CN103900821A - 一种发电机组一次调频功能优化试验方法 - Google Patents

一种发电机组一次调频功能优化试验方法 Download PDF

Info

Publication number
CN103900821A
CN103900821A CN201410161320.5A CN201410161320A CN103900821A CN 103900821 A CN103900821 A CN 103900821A CN 201410161320 A CN201410161320 A CN 201410161320A CN 103900821 A CN103900821 A CN 103900821A
Authority
CN
China
Prior art keywords
primary frequency
power
frequency modulation
load
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410161320.5A
Other languages
English (en)
Inventor
王建军
赵毅
张长志
张应田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410161320.5A priority Critical patent/CN103900821A/zh
Publication of CN103900821A publication Critical patent/CN103900821A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Control Of Eletrric Generators (AREA)

Abstract

本发明涉及一种发电机组一次调频功能试验优化改进方法,包括步骤有:(1)将转速偏差信号变换成频差-功率信号;(2)经标幺处理转换成一次调频功率-阀位增量指令;(3)设置速率限制模块及功率限幅模块产生实际负荷指令;(4)将频差-功率信号与实际负荷指令进行求和形成综合负荷指令,再与发电机组的实际负荷反馈信号进行偏差运算;(5)进行比例-积分PI运算处理,最终产生电调的综合调门指令;(6)综合调门指令与一次调频功率-阀位增量指令叠加求和,处理后调节汽轮发电机组的负荷。本发明有效提高机组参加电网一次调频的能力,电网的供电质量有了明显的改善。

