CN103909115A CN201410124103.9A CN201410124103A CN103909115A CN 103909115 A CN103909115 A CN 103909115A CN 201410124103 A CN201410124103 A CN 201410124103A CN 103909115 A CN103909115 A CN 103909115A
Authority
CN
China
Prior art keywords
steel
storage area
band
place
reel number
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410124103.9A
Other languages
Chinese (zh)
Other versions
CN103909115B (en
Inventor
郭韬
胡松涛
吕敬东
刘福贵
雷红刚
曾虹云
陈平
万光军
杨竹
唐阳华
田丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pangang Group Panzhihua Steel and Vanadium Co Ltd
Original Assignee
Pangang Group Panzhihua Steel and Vanadium Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pangang Group Panzhihua Steel and Vanadium Co Ltd filed Critical Pangang Group Panzhihua Steel and Vanadium Co Ltd
Priority to CN201410124103.9A priority Critical patent/CN103909115B/en
Publication of CN103909115A publication Critical patent/CN103909115A/en
Application granted granted Critical
Publication of CN103909115B publication Critical patent/CN103909115B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Metal Rolling (AREA)
  • Winding, Rewinding, Material Storage Devices (AREA)

Abstract

The invention discloses a method for tracking strip steel in a coiling area of a hot continuous rolling production line. The method comprises the following steps: moving a steel coil number of the strip steel from a first storage area to a second storage area when detecting the strip steel at an inlet of a laminar flow cooling area; moving the steel coil number to a third storage area when detecting the strip steel in a coiling machine and not detecting the strip steel at the inlet or an outlet of the laminar flow cooling area; moving the steel coil number to a fourth storage area when not detecting the strip steel in the coiling machine and detecting the strip steel in a bundler; moving the steel coil number to a fifth storage area when not detecting the strip steel in the bundler and detecting the strip steel in a steel coil trolley; moving the steel coil number to a sixth storage area when not detecting the strip steel in the steel coil trolley and detecting the strip steel in a steel coil conveying trolley; moving the steel coil number to a seventh storage area when not detecting the strip steel in the steel coil conveying trolley and detecting the strip steel in a stepping beam, scheduling the steel coil number and carrying out spray printing of the steel coil number on the strip steel.

