CN103925864B - Utilize ballast for cruising piping installs the method that positioning assisting tooling carries out installing location - Google Patents

Utilize ballast for cruising piping installs the method that positioning assisting tooling carries out installing location Download PDF

Info

Publication number
CN103925864B
CN103925864B CN201410095744.6A CN201410095744A CN103925864B CN 103925864 B CN103925864 B CN 103925864B CN 201410095744 A CN201410095744 A CN 201410095744A CN 103925864 B CN103925864 B CN 103925864B
Authority
CN
China
Prior art keywords
bar
messenger wire
grade
flange
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410095744.6A
Other languages
Chinese (zh)
Other versions
CN103925864A (en
Inventor
许云隆
王辉
朱生月
申寅
奚晨亮
石保国
李国军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hudong Zhonghua Shipbuilding Group Co Ltd
Original Assignee
Hudong Zhonghua Shipbuilding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hudong Zhonghua Shipbuilding Group Co Ltd filed Critical Hudong Zhonghua Shipbuilding Group Co Ltd
Priority to CN201410095744.6A priority Critical patent/CN103925864B/en
Publication of CN103925864A publication Critical patent/CN103925864A/en
Application granted granted Critical
Publication of CN103925864B publication Critical patent/CN103925864B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The installation positioning assisting tooling of a kind of ballast for cruising piping, including opening a grade messenger wire bar, corner location bar and stress protection cylinder;The described grade central authorities for messenger wire bar that open are provided with messenger wire through hole, this is opened a grade stage casing for messenger wire bar and is provided with convex shoulder, described grade one end of messenger wire bar of opening is for measuring end, the other end is fixing end, and the center of this measurement end is provided with datum hole, and the stage casing of described corner location bar is provided with convex shoulder, one end of this corner location bar is for measuring end, the other end is fixing end, and the center of this measurement end is provided with datum hole, and installation and locating method.The present invention avoids on-the-spot each road rib, reinforcing plate or big weld seam, directly measures required size, has that certainty of measurement is high, volume is little, portable and can be with Reusability, the feature of low cost.

