CN103924582B - Prefabricated keeper - Google Patents

Prefabricated keeper Download PDF

Info

Publication number
CN103924582B
CN103924582B CN201410104553.1A CN201410104553A CN103924582B CN 103924582 B CN103924582 B CN 103924582B CN 201410104553 A CN201410104553 A CN 201410104553A CN 103924582 B CN103924582 B CN 103924582B
Authority
CN
China
Prior art keywords
vertical rib
guide pile
bearing steel
rib
buried bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410104553.1A
Other languages
Chinese (zh)
Other versions
CN103924582A (en
Inventor
梁枫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI BAOYE CONSTRUCTION ENGINEERING GROUP CO., LTD.
Original Assignee
Chengdu LVDI Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu LVDI Technology Co Ltd filed Critical Chengdu LVDI Technology Co Ltd
Priority to CN201410104553.1A priority Critical patent/CN103924582B/en
Publication of CN103924582A publication Critical patent/CN103924582A/en
Application granted granted Critical
Publication of CN103924582B publication Critical patent/CN103924582B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of prefabricated keeper, comprise cross rib and vertical rib, vertical rib is two, cross rib splicing is on vertical rib top, vertical rib is provided with tenon near top place, tenon is welded on vertical rib, the inner space that cross rib and vertical rib are formed is provided with guide pile, be fixed on pre-buried bearing steel plate bottom guide pile, pre-buried bearing steel plate is two, and it is setting up and down, cant beam is provided with between two pre-buried bearing steel plates, weld between cant beam with pre-buried bearing steel plate, guide pile is two, embedded bar is connected with between two guide piles, wherein have draw-in groove inside a guide pile, another guide pile is provided with adjusting knob, embedded bar one end is placed in draw-in groove, its other end is placed in adjusting knob.This prefabricated locating element structure is simple, and easy to operate, without the need to changing fulcrum, technology operation is few, need not expand a footpath, and effectively can improve reinforcing bar binding speed and colligation quality, reliability is high, accurate positioning.