Description

In the method for the coiling area track band steel of hot continuous rolling production line
Technical field
The present invention relates to the strip tracking in coiling area, more particularly, relate to a kind of method of the coiling area track band steel at hot continuous rolling production line.
Background technology
In hot continuous rolling production process, be to produce one of necessary condition of carrying out smoothly with the correct tracking of steel.Only have when the steel billet that be rolled and object tape steel are correctly at once, steel rolling production-line could obtain correct parameter information (as the original size of steel billet, strip width, belt steel thickness, band steel steel, lower process information etc.) according to the steel reel number with steel, thereby produces qualified product according to user's requirement.If band steel is in kind inconsistent with steel reel number, will cause the produced demand that can not meet user with steel, even bring serious economic loss to user.At present in the coiling area of hot continuous rolling production line, due to production structure complexity, cause this region easily to occur the phenomenon of strip tracking entanglement, therefore most important in the correct tracking of coiling area band steel.
Band steel enters coiling area from laminar flow cooling zone, and coiling area comprises coiling machine, baler, coil car, coil of strip transport trolley, step rate.The tracking of coiling area band steel generally adopts the test point detecting with steel signal is only set in coiling machine porch at present, and the band steel that acquiescence is introduced into coiling machine first arrives step rate, and in this manner belt steel surface is carried out the spray printing of steel reel number.But when there being multiple coiling machines, and one of them (or multiple) coiling machine breaks down while causing being with steel not arrive step rate smoothly, or while rocking due to equipment the detection signal shakiness that causes test point, the phenomenon that just there will be strip tracking entanglement or strip tracking to lose.
Therefore, need a kind of method of the coiling area track band steel at hot continuous rolling production line, guarantee in coiling area production process the correct tracking with steel.
Summary of the invention
The object of the present invention is to provide a kind of method of the coiling area track band steel at hot continuous rolling production line, thereby can make in kind with steel and be consistent with the steel reel number of steel, can effectively improve the accuracy of coiling area track band steel.
The invention provides a kind of method of the coiling area track band steel at hot continuous rolling production line, described method comprises step: (a) detect in the porch of laminar flow cooling zone that when determining band is when steel, steel reel number with steel is displaced to the second storage area from the first storage area, and calculate the length with steel according to steel reel number, wherein, in the time that band steel does not enter laminar flow cooling zone, be stored in the first storage area with the steel reel number of steel; (b) band steel detected when determining at coiling machine place, and according to determining in the porch of laminar flow cooling zone with the length of steel or when exit can't detect band steel, the steel reel number with steel being displaced to the 3rd storage area from the second storage area; (c) can't detect band steel when determining at coiling machine place, and determine band steel detected during at baler place, the steel reel number with steel is displaced to the 4th storage area from the 3rd storage area; (d) can't detect band steel when determining at baler place, and determine band steel detected during at coil car place, the steel reel number with steel is displaced to the 5th storage area from the 4th storage area; (e) can't detect band steel when determining at coil car place, and determine band steel detected during at coil of strip transport trolley place, the steel reel number with steel is displaced to the 6th storage area from the 5th storage area; (f) can't detect band steel when determining at coil of strip transport trolley place, and determine band steel detected during at step rate place, steel reel number with steel is displaced to the 7th storage area from the 6th storage area, and calls the steel reel number of the 7th storage area, belt steel surface is carried out to the spray printing of steel reel number.
Alternatively, step (b) comprising: in the time being greater than preset value with the length of steel, band steel detected when determining at coiling machine place, and determine can't detect band steel during in the porch of laminar flow cooling zone, the steel reel number with steel is displaced to the 3rd storage area from the second storage area; In the time being less than or equal to preset value with the length of steel, band steel detected when determining at coiling machine place, and determine can't detect band steel during in the exit of laminar flow cooling zone, the steel reel number with steel is displaced to the 3rd storage area from the second storage area.
Alternatively, described coiling machine comprises at least one coiling machine.
Alternatively, preset value is the spacing of the porch of the porch of laminar flow cooling zone and coiling machine farthest.
Alternatively, step (a) also comprises: calculate the length with steel by calling the major parameter with steel corresponding with described steel reel number, wherein, major parameter with steel comprises: the original size of steel billet, belt steel thickness, strip width, wherein, the original size of steel billet comprises: steel billet thickness, steel billet length, width of steel billet, the computational methods of the length with steel are: L=(H 0× L 0× W 0) ÷ (H × W), wherein, H 0for steel billet thickness, L 0for steel billet length, W 0for width of steel billet, H is belt steel thickness, and W is strip width, and L is band steel length.
Alternatively, the major parameter with steel also comprises band steel steel, lower process information.
Alternatively, described method also comprises the trace log of the steel reel number of record paper steel, wherein, described trace log comprises that steel reel number with steel detects at the shift time of storage area, at every place with steel and/or can't detect the time with steel in the displacement information of storage area, steel reel number with steel.