Description

Utilize ballast for cruising piping installs the method that positioning assisting tooling carries out installing location
Technical field
The present invention relates to the installation field of locating technology of ballast for cruising piping, the installation of a kind of ballast for cruising piping Positioning assisting tooling and installation and locating method thereof.
Background technology
Along with the technique lifting requirement of extensively implementation and minimizing or cancellation adjustment pipe (gathering pipe) of boats and ships PSPC specification, The advance fitting-out required precision of ballast for cruising piping is more and more higher.As a example by Mobil LNG series ballast for cruising piping, it builds difficulty Point can be summarized as following three points: first, it is desirable to prepackage installment work settles at one go, and the later stage cannot adjust.Ballast tube branch pipe wall Employing plastic-coated is protected, and coating layer fusing point is the lowest, and scene cannot carry out hot worked adjustment and amendment to pipe.Meanwhile, Mobil LNG Ship performs PSPC specification, it is desirable to the crossing cabin outfititem of ballast tank was the most all welded in place in the advance fitting-out stage, in total group stage Carry out docking of ballast line house steward and crossing cabin arm, no longer carry out the fire operation in ballast tank region.Second, piping during prepackage Positioning difficulty is high.Owing to the glass reinforced plastic pipe house steward of ballast line should not be pre-buried in the segmentation stage, therefore the arm of piping and support Outfititem does not has the centering reference of material object when installing and check.3rd, it is desirable to the required precision that piping is installed is high.In the always company of group When connecing, be responsible for arm between do not adjust pipe, be mounted directly butterfly valve, valve two ends respectively with bolt to wearing connection, this is to butterfly valve The piping installation accuracy at two ends requires the highest.Moreover, the same upper connection of ballast house steward has two sections of arms and installs many Individual support, is responsible for and installs in last, belongs to the situation of " a branched fixed master ", needs the size of each pipe Xi part to be guaranteed simultaneously. Therefore, certainty of measurement when positioning pipe advance fitting-out part proposes the highest requirement.
But, relatively big with the difficulty that existing conventional tool is measured at the scene, result in pipe fittings to a certain extent and be difficult to pacify Dress precisely, occurs in that situation about doing over again in a large number.The difficult point of in-site measurement includes: 1. due to pipe hollow, positions advance fitting-out arm Flange center or bolt hole center are relatively difficult.2. there is multiple tracks rib, strengthen version or big weld seam in scene, need during measurement by Section is measured cumulative, causes measuring cumulative error bigger.3. the requirement to flange face corner and the positioning precision of total pipe holder is higher, But in-site measurement is the most difficult.
Summary of the invention
In order to overcome above-mentioned the deficiencies in the prior art, the present invention provides the installation location auxiliary work of a kind of ballast for cruising piping Dress and installation and locating method thereof, it is possible to control the multinomial location dimension of multiple advance fitting-out arm well fast accurate, including: arm Between open a grade spacing dimension, arm height dimension, the corner size of arm flange face and flange broken face size, improve arm The positioning precision of advance fitting-out part, it is ensured that in follow-up work, main line can be installed smoothly with each arm and be connected.
The technical solution of the present invention is as follows:
The installation positioning assisting tooling of a kind of ballast for cruising piping, the end of this ballast tube adnexa has flange, on flange Having flange hole, its feature is, including opening a grade messenger wire bar, corner location bar and stress protection cylinder;
The described grade central authorities for messenger wire bar that open are provided with messenger wire through hole, and this is opened a grade stage casing for messenger wire bar and is provided with convex shoulder, described in open One end of shelves messenger wire bar is for measuring end, and the other end is fixing end, and the center of this measurement end is provided with datum hole,
The stage casing of described corner location bar is provided with convex shoulder, and one end of this corner location bar is for measuring end, and the other end is solid Fixed end, the center of this measurement end is provided with datum hole;
Described opens grade length of messenger wire bar more than hull reinforcing plate outer, ballast tube adnexa place to be measured away from treating pressure measurement Carry the distance of pipe fittings flange face.
The maximum outside diameter of the fixing end of the described fixing end driving grade messenger wire bar and described corner location bar is all with to be measured It is equal or less than within 0.5 millimeter that piezometric carries the flange bolt hole internal diameter of pipe fittings.
The internal diameter of described stress protection cylinder is respectively greater than described grade messenger wire bar of opening and measures the external diameter of end and described turning The external diameter of end measured by location, angle bar, and is respectively smaller than the described convex shoulder external diameter driving grade messenger wire bar and described corner location bar Convex shoulder external diameter.
A kind of positioning assisting tooling of installing utilizing described ballast for cruising piping carries out installing the method positioned, its feature Being, the method comprises the steps:
1. measure ballast tube adnexa to be measured by level indicator respectively, confirm that it is put and be in level;
2. the measurement end driving grade messenger wire bar is inserted in a stress protection cylinder;
The measurement end that 3. corner positions bar inserts in another root stress protection cylinder;
4., under the protection of described stress protection cylinder, a described grade messenger wire bar of opening is penetrated ballast tube adnexa method to be measured In blue top flange hole, and left behind weight by messenger wire through hole;
5., under the protection of described stress protection cylinder, described corner location bar is penetrated ballast tube adnexa method to be measured In blue flange in the bottom hole;
6. face angle and broken face situation are turned according to the relative location test flange of described weight and corner location bar, And adjust location, make the corner described in weight sensing position the datum hole of bar;
