CN103899071B - Frame laid by a kind of ceramic tile - Google Patents

Frame laid by a kind of ceramic tile Download PDF

Info

Publication number
CN103899071B
CN103899071B CN201310062158.7A CN201310062158A CN103899071B CN 103899071 B CN103899071 B CN 103899071B CN 201310062158 A CN201310062158 A CN 201310062158A CN 103899071 B CN103899071 B CN 103899071B
Authority
CN
China
Prior art keywords
main joist
stiles
ceramic tile
suspension member
stile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310062158.7A
Other languages
Chinese (zh)
Other versions
CN103899071A (en
Inventor
金育光
金九成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jin Jiucheng
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310062158.7A priority Critical patent/CN103899071B/en
Publication of CN103899071A publication Critical patent/CN103899071A/en
Application granted granted Critical
Publication of CN103899071B publication Critical patent/CN103899071B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The device that frame relates to a kind of laying or spreads when hanging ceramic tile laid by ceramic tile.The problems such as the ceramic tile mainly for solving current concrete bonding easily comes off and designing.It comprises main joist, rider keel and main joist connector and suspension member; The bottom surface of main joist there is screw, two stiles that the both sides of bottom surface are upwards bent to form have screw, two stiles that the both sides of main joist connector bottom surface are upwards bent to form have screw.The top of main joist two stiles outwards or bend inwards and form edge in twice level.The both sides of rider keel bottom surface are upwards bent to form two stiles, and the junction plate at rider keel two ends has screw.The top of rider keel two stiles outwards or bend inwards and form edge in twice level.Suspension member has A, B two kinds of form of structure, and suspension member A and B is formed by connecting by orthogonal rib and extension limit, and the two ends that suspension member A hangs limit are provided with hook; The two ends that suspension member B hangs limit are provided with opening.Advantage is laid or spreads the ceramic tile difficult drop-off hung.

Description

Frame laid by a kind of ceramic tile
Technical field:
Device when the present invention relates to a kind of laying ceramic tile on the ground or hang ceramic tile on metope upper berth.
Background technology:
Lay at present ceramic tile on the ground and be all with concrete bonding at metope laying tiles, its shortcoming is: easily come off with the ceramic tile of concrete bonding on metope, ceramic tile is laid on the ground with concrete, ceramic tile and concrete plane need be opened when geothermal heat pipeline damages or block for the user laying underground heat, just can carry out keeping in repair and changing, not only waste raw material but also time-consuming, and be embedded in concrete due to geothermal heat pipeline, also affect heat radiation.
Summary of the invention:
Technical problem to be solved by this invention is to provide a kind of ceramic tile difficult drop-off laid on metope, and lay ceramic tile on the ground and be convenient to geothermal tube maintenance and change, frame laid by the ceramic tile being conducive to again geothermal heat pipeline heat radiation.
Above-mentioned purpose is achieved in that ceramic tile is laid frame and comprised main joist, rider keel and main joist connector, when when metope laying tiles, also comprises suspension member;
Main joist has bottom surface, and the bottom surface of main joist is provided with several for the screw filling leveling serew, and the both sides upwards 90-degree bent of bottom surface, forms two stiles, two stiles are all provided with several screws; Main joist connector has bottom surface, the both sides upwards 90-degree bent of bottom surface, forms two stiles, two stiles are also all provided with several screws, and the height of main joist connector stile is slightly less than the height of main joist stile.
In order to increase lay after the compressive resistance of ceramic tile, by the top of main joist two stiles outwards or bend inwards 90 °, edge in the contour level of twice can be formed.
In order to increase the compressive resistance laying rear ceramic tile, rider keel can be set up, rider keel has bottom surface, the both sides upwards 90-degree bent of bottom surface, form two stiles, the height of two stiles of rider keel is equal with the height of main joist stile, and the two ends of rider keel are all fixed with junction plate, two junction plates is all provided with the screw for being connected with main joist stile.
In order to increase lay after the compressive resistance of ceramic tile, by the top of rider keel two stiles outwards or bend inwards 90 °, form edge in the contour level of twice.
Be used for hanging ceramic tile to this device is fixed on metope, suspension member can be set up, suspension member has A, B two kinds of form of structure, suspension member A is used to hang on the main joist of the outside 90-degree bent in stile top, it is formed by connecting by orthogonal rib and extension limit, hang the two ends on limit and be provided with hook, toward each other, the distance between the hook of two ends is so that edge to be as the criterion two levels overlapping the main joist hanging over the outside 90-degree bent in stile top the hook at two ends; Suspension member B is used to hang over stile top and bends inwards on the main joist of 90 °, it is formed by connecting by orthogonal rib and extension limit, its two ends hanging limit are provided with opening, distance between the size of suspension member B and both ends open with its can load stile top bend inwards 90 ° main joist two stiles between, and the upper edge that the opening at two ends can be hung over two stiles to be as the criterion.
Advantage of the present invention is: the ceramic tile difficult drop-off laid on metope, lays ceramic tile on the ground and is convenient to geothermal tube maintenance and changes, be conducive to again the heat radiation of geothermal heat pipeline, and easy construction, and recruitment is few, and speed is fast, and expense is low.
Accompanying drawing illustrates:
Fig. 1 is the structural representation of main joist;
Fig. 2 is the structural representation of main joist connector;
Fig. 3 is the structural representation of main joist two outside 90-degree bents in stile top;
Fig. 4 is that main joist two stile tops bend inwards the structural representation of 90 °;
Fig. 5 is the structural representation of rider keel;
Fig. 6 is the structural representation of rider keel two outside 90-degree bents in stile top;
Fig. 7 is that rider keel two stile tops bend inwards the structural representation of 90 °;
Fig. 8 is the structural representation of suspension member A;
Fig. 9 is the structural representation of suspension member B.
Detailed description of the invention:
Ceramic tile is laid frame and is comprised main joist 1, rider keel 2 and main joist connector 3, when when metope laying tiles, also comprises suspension member 4.
See figures.1.and.2, main joist 1 has bottom surface 1-1, and the bottom surface of main joist is provided with several for the screw 1-3 filling leveling serew, and the both sides upwards 90-degree bent of bottom surface, is formed on two stiles, 1-2, two stiles and be also all provided with several screws 1-3; Main joist connector 3 has bottom surface 3-1, the both sides upwards 90-degree bent of bottom surface, and formed on two stiles, 3-2, two stiles and be all provided with several screws 3-3, the height of main joist connector stile is slightly less than the height of main joist stile;
With reference to Fig. 3 and Fig. 4, the top of main joist two stiles is outside or bend inwards 90 °, is formed in the contour level of twice along 1-4;
With reference to Fig. 5, also comprise rider keel 2, rider keel has bottom surface 2-1, the both sides upwards 90-degree bent of bottom surface, form two stiles 2-2, the height of two stiles of rider keel should be equal with the height of main joist stile, and the two ends of rider keel are all fixed with the screw 2-3 junction plate 2-5, two junction plates being all provided with and supplying to be connected with main joist stile;
With reference to Fig. 6 and Fig. 7, the top of rider keel two stiles is outside or bend inwards 90 °, is formed in the contour level of twice along 2-4;
Suspension member 4 can be set up, suspension member has A, B two kinds of form of structure, suspension member A(is with reference to Fig. 8) be used to hang on the main joist of the outside 90-degree bent in stile top, it is formed by connecting by orthogonal rib 4-1 and extension limit 4-2, the two ends hanging limit are provided with hook 4-3, toward each other, the distance between the hook of two ends is so that edge to be as the criterion two levels overlapping the main joist hanging over the outside 90-degree bent in stile top the hook at two ends; Suspension member B(is with reference to Fig. 9) be used to hang over stile top and bend inwards on the main joist of 90 °, it is formed by connecting by orthogonal rib 4-1 and extension limit 4-2, its two ends hanging limit are provided with opening 4-4, distance between the size of suspension member B and both ends open with its can load stile top bend inwards 90 ° main joist two stiles between, and the upper edge that the opening at two ends can be hung over two stiles to be as the criterion.
Installation and application: when laying ceramic tile on the ground with laying frame, first main joist is laid, two sections of main joist junction main joist connectors connect, main joist and screw corresponding to main joist connector are screwed, and in the screw of main joist bottom surface, fill leveling serew carry out leveling, when setting up rider keel, be contained in by rider keel between adjacent twice main joist, rider keel two ends and main joist screw are connected and fixed.Also should be bonding with ground at the bottom surface cranny filler of polyurethane foam of main joist and rider keel, in the groove of main joist and rider keel, filled polyurethane foam gap filler glues ceramic tile.When metope laying tiles, with setscrew, upright for main joist is fixed on metope, for the main joist of the outside 90-degree bent in stile top, suspension member A is hung over main joist on along upper, now, hang limit level, rib upward, ceramic tile is stood on stile, rib is had to keep off on ceramic tile, again above ceramic tile, with a suspension member A oppositely hang over main joist on along upper, now, ceramic tile blocks by rib down, it is made to come off, a suspension member A is hung again on this rib suspension member A down, make its rib upward, upwards to continue paving hanging ceramic tile, install successively from bottom to top like this, suspension member B is then used for the bend inwards main joist of 90 ° of stile, suspension member B is loaded between this main joist two stile, two openings of suspension member B hang over this main joist two stiles on along upper, now, hang limit level, rib upward, ceramic tile is stood in and hangs on limit, rib is had to keep off on ceramic tile, again above ceramic tile, with a suspension member B oppositely hang over main joist on along upper, now, ceramic tile blocks by rib down, it is made to come off, a suspension member B is hung again on this rib suspension member B down, make its rib upward, upwards to continue paving hanging ceramic tile, also be install successively from bottom to top.

Claims (5)

1. frame laid by a ceramic tile, comprise main joist (1), it is characterized in that: main joist has bottom surface (1-1), the bottom surface of main joist is provided with several for the screw (1-3) filling leveling serew, the both sides upwards 90-degree bent of bottom surface, form two stiles (1-2), two stiles are also all provided with several screws (1-3); Main joist connector (3) has bottom surface (3-1), the both sides upwards 90-degree bent of bottom surface, forms two stiles (3-2), two stiles is all provided with several screws (3-3), and the height of main joist connector stile is slightly less than the height of main joist stile.
2. lay frame according to ceramic tile according to claim 1, it is characterized in that: the top of main joist two stiles is outside or bend inwards 90 °, formed in the contour level of twice along (1-4).
3. lay frame according to ceramic tile according to claim 1, it is characterized in that: also comprise rider keel (2), rider keel has bottom surface (2-1), the both sides upwards 90-degree bent of bottom surface, form two stiles (2-2), the height of rider keel two stiles is equal with the height of main joist stile, and the two ends of rider keel are all fixed with junction plate (2-5), two junction plates is all provided with the screw (2-3) for being connected with main joist stile.
4. lay frame according to ceramic tile according to claim 3, it is characterized in that: the top of rider keel two stiles is outside or bend inwards 90 °, formed in the contour level of twice along (2-4).
5. lay frame according to ceramic tile according to claim 2, it is characterized in that: also comprise suspension member (4), suspension member has A, B two kinds of form of structure, suspension member A is used to hang on the main joist of the outside 90-degree bent in stile top, it is formed by connecting by orthogonal rib (4-1) and extension limit (4-2), the two ends hanging limit are provided with hook (4-3), toward each other, the distance between the hook of two ends is so that edge to be as the criterion two levels overlapping the main joist hanging over the outside 90-degree bent in stile top the hook at two ends; Suspension member B is used to hang over stile top and bends inwards on the main joist of 90 °, it is formed by connecting by orthogonal rib (4-1) and extension limit (4-2), its two ends hanging limit are provided with opening (4-4), distance between the size of suspension member B and both ends open with its can load stile top bend inwards 90 ° main joist two stiles between, and the upper edge that the opening at two ends can be hung over two stiles to be as the criterion.
CN201310062158.7A 2012-12-25 2013-02-28 Frame laid by a kind of ceramic tile Active CN103899071B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310062158.7A CN103899071B (en) 2012-12-25 2013-02-28 Frame laid by a kind of ceramic tile

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201210597736 2012-12-25
CN201210597736.2 2012-12-25
CN201310062158.7A CN103899071B (en) 2012-12-25 2013-02-28 Frame laid by a kind of ceramic tile

Publications (2)

Publication Number Publication Date
CN103899071A CN103899071A (en) 2014-07-02
CN103899071B true CN103899071B (en) 2016-01-13

Family

ID=50990620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310062158.7A Active CN103899071B (en) 2012-12-25 2013-02-28 Frame laid by a kind of ceramic tile

Country Status (1)

Country Link
CN (1) CN103899071B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104264945B (en) * 2014-10-27 2017-03-08 金育光 A kind of tile floor spreads hanger
CN107060256A (en) * 2017-06-09 2017-08-18 金育光 Ceramic tile spreads frame for intangling net

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101550761A (en) * 2008-04-02 2009-10-07 余五京 Ceramic tile laying assistor
CN101775895A (en) * 2010-02-09 2010-07-14 张志强 Ground brick paving machine
CN102140836A (en) * 2010-01-29 2011-08-03 华煜建设集团有限公司 Construction method of large-size floor tile
CN203113745U (en) * 2012-12-25 2013-08-07 金育光 Ceramic tile paving frame

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT504565B1 (en) * 2006-11-24 2008-09-15 Sola Messwerkzeuge Gmbh CROSS-LASER DEVICE FOR LAYING UP PANEL OR BOARD FLOOR ELEMENTS

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101550761A (en) * 2008-04-02 2009-10-07 余五京 Ceramic tile laying assistor
CN102140836A (en) * 2010-01-29 2011-08-03 华煜建设集团有限公司 Construction method of large-size floor tile
CN101775895A (en) * 2010-02-09 2010-07-14 张志强 Ground brick paving machine
CN203113745U (en) * 2012-12-25 2013-08-07 金育光 Ceramic tile paving frame

Also Published As

Publication number Publication date
CN103899071A (en) 2014-07-02

Similar Documents

Publication Publication Date Title
CN103899071B (en) Frame laid by a kind of ceramic tile
CN105064660A (en) Structure for preventing laying surface layer from cracking and method for preventing laying surface layer from cracking
CN104631829B (en) Technique for high-precision leveling of structural flooring
CN104631674A (en) Composite floor slab and construction method thereof
CN204960240U (en) Structure of surface course fracture prevents to mat formation
CN201817958U (en) Plastic brick with pipe/line groove
CN205444206U (en) Prevent fixing device on highway side slope landslide
CN203113745U (en) Ceramic tile paving frame
CN204112665U (en) A kind of tile floor paving hanger
CN204608614U (en) Steel box beam erection bracing or strutting arrangement
CN203856141U (en) Exhaust construction structure of roof sloping layer
CN206673539U (en) A kind of cable laying piping lane
CN104264945A (en) Ceramic floor tile paving and suspending bracket
CN203113697U (en) Wall tile laying and hanging device
CN206865082U (en) A kind of cable duct of substation
CN205489357U (en) Adjustable cable hook of mining multistage interval size
CN204455812U (en) A kind of embedded part structure of bridge extension joint
CN204156470U (en) Detachable routing device laid by a kind of power line
CN205046822U (en) Ceramic tile and compound instrument of base plate
CN204552115U (en) For the floating screed part that structure flooring high accuracy is levelling
CN202831307U (en) Fixing device of lower end of glass partition wall
CN205078922U (en) Can splice cable support
CN204030519U (en) Zanjon section cable laying device
CN203213322U (en) Deformation joint construction structure of thermoplastic elastic rubber plate of building ground
CN104018639A (en) Wall tile paving and hanging device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190410

Address after: 111300 No. 352, Building 1-3, Jinhuang Garden C, Lighthouse City, Liaoyang City, Liaoning Province

Patentee after: LIAONING TIANCHENG ENVIRONMENTAL PROTECTION TECHNOLOGY Co.,Ltd.

Address before: 111300 Liaoyang City Lighthouse Weiguo Road Liaoyang Iron Winery, Liaoyang City, Liaoning Province

Patentee before: Jin Yuguang

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191025

Address after: 200129 room 2012, building a, No. 1088, Xinjinqiao Road, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai

Patentee after: Shanghai Jiezhuang Technology Co.,Ltd.

Address before: 111300 No. 1-3 floor, C building, Golden Garden, Liaoyang, Liaoning Province, China.

Patentee before: LIAONING TIANCHENG ENVIRONMENTAL PROTECTION TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221208

Address after: No. 435, Group 3, Tujiatun Village, Yantai Street, Dengta City, Liaoyang City, Liaoning Province, 111300

Patentee after: Jin Jiucheng

Address before: Room 2012, building a, 1088 Xinjinqiao Road, China (Shanghai) pilot Free Trade Zone, Pudong New Area, Shanghai, 200129

Patentee before: Shanghai Jiezhuang Technology Co.,Ltd.

TR01 Transfer of patent right