Alternatively, described step rate comprises at least one step rate, wherein, described step rate comprises at least one step rate, wherein, described step rate comprises N step rate, described the 7th storage area comprises N sub-storage area, N is greater than 1 natural number, band steel detected when determining at R step rate place, and determine while band steel being detected at R+1 the step rate place adjacent with R step rate, steel reel number is displaced to R+1 subpool territory from R subpool territory, wherein, R is more than or equal to 1 and be less than the natural number of N, wherein, in the time that the steel reel number with steel is displaced to N subpool territory, call the major parameter with steel according to the steel reel number with steel in N subpool territory, to carry out the spray printing of major parameter and steel reel number with steel, wherein, major parameter with steel comprises strip width, belt steel thickness, band steel steel, lower process information.
According to the method for the coiling area track band steel at hot continuous rolling production line of the present invention, because each production link of the coiling area at hot continuous rolling production line is provided with the test point with steel, and the information with steel detecting according to test point is shifted the steel reel number with steel accordingly at storage area, thereby guarantee with steel correct corresponding with steel reel number in kind, realize coiling area at hot continuous rolling production line to the correct tracking with steel, effectively improved the accuracy to strip tracking in coiling area.
By part in ensuing description set forth the present invention other aspect and/or advantage, some will be clearly by descriptions, or can pass through enforcement of the present invention and learning.
Accompanying drawing explanation
By the detailed description of carrying out below in conjunction with accompanying drawing, above and other objects of the present invention, feature and advantage will become apparent, wherein:
Fig. 1 illustrates according to an embodiment of the invention the flow chart in the method for the coiling area track band steel of hot continuous rolling production line.
Fig. 2 illustrates when the coiling area at hot continuous rolling production line exists multiple step rate according to an embodiment of the invention the flow chart in the method for step rate place track band steel.
The specific embodiment
Below, describe more fully with reference to the accompanying drawings exemplary embodiment of the present invention, exemplary embodiment is shown in the drawings.But, exemplifying embodiment embodiment in many different forms, and should not be construed as limited to exemplary embodiment set forth herein.On the contrary, thereby provide these embodiment disclosure will be thoroughly and complete, and will fully the scope of exemplary embodiment be conveyed to those skilled in the art.Wherein, identical label represents identical step all the time.
Fig. 1 illustrates according to an embodiment of the invention the flow chart in the method for the coiling area track band steel of hot continuous rolling production line.
In step 101, judge in the porch of laminar flow cooling zone band steel whether detected.
For example, determine in the porch of laminar flow cooling zone band steel whether detected by the porch temperature that detects laminar flow cooling zone.For example, when the porch of laminar flow cooling zone temperature is during higher than predetermined temperature threshold, determine in the porch of laminar flow cooling zone and band steel detected, determine in the porch of laminar flow cooling zone during lower than predetermined temperature threshold and band steel do not detected when the porch of laminar flow cooling zone temperature.
Do not detect in the porch of laminar flow cooling zone that when determining in step 101 band when steel, performs step 101: judge in the porch of laminar flow cooling zone band steel whether detected again.
Detect that in the porch of laminar flow cooling zone band is when steel, execution step 102: the steel reel number with steel is displaced to the second storage area from the first storage area, and calculates the length with steel according to steel reel number when determining in step 101.
Here, in the time that band steel does not enter laminar flow cooling zone, be stored in the first storage area with the steel reel number of steel.For example, be that 1234567890(steel reel number is not limited to this form with the steel reel number of steel, also can be other any type of steel reel numbers), in the time that band steel does not enter laminar flow cooling zone, be stored in the first storage area with the steel reel number 1234567890 of steel, detect in the porch of laminar flow cooling zone that when determining in step 101 band is when steel, execution step 102 is displaced to the second storage area by the steel reel number 1234567890 with steel from the first storage area.
The computational methods of the length with steel in described embodiment comprise: calculate the length with steel by calling the major parameter with steel corresponding with described steel reel number.Specifically, read steel reel number from the second storage area, and determine the corresponding major parameter with steel based on steel reel number.
Major parameter with steel comprises: the original size of steel billet, belt steel thickness, strip width, wherein, the original size of steel billet comprises: steel billet thickness, steel billet length, width of steel billet.
Length with steel is by formula below:
L=(H 0×L 0×W 0)÷(H×W)
Wherein, H 0for steel billet thickness, L 0for steel billet length, W 0for width of steel billet, H is belt steel thickness, and W is strip width, and L is band steel length.
In step 103, judge at coiling machine place band steel whether detected.
For example, determine at coiling machine place band steel whether detected by the operating current that detects coiling machine.For example, in the time that the operating current of coiling machine is greater than predetermined current threshold, determines at coiling machine place and band steel detected, in the time that the operating current of coiling machine is less than predetermined current threshold, determines at coiling machine place and band steel do not detected.
Do not detect at coiling machine place that when determining in step 103 band when steel, performs step 103: judge at coiling machine place band steel whether detected again.
Detect that at coiling machine place band is when steel, execution step 104 when determining in step 103: whether the length of judgement with steel is greater than preset value.
Here, the coiling machine of coiling area can comprise one or more coiling machines.In the time that the coiling machine of coiling area comprises multiple coiling machine, described preset value is the spacing of the porch of the porch of laminar flow cooling zone and coiling machine farthest.For example, coiling area comprises the first coiling machine and the second coiling machine, the spacing of the porch of the porch of laminar flow cooling zone and the first coiling machine is 154.2 meters, and the spacing of the porch of the porch of laminar flow cooling zone and the second coiling machine is 164.2 meters, and preset value is 164.2 meters.The length with steel and preset value that step 102 is calculated compare, and whether the length of judgement with steel is greater than preset value.