Description

Prefabricated keeper
Technical field
The present invention relates to a kind of keeper, particularly the prefabricated keeper of one.
Background technology
Along with the deep development of urbanization process, abundant Appropriate application urban underground space is more and more subject to the attention of relevant all circles, and in urban construction and civilian construction, the underground excavation degree of depth is more and more darker, and Top-Down Construction Method for Deep Foundation Pit is more and more extensive in urban construction application.And prefabricated keeper is as a building operations instrument indispensable in building, receive the concern of constructor equally, prefabricated keeper is utilized to be located, certain operating efficiency can be improved, shorten construction period, save construction cost, but general prefabricated keeper self does not also play better promotion construction action, also there is certain defect, also need to make corresponding improvement to it.
Summary of the invention
The technical problem to be solved in the present invention is: overcome the problems referred to above, and provide a kind of structure simple, easy to operate, without the need to changing fulcrum, technology operation is few, need not expand a footpath, effectively can improve the prefabricated keeper of reinforcing bar binding speed and colligation quality.
To achieve these goals, the technical solution used in the present invention is such: prefabricated keeper of the present invention, comprise cross rib and vertical rib, vertical rib is two, cross rib splicing is on vertical rib top, vertical rib is provided with tenon near top place, tenon is welded on vertical rib, the inner space that cross rib and vertical rib are formed is provided with guide pile, be fixed on pre-buried bearing steel plate bottom guide pile, pre-buried bearing steel plate is two, and it is setting up and down, cant beam is provided with between two pre-buried bearing steel plates, weld between cant beam with pre-buried bearing steel plate, guide pile is two, embedded bar is connected with between two guide piles, wherein have draw-in groove inside a guide pile, another guide pile is provided with adjusting knob, embedded bar one end is placed in draw-in groove, its other end is placed in adjusting knob.
Further, as a kind of concrete form of structure, tenon of the present invention is welded by two trapezoidal blooms.
Further, as a kind of concrete form of structure, cant beam of the present invention is made up of Steel material.
Further, as a kind of concrete form of structure, more than one of embedded bar of the present invention.
Compared with prior art, the invention has the advantages that: this prefabricated locating element structure is simple, and easy to operate, without the need to changing fulcrum, technology operation is few, need not expand a footpath, and effectively can improve reinforcing bar binding speed and colligation quality, reliability is high, accurate positioning.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described.
Fig. 1 is structural representation of the present invention;
In figure: 1. vertical rib; 2. cross rib; 3. tenon; 4. pre-buried bearing steel plate; 5. cant beam; 6. guide pile; 7. draw-in groove; 8. embedded bar; 9. adjusting knob.
Detailed description of the invention
In conjunction with the accompanying drawings, the present invention is further detailed explanation.These accompanying drawings are the schematic diagram of simplification, only basic structure of the present invention are described in a schematic way, and therefore it only shows the formation relevant with the present invention.
The preferred embodiment of the prefabricated keeper of the present invention as shown in Figure 1, comprise cross rib 2 and vertical rib 1, vertical rib 1 is two, cross rib 2 splices on vertical rib 1 top, vertical rib 1 is provided with tenon 3 near top place, tenon 3 is welded on vertical rib 1, the inner space that cross rib 2 and vertical rib 1 are formed is provided with guide pile 6, be fixed on pre-buried bearing steel plate 4 bottom guide pile 6, pre-buried bearing steel plate 4 is two, and it is setting up and down, cant beam 5 is provided with between two pre-buried bearing steel plates 4, weld between cant beam 5 with pre-buried bearing steel plate 4, guide pile 6 is two, embedded bar 8 is connected with between two guide piles 6, wherein have draw-in groove 7 inside a guide pile 6, another guide pile 6 is provided with adjusting knob 9, embedded bar 8 one end is placed in draw-in groove 7, its other end is placed in adjusting knob 9, described tenon 3 is welded by two trapezoidal blooms, described cant beam 5 is made up of Steel material, more than one of described embedded bar 8.
Prefabricated locating element structure of the present invention is simple, and easy to operate, without the need to changing fulcrum, technology operation is few, need not expand a footpath, and effectively can improve reinforcing bar binding speed and colligation quality, reliability is high, accurate positioning.Described tenon 3 is welded by two trapezoidal blooms, and construction effect is better; Described cant beam 5 is made up of Steel material, enhances its hardness, improves switching performance; More than one of described embedded bar 8, reasonable in design.
With above-mentioned according to desirable embodiment of the present invention for enlightenment, by above-mentioned description, relevant staff in the scope not departing from this invention technological thought, can carry out various change and amendment completely.The technical scope of this invention is not limited to the content on manual, must determine its technical scope according to right.

Claims (1)

1. a prefabricated keeper, comprise cross rib and vertical rib, it is characterized in that: vertical rib is two, cross rib splicing is on vertical rib top, vertical rib is provided with tenon near top place, tenon is welded on vertical rib, the inner space that cross rib and vertical rib are formed is provided with guide pile, be fixed on pre-buried bearing steel plate bottom guide pile, pre-buried bearing steel plate is two, and it is setting up and down, cant beam is provided with between two pre-buried bearing steel plates, weld between cant beam with pre-buried bearing steel plate, guide pile is two, embedded bar is connected with between two guide piles, wherein have draw-in groove inside a guide pile, another guide pile is provided with adjusting knob, embedded bar one end is placed in draw-in groove, its other end is placed in adjusting knob, described tenon is welded by two trapezoidal blooms, described cant beam is made up of Steel material, more than one of described embedded bar.
CN201410104553.1A 2014-03-20 2014-03-20 Prefabricated keeper Active CN103924582B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410104553.1A CN103924582B (en) 2014-03-20 2014-03-20 Prefabricated keeper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410104553.1A CN103924582B (en) 2014-03-20 2014-03-20 Prefabricated keeper

Publications (2)

Publication Number Publication Date
CN103924582A CN103924582A (en) 2014-07-16
CN103924582B true CN103924582B (en) 2016-03-30

