CN103911951A CN201410067746.4A CN201410067746A CN103911951A CN 103911951 A CN103911951 A CN 103911951A CN 201410067746 A CN201410067746 A CN 201410067746A CN 103911951 A CN103911951 A CN 103911951A
Authority
CN
China
Prior art keywords
formwork
bridge
template
plate
riser
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410067746.4A
Other languages
Chinese (zh)
Other versions
CN103911951B (en
Inventor
黄涛
邓学荣
王卓
彭松
王大雨
何少波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction Road & Bridge Group Co Ltd
Original Assignee
Beijing Urban Construction Road & Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction Road & Bridge Group Co Ltd filed Critical Beijing Urban Construction Road & Bridge Group Co Ltd
Priority to CN201410067746.4A priority Critical patent/CN103911951B/en
Publication of CN103911951A publication Critical patent/CN103911951A/en
Application granted granted Critical
Publication of CN103911951B publication Critical patent/CN103911951B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

Disclosed are a special formwork for a bridge integrated cast-in-situ anti-collision barrier and hanging plate and a construction method thereof. The formwork comprises an internal formwork, an external formwork and a base formwork; the internal formwork is fixed on a bridge edge plate through a supporting system; the external formwork which is hung on the external side is connected with the internal formwork through split bolts; one end of the base formwork is connected with the bottom of the external formwork and the other end is provided with a height adjustable vertical plate to be abut against the bottom surface of a bridge; the base formwork and arrangement achieved barrier internal reinforcement bars are fixedly welded through T-shaped hooks. A construction process comprises assembly, hoisting, fixation and connection of the formworks, height adjustment of the vertical plate, formwork integral quality testing and the like. According to the special formwork for the bridge integrated cast-in-situ anti-collision barrier and hanging plate, a detailed design is performed on the prior art, flexible adjustment of the formwork is achieved through the height adjustment vertical plate, support-free fixation of the bottom of the formwork is achieved through the T-shaped hooks, and accordingly preconditions are provided for integral effect formation of the anti-collision barrier and the hanging plate, the safety, the reasonability and the economic efficiency of the formwork are guaranteed, and the engineering construction quality and safety is effectively guaranteed.