With corner location bar, relative alternate position spike X millimeter is formed for weight, during adjustment, needs the angle turned over (α unit is °;β is the angle of the corner location bar place bolt hole center line to flange center and plumb line;R is flange spiral shell Hole pitch radius, unit is millimeter), as shown in Figure 4 (b).As a example by the size of Mobil/MOL LNG ship ballast tube, α ≈ 0.335X(°)。
With corner location bar, relative alternate position spike Y millimeter is formed for weight, during adjustment, needs the angle turned over (θ unit is °;R is flange screw pitch radius, and unit is millimeter), as shown in Fig. 5 (b).With Mobil/MOL LNG ship pressure As a example by carrying pipe size, θ ≈ 0.073Y (°).
7. measure described corner and position the datum hole distance to segmentation bottom surface of bar, control ballast tube adnexa to be measured high Degree;
8. measure on each ballast tube adnexa to be measured and described to open a grade spacing for the datum hole of messenger wire bar, control piezometric to be measured Carry pipe fittings opens a grade size.
Compared with prior art, the invention has the beneficial effects as follows:
(1) avoid on-the-spot each road rib, reinforcing plate or big weld seam, directly measure required size;
(2) certainty of measurement is high;
(3) volume is little, portable and can be with Reusability, low cost.
Accompanying drawing explanation
Fig. 1 is that installing in positioning assisting tooling of ballast for cruising piping of the present invention opens a grade structural representation for messenger wire bar.
Fig. 2 is that the corner in positioning assisting tooling of installing of ballast for cruising piping of the present invention positions the structural representation of bar.
Fig. 3 is that the stress in positioning assisting tooling of installing of ballast for cruising piping of the present invention protects the structural representation of cylinder.
Fig. 4 is that the present invention uses state front view, and wherein (a) is the state that angular rotation of flange has adjusted, and (b) is that flange goes out The situation of existing corner.
Fig. 5 is that the present invention uses side view of the state, and wherein (a) is the state that broken face has adjusted, and (b) is that flange occurs splitting The situation in face.
Fig. 6 is design load or the value of calculation that some height measured by ballast tube adnexa.
Detailed description of the invention
Being described in detail the present invention below in conjunction with embodiment and accompanying drawing, the present embodiment with technical solution of the present invention is being Implement under premise, give detailed embodiment and concrete operating process, but protection scope of the present invention is not limited to Following embodiment.
Refer to Fig. 1, Fig. 2 and Fig. 3, as it can be seen, the installation positioning assisting tooling of a kind of ballast for cruising piping, this ballast The end of pipe fittings has flange, and flange has flange hole, including opening a grade messenger wire bar 1, corner location bar 2 and stress protection cylinder 3;
The described grade central authorities for messenger wire bar 1 that open are provided with messenger wire through hole 4, and this is opened a grade stage casing for messenger wire bar 1 and is provided with convex shoulder 6, institute Stating out grade one end of messenger wire bar 1 is to measure end, and the other end is fixing end, and the center of this measurement end is provided with datum hole 5;
The stage casing of described corner location bar 2 is provided with convex shoulder 7, and one end of this corner location bar 2 is for measuring end, and the other end is Fixing end, the center of this measurement end is provided with datum hole 8.
Described opens grade length of messenger wire bar more than hull reinforcing plate outer, ballast tube adnexa place to be measured away from treating pressure measurement Carry the distance of pipe fittings flange face.
The described fixing end driving grade messenger wire bar 1 and described corner location bar 2 fixing end maximum outside diameter all with treat Measure the flange bolt hole internal diameter of ballast tube adnexa equal or less than within 0.5 millimeter.
The internal diameter of described stress protection cylinder 3 is respectively greater than described grade messenger wire bar 1 of opening and measures the external diameter of end with described The external diameter of end measured by corner location bar 2, and is respectively smaller than the described convex shoulder external diameter driving grade messenger wire bar 1 and described corner location The convex shoulder external diameter of bar 2.
A kind of positioning assisting tooling of installing utilizing described ballast for cruising piping carries out installing the method positioned, the method Comprise the steps:
1. measure ballast tube adnexa to be measured by level indicator respectively, confirm that it is put and be in level;
2. the measurement end driving grade messenger wire bar 1 is inserted in a stress protection cylinder 3;
The measurement end that 3. corner positions bar 2 inserts in another root stress protection cylinder 3;
4., under the protection of described stress protection cylinder, a described grade messenger wire bar of opening is penetrated ballast tube adnexa method to be measured In blue top flange hole, and left behind weight by messenger wire through hole;
5., under the protection of described stress protection cylinder, described corner location bar is penetrated ballast tube adnexa method to be measured In blue flange in the bottom hole;
6. face angle and broken face situation are turned according to the relative location test flange of described weight and corner location bar, And adjust location, make the corner described in weight sensing position the datum hole of bar;
With corner location bar, relative alternate position spike X millimeter is formed for weight, during adjustment, needs the angle turned over (α unit is °;β is the angle of the corner location bar place bolt hole center line to flange center and plumb line;R is flange spiral shell Hole pitch radius, unit is millimeter), as shown in Figure 4 (b).As a example by the size of Mobil/MOL LNG ship ballast tube, α ≈ 0.335X(°)。
With corner location bar, relative alternate position spike Y millimeter is formed for weight, during adjustment, needs the angle turned over (θ unit is °;R is flange screw pitch radius, and unit is millimeter), as shown in Fig. 5 (b).With Mobil/MOL LNG ship pressure As a example by carrying pipe size, θ ≈ 0.073Y (°).
7. according to design or value of calculation, the datum hole of the corner location bar described in measurement, to the distance of segmentation bottom surface, controls Ballast tube attachment elevation to be measured, sees Fig. 6;
8. measure on each ballast tube adnexa to be measured and described to open a grade spacing for the datum hole of messenger wire bar, control piezometric to be measured Carry pipe fittings opens a grade size.

