索锁定48小时内,判断锚索的预应力损失是否明显,如果损失明显转至步骤5,如果损失不明显整个张拉过程结束。
CN201410190603.2A 2014-05-07 2014-05-07 一种荷载分散型锚索的张拉方法 Active CN103938627B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410190603.2A CN103938627B (zh) 2014-05-07 2014-05-07 一种荷载分散型锚索的张拉方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410190603.2A CN103938627B (zh) 2014-05-07 2014-05-07 一种荷载分散型锚索的张拉方法

Publications (2)

Publication Number Publication Date
CN103938627A true CN103938627A (zh) 2014-07-23
CN103938627B CN103938627B (zh) 2016-03-02

Family

ID=51186482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410190603.2A Active CN103938627B (zh) 2014-05-07 2014-05-07 一种荷载分散型锚索的张拉方法

Country Status (1)

Country Link
CN (1) CN103938627B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106149717A (zh) * 2016-07-22 2016-11-23 四川大学 一种高安全性预应力锚索施工方法
CN106149715A (zh) * 2015-04-28 2016-11-23 中铁西北科学研究院有限公司深圳南方分院 锚固工程中锚索预应力补偿或者张拉方法
CN106149716A (zh) * 2015-04-28 2016-11-23 中铁西北科学研究院有限公司深圳南方分院 压力分散型锚索的分单元张拉系统
CN106223336A (zh) * 2016-07-22 2016-12-14 四川大学 一种预应力锚索施工方法
CN110284500A (zh) * 2019-06-21 2019-09-27 中国葛洲坝集团三峡建设工程有限公司 锚索快速简易补偿张拉施工方法
CN110318546A (zh) * 2018-03-30 2019-10-11 中铁西北科学研究院有限公司深圳南方分院 预应力锚索张拉系统及预应力锚索张拉方法
CN110468719A (zh) * 2019-08-29 2019-11-19 中国十七冶集团有限公司 一种减少自锚式悬索桥大长钢绞线预应力损失的施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090010856A (ko) * 2007-07-23 2009-01-30 김용기 일체식 분산압축형 앵커 및 이를 이용한 가압그라우팅앵커링 공법
KR20100052644A (ko) * 2008-11-11 2010-05-20 김승관 정착체스틸파이프를 구비한 하중분산형 영구앵커
CN202194135U (zh) * 2011-07-18 2012-04-18 中铁西北科学研究院有限公司深圳南方分院 锚索预应力荷载补偿或卸荷装置
CN202543920U (zh) * 2012-04-19 2012-11-21 杭州图强工程材料有限公司 一种压力分散型让压锚索

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090010856A (ko) * 2007-07-23 2009-01-30 김용기 일체식 분산압축형 앵커 및 이를 이용한 가압그라우팅앵커링 공법
KR20100052644A (ko) * 2008-11-11 2010-05-20 김승관 정착체스틸파이프를 구비한 하중분산형 영구앵커
CN202194135U (zh) * 2011-07-18 2012-04-18 中铁西北科学研究院有限公司深圳南方分院 锚索预应力荷载补偿或卸荷装置
CN202543920U (zh) * 2012-04-19 2012-11-21 杭州图强工程材料有限公司 一种压力分散型让压锚索