When the result judging in step 104 is while being greater than preset value with the length of steel, execution step 105: judge in the porch of laminar flow cooling zone band steel whether detected.
For example, when the length with steel calculating is 170 meters, preset value is 164.2 meters, and the result judging in step 104 is while being greater than preset value with the length of steel, can judge in the porch of laminar flow cooling zone band steel whether detected by the judgment mode identical with step 101.
Detect in the porch of laminar flow cooling zone that when determining in step 105 band when steel, performs step 105: judge in the porch of laminar flow cooling zone band steel whether detected again.
Do not detect that in the porch of laminar flow cooling zone band is when steel, execution step 107: the steel reel number with steel is displaced to the 3rd storage area from the second storage area when determining in step 105.
For example, be 1234567890 with the steel reel number of steel, when determining at coiling machine place and band steel detected in step 103, and determine and do not detect that in the porch of laminar flow cooling zone band is when steel in step 105, execution step 107 is displaced to the 3rd storage area by the steel reel number 1234567890 with steel from the second storage area.
When the result judging in step 104 is while being less than preset value with the length of steel, execution step 106: judge in the exit of laminar flow cooling zone band steel whether detected.
For example, when the length with steel calculating is 150 meters, preset value is 164.2 meters, and the result judging in step 104 is, while being less than preset value with the length of steel, to judge in the exit of laminar flow cooling zone band steel whether detected.
For example, determine in the exit of laminar flow cooling zone band steel whether detected by the exit temperature that detects laminar flow cooling zone.For example, in the time that the exit of laminar flow cooling zone temperature exceedes predetermined temperature threshold, determine in the exit of laminar flow cooling zone and band steel detected, determine in the exit of laminar flow cooling zone during lower than predetermined temperature threshold and band steel do not detected when the exit of laminar flow cooling zone temperature.
Detect in the exit of laminar flow cooling zone that when determining in step 106 band when steel, performs step 106: judge in the exit of laminar flow cooling zone band steel whether detected again.
Do not detect that in the exit of laminar flow cooling zone band is when steel, execution step 107: the steel reel number with steel is displaced to the 3rd storage area from the second storage area when determining in step 106.
For example, be 1234567890 with the steel reel number of steel, when determining at coiling machine place and band steel detected in step 103, and determine and do not detect that in the exit of laminar flow cooling zone band is when steel in step 106, execution step 107 is displaced to the 3rd storage area by the steel reel number 1234567890 with steel from the second storage area.
In step 108, judge at coiling machine place band steel whether detected.
Can judge at coiling machine place band steel whether detected by the judgment mode identical with step 103.
Detect at coiling machine place that when determining in step 108 band when steel, performs step 108: judge at coiling machine place band steel whether detected again.
Do not detect that at coiling machine place band is when steel, execution step 109: judge at baler place band steel whether detected when determining in step 108.
For example, can determine at baler place band steel whether detected transporting the position of dolly of coil of strip and the position of transporting the coil car of coil of strip between baler and step rate between coiling machine and baler by detecting.For example, in the time dolly being detected in baler porch, determine at baler place and band steel detected, in the time coil car being detected in baler exit, determine at baler place and band steel do not detected.
In one example, can approach switch (displacement transducer) be set respectively in the exit of the porch of baler and baler and determine at baler place band steel whether detected.For example, in the time that the approach switch of the porch of baler detects that the distance of dolly and baler entrance is less than preset distance, illustrate that band steel will be transported to baler, now determine at baler place and band steel detected, in the time that the approach switch in the exit of baler detects that the distance of coil car and baler outlet is less than preset distance, illustrate that band steel will transport from baler, now determine at baler place and band steel do not detected.
Do not detect at baler place that when determining in step 109 band when steel, performs step 109: judge at baler place band steel whether detected again.
Detect that at baler place band is when steel, execution step 110: the steel reel number with steel is displaced to the 4th storage area from the 3rd storage area when determining in step 109.
For example, be 1234567890 with the steel reel number of steel, when determining at coiling machine place and band steel do not detected in step 108, and determine and detect that at baler place band is when steel in step 109, execution step 110 is displaced to the 4th storage area by the steel reel number 1234567890 with steel from the 3rd storage area.
In step 111, judge at baler place band steel whether detected.
Can judge at baler place band steel whether detected by the judgment mode identical with step 109.
Detect at baler place that when determining in step 111 band when steel, performs step 111: judge at baler place band steel whether detected again.
Do not detect that at baler place band is when steel, execution step 112: judge at coil car place band steel whether detected when determining in step 111.
For example, can determine at coil car place band steel whether detected by detecting the position of the above-mentioned coil car of mentioning.For example, coil car moves along the orbit of coil car, in the time coil car being detected at the starting point place of the track of coil car, determine at coil car place and band steel detected, when in the time that the destination county of the track of coil car detects coil car, determine at coil car place and band steel do not detected.
In one example, can approach switch be set respectively at the destination county of the track of the starting point place of the track of coil car and coil car and determine at coil car place band steel whether detected, for example, in the time that the approach switch at the starting point place of the track of coil car detects that the distance of coil car and track starting point is less than preset distance, illustrate that band steel will be transported to coil car, now determine at coil car place and band steel detected, in the time that the approach switch of the destination county of the track of coil car detects that the distance of coil car and track terminal is less than preset distance, illustrate that band steel will transport from coil car, now determine at coil car place and band steel do not detected.
Do not detect at coil car place that when determining in step 112 band when steel, performs step 112: judge at coil car place band steel whether detected again.
Detect that at coil car place band is when steel, execution step 113: the steel reel number with steel is displaced to the 5th storage area from the 4th storage area when determining in step 112.
For example, be 1234567890 with the steel reel number of steel, when determining at baler place and band steel do not detected in step 111, and determine and detect that at coil car place band is when steel in step 112, execution step 113 is displaced to the 5th storage area by the steel reel number 1234567890 with steel from the 4th storage area.
In step 114, judge at coil car place band steel whether detected.
Can judge at coil car place band steel whether detected by the judgment mode identical with step 112.
Detect at coil car place that when determining in step 114 band when steel, performs step 114: judge at coil car place band steel whether detected again.
Do not detect that at coil car place band is when steel, execution step 115: judge at coil of strip transport trolley place band steel whether detected when determining in step 114.
For example, can determine at coil of strip transport trolley place band steel whether detected by the position of detecting the coil of strip transport trolley that transports coil of strip between coil car and step rate.For example, coil of strip transport trolley moves along the orbit of coil of strip transport trolley, in the time coil of strip transport trolley being detected at the starting point place of the track of coil of strip transport trolley, determine at coil of strip transport trolley place and band steel detected, when in the time that the destination county of the track of coil of strip transport trolley detects coil of strip transport trolley, determine at coil of strip transport trolley place and band steel do not detected.
In one example, can approach switch be set respectively at the destination county of the track of the starting point place of the track of coil of strip transport trolley and coil of strip transport trolley and determine at coil of strip transport trolley place band steel whether detected, for example, in the time that the approach switch at the starting point place of the track of coil of strip transport trolley detects that the distance of coil of strip transport trolley and track starting point is less than preset distance, illustrate that band steel will be transported to coil of strip transport trolley, now determine at coil of strip transport trolley place and band steel detected, in the time that the approach switch of the destination county of the track of coil of strip transport trolley detects that the distance of coil of strip transport trolley and track terminal is less than preset distance, illustrate that band steel will transport from coil of strip transport trolley, now determine at coil of strip transport trolley place and band steel do not detected.
Do not detect at coil of strip transport trolley place that when determining in step 115 band when steel, performs step 115: judge at coil of strip transport trolley place band steel whether detected again.
Detect that at coil of strip transport trolley place band is when steel, execution step 116: the steel reel number with steel is displaced to the 6th storage area from the 5th storage area when determining in step 115.
For example, be 1234567890 with the steel reel number of steel, when determining at coil car place and band steel do not detected in step 114, and determine and detect that at coil of strip transport trolley place band is when steel in step 115, execution step 116 is displaced to the 6th storage area by the steel reel number 1234567890 with steel from the 5th storage area.
In step 117, judge at coil of strip transport trolley place band steel whether detected.
Can judge at coil of strip transport trolley place band steel whether detected by the judgment mode identical with step 115.
Detect at coil of strip transport trolley place that when determining in step 117 band when steel, performs step 117: judge at coil of strip transport trolley place band steel whether detected again.
Do not detect that at coil of strip transport trolley place band is when steel, execution step 118: judge at step rate place band steel whether detected when determining in step 117.
For example, really fix on step rate place by the lifting position of the saddle for mobile coil of strip on detection step rate and the pressure at step rate place and band steel whether detected.Detect and belong to prior art with the method for steel at step rate place, no longer describe in detail.
Do not detect at step rate place that when determining in step 118 band when steel, performs step 118: judge at step rate place band steel whether detected again.
Detect that at step rate place band is when steel, execution step 119: the steel reel number with steel is displaced to the 7th storage area from the 6th storage area when determining in step 118.
For example, be 1234567890 with the steel reel number of steel, band steel do not detected when determining in step 117 at coil of strip transport trolley place, and determine and detect that at step rate place band is when steel in step 118, execution step 119 is displaced to the 7th storage area by the steel reel number 1234567890 with steel from the 6th storage area.
In step 120, call the steel reel number of the 7th storage area, belt steel surface is carried out to the spray printing of steel reel number.
From the 7th storage area, call steel reel number, and determine the corresponding major parameter with steel based on steel reel number, belt steel surface is carried out to the spray printing of major parameter and steel reel number.Major parameter with steel can comprise strip width, belt steel thickness, band steel steel, lower process information.For example, the steel reel number with steel in the 7th storage area reading is 1234567890, the corresponding major parameter with steel of determining according to steel reel number 1234567890 comprises: belt steel thickness: 6 millimeters, strip width: 1050 millimeters, band steel steel: Q235B, lower operation: E, at steel reel number 1234567890, the belt steel thickness of belt steel surface spray printing band steel: 6 millimeters, strip width: 1050 millimeters, band steel steel: Q235B, lower operation: E.
In addition, the trace log of the steel reel number with steel can be recorded.Described trace log comprises that steel reel number with steel detects with steel at the shift time of storage area, at every place and/or the time with steel do not detected in the displacement information of storage area, steel reel number with steel.For example, when 13 days 15 March in 2014, determine and do not detect that at coiling machine place steel reel number is 1234567890 band steel for 50 points, determine and detect that at baler place steel reel number is 1234567890 band steel 15: 53 on the 13rd March in 2014, and in the time that 15: 53 on the 13rd March in 2014, the steel reel number 1234567890 with steel was displaced to the 4th storage area from the 3rd storage area, the trace log of the steel reel number 1234567890 with steel can be recorded, the trace log recording comprises: the displacement information of the steel reel number 1234567890 with steel: be displaced to the 4th storage area from the 3rd storage area, steel reel number 1234567890 with steel is displaced to the shift time of the 4th storage area from the 3rd storage area: 15: 53 on the 13rd March in 2014, determine and do not detect that at coiling machine place steel reel number is 1234567890 the time with steel: 15: 50 on the 13rd March in 2014, determine and detect that at baler place steel reel number is 1234567890 the time with steel: 15: 53 on the 13rd March in 2014.
The step rate of coiling area can comprise one or more step rates.To the method at step rate place track band steel in the time that coiling area exists multiple step rate be described based on Fig. 2 below.Fig. 2 illustrates according to an embodiment of the invention in the time that coiling area exists multiple step rate the flow chart in the method for step rate place track band steel.
As shown in Figure 2, in one example, step rate comprises three step rates: first step rate, second step rate, the 3rd step rate.First step rate and coil of strip transport trolley are adjacent with second step rate, and second step rate and first step rate are adjacent with the 3rd step rate, and the 3rd step rate is adjacent with second step rate.
In step 201: judge at first step rate place band steel whether detected.
Can judge at first step rate place band steel whether detected by the judgment mode identical with step 118.
Do not detect at first step rate place that when determining in step 201 band when steel, performs step 201: judge at first step rate place band steel whether detected again.
Detect that at first step rate place band is when steel, execution step 202: the first subpool territory that the steel reel number with steel is displaced to the 7th storage area from the 6th storage area when determining in step 201.
For example, be 1234567890 with the steel reel number of steel, band steel do not detected when determining in step 117 at coil of strip transport trolley place, and determine and detect that at first step rate place band is when steel in step 201, execution step 202 is displaced to the steel reel number 1234567890 with steel the first subpool territory of the 7th storage area from the 6th storage area.
In step 203: judge at second step rate place band steel whether detected.
Can judge at second step rate place band steel whether detected by the judgment mode identical with step 118.
Do not detect at second step rate place that when determining in step 203 band when steel, performs step 203: judge at second step rate place band steel whether detected again.
Detect that at second step rate place band is when steel, execution step 204: the second subpool territory that the steel reel number with steel is displaced to the 7th storage area from the first subpool territory of the 7th storage area when determining in step 203.
For example, be 1234567890 with the steel reel number of steel, band steel detected when determining in step 203 at second step rate place, and determine and also detect that at first step rate place band is when steel in step 201, execution step 204 is displaced to the steel reel number 1234567890 with steel the second subpool territory of the 7th storage area from the first subpool territory of the 7th storage area.
In step 205: judge at the 3rd step rate place band steel whether detected.
Can judge at the 3rd step rate place band steel whether detected by the judgment mode identical with step 118.
Do not detect at the 3rd step rate place that when determining in step 205 band when steel, performs step 205: judge at the 3rd step rate place band steel whether detected again.
Detect that at the 3rd step rate place band is when steel, execution step 206: the 3rd subpool territory that the steel reel number with steel is displaced to the 7th storage area from the second subpool territory of the 7th storage area when determining in step 205.
For example, be 1234567890 with the steel reel number of steel, band steel detected when determining in step 205 at the 3rd step rate place, and determine that in step 203 execution step 206 is displaced to the steel reel number 1234567890 with steel the 3rd subpool territory of the 7th storage area from the second subpool territory of the 7th storage area in the time that second step rate also detects band steel.
In the case, in step 120, call the steel reel number in the 3rd subpool territory of the 7th storage area, belt steel surface is carried out to the spray printing of steel reel number.
Should be appreciated that, the quantity of step rate is not limited to three, can be also other quantity.For example, step rate can comprise that N(N is greater than 1 natural number) individual step rate, the 7th storage area comprises N sub-storage area.For adjacent any two step rates (for example, R(R be more than or equal to 1 and be less than the natural number of N) individual step rate and R+1 step rate), band steel detected when determining at R step rate place, and determine while band steel being detected at R+1 the step rate place adjacent with R step rate, steel reel number is displaced to R+1 subpool territory from R subpool territory.
Can follow the tracks of exactly the band steel of coiling area in the method for the coiling area track band steel of hot continuous rolling production line according to an embodiment of the invention, thereby make the steel reel number of belt steel surface spray printing in kind accurately corresponding with band steel.Like this, can effectively improve the qualification rate with steel that coiling area is produced.
Although specifically shown with reference to its exemplary embodiment and described the present invention, but it should be appreciated by those skilled in the art, in the case of not departing from the spirit and scope of the present invention that claim limits, can carry out the various changes in form and details to it.

Claims (8)

1. in a method for the coiling area track band steel of hot continuous rolling production line, described method comprises step:
(a) detect in the porch of laminar flow cooling zone that when determining band is when steel, steel reel number with steel is displaced to the second storage area from the first storage area, and calculate the length with steel according to steel reel number, wherein, in the time that band steel does not enter laminar flow cooling zone, be stored in the first storage area with the steel reel number of steel;
(b) band steel detected when determining at coiling machine place, and according to determining in the porch of laminar flow cooling zone with the length of steel or when exit can't detect band steel, the steel reel number with steel being displaced to the 3rd storage area from the second storage area;
(c) can't detect band steel when determining at coiling machine place, and determine band steel detected during at baler place, the steel reel number with steel is displaced to the 4th storage area from the 3rd storage area;
(d) can't detect band steel when determining at baler place, and determine band steel detected during at coil car place, the steel reel number with steel is displaced to the 5th storage area from the 4th storage area;
(e) can't detect band steel when determining at coil car place, and determine band steel detected during at coil of strip transport trolley place, the steel reel number with steel is displaced to the 6th storage area from the 5th storage area;
(f) can't detect band steel when determining at coil of strip transport trolley place, and determine band steel detected during at step rate place, steel reel number with steel is displaced to the 7th storage area from the 6th storage area, and calls the steel reel number of the 7th storage area, belt steel surface is carried out to the spray printing of steel reel number.
2. method according to claim 1, wherein, step (b) comprising: in the time being greater than preset value with the length of steel, band steel detected when determining at coiling machine place, and determine can't detect band steel during in the porch of laminar flow cooling zone, the steel reel number with steel is displaced to the 3rd storage area from the second storage area; In the time being less than or equal to preset value with the length of steel, band steel detected when determining at coiling machine place, and determine can't detect band steel during in the exit of laminar flow cooling zone, the steel reel number with steel is displaced to the 3rd storage area from the second storage area.
3. method according to claim 2, wherein, described coiling machine comprises at least one coiling machine.
4. method according to claim 3, wherein, preset value is the spacing of the porch of the porch of laminar flow cooling zone and coiling machine farthest.
5. method according to claim 1, wherein, step (a) also comprises:
Calculate the length with steel by calling the major parameter with steel corresponding with described steel reel number, wherein, comprise with the major parameter of steel: the original size of steel billet, belt steel thickness, strip width, wherein, the original size of steel billet comprises: steel billet thickness, steel billet length, width of steel billet
The computational methods of the length with steel are:
L=(H 0×L 0×W 0)÷(H×W)
Wherein, H 0for steel billet thickness, L 0for steel billet length, W 0for width of steel billet, H is belt steel thickness, and W is strip width, and L is band steel length.
6. method according to claim 5, wherein, the major parameter with steel also comprises band steel steel, lower process information.
7. method according to claim 1, wherein, described method also comprises the trace log of the steel reel number of record paper steel, wherein, described trace log comprises that steel reel number with steel detects at the shift time of storage area, at every place with steel and/or can't detect the time with steel in the displacement information of storage area, steel reel number with steel.
8. method according to claim 1, wherein, described step rate comprises at least one step rate, wherein, described step rate comprises N step rate, described the 7th storage area comprises N sub-storage area, N is greater than 1 natural number, band steel detected when determining at R step rate place, and determine while band steel being detected at R+1 the step rate place adjacent with R step rate, steel reel number is displaced to R+1 subpool territory from R subpool territory, wherein, R is more than or equal to 1 and be less than the natural number of N
Wherein, in the time that the steel reel number with steel is displaced to N subpool territory, call the major parameter with steel according to the steel reel number with steel in N subpool territory, to carry out the spray printing of major parameter and steel reel number with steel, wherein, comprise strip width, belt steel thickness, band steel steel, lower process information with the major parameter of steel.
CN201410124103.9A 2014-03-28 2014-03-28 In the method for the coiling area track band steel of hot continuous rolling production line Expired - Fee Related CN103909115B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410124103.9A CN103909115B (en) 2014-03-28 2014-03-28 In the method for the coiling area track band steel of hot continuous rolling production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410124103.9A CN103909115B (en) 2014-03-28 2014-03-28 In the method for the coiling area track band steel of hot continuous rolling production line

Publications (2)

Publication Number Publication Date
CN103909115A true CN103909115A (en) 2014-07-09
CN103909115B CN103909115B (en) 2016-03-23

Family

ID=51035293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410124103.9A Expired - Fee Related CN103909115B (en) 2014-03-28 2014-03-28 In the method for the coiling area track band steel of hot continuous rolling production line

Country Status (1)

Country Link
CN (1) CN103909115B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106370507A (en) * 2016-08-17 2017-02-01 武汉钢铁股份有限公司 Strip steel experiment method and device
CN108357734A (en) * 2018-01-30 2018-08-03 柳州钢铁股份有限公司 Steel coil bundling band passage change control method
CN109317548A (en) * 2018-08-31 2019-02-12 苏州普热斯勒先进成型技术有限公司 Data traceability method and production line in a kind of hot-forming production line
CN112044955A (en) * 2020-08-03 2020-12-08 广西柳州钢铁集团有限公司 Data tracking and marking method for steel coil at outlet of acid rolling mill

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09253747A (en) * 1996-03-26 1997-09-30 Kawasaki Steel Corp Method and device for automatic identification of steel
CN101032725A (en) * 2006-03-06 2007-09-12 上海宝信软件股份有限公司 Automatic ribbon lap method of cold rolling serial production line
CN201702207U (en) * 2010-04-21 2011-01-12 山西太钢不锈钢股份有限公司 Position detection device for strip steel at inlet of coiling machine
CN102274874A (en) * 2010-06-10 2011-12-14 上海宝信软件股份有限公司 Method and device for tracking steel coil on human-computer interaction interface of cold-rolling process control system
CN102495955A (en) * 2011-11-30 2012-06-13 攀钢集团攀枝花钢钒有限公司 Coil data tracking method for continuous hot-rolled slitting machine
CN102521490A (en) * 2011-11-30 2012-06-27 攀钢集团攀枝花钢钒有限公司 Set material data tracing method for hot continuous rolling slitting machine
CN102929190A (en) * 2012-10-17 2013-02-13 宁波钢铁有限公司 System and method for calibrating number of cold and hot rolled finished product steel coil

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09253747A (en) * 1996-03-26 1997-09-30 Kawasaki Steel Corp Method and device for automatic identification of steel
CN101032725A (en) * 2006-03-06 2007-09-12 上海宝信软件股份有限公司 Automatic ribbon lap method of cold rolling serial production line
CN201702207U (en) * 2010-04-21 2011-01-12 山西太钢不锈钢股份有限公司 Position detection device for strip steel at inlet of coiling machine
CN102274874A (en) * 2010-06-10 2011-12-14 上海宝信软件股份有限公司 Method and device for tracking steel coil on human-computer interaction interface of cold-rolling process control system
CN102495955A (en) * 2011-11-30 2012-06-13 攀钢集团攀枝花钢钒有限公司 Coil data tracking method for continuous hot-rolled slitting machine
CN102521490A (en) * 2011-11-30 2012-06-27 攀钢集团攀枝花钢钒有限公司 Set material data tracing method for hot continuous rolling slitting machine
CN102929190A (en) * 2012-10-17 2013-02-13 宁波钢铁有限公司 System and method for calibrating number of cold and hot rolled finished product steel coil

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106370507A (en) * 2016-08-17 2017-02-01 武汉钢铁股份有限公司 Strip steel experiment method and device
CN106370507B (en) * 2016-08-17 2019-10-25 武汉钢铁有限公司 A kind of strip experimental method and device
CN108357734A (en) * 2018-01-30 2018-08-03 柳州钢铁股份有限公司 Steel coil bundling band passage change control method
CN109317548A (en) * 2018-08-31 2019-02-12 苏州普热斯勒先进成型技术有限公司 Data traceability method and production line in a kind of hot-forming production line
CN109317548B (en) * 2018-08-31 2020-07-21 苏州普热斯勒先进成型技术有限公司 Data tracing method in hot-press forming production line and production line
CN112044955A (en) * 2020-08-03 2020-12-08 广西柳州钢铁集团有限公司 Data tracking and marking method for steel coil at outlet of acid rolling mill

Also Published As

Publication number Publication date
CN103909115B (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN103909115B (en) In the method for the coiling area track band steel of hot continuous rolling production line
EP2306131B1 (en) Pallet position recognition device of sintering machine and air leak detector
CN205138431U (en) Material recognition device and transfer chain of transfer chain
CN101687599B (en) Tracking device
CN102129611B (en) Warehousing retroactive method and system of cigarette finished products
CN108861276A (en) One kind being based on AGV trailing type warehouse goods sorting method
CN106429305B (en) A kind of pipeline blocking package detection method and device
CN203955774U (en) A kind of withdrawal straightening machine control device and system
CN204093840U (en) A kind of strip tracking device
CN201955813U (en) Finished cigarette warehousing tracing system
CN107220701B (en) Accurate counting detection method for belt conveying bagged objects
CN106395219A (en) Method and device for automatically acquiring in-out records of cargos in warehouse
CN102152960B (en) Finished cigarette warehousing random inspection method and system
CN107051891A (en) A kind of trolley positioning identifying method based on bar code
JP2006218505A (en) Metallic strip with marking
CN108816776A (en) A kind of control system and control method of turntable sorter
CN208412899U (en) A kind of obstacleable RGV trolley
CN103801564B (en) Coil data tracking method for cold rolled continuous annealing pickling line
CN110723341A (en) State monitoring method for visual appearance detection device in online production process of cigarette packaging machine
CN104290444B (en) Adhesive label testing equipment halt control method
CN111137644B (en) Recording method of workpiece queue, robot conveyor belt tracking system and storage medium
CN113682766B (en) Robot code scanning conveying line detection method, system, device and storage medium
CN105425825A (en) Dynamic plasterboard tracking device and dynamic plasterboard tracking method
US20140180471A1 (en) Control device and control method for controlling carriers in a machine
CN103753071A (en) Cold rolling processing line welding seam tracking method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160323

Termination date: 20190328