Description

The cast-in-place anticollision barrier of bridge integral type and link plate dedicated templates and construction method thereof
Technical field
The present invention relates to Urban Bridge anticollision barrier construction field, particularly a kind of dedicated templates and construction method thereof being applied in the cast-in-place anticollision barrier of bridge integral type and Slate hanging construction.
Background technology
Tradition anticollision barrier comprises the prefabricated concrete board in outside and the cast-in-place part of inner side, it makes complicated, cost is high, split working procedure is many, speed of application is slow, cladding panel and anticollision barrier irregular colour, the cast-in-place anticollision barrier of integral type and the link plate design form novelty that occur in the recent period, good looking appearance, can solve preferably traditional split working procedure many, speed of application is slow, between cladding panel and anticollision barrier irregular colour and structure, water causes polluting the problems such as cladding panel, further promote the globality of anticollision barrier and link plate, but in the cast-in-place anticollision barrier of integral type and the application and construction of link plate on bridge, also there are problems at present, the particularly safety of construction formwork and practicality problem, as because the cast-in-place anticollision barrier bridge floor of integral type is with link plate below, the load-bearing of bridge floor bottom template is larger, but prior art lacks fixed component, the destruction that if the size-constrained system of link plate exceedes limit value very easily causes bottom template, cause the generation of safety issue, in addition, in existing template, the size of soffit formwork is fixed, and the thickness that need to rely on bridge wing plate is determined the vertical extension of link plate inner side, if in uneven thickness, the bottom line style of bridge wing plate have some setbacks or alignment error causes bottom surface height to differ, link plate bottom line style can not ensure smooth.For this reason, need at present a kind of dedicated templates and matching operation method that is applied to the cast-in-place anticollision barrier of bridge integral type and link plate badly, solve deficiency of the prior art.
Summary of the invention
The object of the invention is to provide the cast-in-place anticollision barrier of a kind of bridge integral type and link plate dedicated templates, if solve the size of existing integrated template fix, need to rely on the thickness of bridge wing plate determines that in uneven thickness, the bottom line style of the vertical extension bridge wing plate of link plate inner side have some setbacks or alignment error cause bottom surface height not first link plate bottom line style can not ensure smooth problem; If also solving the size-constrained system that lacks special fixed component, link plate template inner side compared with large prior art due to the load-bearing of the cast-in-place anticollision barrier band of integral type link plate, bridge floor bottom template exceedes destruction that limit value very easily causes bottom template, causes the poor problem of formwork safety; Also solve the problem that existing form stable is poor, application life is short simultaneously; In addition, the present invention is directed to this kind of bridge construction template and propose a kind of construction method of specification, solve existing anticollision barrier constructing operation and lack normative, poor for applicability, can not to ensure construction quality problem.
For solving above-mentioned technical purpose, the present invention by the following technical solutions:
A kind of cast-in-place anticollision barrier of bridge integral type and link plate dedicated templates, template is provided with baffle plate along the extension of bridge direction, two, comprise exterior sheathing, inner formword and soffit formwork, described inner formword is fixed on by support system on the plate face at bridge wing plate edge, described exterior sheathing is suspended from the outside of bridge wing plate, longer than inner formword, bottom is positioned at below bridge floor, and be connected by split bolt between inner formword, one end of described soffit formwork connects the bottom of exterior sheathing, the other end props up the bottom surface of bridge wing plate, it is characterized in that: described soffit formwork comprises transverse slat and riser; On described riser, be useful on the reserved slotted hole of bolt that regulates riser height; The afterbody of the described transverse slat formation swash plate that is upturned, and end thickness of slab gradually thin type becomes vertical connection small pieces, except connecting small pieces part, the back of the other parts of transverse slat is all with floor, connect the inner surface of small pieces and the smooth interior surfaces transition of riser laminating,, and by being connected with riser is adjustable through the fastening bolt of the reserved slotted hole of bolt, form the integral structure of crash barrier template and link plate template; The top of described riser props up the bottom surface of bridge wing plate; Described transverse slat is connected and fixed by vertical T shape hook with the inner reinforcing bar of the guardrail of having arranged.
As the preferred technical solution of the present invention, described T shape hook is formed by horizontal bar and vertical muscle welding, and vertical muscle is bolted with it through after the floor through transverse slat back, and described horizontal bar firmly welds with the inner reinforcing bar of the guardrail of having arranged.
As further optimal technical scheme, described T shape hook arranges at interval of 80~120cm in bridge direction.