Family

ID=51142962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410104553.1A Active CN103924582B (en) 2014-03-20 2014-03-20 Prefabricated keeper

Country Status (1)

Country Link
CN (1) CN103924582B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019220491A1 (en) * 2018-05-14 2019-11-21 日立ジョンソンコントロールズ空調株式会社 Air conditioner

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4111214B2 (en) * 2005-08-29 2008-07-02 共和コンクリート工業株式会社 How to mount the gate block reinforcing bar to the formwork for manufacturing the coupler assembling jig and the reinforcing bar with the coupler
KR20100018877A (en) * 2008-08-07 2010-02-18 주식회사 아이스트 Structure for jointing framework of vertical construction supporting precast concrete girder panel and method thereof
CN201747071U (en) * 2010-06-30 2011-02-16 广东省基础工程公司 Precast reinforced concrete column positioning device
CN202148694U (en) * 2011-05-18 2012-02-22 新疆生产建设兵团第五建筑安装工程公司 Prefabricated T-shaped beam steel bar colligation positioning device
CN202431008U (en) * 2012-02-21 2012-09-12 浙江工程建设监理公司 Auxiliary binding tool for grid beam steel bars
CN203855952U (en) * 2014-03-20 2014-10-01 丁西焘 Prefabricated locating component

Also Published As

Publication number Publication date
CN103924582A (en) 2014-07-16

Similar Documents

Publication Publication Date Title
CN103122636A (en) Superficial layer groove wall reinforcing method of feeble stratum underground continuous wall
CN204849571U (en) Prefabricated assembly pier of posttension prestressing force tongue -and -groove plug -in type
CN102653945A (en) Foundation reinforcing and replacing structure and construction method thereof
CN103742157A (en) Method of newly building underground space under ground by pipe jacking method
CN103485339A (en) Static pressure expanded foot prestress high strength concrete pipe pile
CN103924582B (en) Prefabricated keeper
CN108643219A (en) A kind of assembled transmission line of electricity anchor rod static pressure Minitype pile foundation and its construction method
CN204002832U (en) A kind of shield tunnel portal structure
CN202688991U (en) Specially-made sleeve construction structure used for repairing head of reinforced concrete cast-in-situ pile
CN105065040B (en) A kind of prefabricated underground space tunneling construction method of top plate
CN203855952U (en) Prefabricated locating component
CN103953358A (en) Clearing construction method for underground obstacle
CN207934054U (en) A kind of prefabricated assembled raft foundation
CN202925557U (en) Steel cofferdam assembled floating platform
CN207878472U (en) Solid matter step type rotary digging pile supporting system
CN105369814A (en) Prefabricated assembled type prestressed concrete support and erecting method thereof
CN104032732B (en) Cast-type pre-stressed steel plate concrete-pile and construction method thereof and supporting piling wall
CN210315499U (en) Enclosure based on prefabricated H-shaped pile
CN204062150U (en) Ductile iron pipe push pipe ruggedized construction
CN202578513U (en) Filling pile aiguille
CN208501724U (en) A kind of assembled transmission line of electricity anchor rod static pressure Minitype pile foundation
CN206289633U (en) A kind of foundation ditch flexible supporting structure
CN204551432U (en) The I-shaped casing joint that a kind of diaphragm wall can independently be arranged in advance
CN204590010U (en) Concrete pile
CN203834475U (en) Pipe pile with pre-locating function

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Xie Qisheng

Inventor after: Gao Jun

Inventor after: Zhou Zhishao

Inventor after: Chen Caifeng

Inventor after: Xie Qiyang

Inventor before: Liang Feng

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20160422

Address after: The 230000 Industrial Park in Anhui province Hefei Xinzhan Comprehensive Development Experimental Zone City

Patentee after: ANHUI BAOYE CONSTRUCTION ENGINEERING GROUP CO., LTD.

Address before: 610000 Jinjiang District, Chengdu, East Street, 18-32 No. 1, floor 5, layer 517,

Patentee before: Chengdu Lyudi Technology Co., Ltd.