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
张勇等: "压力分散型锚索施工中张拉方法的探讨", 《第20届全国结构工程学术会议》, 31 December 2011 (2011-12-31), pages 494 - 499 *
张勇等: "张拉工艺对压力分散型锚索荷载不均匀系数的影响", 《岩土力学与工程学报》, vol. 28, no. 1, 31 May 2009 (2009-05-31), pages 2954 - 2959 *
张海生等: "压力分散型预应力锚索张拉施工工艺研究", 《中国地质灾害与防治学报》, vol. 15, no. 1, 31 July 2004 (2004-07-31), pages 16 - 21 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106149715A (zh) * 2015-04-28 2016-11-23 中铁西北科学研究院有限公司深圳南方分院 锚固工程中锚索预应力补偿或者张拉方法
CN106149716A (zh) * 2015-04-28 2016-11-23 中铁西北科学研究院有限公司深圳南方分院 压力分散型锚索的分单元张拉系统
CN106149716B (zh) * 2015-04-28 2018-03-20 中铁西北科学研究院有限公司深圳南方分院 压力分散型锚索的分单元张拉系统
CN106149715B (zh) * 2015-04-28 2018-03-20 中铁西北科学研究院有限公司深圳南方分院 锚固工程中锚索预应力补偿或者张拉方法
CN106149717A (zh) * 2016-07-22 2016-11-23 四川大学 一种高安全性预应力锚索施工方法
CN106223336A (zh) * 2016-07-22 2016-12-14 四川大学 一种预应力锚索施工方法
CN110318546A (zh) * 2018-03-30 2019-10-11 中铁西北科学研究院有限公司深圳南方分院 预应力锚索张拉系统及预应力锚索张拉方法
CN110284500A (zh) * 2019-06-21 2019-09-27 中国葛洲坝集团三峡建设工程有限公司 锚索快速简易补偿张拉施工方法
CN110468719A (zh) * 2019-08-29 2019-11-19 中国十七冶集团有限公司 一种减少自锚式悬索桥大长钢绞线预应力损失的施工方法

Also Published As

Publication number Publication date
CN103938627B (zh) 2016-03-02

Similar Documents

Publication Publication Date Title
CN103938627A (zh) 一种荷载分散型锚索的张拉方法
EP3028979A1 (en) Method for manufacturing an electrical contact arrangement and arrangement
CN107655755B (zh) 一种拉索-索夹组装件抗滑移承载力的试验方法
CN101638893B (zh) 压力均布型锚索
CN103422676B (zh) 锚索均匀张拉装置
CN108292722B (zh) 用于机动车电池的电池单元模块以及用于制造这种电池单元模块的方法
CN106872259B (zh) 用于计算配置高强钢筋的受弯构件的最大裂缝宽度的方法及确定高强钢筋截面积的计算方法
CN102296605A (zh) 锚索预应力荷载补偿或卸荷的装置及方法
CN103485220A (zh) 一种高强度牵引结构用钢索的制造方法
CN204081520U (zh) 预应力张拉装置
CN109083022B (zh) 平行钢绞线斜拉索施工索力均匀性监测系统及施工方法
Sandovič et al. The analysis of the behaviour of an innovative pedestrian steel bridge
PRECONTRAINTES a Discrete Bond Model for 3D Analysis of Textile Rein-Forced and Prestressed Concrete Elements
US9315998B1 (en) Cable lock-off block for repairing a plurality of post-tensioned tendons
Oshima et al. Highly durable ultra-high Strength prestressing strand system with large diameter
CN203362193U (zh) 锚索均匀张拉装置
CN110284500B (zh) 锚索快速简易补偿张拉施工方法
CN218291599U (zh) 一种斜拉索的抗滑锁紧结构以及索鞍
EP3859853A1 (de) Batterieanordnung
CN110704958A (zh) 一种多内力构件的预内力及其计算方法
Volkov et al. Deformation diagrams of metals with different types of microstructure damage
JP2002266347A (ja) 荷重分散型アンカーの緊張方法およびその緊張用治具
CN112711784B (zh) 一种栓接型钢梁的支座连接方法
CN108151939A (zh) 基于变形和拉力关系曲线的测试既有结构预应力值的方法
US20210273300A1 (en) Method for forming a connection between battery cells, and battery module

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170706

Address after: 510600 No. 6 Gonghe West Road, Guangzhou, Guangdong, Yuexiu District

Patentee after: GUANGZHOU HOLDING COMPANY OF THE CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP Co.,Ltd.

Address before: 430063 Wuchang, Hubei, Yang Park, Peace Avenue, No. 745

Patentee before: CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 510030 No.6 Gonghe West Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee after: Guangdong railway planning, design and Research Institute Co.,Ltd.

Address before: 510030 No.6 Gonghe West Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee before: Guangdong Railway Planning, Design and Research Institute Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 510030 No.6 Gonghe West Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee after: Guangdong Railway Planning, Design and Research Institute Co.,Ltd.

Address before: 510600 6 Gonghe West Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee before: GUANGZHOU HOLDING COMPANY OF THE CHINA RAILWAY SIYUAN SURVEY AND DESIGN GROUP Co.,Ltd.