As further optimal technical scheme, described set bolt arranges at interval of 20~40cm in bridge direction.
As further optimal technical scheme, the height of described riser is 12~18cm, and the height of described connection small pieces is 4~6cm.
The construction method of the cast-in-place anticollision barrier of above-mentioned bridge integral type and link plate dedicated templates is as follows:
The preparation of step 1, basic material and transport: template basic material comprises the template standard sheet of steel, the T shape hook of reinforcing bar welding, transverse slat, riser and the set bolt etc. of soffit formwork, be made and be transported to job site, the composition substrate that described template standard sheet is exterior sheathing and inner formword by factory is unified;
The processing of step 2, form surfacing: the rust cleaning of first panel being polished before template use, after processing totally, cook interleaving agent at the even brushing vegetable oil of panel surface, select sponge strip to do caulking joint material simultaneously;
The setting of step 3, deformation joint: every 4m arranges deformation joint one along bridge direction, adopts bituminous wood filament plate, and both sides are fixed with reinforcing bar dieback, reinforcing bar and the inner reinforcing bar firm welding of the guardrail of having arranged;
The assembling of step 4, inner formword: at the construction field (site) the template standard sheet of prefabricated inner formword is assembled into inner formword;
The lifting of step 5, inner formword: adopt special tool by inner formword hoisted in position;
The setting of step 6, inner formword support system: at guardrail clear width embedded bar as earth anchor, place the lumps of wood at earth anchor place along bridge direction, horizontal brace and diagonal brace all adopt shelf pipe to coordinate jackscrew setting, on the cross rib plate of the lower edge that horizontal brace one end withstands on the lumps of wood, the other end withstands on inner formword, diagonal brace one end withstands on the other end on the lumps of wood and withstands on the cross rib plate of upper limb of inner formword;
Step 7, arrange and tow: at the upper limb setting of inner formword and the floor of template steel plate welded together, open circular hole in the middle of steel plate, setting is towed and earth anchor and this steel plate connected together with turnbuckle;
The assembling of step 8, exterior sheathing and soffit formwork be connected: assemble respectively exterior sheathing and soffit formwork, fit together with bolts the transverse slat of the bottom of exterior sheathing and soffit formwork, riser wouldn't be assembled;
Step 9, exterior sheathing and soffit formwork combine lifting: use special hoisting facility by the assembly hoisted in position of exterior sheathing and soffit formwork, lifting rope keeps tight state;
Step 10, exterior sheathing are fixedly connected with inner formword: after the assembly hoisted in position of exterior sheathing and soffit formwork, at once inner formword and exterior sheathing are contacted fixing by split bolt, split bolt arranges upper and lower twice, and PVC sleeve pipe is established in concrete inner side, to facilitate bolt to extract smoothly;
The reinforcement measure of step 11, soffit formwork: adopt the T shape hook of reinforcing bar processing to reinforce soffit formwork, the horizontal bar of T shape hook and the inner reinforcing bar welding of the guardrail of having arranged, vertical muscle passes from the transverse slat of soffit formwork, screw thread is arranged at its bottom, utilize the nut of transverse slat floor bottom tentatively to fix, after having reinforced, cancel lifting rope;
Step 12, the riser of soffit formwork is installed: the bolt that the afterbody of transverse slat pass to riser by fastening bolt is reserved the adjustable connection of slotted hole, is tentatively fixed with nut;
The adjustment of step 13, riser height: the height of adjusting transverse slat bottom surface, for adjusting planeness and the height of soffit formwork, bridge floor is met the demands with size and the line style of lower bolster, make riser top tightly prop up the bottom surface of bridge wing plate simultaneously, after to be adjusted completing, tighten respective nut T shape hook and riser are fixed, template is shaped;
Step 14: the shutoff at template two: plugging plate adopts steel plate to make, profile is consistent with anticollision barrier cross-sectional profile, size is than large 20~30 cm of anticollision barrier cross section, on it, press the connecting bolt hole perforate of anticollision barrier inner formword, exterior sheathing and soffit formwork side, use bolt and guardrail template reinforcement by connection;
The quality inspection of step 15, template: template is carried out to overall quality inspection, and formwork erection completes.
As the preferred version of constructure scheme, in described step 12, the preparation method that connects small pieces is that the afterbody of transverse slat is upwarped and forms or the afterbody of transverse slat is upwarped and forms a swash plate, upwarp and form vertical connection platelet at the afterbody of swash plate again, the setting of swash plate makes guardrail in ensureing guardrail quality, reduce the overall volume of guardrail, not only save material, and greatly reduced the weight of the following guardrail of bridge floor.
As the further preferred version of constructure scheme, in described step 12, be polished into wedge shape by connecting small pieces with treating the one side that joints cement contacts, template is closely connected seamless, avoid the generation of spillage phenomenon.
Compared with prior art, technical advantage of the present invention is:
At bridge floor thickness or absolute altitude inaccurate in the situation that, ensure line style and the side dimension of guardrail bottom by height-adjustable riser, if solved while utilizing template contral link plate in prior art, due to the size of soffit formwork fix, need to rely on the construction precision of bridge wing plate determine that in uneven thickness, the bottom line style of the bottom line style bridge wing plate of link plate have some setbacks or alignment error cause bottom surface height not first link plate bottom line style can not ensure smooth problem;
T shape that soffit formwork is made by reinforcing bar hook is connected and fixed with the inner reinforcing bar of the guardrail of having arranged, solved bottom bearing form without support fixation problem, long service life, sound construction, safety is good;
In addition, the present invention is directed to this kind of template and proposed a kind of construction method of specification, solved existing anticollision barrier constructing operation and lacked normative, poor for applicability, can not to ensure construction quality problem.
Stencil design of the present invention is flexible, make simple, draw materials conveniently, in ensureing template quality, control cost, rely on grade separation bridge engineering, carry out the development and application of anticollision barrier and link plate integral type cast-in-place construction template, can realize preferably design idea, realize the flexible modulation of template by adopting adjustable for height riser, utilize T shape to link up with the bottom of realizing template without Deepen Designs such as support reinforcings, for the integraty effect moulding of final anticollision barrier and link plate provides precondition, ensure the safety of template, reasonability and economy, construction quality and the safety of engineering are effectively guaranteed, to play exemplary role energetically to the construction of similar engineering.
Brief description of the drawings
Fig. 1 is the structural representation of the cast-in-place anticollision barrier of bridge integral type of the present invention and link plate dedicated templates;
Fig. 2 is transverse slat 31 and riser 32 syndeton schematic diagrames in the soffit formwork 3 the present invention relates to;
Fig. 3 is the structural representation that connects the lateral view of small pieces in Fig. 2;
Fig. 4 is the structural representation of the lateral view of the riser 32 in Fig. 2.
Reference numeral: 1-exterior sheathing, 2-inner formword, 3-soffit formwork, 31-transverse slat, 32-riser, 4-T shape hook, 41-horizontal bar, the vertical muscle of 42-, 5-split bolt, 6-earth anchor, 7-bridge wing plate, 8-horizontal brace, 9-diagonal brace, 10-fastening bolt, the reserved slotted hole of 11-bolt, 12-tow, the inner reinforcing bar of 13-guardrail.
Detailed description of the invention
The present embodiment is overpass bridge anticollision barrier and link plate global design, the high 1.013m of anticollision barrier, wide 0.3m suitable for reading, the wide 0.678m of end opening, the high 0.53m of link plate below bridge wing plate plate face, wide 0.2m, overall length 8211 linear meter(lin.m.)s.By reference to the accompanying drawings 1~4, as shown in the figure, a kind of cast-in-place anticollision barrier of bridge integral type and link plate dedicated templates, comprise the exterior sheathing 1, inner formword 2 and the soffit formwork 3 that extend along bridge floor direction, described inner formword 2 is located on the plate face of bridge wing plate 7, fixed by support system, support system comprises horizontal brace 8 and the diagonal brace 9 fixed by earth anchor 6, and earth anchor 6 is Φ 25 reinforcing bars pre-buried at interval of 2m, described exterior sheathing 1 is suspended at the outside of bridge wing plate 7, longer than inner formword 2, bottom is positioned at below bridge floor, and be connected by split bolt 5 between inner formword 1, one end of soffit formwork 3 connects the bottom of exterior sheathing 1, the other end props up the bottom surface of bridge wing plate 7, it is characterized in that: described soffit formwork comprises the transverse slat 31 and the riser 32 that are linked to be successively chamfering shape, on described riser 32, have the reserved slotted hole 11 of bolt for regulating riser height, the width of described transverse slat 31 is determined by the width of the following guardrail expection of bridge floor, its one end connects the bottom of exterior sheathing, opposite side gos deep into the bottom of bridge wing plate, its afterbody upwarps and forms vertical connection small pieces 32, connect the inner surface of small pieces and the smooth interior surfaces transition of riser laminating, described connection small pieces 32 are connected by the fastening bolt 10 of reserving slotted hole 11 through bolt with riser 32, in addition, between described transverse slat 31 and riser 32, also can there is swash plate, reduce the overall volume of guardrail, not only save material, also reduce the weight of the following guardrail of bridge floor, then upwarp and form vertical connection small pieces 32 at the afterbody of swash plate, described transverse slat 31, swash plate be connected the steel plate that small pieces 32 are one, the top of described riser 32 props up the bottom surface of bridge wing plate 7, the bottom surface of described soffit formwork 3 is connected and fixed by vertical T shape hook 4 with the inner reinforcing bar 13 of the guardrail of having arranged.Described T shape hook is welded and is formed by horizontal bar 41 and vertical muscle 42, vertical muscle 42 passes the transverse slat 31 of soffit formwork and is bolted with it, described horizontal bar 41 firmly welds with the inner reinforcing bar 13 of the guardrail of having arranged, T shape hook arranges at interval of 100cm in bridge direction.Described connection small pieces 32 are wedged plate, and its vertical plane and riser 32 fit tightly.On described connection small pieces 32, at interval of 20~40cm, a set bolt 10 is set in bridge direction, on the correspondence position on riser 32, offers the reserved slotted hole 11 of bolt.The height of described riser 32 is 12~18cm, and the reserved width of slotted hole 11 of bolt and the diameter of fastening bolt 10 adapt, and length is 7~8cm.