Claims (1)

1. utilize the method that positioning assisting tooling carries out installing location of installing of ballast for cruising piping, described installation location Auxiliary mould, the end of ballast tube adnexa has flange, and flange has flange hole, including opening a grade messenger wire bar (1), corner location Bar (2) and stress protection cylinder (3);The described grade central authorities for messenger wire bar (1) that open are provided with messenger wire through hole (4), and this drives a grade messenger wire bar (1) Stage casing be provided with convex shoulder (6), described in open grade one end of messenger wire bar (1) for measuring end, the other end is fixing end, in this measurement end The heart is provided with datum hole (5);The stage casing of described corner location bar (2) is provided with convex shoulder (7), and one end of this corner location bar (2) is Measuring end, the other end is fixing end, and the center of this measurement end is provided with datum hole (8), it is characterised in that the method includes walking as follows Rapid:
1. measure ballast tube adnexa to be measured by level indicator respectively, confirm that it is put and be in level;
2. the measurement end that will drive grade messenger wire bar (1) inserts in stress protection cylinder (3);
The measurement end that 3. corner positions bar (2) inserts in another root stress protection cylinder (3);
4., under the protection of described stress protection cylinder, described grade messenger wire bar of opening is penetrated ballast tube attachment flange to be measured In top flange hole, and left behind weight by messenger wire through hole;
5., under the protection of described stress protection cylinder, described corner location bar is penetrated ballast tube attachment flange to be measured In flange in the bottom hole;
6. according to the relative position of described weight and corner location bar, inspection flange turn face angle and broken face situation, and Adjust location, make the corner described in weight sensing position the datum hole of bar;
7. measure the datum hole of described corner location bar to the distance of segmentation bottom surface, control ballast tube attachment elevation to be measured;
8. measure on each ballast tube adnexa to be measured and described to open a grade spacing for the datum hole of messenger wire bar, control ballast tube to be measured Adnexa open a grade size.
CN201410095744.6A 2014-03-14 2014-03-14 Utilize ballast for cruising piping installs the method that positioning assisting tooling carries out installing location Active CN103925864B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410095744.6A CN103925864B (en) 2014-03-14 2014-03-14 Utilize ballast for cruising piping installs the method that positioning assisting tooling carries out installing location

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410095744.6A CN103925864B (en) 2014-03-14 2014-03-14 Utilize ballast for cruising piping installs the method that positioning assisting tooling carries out installing location

Publications (2)

Publication Number Publication Date
CN103925864A CN103925864A (en) 2014-07-16
CN103925864B true CN103925864B (en) 2016-09-14

Family

ID=51144165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410095744.6A Active CN103925864B (en) 2014-03-14 2014-03-14 Utilize ballast for cruising piping installs the method that positioning assisting tooling carries out installing location

Country Status (1)

Country Link
CN (1) CN103925864B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105299005B (en) * 2015-11-09 2018-07-20 河南平高电气股份有限公司 Flange to positive assembly method and implement this method to positive rigging position degree cubing
CN110170813A (en) * 2019-06-24 2019-08-27 大连中远海运川崎船舶工程有限公司 Auxiliary fixture is used in a kind of pipeline branch tube and main pipe assembly
CN112325059B (en) * 2020-09-22 2022-08-02 沪东中华造船(集团)有限公司 Laser transmitter fixing method in ship construction
CN114179994B (en) * 2021-11-08 2023-12-26 上海江南长兴造船有限责任公司 Ship building piping installation accuracy control method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201892537U (en) * 2010-12-07 2011-07-06 江苏南通二建集团有限公司 Template perpendicularity measuring ruler
CN203116729U (en) * 2013-02-05 2013-08-07 中国建筑第七工程局有限公司 Plumb-line rod
CN203337148U (en) * 2013-05-21 2013-12-11 中国十七冶集团有限公司 Auxiliary device for verticality alignment
CN203811078U (en) * 2014-03-14 2014-09-03 沪东中华造船(集团)有限公司 Installation positioning auxiliary tool of ship ballast pipe system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101028360B1 (en) * 2008-04-15 2011-04-11 (주)광산 Ballast water treatment device with electric disinfection grid using virtual electrodes

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201892537U (en) * 2010-12-07 2011-07-06 江苏南通二建集团有限公司 Template perpendicularity measuring ruler
CN203116729U (en) * 2013-02-05 2013-08-07 中国建筑第七工程局有限公司 Plumb-line rod
CN203337148U (en) * 2013-05-21 2013-12-11 中国十七冶集团有限公司 Auxiliary device for verticality alignment
CN203811078U (en) * 2014-03-14 2014-09-03 沪东中华造船(集团)有限公司 Installation positioning auxiliary tool of ship ballast pipe system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《船舶压载舱结构及压载管系运行情况调查报告》;聂维忠 等;《中国国境卫生检疫杂志》;20100228;第33卷(第1期);第42-44页 *

Also Published As

Publication number Publication date
CN103925864A (en) 2014-07-16

Similar Documents

Publication Publication Date Title
CN103925864B (en) Utilize ballast for cruising piping installs the method that positioning assisting tooling carries out installing location
CN108657393B (en) A kind of underwater towing formula high-precision weight Magnetic Detection System and method
CN201803687U (en) Flange connection type expansion bend measuring instrument for submarine pipes
CN202834381U (en) Three-dimensional hyperbolic curve steel pushing pipe rectifying device
CN109059845B (en) Method and system for monitoring internal deformation of face rockfill dam
CN206410623U (en) It is a kind of to indulge the survey tool that bone is installed for ship hull plate
CN109707934A (en) A kind of pipeline installation sampler and sampling method
CN107860378A (en) A kind of Portable hidden Pipe installing deviation judges auxiliary mould and its application method
CN109606563A (en) A kind of installation method of two phase stainless steel chemical tanker liquid pump pedestal
CN110594536B (en) Verticality adjusting method for tower equipment
CN101797956A (en) Field digitized laser lofting method of ship piping system
CN205889917U (en) Formpiston location interfacing apparatus and fan blade mould
CN104085499A (en) Ship fin stabilizer installation method
CN106289193A (en) The dynamic positioning method of FPSO large area sea work module
CN111121670A (en) Laser measurement method for ship shafting
CN103010402B (en) Pre-installation method of bulker hawse pipe on section
CN100501109C (en) Method for measuring and locating virtual tetrahedron top of abnormity component
CN105241623A (en) Local flow velocity increase inclination angle step incoming flow marine riser vortex-induced vibration testing device
CN102951260B (en) Method for installing steering oar on ship body sections
CN104443334B (en) A kind of all-rotation device Accessory Members high accuracy installation method
CN203811078U (en) Installation positioning auxiliary tool of ship ballast pipe system
CN104608878A (en) Mounting technology of rudder horn of transport ship for liquified natural gas (LNG)
CN202393382U (en) Hanging center aligning and leveling device for composite furnace shell
CN105203298A (en) Inclination angle local flow speed increase incoming flow ocean riser vortex-induced vibration testing device
CN111577244B (en) Real-time monitoring method for inclination angle of top of drilling riser and rotation angle of top joint

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant