CN103898879B - 兼顾初期供水的导流底孔改造方法 - Google Patents

兼顾初期供水的导流底孔改造方法 Download PDF

Info

Publication number
CN103898879B
CN103898879B CN201410147412.8A CN201410147412A CN103898879B CN 103898879 B CN103898879 B CN 103898879B CN 201410147412 A CN201410147412 A CN 201410147412A CN 103898879 B CN103898879 B CN 103898879B
Authority
CN
China
Prior art keywords
outlet
diversion outlet
concrete
initial stage
bottom diversion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410147412.8A
Other languages
English (en)
Other versions
CN103898879A (zh
Inventor
王惠芹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201410147412.8A priority Critical patent/CN103898879B/zh
Publication of CN103898879A publication Critical patent/CN103898879A/zh
Application granted granted Critical
Publication of CN103898879B publication Critical patent/CN103898879B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Barrages (AREA)
  • Revetment (AREA)

Abstract

本发明公开了一种兼顾初期供水的导流底孔改造方法,混凝土坝坝身的导流底孔断面根据后期导流规模确定,导流底孔的工作弧门、出口闸墩及支撑大梁均按照初期供水底孔的设计要求布置;在混凝土坝坝身施工后期将导流底孔改造为初期供水底孔;改造方法为:在导流底孔的底板回填第一期封堵混凝土,第一期封堵混凝土与封堵闸门之间预留3m宽的区域不进行封堵;当水库蓄水至死水位后,进行第二期回填封堵混凝土施工;将两期封堵混凝土结合为一个整体且与坝身混凝土紧密结合,将导流底孔完全封堵。本发明优点在于导流底孔布置时兼顾了水库初期供水要求,在增加投资少、施工方便的前提下达到尽早发挥供水作用。

Description

兼顾初期供水的导流底孔改造方法
技术领域
本发明涉及混凝土坝导流底孔改造方法,尤其是涉及兼顾初期供水的导流底孔改造方法。
背景技术
在水利工程中,向下游供水是水库常见的一种开发任务,对于水库库容较大的工程,水库蓄水到死水位需要很长时间,为尽早发挥水库工程的效益,需要研究水库的初期供水方案。建设在大江大河上的混凝土坝,在施工期的后期导流往往采用岸边导流洞和坝身导流底孔联合泄洪的方式。坝身设置的导流底孔,其底板高程距河床高程的高度往往差别不大,水库一旦蓄水很快就能蓄到导流底孔底板高程。因此,利用导流底孔兼顾初期供水,以解决水库初期供水问题不失为一种有效的方法。
发明内容
本发明目的在于提供一种兼顾初期供水的导流底孔改造方法。
为实现上述目的,本发明采取下述技术方案:
本发明所述的兼顾初期供水的导流底孔改造方法,混凝土坝坝身的导流底孔断面根据后期导流规模确定,导流底孔的工作弧门、出口闸墩及支撑大梁均按照初期供水底孔的设计要求布置;在混凝土坝坝身施工期的后期导流功能完成后,利用河道的枯水期将所述导流底孔改造为初期供水底孔;改造方法为:导流底孔的宽度不变,在导流底孔的底板回填第一期封堵混凝土,回填第一期封堵混凝土的高度根据初期供水的设计流量确定;为方便导流底孔封堵时止水装置的设置,第一期封堵混凝土与封堵闸门之间预留3m宽的区域不进行封堵;当水库蓄水至死水位后,利用导流底孔前的封堵平台将封堵闸门闭门挡水,进行第二期回填封堵混凝土施工;将两期封堵混凝土结合为一个整体且与坝身混凝土紧密结合,将导流底孔完全封堵。
本发明优点在于所述导流底孔布置时兼顾了水库初期供水要求,在增加投资少、施工方便的前提下达到尽早发挥供水作用。第一期封堵混凝土施工时预留3m未封堵段,有利于导流底孔完全封堵时止水装置的布置。
附图说明
图1是导流底孔改造前的纵剖面图。
图2是改造后的初期供水底孔的纵剖面图。
图3是完全封堵后的导流底孔纵剖面图。
具体实施方式
如图1-3所示,本发明所述的兼顾初期供水的导流底孔改造方法,混凝土坝坝身1的导流底孔2断面根据后期导流规模确定,导流底孔2的工作弧门4、出口闸墩5及支撑大梁6均按照初期供水底孔3的设计要求布置;在水库坝身1施工期的后期导流功能完成后,利用河道的枯水期将所述导流底孔2改造为初期供水底孔3;改造方法为:导流底孔2的宽度不变,在导流底孔2的底板回填第一期封堵混凝土7,回填第一期封堵混凝土7的高度根据初期供水底孔3的设计流量确定;为方便导流底孔2封堵时止水装置的设置,第一期封堵混凝土7与封堵闸门8之间预留3m宽的区域9不进行封堵;当水库蓄水至死水位后,利用导流底孔2前的封堵平台10将封堵闸门8闭门挡水,进行第二期回填封堵混凝土11的施工;将两期封堵混凝土7、11结合为一个整体且与坝身1混凝土紧密结合,将导流底孔2完全封堵。

Claims (1)

1.一种兼顾初期供水的导流底孔改造方法,混凝土坝坝身的导流底孔断面根据后期导流规模确定,导流底孔的工作弧门、出口闸墩及支撑大梁均按照初期供水底孔的设计要求布置;在混凝土坝坝身施工期的后期导流功能完成后,利用河道的枯水期将所述导流底孔改造为初期供水底孔;改造方法为:导流底孔的宽度不变,在导流底孔的底板回填第一期封堵混凝土,回填第一期封堵混凝土的高度根据初期供水的设计流量确定;为方便导流底孔封堵时止水装置的设置,第一期封堵混凝土与封堵闸门之间预留3m宽的区域不进行封堵;当水库蓄水至死水位后,利用导流底孔前的封堵平台将封堵闸门闭门挡水,进行第二期回填封堵混凝土施工;将两期封堵混凝土结合为一个整体且与坝身混凝土紧密结合,将导流底孔完全封堵。
CN201410147412.8A 2014-04-12 2014-04-12 兼顾初期供水的导流底孔改造方法 Active CN103898879B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410147412.8A CN103898879B (zh) 2014-04-12 2014-04-12 兼顾初期供水的导流底孔改造方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410147412.8A CN103898879B (zh) 2014-04-12 2014-04-12 兼顾初期供水的导流底孔改造方法

Publications (2)

Publication Number Publication Date
CN103898879A CN103898879A (zh) 2014-07-02
CN103898879B true CN103898879B (zh) 2015-12-09

Family

ID=50990434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410147412.8A Active CN103898879B (zh) 2014-04-12 2014-04-12 兼顾初期供水的导流底孔改造方法

Country Status (1)

Country Link
CN (1) CN103898879B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109295940B (zh) * 2018-11-19 2023-12-26 黄河勘测规划设计研究院有限公司 利用导流底孔改造的供水底孔结构及改造方法

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU949058A1 (ru) * 1980-05-21 1982-08-07 Сибирский Филиал Всесоюзного Ордена Трудового Красного Знамени Научно-Исследовательского Института Гидротехники Им.Б.Е.Веденеева Водосбросное устройство
CN1089132C (zh) * 1998-05-15 2002-08-14 刘伟亮 泄洪水坝
JP4686398B2 (ja) * 2006-04-24 2011-05-25 シーアイ化成株式会社 水路構造及びその構築方法
CN100557141C (zh) * 2007-10-12 2009-11-04 四川大学 用于河道闸坝和溢洪道的导流设施
CN102787586B (zh) * 2012-08-22 2014-04-16 黄河勘测规划设计有限公司 二期导流建筑与排沙闸相结合的布置方法
CN102953358A (zh) * 2012-11-23 2013-03-06 中国水电顾问集团贵阳勘测设计研究院 重力坝溢流面抗冲结构的改进方法及结构

Also Published As

Publication number Publication date
CN103898879A (zh) 2014-07-02

Similar Documents

Publication Publication Date Title
CN105839604B (zh) 用于初期蓄水的导流洞封堵结构及导流洞快速封堵方法
CN209053164U (zh) 引水隧洞进水口分层取水结构
CN104631396A (zh) 叠套式取水闸门
CN205205793U (zh) 一种利用导流隧洞改建的输水兼放空洞进口结构
CN203429606U (zh) 一种临时围堰改建而成的拦沙坎
CN105386426A (zh) 导流隧洞改建为弧形闸门控制的生态放水洞及方法
CN103898879B (zh) 兼顾初期供水的导流底孔改造方法
CN201943053U (zh) 导流泄洪洞结构
CN203808020U (zh) 一种利用泥岩筑坝料的面板堆石坝结构
CN103898915B (zh) 建筑物小面积深基坑抗浮止水施工方法
CN205348132U (zh) 一种岸塔式进水口
CN203113359U (zh) 土石围堰结构
CN204212180U (zh) 一种用于地下室降水井封堵的钢筋笼
CN205444124U (zh) 一种水泥块式防水坝
CN103898880B (zh) 水库导流洞回填改建泄洪洞的方法
CN203808019U (zh) 深厚软基高水头多功能坝的布置结构
CN203559405U (zh) 一种大坝泄水结构
CN203729280U (zh) 一种低水头导流洞封堵下闸挡水结构
CN208733589U (zh) 一种修建在陡峻边坡上的岸塔式进水口
CN203096696U (zh) 一种高低复合型壅水堰
CN202247724U (zh) 一种泥石流排导结构
CN205314072U (zh) 导流隧洞改建为弧形闸门控制的生态放水洞
CN104452683B (zh) 一种可控挡水钢面板坝
CN204225061U (zh) 一种分流式坝体结构
CN204238191U (zh) 一种高水头鱼道的布置结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee after: Yellow River Survey Planning and Design Research Institute Co., Ltd.

Address before: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee before: Yellow River Engineering Consulting Co., Ltd.