The construction method of the cast-in-place anticollision barrier of above-mentioned bridge integral type and link plate dedicated templates is as follows:
The preparation of step 1, basic material and transport: template basic material comprise each template standard sheet, the reinforcing bar welding of steel T shape hook 4, soffit formwork transverse slat 31, riser 32 and set bolt 10 etc. and be transported to job site, described template standard sheet is formed by the design drawing respective production of exterior sheathing 1 and inner formword 2 by factory;
The processing of step 2, form surfacing: the rust cleaning of first panel being polished before template use, after processing totally, cook interleaving agent at the even brushing vegetable oil of panel surface, select sponge strip to do caulking joint material simultaneously;
The setting of step 3, deformation joint: every 4m arranges deformation joint one along bridge direction, adopts bituminous wood filament plate, and both sides are fixed with Φ 16 reinforcing bar diebacks, reinforcing bar and inner reinforcing bar 13 firm welding of the guardrail of having arranged;
The assembling of step 4, inner formword 2: at the construction field (site) the template standard sheet of prefabricated inner formword is assembled into inner formword 2;
The lifting of step 5, inner formword 2: adopt special tool by inner formword hoisted in position;
The setting of step 6, inner formword support system: apart from 1.5m place inside guardrail at interval of pre-buried Φ 25 reinforcing bars of 2m as earth anchor 6, earth anchor 6 is in along bridge to placing the 10cm*10cm lumps of wood, horizontal brace 8 and diagonal brace 9 all adopt shelf pipe to coordinate jackscrew setting, one end withstands on the lumps of wood, and other end horizontal brace 8 withstands on the lower edge cross rib of inner formword 2, diagonal brace 9 withstands on the upper limb cross rib of inner formword 2;
Step 7, arrange and tow 12: establish at the upper limb of inner formword 2 8cm*8cm steel plate that 8mm is thick welded together with the perpendicular rib of template, establish Φ 25mm circular hole in the middle of steel plate, the employing 12 use turnbuckles of towing connect together earth anchor 6 and inner formword 2 upper steel plates;
The assembling of step 8, exterior sheathing 1 and soffit formwork 3: assemble respectively exterior sheathing 1 and soffit formwork 3, by with bolts the fitting together of transverse slat 31 of the bottom of exterior sheathing 1 and soffit formwork 3, the riser 32 of soffit formwork 3 wouldn't be assembled;
Step 9, exterior sheathing 1 and soffit formwork 3 combine lifting: use special hoisting facility by the assembly hoisted in position of exterior sheathing 1 and soffit formwork 3, lifting rope keeps tight state;
Step 10, exterior sheathing 1 are fixedly connected with inner formword 2: after the assembly hoisted in position of exterior sheathing 1 and soffit formwork 3, at once inner formword 2 and exterior sheathing 1 are contacted fixing by split bolt 5, split bolt arranges upper and lower twice, and PVC sleeve pipe is established in concrete inner side, to facilitate bolt to extract smoothly;
The reinforcement measure of step 11, soffit formwork 3: adopt 4 pairs of soffit formworks 3 of T shape hook of reinforcing bar processing to reinforce, the horizontal bar 41 of T shape hook 4 welds with the inner reinforcing bar 13 of the guardrail of having arranged, vertical muscle 41 passes from the transverse slat 31 of soffit formwork 3, screw thread is arranged at its bottom, utilize the nut of transverse slat floor bottom tentatively to reinforce, after having reinforced, cancel lifting rope;
Step 12, the riser 32 of soffit formwork is installed: the transverse slat of soffit formwork 3 31 upwarped to form connect platelet 32, by riser 32 be connected platelet 32 and carry out adjustable connection by bolt;
The adjustment of step 13, riser 32 height: the height of adjusting transverse slat bottom surface, for adjusting planeness and the height of soffit formwork, bridge floor is met the demands with size and the line style of lower bolster, make the top of riser 32 tightly prop up the bottom surface of bridge wing plate simultaneously, after to be adjusted completing, tighten respective nut T shape hook 4 and riser 32 are fixed, template is shaped;
Step 14: the shutoff at template two: plugging plate adopts 8mm steel plate to make, profile is consistent with anticollision barrier cross-sectional profile, size is than large 20 cm of anticollision barrier cross section, on it, press the connecting bolt hole perforate of anticollision barrier inner formword, exterior sheathing and soffit formwork side, use bolt and guardrail template reinforcement by connection;
The quality inspection of step 15, template: template is carried out to overall quality inspection, and formwork erection completes.
As the preferred version of constructure scheme, in described step 12, the preparation method that connects small pieces is that the afterbody of transverse slat is upwarped and forms or the afterbody of transverse slat is bent to form to a swash plate, upwarp and form vertical connection platelet at the afterbody of swash plate, the setting of swash plate makes guardrail in ensureing guardrail quality, reduce the overall volume of guardrail, not only save material, and greatly reduced the weight of the following guardrail of bridge floor.Be polished into wedge shape by connecting small pieces with treating the one side that joints cement contacts, template closely connected seamless, avoid the generation of spillage phenomenon.