Description

一种发电机组一次调频功能优化试验方法
技术领域
本发明属于自动发电控制技术领域,是一种发电机组一次调频功能优化试验方法。
背景技术
随着科学技术的发展,社会对电能质量的要求越来越高,这就要求并网发电机组不仅具备快速适应外界负荷变化的能力,还必须具备快速调整电网频率的能力。汽轮发电机组调速系统根据电网频率的变化自动改变调速汽门的开度调节汽轮发电机组的功率以适应电网频率波动的能力,即为一次调频。新建的大容量汽轮发电机组或经过控制系统技术改造的汽轮发电机组其控制系统普遍采用数字电液调节系统,其一次调频功能需要由数字电液调节系统组态编程实现,原先采用液压调节控制技术的汽轮发电机组固有的一次调频能力失去,所以要求并网运行的所有发电机组的调速系统共同承担电网的一次调频功能。
由于不同的电调生产厂家在设计理念、实现方法上存在一些差异,造成汽轮发电机组一次调频功能存在较多问题,甚至一些发电机组一次调频功能长期不能正常投入,导致电网频率经常发生波动,使得电网运行存在一定的安全隐患。为此电监会要求电力技术监督部门强制对汽轮发电机组的一次调频功能进行定期试验验证。
发明内容
本发明的目的是针对现有技术的不足,而提出一种发电机组一次调频功能试验优化改进方法。
本发明解决其技术问题是采取以下技术方案实现的:
一种发电机组一次调频功能试验优化改进方法,包括步骤如下:
(1)发电机组的额定转速值与机组的实际转速测量值经过偏差计算,产生的转速偏差信号经过转速不等率功-频函数f1(x)计算变换成频差-功率信号;
(2)将上述频差-功率信号经过标幺处理函数f2(x)处理转换成一次调频功率-阀位增量指令;
(3)在分散控制系统的协调控制系统的功率控制回路中设置速率限制模块及功率限幅模块产生实际负荷指令;
(4)将步骤(1)得到的频差-功率信号与上述经过功率限幅后的信号进行求和形成发电机组的综合负荷指令,与发电机组的实际负荷反馈信号进行偏差运算;
(5)将上述经过偏差运算的输出信号进行比例-积分PI运算处理,最终产生电调的综合调门指令;
(6)实现一次调频优化改进:将上述生成的电调综合调门指令与步骤(2)中一次调频功率-阀位增量指令叠加求和,再经过电调的阀门管理处理后分别去控制各调速汽门的开度,调节汽轮发电机组的负荷,实现一次调频优化改进。
而且,步骤(1)中所述偏差计算所采用的公式为:发电机组的额定转速值减去实际转速测量值,公式中各参数均为工程量,单位为:转/分钟。
而且,步骤(1)中所述转速不等率功-频函数f1(x)为分段函数由6个坐标点(-150,-8%Pe);(-14,-8%Pe);(-2,0);(2,0);(14,8%Pe);(150,8%Pe)拟合而成;
而且,步骤(2)中所述标幺处理函数f2(x)是将转速不等率功-频函数f1(x)计算后输出的频差-功率信号转换成百分量的一次调频功率-阀位增量指令信号,即f1(x)的输出除以100即为f2(x)。
而且,步骤(3)中所述速率限制模块是将输入的机组负荷指令信号变化速率限制在机组额定负荷的0-2%范围内;所述功率限幅模块是将输入信号的功率限制在机组额定负荷的50%-100%范围内,以保证机组的负荷变化在正常调整范围内。
而且,步骤(4)中所述偏差运算的公式为:综合负荷指令减去发电机组的实际负荷反馈信号。
而且,步骤(5)中所述PI运算处理的数学描述式是:
Y ( s ) = ( Kp + 1 Ti * S ) E ( s ) ,
式中Kp为比例放大系数,Ti为积分时间,单位为秒,公式中各参数可根据实际运行情况做适当调整。
本发明的优点和积极效果是:
现役发电机组的一次调频控制功能采取本发明方法优化改进后,经过多次联调试验和长期运行考核验证,机组响应电网频率变化的能力有效提高,既能保证机组一次调频的响应速度,又保证机组参与一次调频的持续性,同时可以保证机组的一次调频功能始终在投入状态。满足机组一次调频响应15秒内达到目标负荷的75%、30秒达到目标负荷90%及机组转速不等率为4%~5%的技术指标要求,并且控制稳定,机组的主要技术指标均高于《汽轮机调节控制系统试验导则》(DL/T711-1999)的要求,有效提高机组参加电网一次调频的能力,电网的供电质量有了明显的改善。
附图说明
图1为本发明一次调频功能在分散控制系统的电调控制回路及功率控制回路投入示意图;
图2为转速不等率功-频函数f1(x)由6个坐标点(-150,-8%Pe);(-14,-8%Pe);(-2,0);(2,0);(14,8%Pe);(150,8%Pe)拟合而成的曲线图。
具体实施方式
以下结合附图对本发明实施做进一步详述,以下实施例只是描述性的,不是限定性的,不能以此限定本发明的保护范围。
一种发电机组一次调频功能试验优化改进方法,该方法采取将频差信号经转速不等率功-频函数转换的信号叠加在汽轮机调速汽门指令处的方法实现;同时在分散控制系统的功率控制回路中投入频率校正功能,以保证机组一次调频的响应速度和机组参与一次调频的持续性;并且要保证二者的功能一致且要相互匹配。如图1所示,包括步骤如下:
(1)发电机组的额定转速值(3000rpm)与机组的实际转速测量值经过偏差计算,产生的转速偏差信号经过转速不等率功-频函数f1(x)计算变换成频差-功率信号;
(2)转速不等率功-频函数f1(x)计算后输出的频差-功率信号经过标幺处理函数f2(x)处理转换成一次调频功率-阀位增量指令;
其中,所述偏差计算所采用的公式为:发电机组的额定转速值(3000rpm)减去实际转速测量值(单位为:rpm),公式中各参数均为工程量,单位为:转/分钟;
其中,所述转速不等率功-频函数f1(x)为分段函数由6个坐标点(-150,-8%Pe);(-14,-8%Pe);(-2,0);(2,0);(14,8%Pe);(150,8%Pe)拟合而成,其中Pe为发电机组的额定功率,单位为兆瓦(MW),拟合后的实际曲线如图2所示,
其中,为了与电调的综合调门指令匹配,所述标幺处理函数f2(x)是将转速不等率功-频函数f1(x)计算后输出的频差-功率信号转换成百分量的一次调频功率-阀位增量指令信号,即f1(x)的输出除以100即为f2(x)。
(3)在分散控制系统的协调控制系统的功率控制回路中投入频率校正功能,以保证机组一次调频的响应速度和机组参与一次调频的持续性;
发电机组负荷管理中心接受的中调负荷指令,或现场值班员设置的手动负荷指令经限制模块限速、功率限幅模块限幅处理产生实际负荷指令,所述速率限制模块是将输入的机组负荷指令信号变化速率限制在机组额定负荷的0-2%范围内,所述功率限幅模块是将输入信号的功率限制在机组额定负荷的50%-100%范围内,以保证机组的负荷变化在正常调整范围内;
(4)将转速不等率功-频函数f1(x)转换处理后的一次调频负荷增量信号与上述经过功率限幅后的信号进行求和形成发电机组的综合负荷指令,与发电机组的实际负荷反馈信号进行偏差运算;
其中,所述偏差运算的公式为:综合负荷指令减去发电机组的实际负荷反馈信号,公式中各参数单位为:兆瓦(MW);
(5)将上述经过偏差运算的输出信号进行比例-积分PI运算处理,最终产生电调的综合调门指令,其中PI控制模块的数学描述式是:
Y ( s ) = ( Kp + 1 Ti * S ) E ( s ) ,
式中Kp为比例放大系数,Ti为积分时间,单位为秒,公式中各参数可根据实际运行情况做适当调整。
(6)将上述生成的电调综合调门指令与频差-功率信号经过标幺处理函数f2(x)处理转换成一次调频功率-阀位增量指令叠加求和,再经过电调的阀门管理程序处理后分别去控制各调速汽门的开度,调节汽轮发电机组的负荷,实现其一次调频功能。

Claims (7)

1.一种发电机组一次调频功能试验优化改进方法,其特征在于包括步骤如下:
(1)发电机组的额定转速值与机组的实际转速测量值经过偏差计算,产生的转速偏差信号经过转速不等率功-频函数f1(x)计算变换成频差-功率信号;
(2)将上述频差-功率信号经过标幺处理函数f2(x)处理转换成一次调频功率-阀位增量指令;
(3)在分散控制系统的协调控制系统的功率控制回路中设置速率限制模块及功率限幅模块产生实际负荷指令;
(4)将步骤(1)得到的频差-功率信号与上述经过功率限幅后的信号进行求和形成发电机组的综合负荷指令,与发电机组的实际负荷反馈信号进行偏差运算;
(5)将上述经过偏差运算的输出信号进行比例-积分PI运算处理,最终产生电调的综合调门指令;
(6)实现一次调频优化改进:将上述生成的电调综合调门指令与步骤(2)中一次调频功率-阀位增量指令叠加求和,再经过电调的阀门管理处理后分别去控制各调速汽门的开度,调节汽轮发电机组的负荷,实现一次调频优化改进。
2.根据权利要求1所述的发电机组一次调频功能试验优化改进方法,其特征在于:步骤(1)中所述偏差计算所采用的公式为:发电机组的额定转速值减去实际转速测量值,公式中各参数均为工程量,单位为:转/分钟。
3.根据权利要求1所述的发电机组一次调频功能试验优化改进方法,其特征在于:步骤(1)中所述转速不等率功-频函数f1(x)为分段函数由6个坐标点(-150,-8%Pe);(-14,-8%Pe);(-2,0);(2,0);(14,8%Pe);(150,8%Pe)拟合而成。
4.根据权利要求1所述的发电机组一次调频功能试验优化改进方法,其特征在于:步骤(2)中所述标幺处理函数f2(x)是将转速不等率功-频函数f1(x)计算后输出的频差-功率信号转换成百分量的一次调频功率-阀位增量指令信号,即f1(x)的输出除以100即为f2(x)。
5.根据权利要求1所述的发电机组一次调频功能试验优化改进方法,其特征在于:步骤(3)中所述速率限制模块是将输入的机组负荷指令信号变化速率限制在机组额定负荷的0-2%范围内;所述功率限幅模块是将输入信号的功率限制在机组额定负荷的50%-100%范围内,以保证机组的负荷变化在正常调整范围内。
6.根据权利要求1所述的发电机组一次调频功能试验优化改进方法,其特征在于:步骤(4)中所述偏差运算的公式为:综合负荷指令减去发电机组的实际负荷反馈信号。
7.根据权利要求1所述的发电机组一次调频功能试验优化改进方法,其特征在于:步骤(5)中所述PI运算处理的数学描述式是:
Y ( s ) = ( Kp + 1 Ti * S ) E ( s ) ,
式中Kp为比例放大系数,Ti为积分时间,单位为秒,公式中各参数可根据实际运行情况做适当调整。
CN201410161320.5A 2014-04-22 2014-04-22 一种发电机组一次调频功能优化试验方法 Pending CN103900821A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410161320.5A CN103900821A (zh) 2014-04-22 2014-04-22 一种发电机组一次调频功能优化试验方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410161320.5A CN103900821A (zh) 2014-04-22 2014-04-22 一种发电机组一次调频功能优化试验方法

Publications (1)

Publication Number Publication Date
CN103900821A true CN103900821A (zh) 2014-07-02

Family

ID=50992284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410161320.5A Pending CN103900821A (zh) 2014-04-22 2014-04-22 一种发电机组一次调频功能优化试验方法

Country Status (1)

Country Link
CN (1) CN103900821A (zh)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104166093A (zh) * 2014-07-23 2014-11-26 国网上海市电力公司 兼顾电网调频需求的超临界机组调速系统建模参数测量方法
CN104269871A (zh) * 2014-10-27 2015-01-07 国家电网公司 提高火力发电机组一次调频正确动作合格率的方法
CN105134310A (zh) * 2015-10-20 2015-12-09 国网新疆电力公司电力科学研究院 修正阀门流量特性偏差的一次调频方法
CN106089447A (zh) * 2016-07-05 2016-11-09 国网天津市电力公司 一种提升燃气轮机组一次调频响应能力的方法
CN106410857A (zh) * 2016-04-08 2017-02-15 国网天津市电力公司 单元发电机组一次调频功能实现方法
CN107725123A (zh) * 2017-08-18 2018-02-23 中国神华能源股份有限公司 汽轮机的控制方法和装置
CN109802416A (zh) * 2019-01-07 2019-05-24 国网新疆电力有限公司电力科学研究院 提高汽轮发电机组deh一次调频性能的方法
CN110212555A (zh) * 2019-07-05 2019-09-06 中国大唐集团科学技术研究院有限公司华东电力试验研究院 一种火电机组一次调频功率补偿方法
CN110320470A (zh) * 2019-07-22 2019-10-11 中国海洋石油集团有限公司 一种测试系统
CN110912157A (zh) * 2019-12-06 2020-03-24 中国国电集团有限公司湖南分公司 一种小频差条件下的一次调频性能优化方法、系统及介质
CN112531769A (zh) * 2020-11-20 2021-03-19 华能国际电力股份有限公司汕头电厂 一种火力发电厂一次调频控制方法
CN112564136A (zh) * 2020-12-25 2021-03-26 中国海洋石油集团有限公司 储能系统辅助发电机组调频的柔性控制方法及系统
CN112564169A (zh) * 2020-12-14 2021-03-26 济宁华源热电有限公司 一种基于负荷反馈的火力发电一次调频系统及方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006208130A (ja) * 2005-01-27 2006-08-10 Tatsumi Ryoki:Kk 発電機試験装置及びこれを備えた発電装置及びこれを用いた試験システム
CN101892873A (zh) * 2010-07-09 2010-11-24 山东中实易通集团有限公司 基于机前压力补偿的一次调频方法
CN102565705A (zh) * 2012-01-16 2012-07-11 河北省电力研究院 基于调节控制系统消除二次调频影响的一次调频定量评价方法
CN103378601A (zh) * 2012-04-20 2013-10-30 华北电力科学研究院有限责任公司 一种基于bang-bang控制的一次调频方法及装置
CN103713613A (zh) * 2014-01-02 2014-04-09 国家电网公司 Propr模式下火电机组负荷优化控制方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006208130A (ja) * 2005-01-27 2006-08-10 Tatsumi Ryoki:Kk 発電機試験装置及びこれを備えた発電装置及びこれを用いた試験システム
CN101892873A (zh) * 2010-07-09 2010-11-24 山东中实易通集团有限公司 基于机前压力补偿的一次调频方法
CN102565705A (zh) * 2012-01-16 2012-07-11 河北省电力研究院 基于调节控制系统消除二次调频影响的一次调频定量评价方法
CN103378601A (zh) * 2012-04-20 2013-10-30 华北电力科学研究院有限责任公司 一种基于bang-bang控制的一次调频方法及装置
CN103713613A (zh) * 2014-01-02 2014-04-09 国家电网公司 Propr模式下火电机组负荷优化控制方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张应田等: "国产220MW火电机组一次调频功能试验及分析", 《天津电力技术》 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104166093B (zh) * 2014-07-23 2017-05-10 国网上海市电力公司 兼顾电网调频需求的超临界机组调速系统建模参数测量方法
CN104166093A (zh) * 2014-07-23 2014-11-26 国网上海市电力公司 兼顾电网调频需求的超临界机组调速系统建模参数测量方法
CN104269871A (zh) * 2014-10-27 2015-01-07 国家电网公司 提高火力发电机组一次调频正确动作合格率的方法
CN105134310A (zh) * 2015-10-20 2015-12-09 国网新疆电力公司电力科学研究院 修正阀门流量特性偏差的一次调频方法
CN106410857A (zh) * 2016-04-08 2017-02-15 国网天津市电力公司 单元发电机组一次调频功能实现方法
CN106089447A (zh) * 2016-07-05 2016-11-09 国网天津市电力公司 一种提升燃气轮机组一次调频响应能力的方法
CN107725123B (zh) * 2017-08-18 2020-07-14 中国神华能源股份有限公司 汽轮机的控制方法和装置
CN107725123A (zh) * 2017-08-18 2018-02-23 中国神华能源股份有限公司 汽轮机的控制方法和装置
CN109802416A (zh) * 2019-01-07 2019-05-24 国网新疆电力有限公司电力科学研究院 提高汽轮发电机组deh一次调频性能的方法
CN110212555A (zh) * 2019-07-05 2019-09-06 中国大唐集团科学技术研究院有限公司华东电力试验研究院 一种火电机组一次调频功率补偿方法
CN110212555B (zh) * 2019-07-05 2023-05-30 中国大唐集团科学技术研究院有限公司华东电力试验研究院 一种火电机组一次调频功率补偿方法
CN110320470A (zh) * 2019-07-22 2019-10-11 中国海洋石油集团有限公司 一种测试系统
CN110912157A (zh) * 2019-12-06 2020-03-24 中国国电集团有限公司湖南分公司 一种小频差条件下的一次调频性能优化方法、系统及介质
CN112531769A (zh) * 2020-11-20 2021-03-19 华能国际电力股份有限公司汕头电厂 一种火力发电厂一次调频控制方法
CN112564169A (zh) * 2020-12-14 2021-03-26 济宁华源热电有限公司 一种基于负荷反馈的火力发电一次调频系统及方法
CN112564169B (zh) * 2020-12-14 2021-10-26 济宁华源热电有限公司 一种基于负荷反馈的火力发电一次调频系统及方法
CN112564136A (zh) * 2020-12-25 2021-03-26 中国海洋石油集团有限公司 储能系统辅助发电机组调频的柔性控制方法及系统

Similar Documents

Publication Publication Date Title
CN103900821A (zh) 一种发电机组一次调频功能优化试验方法
CN107453375B (zh) 巨型水电机组的一次调频电量补偿精细化控制方法及装置
CN109638879B (zh) 基于性能指标评估的一次调频动态补偿调整系统及方法
CN106410857A (zh) 单元发电机组一次调频功能实现方法
CN103104931B (zh) 一种基于锅炉一次风压动态补偿的一次调频方法及系统
US11245261B2 (en) Method for controlling a wind power plant
CN111997825B (zh) 一种水轮机调速器功率频率控制方法
CN105917544B (zh) 用于运行风能设备和/或风电场的方法和调节和/或控制装置以及风能设备和风电场
CN110518631B (zh) 一种直驱风电机组的稳定性评估方法及系统
US11146193B2 (en) Genset engine paralleling controls, devices, systems, and methods
CN104205548A (zh) 系统稳定化装置
CN108695863A (zh) 一种电源友好型受端电网一次调频控制方法及系统
Attya et al. Novel concept of renewables association with synchronous generation for enhancing the provision of ancillary services
CN104167758B (zh) 基于超调补偿的一次调频优化控制方法及系统
Koiwa et al. Analysis and design of filters for the energy storage system: Optimal tradeoff between frequency guarantee and energy capacity/power rating
Yoo et al. Frequency stability support of a DFIG to improve the settling frequency
CN104320030B (zh) 永磁同步风力发电机的整流电压的控制方法及控制装置
CN105045229B (zh) 基于时间补偿的火电机组一次调频优化控制方法及装置
Pandey et al. An advanced LMI-based-LQR design for load frequency control of an autonomous hybrid generation system
US9970417B2 (en) Wind converter control for weak grid
Kachhwaha et al. Interconnected multi unit two-area Automatic Generation Control using optimal tuning of fractional order PID controller along with Electrical Vehicle loading
CN104333044A (zh) 一种agc与一次调频协调控制的电网频率调整方法
Shah et al. The state space modeling of single two and three ALFC of power system using integral control and optimal LQR control method
CN104240151A (zh) 一种电力系统暂态稳定最优校正控制系统和方法
Asadollah et al. Decentralized reactive power and voltage control of wind farms with type-4 generators

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 300010 Tianjin city Hebei District Wujing Road No. 39

Applicant after: State Grid Corporation of China

Applicant after: State Grid Tianjin Electric Power Company

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: State Grid Tianjin Electric Power Company

RJ01 Rejection of invention patent application after publication

Application publication date: 20140702

RJ01 Rejection of invention patent application after publication