Claims (7)

1. the cast-in-place anticollision barrier of bridge integral type and link plate dedicated templates, template is extended along bridge direction, two is provided with baffle plate, comprise exterior sheathing (1), inner formword (2) and soffit formwork (3), described inner formword (2) is fixed on by support system on the plate face at bridge wing plate (7) edge, described exterior sheathing (1) is suspended from the outside of bridge wing plate (7), longer than inner formword (2), bottom is positioned at below bridge floor, and be connected by split bolt (5) between inner formword (2), one end of described soffit formwork (3) connects the bottom of exterior sheathing (1), the other end props up the bottom surface of bridge wing plate (7), it is characterized in that: described soffit formwork (3) comprises transverse slat (31) and riser (32), on described riser (32), be useful on the reserved slotted hole (11) of bolt that regulates riser height, the afterbody of described transverse slat (31) the formation swash plate that is upturned, and end thickness of slab gradually thin type becomes vertical connection small pieces, except connecting small pieces part, the back of the other parts of transverse slat is all with floor, connect the inner surface of small pieces and the smooth interior surfaces transition of riser (32) laminating, by fastening bolt (10) and adjustable connection of riser (32) through the reserved slotted hole (11) of bolt, form the integral structure of crash barrier template and link plate template, the top of described riser (32) props up the bottom surface of bridge wing plate (7), described transverse slat (31) is connected and fixed by vertical T shape hook (4) with the inner reinforcing bar of the guardrail of having arranged (13).
2. the cast-in-place anticollision barrier of bridge integral type according to claim 1 and link plate dedicated templates, it is characterized in that: described T shape hook is formed by horizontal bar (41) and vertical muscle (42) welding, vertical muscle (42) passes the floor of transverse slat (31) and carries out bolt in the bottom of floor and fix, and described horizontal bar (41) firmly welds with the inner reinforcing bar of the guardrail of having arranged (13).
3. the cast-in-place anticollision barrier of bridge integral type according to claim 2 and link plate dedicated templates, is characterized in that: described T shape hook arranges at interval of 80~120cm in bridge direction.
4. the cast-in-place anticollision barrier of bridge integral type according to claim 3 and link plate dedicated templates, is characterized in that: described set bolt (10) arranges at interval of 20~40cm in bridge direction.
5. the cast-in-place anticollision barrier of bridge integral type according to claim 4 and link plate dedicated templates, is characterized in that: the height of described riser (32) is 12~18cm, and the height of described connection small pieces is 4~6cm.
6. the cast-in-place anticollision barrier of bridge integral type described in any one of the claims 1~5 and a construction method for link plate dedicated templates, is characterized in that: its concrete operation step is as follows:
The preparation of step 1, basic material and transport: template basic material comprises the template standard sheet of steel, the T shape hook (4) of reinforcing bar welding, transverse slat (31), riser (32) and the set bolt (10) etc. of soffit formwork, be made and be transported to job site by factory is unified, described template standard sheet is the composition substrate of exterior sheathing (1) and inner formword (2);
The processing of step 2, form surfacing: the rust cleaning of first panel being polished before template use, after processing totally, cook interleaving agent at the even brushing vegetable oil of panel surface, select sponge strip to do caulking joint material simultaneously;
The setting of step 3, deformation joint: every 4m arranges deformation joint one along bridge direction, adopts bituminous wood filament plate, and both sides are fixed with reinforcing bar dieback, reinforcing bar and inner reinforcing bar (13) firm welding of the guardrail of having arranged;
The assembling of step 4, inner formword (2): at the construction field (site) the template standard sheet of prefabricated inner formword is assembled into inner formword (2);
The lifting of step 5, inner formword (2): adopt special tool by inner formword hoisted in position;
The setting of step 6, inner formword support system: at pre-buried Φ 25 reinforcing bars of guardrail clear width 2m as earth anchor (6), locate to place the lumps of wood along bridge direction at earth anchor (6), horizontal brace (8) and diagonal brace (9) all adopt shelf pipe to coordinate jackscrew setting, on the cross rib plate of the lower edge that horizontal brace (8) one end withstands on the lumps of wood, the other end withstands on inner formword (2), diagonal brace (9) one end withstands on the other end on the lumps of wood and withstands on the cross rib plate of upper limb of inner formword (2);
Step 7, arrange and tow (12): at the upper limb setting of inner formword (2) and the floor of template steel plate welded together, in the middle of steel plate, open circular hole, setting tow (12) with turnbuckle, earth anchor (6) and this steel plate are connected together;
The assembling of step 8, exterior sheathing (1) and soffit formwork (3) be connected: assemble respectively exterior sheathing (1) and soffit formwork (3), by with bolts the fitting together of transverse slat (31) of the bottom of exterior sheathing (1) and soffit formwork (3), riser (32) wouldn't be assembled;
Step 9, exterior sheathing (1) and soffit formwork (3) combine lifting: use special hoisting facility by the assembly hoisted in position of exterior sheathing (1) and soffit formwork (3), lifting rope keeps tight state;
Step 10, exterior sheathing (1) are fixedly connected with inner formword (2): after the assembly hoisted in position of exterior sheathing (1) and soffit formwork (3), at once by fixing by split bolt (5) contact to inner formword (2) and exterior sheathing (1), split bolt arranges upper and lower twice, PVC sleeve pipe is established in concrete inner side, to facilitate bolt to extract smoothly;
The reinforcement measure of step 11, soffit formwork (3): adopt the T shape hook (4) of reinforcing bar processing to reinforce soffit formwork (3), the horizontal bar (41) of T shape hook (4) and the inner reinforcing bar of the guardrail of having arranged (13) welding, vertical muscle (41) passes from the transverse slat (31) of soffit formwork (3), screw thread is arranged at its bottom, utilize the nut of transverse slat floor bottom tentatively to fix, after having reinforced, cancel lifting rope;
Step 12, the riser (32) of soffit formwork is installed: the reserved adjustable connection of slotted hole (11) of bolt through riser (32) by fastening bolt (10) by the afterbody of transverse slat (31), tentatively fix with nut;
The adjustment of step 13, riser (32) height: the height of adjusting transverse slat bottom surface, for adjusting planeness and the height of soffit formwork, bridge floor is met the demands with size and the line style of lower bolster, make riser (32) top tightly prop up the bottom surface of bridge wing plate simultaneously, after to be adjusted completing, tighten respective nut T shape hook (4) and riser are fixed, template is shaped;
Step 14: the shutoff at template two: plugging plate adopts steel plate to make, profile is consistent with anticollision barrier cross-sectional profile, size is than large 20~30 cm of anticollision barrier cross section, on it, press the connecting bolt hole perforate of anticollision barrier inner formword, exterior sheathing and soffit formwork side, use bolt and guardrail template reinforcement by connection;
The quality inspection of step 15, template: template is carried out to overall quality inspection, and formwork erection completes.
7. the cast-in-place anticollision barrier of bridge integral type according to claim 6 and link plate dedicated templates, it is characterized in that: in described step 1, the preparation method that connects small pieces is that the afterbody of transverse slat (31) is upwarped to formation swash plate, upwarp and form vertical connection platelet at the afterbody of swash plate, be polished into wedge shape by connecting small pieces with treating the one side that joints cement contacts.
CN201410067746.4A 2014-02-27 2014-02-27 The cast-in-place anticollision barrier of bridge integral type and link plate dedicated templates and construction method thereof Active CN103911951B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410067746.4A CN103911951B (en) 2014-02-27 2014-02-27 The cast-in-place anticollision barrier of bridge integral type and link plate dedicated templates and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410067746.4A CN103911951B (en) 2014-02-27 2014-02-27 The cast-in-place anticollision barrier of bridge integral type and link plate dedicated templates and construction method thereof

Publications (2)

Publication Number Publication Date
CN103911951A true CN103911951A (en) 2014-07-09
CN103911951B CN103911951B (en) 2015-08-26

Family

ID=51037922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410067746.4A Active CN103911951B (en) 2014-02-27 2014-02-27 The cast-in-place anticollision barrier of bridge integral type and link plate dedicated templates and construction method thereof

Country Status (1)

Country Link
CN (1) CN103911951B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213510A (en) * 2014-09-29 2014-12-17 中建八局第三建设有限公司 Combined steel formwork fixing structure and method for ramp bridge anti-collision wall construction
CN106049285A (en) * 2016-06-07 2016-10-26 中铁港航局集团有限公司 Method for reinforcing cast-in-place framed flower bed type anti-collision wall formwork of urban overpass
CN107237272A (en) * 2017-07-24 2017-10-10 中交二航局南方工程有限公司 Crash barrier template structure and anticollision barrier casting system
CN107338727A (en) * 2016-12-28 2017-11-10 广西路建工程集团有限公司 A kind of overall demolition, installation anticollision wall form and its walking track crane move system
CN107386638A (en) * 2017-08-24 2017-11-24 深圳市建艺装饰集团股份有限公司 The construction method of cast-in-place Decorative hanging board structure under a kind of beam
CN107629468A (en) * 2017-09-30 2018-01-26 重庆市智翔铺道技术工程有限公司 A kind of casting type asphaltic mixture interleaving agent and preparation method thereof and the method that paves
CN108004986A (en) * 2017-12-28 2018-05-08 上海建工二建集团有限公司 Tunnel anti-collision wall formwork reinforcement system and construction method
CN108677712A (en) * 2018-06-27 2018-10-19 上海市政工程设计研究总院(集团)有限公司 A kind of connecting structure and its construction method of Steel Bridge Deck concrete anti-collision guard bar
CN109750598A (en) * 2018-12-18 2019-05-14 中交第一航务工程局有限公司 A kind of readily removable New Jersey safety barrier structure and construction method removed
CN110042765A (en) * 2019-05-20 2019-07-23 北京城建集团有限责任公司 Crash bearer and dripping eaves primary concreting template
CN110318337A (en) * 2019-05-22 2019-10-11 中建四局第六建筑工程有限公司 A kind of bridge side guardrail formwork structure and its construction method
CN110344326A (en) * 2019-07-12 2019-10-18 广州北环高速公路有限公司 Protective fence formwork for placing
CN111137204A (en) * 2020-01-17 2020-05-12 广东冠粤路桥有限公司 T-shaped long-beam short-distance transport tool and using method thereof
CN113585736A (en) * 2021-07-26 2021-11-02 中铁一局集团(广州)建设工程有限公司 Cast-in-place case roof beam integral sliding type side form with adjustable it is multidirectional
CN114561874A (en) * 2022-03-18 2022-05-31 四川华远建设工程有限公司 Outer packet mode anticollision barrier template reinforced structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1136234A (en) * 1997-07-22 1999-02-09 Kawada Kensetsu Kk Construction method for concrete structure with precast buried form
CN201794028U (en) * 2010-09-16 2011-04-13 中铁十九局集团第二工程有限公司 Crash barrier template
CN102877418A (en) * 2012-10-26 2013-01-16 济南城建集团有限公司 Stentless urban bridge anti-collision guardrail construction method and cradle vehicle and gun carrier thereof
JP2013057215A (en) * 2011-09-09 2013-03-28 Ps Mitsubishi Construction Co Ltd Construction method for wall balustrade of projection constructed pc bridge
JP2013124518A (en) * 2011-12-15 2013-06-24 Sumikei-Nikkei Engineering Co Ltd Form component, form unit, permanent form, and wall balustrade for bridge
CN203700973U (en) * 2014-02-27 2014-07-09 北京城建道桥建设集团有限公司 Special construction formwork for bridge integrated type cast-in-place anti-collision guardrail and hanging plate

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1136234A (en) * 1997-07-22 1999-02-09 Kawada Kensetsu Kk Construction method for concrete structure with precast buried form
CN201794028U (en) * 2010-09-16 2011-04-13 中铁十九局集团第二工程有限公司 Crash barrier template
JP2013057215A (en) * 2011-09-09 2013-03-28 Ps Mitsubishi Construction Co Ltd Construction method for wall balustrade of projection constructed pc bridge
JP2013124518A (en) * 2011-12-15 2013-06-24 Sumikei-Nikkei Engineering Co Ltd Form component, form unit, permanent form, and wall balustrade for bridge
CN102877418A (en) * 2012-10-26 2013-01-16 济南城建集团有限公司 Stentless urban bridge anti-collision guardrail construction method and cradle vehicle and gun carrier thereof
CN203700973U (en) * 2014-02-27 2014-07-09 北京城建道桥建设集团有限公司 Special construction formwork for bridge integrated type cast-in-place anti-collision guardrail and hanging plate

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213510B (en) * 2014-09-29 2016-02-10 中建八局第三建设有限公司 For the combined steel formwork fixing means of ring road bridge anti-collision wall construction
CN104213510A (en) * 2014-09-29 2014-12-17 中建八局第三建设有限公司 Combined steel formwork fixing structure and method for ramp bridge anti-collision wall construction
CN106049285A (en) * 2016-06-07 2016-10-26 中铁港航局集团有限公司 Method for reinforcing cast-in-place framed flower bed type anti-collision wall formwork of urban overpass
CN106049285B (en) * 2016-06-07 2018-06-19 中铁港航局集团有限公司 A kind of method of the cast-in-place colored pool anti-collision wall formwork reinforcement of urban interchange
CN107338727A (en) * 2016-12-28 2017-11-10 广西路建工程集团有限公司 A kind of overall demolition, installation anticollision wall form and its walking track crane move system
CN107237272A (en) * 2017-07-24 2017-10-10 中交二航局南方工程有限公司 Crash barrier template structure and anticollision barrier casting system
CN107386638B (en) * 2017-08-24 2019-11-26 深圳市建艺装饰集团股份有限公司 The construction method of cast-in-place Decorative hanging board structure under a kind of beam
CN107386638A (en) * 2017-08-24 2017-11-24 深圳市建艺装饰集团股份有限公司 The construction method of cast-in-place Decorative hanging board structure under a kind of beam
CN107629468A (en) * 2017-09-30 2018-01-26 重庆市智翔铺道技术工程有限公司 A kind of casting type asphaltic mixture interleaving agent and preparation method thereof and the method that paves
CN108004986A (en) * 2017-12-28 2018-05-08 上海建工二建集团有限公司 Tunnel anti-collision wall formwork reinforcement system and construction method
CN108004986B (en) * 2017-12-28 2024-02-13 上海建工二建集团有限公司 Tunnel anti-collision wall template reinforcing system and construction method
CN108677712A (en) * 2018-06-27 2018-10-19 上海市政工程设计研究总院(集团)有限公司 A kind of connecting structure and its construction method of Steel Bridge Deck concrete anti-collision guard bar
CN109750598A (en) * 2018-12-18 2019-05-14 中交第一航务工程局有限公司 A kind of readily removable New Jersey safety barrier structure and construction method removed
CN110042765A (en) * 2019-05-20 2019-07-23 北京城建集团有限责任公司 Crash bearer and dripping eaves primary concreting template
CN110318337A (en) * 2019-05-22 2019-10-11 中建四局第六建筑工程有限公司 A kind of bridge side guardrail formwork structure and its construction method
CN110344326A (en) * 2019-07-12 2019-10-18 广州北环高速公路有限公司 Protective fence formwork for placing
CN111137204A (en) * 2020-01-17 2020-05-12 广东冠粤路桥有限公司 T-shaped long-beam short-distance transport tool and using method thereof
CN113585736A (en) * 2021-07-26 2021-11-02 中铁一局集团(广州)建设工程有限公司 Cast-in-place case roof beam integral sliding type side form with adjustable it is multidirectional
CN114561874A (en) * 2022-03-18 2022-05-31 四川华远建设工程有限公司 Outer packet mode anticollision barrier template reinforced structure
CN114561874B (en) * 2022-03-18 2024-01-16 四川华远建设工程有限公司 Outsourcing formula anticollision barrier template reinforced structure

Also Published As

Publication number Publication date
CN103911951B (en) 2015-08-26

Similar Documents

Publication Publication Date Title
CN103911951B (en) The cast-in-place anticollision barrier of bridge integral type and link plate dedicated templates and construction method thereof
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
WO2017031627A1 (en) Assembled building structure, wallboard installation hanger, and assembled building construction method
CN204899220U (en) Shear force wall outer wall meet a batch connection structure
CN101839061A (en) Unilateral formwork erecting system of cast-in-site concrete arc outer wall body and construction method thereof
CN104532953B (en) 3D printing based assembly type special-shaped column framework structure and construction method thereof
CN104196055A (en) Construction method for frameworks on lower portion of basement exterior wall
CN103981897A (en) Waterproof construction method of basement exterior wall stiffness pillar
CN206352391U (en) Socket joint type key slot type Quick Release support system
CN103276893A (en) Novel composite structure for supporting rigid building template and construction method
CN104895193A (en) Precast outer wallboard connecting box and connecting joint
CN105178604A (en) Construction method of assembly type superimposed floor slab
CN204626966U (en) A kind of deformation joint formwork erection device
CN204282530U (en) Adopt the industrial premises frame construction of prefabricated concrete column structure
CN109869153B (en) Integral lifting cantilever formwork device for rapidly constructing shaft lining and construction method
CN203700973U (en) Special construction formwork for bridge integrated type cast-in-place anti-collision guardrail and hanging plate
CN202324501U (en) Full clamping piece connecting member for mounting low carbon board on building outer brim
CN204311628U (en) The precast prestressed floor slab structure of fall arrest
CN101858133A (en) Wall connecting piece of plug-in type low-carbon heat preservation energy-saving board
CN106284999A (en) Assembled architecture haydite concrete batten of internal partition mounting process
CN104912231A (en) Dry-hanging connecting structure of precast outer wall panel and shear wall and construction method of same
CN111851827A (en) Assembly type prefabricated steel bar truss disassembly-free template system and manufacturing method thereof
CN104005476B (en) Be easy to fabrication and installation precast frame system and construction method
CN204059940U (en) A kind of concrete floor aluminum alloy mould plate
CN102605945B (en) Manufacturing method of big wood formwork

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant