CN203559405U - 一种大坝泄水结构 - Google Patents

一种大坝泄水结构 Download PDF

Info

Publication number
CN203559405U
CN203559405U CN201320667848.0U CN201320667848U CN203559405U CN 203559405 U CN203559405 U CN 203559405U CN 201320667848 U CN201320667848 U CN 201320667848U CN 203559405 U CN203559405 U CN 203559405U
Authority
CN
China
Prior art keywords
water
dam
emptying
tunnel
bottom outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201320667848.0U
Other languages
English (en)
Inventor
刘昊
胡娟
朱友军
陈刚
王小平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Powerchina Zhongnan Engineering Corp Ltd
Original Assignee
Hydrochina Zhongnan Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Zhongnan Engineering Corp filed Critical Hydrochina Zhongnan Engineering Corp
Priority to CN201320667848.0U priority Critical patent/CN203559405U/zh
Application granted granted Critical
Publication of CN203559405U publication Critical patent/CN203559405U/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本实用新型公开了一种大坝泄水结构,它包括大坝上部的泄水表孔,泄水表孔闸门井,大坝底部的放空底孔,放空底孔闸门井,与放空底孔闸门井连通的底部退水隧洞;所述底部退水隧洞下游设有竖直穿过底部退水隧洞的竖井,所述竖井与泄水表孔闸门井连通。本实用新型能充分利用有限的建筑物布置空间,使之兼具泄洪和放空的功能;将泄洪表孔和放空底孔共用一个退水隧洞,无需将泄水表孔泄水结构和放空底孔泄水结构分开布置,减少了洞挖量、支护量及占地面积。

Description

一种大坝泄水结构
技术领域
[0001] 本实用新型属于水利水电技术领域,具体涉及一种将泄洪表孔和放空底孔结合的大坝泄水结构。
背景技术
[0002] 在水利水电工程中,为保障大坝的安全,常采用泄洪表孔来宣泄洪水。而在非常情况下,还需布置放空洞,以实现放空和检修功能。
[0003] 传统的大坝中,泄洪表孔泄水结构与放空底孔泄水结构一般分开布置,S卩,泄水表孔与大坝上端的退水隧洞连通,放空底孔与坝底部的退水隧洞连通。这样就需要在坝的上、下端都开挖横穿水坝的隧洞,而隧洞的开挖要根据地形、河道等实地环境来设计,将占用一定的地形和河道,而且横向隧洞开挖量及其支护量大,成本高、造价高。对于河道狭窄,泄洪建筑物布置空间有限的工程,这种问题尤为突出。
实用新型内容
[0004] 本实用新型旨在克服现有技术的不足,提供一种大坝泄水结构。
[0005] 为了达到上述目的,本实用新型提供的技术方案为:
[0006] 所述大坝泄水结构包括大坝上部的泄水表孔,泄水表孔闸门井,大坝底部的放空底孔,放空底孔闸门井,与放空底孔闸门井连通的底部退水隧洞;所述底部退水隧洞下游设有竖直穿过底部退水隧洞的竖井,所述竖井与泄水表孔闸门井连通。
[0007] 优选地,所述竖井底端设有水垫塘。
[0008] 优选地,所述水垫塘深度为大坝上游水位与水垫塘高程差的8 —12%,优选10%。
[0009] 优选地,所述竖井与底部退水隧洞下游出水端之间的连接段为压坡段。
[0010] 下面结合设计原理对本实用新型作进一步说明:
[0011] 本实用新型在大坝放空底孔退水隧洞下游开挖一竖井,通过此竖井将放空底孔和泄水表孔连通,这样就不需要在泄水表孔处额外开挖一条退水隧洞了,节约了开挖成本,降低了工程造价,同时也减少了支护量,减少了人力、物力。
[0012] 作为一种优选方案,在竖井底端设置一个水垫塘。该水垫塘主要用于对水流的消能,其消能效果与其消能容积有关,本实用新型中,水垫塘深度取上游水位与水垫塘高程差的8 —12%,通过水力学试验发现,本实用新型水垫塘的水流消能率可达到74%以上。
[0013] 另外,从泄水表孔闸门井处放出的水流经竖井跌落及在水垫塘消能后,其流态相当紊乱。因此,为改善流态,作为一种优选方案,本实用新型将竖井与底部退水隧洞下游出水端之间的连接段设为压坡段。
[0014] 总之,与现有技术相比,本实用新型的有益效果为:
[0015] (I)能充分利用有限的建筑物布置空间,使之兼具泄洪和放空的功能;
[0016] (2)将泄洪表孔和放空底孔共用一个退水隧洞,无需将泄水表孔泄水结构和放空底孔泄水结构分开布置,减少了洞挖量、支护量及占地面积。附图说明
[0017] 下面结合附图对本实用新型进一步说明。
[0018] 图1为本实用新型大坝泄水结构纵向剖面示意图;
[0019] 图2为本实用新型大坝泄水结构的俯视示意图。
[0020] 图中:1、泄水表孔;2、放空底孔;3、放空底孔闸门井;4、底部退水隧洞;5、竖井;
6、泄水表孔闸门井;7、水垫塘;8、压坡段。
具体实施方式
[0021] 参见图1和图2,所述大坝泄水结构包括大坝上部的泄水表孔1,泄水表孔闸门井6,大坝底部的放空底孔2,放空底孔闸门井3,与放空底孔闸门井3连通的底部退水隧洞4 ;所述底部退水隧洞4下游设有竖直穿过底部退水隧洞4的竖井5,所述竖井5与泄水表孔闸门井6连通。 [0022] 所述竖井5底端设有水垫塘7。
[0023] 所述水垫塘7深度为大坝上游水位与水垫塘7高程差的10%。
[0024] 所述竖井5与底部退水隧洞4下游出水端之间的连接段为压坡段8。
[0025] 以某水库为例,泄洪表孔泄洪流量359m??/s,放空底孔泄洪流量127 m??/s,原方案泄洪表孔、放空底孔洞身采用城门洞型,表孔洞身长258m,尺寸为5m (宽)X 7m (高),底孔洞身长298m,尺寸3m (宽)X4m (高),原投资分别为2451万元和1141万元。现将表孔与底孔结合,共用的退水隧洞尺寸为5m (宽)X7m (高),节省投资864万元。

Claims (4)

1.一种大坝泄水结构,包括大坝上部的泄水表孔(I),泄水表孔闸门井(6),大坝底部的放空底孔(2),放空底孔闸门井(3),与放空底孔闸门井(3)连通的底部退水隧洞(4);其特征在于,所述底部退水隧洞(4)下游设有竖直穿过底部退水隧洞(4)的竖井(5),所述竖井(5 )与泄水表孔闸门井(6 )连通。
2.如权利要求1所述的大坝泄水结构,其特征在于,所述竖井(5)底端设有水垫塘(7)。
3.如权利要去2所述的大坝泄水结构,其特征在于,所述水垫塘(7)深度为大坝上游水位与水垫塘(7)高程差的8 —12%。
4.如权利要求1所述的大坝泄水结构,其特征在于,所述竖井(5)与底部退水隧洞(4)下游出水端之间的连接段为压坡段(8 )。
CN201320667848.0U 2013-10-28 2013-10-28 一种大坝泄水结构 Active CN203559405U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320667848.0U CN203559405U (zh) 2013-10-28 2013-10-28 一种大坝泄水结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320667848.0U CN203559405U (zh) 2013-10-28 2013-10-28 一种大坝泄水结构

Publications (1)

Publication Number Publication Date
CN203559405U true CN203559405U (zh) 2014-04-23

Family

ID=50509136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320667848.0U Active CN203559405U (zh) 2013-10-28 2013-10-28 一种大坝泄水结构

Country Status (1)

Country Link
CN (1) CN203559405U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103526732A (zh) * 2013-10-28 2014-01-22 中国水电顾问集团中南勘测设计研究院有限公司 一种大坝泄水结构
CN104895022A (zh) * 2015-05-26 2015-09-09 中国电建集团中南勘测设计研究院有限公司 一种连通泄水建筑物的竖井结构及泄洪方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103526732A (zh) * 2013-10-28 2014-01-22 中国水电顾问集团中南勘测设计研究院有限公司 一种大坝泄水结构
CN104895022A (zh) * 2015-05-26 2015-09-09 中国电建集团中南勘测设计研究院有限公司 一种连通泄水建筑物的竖井结构及泄洪方法
CN104895022B (zh) * 2015-05-26 2016-09-07 中国电建集团中南勘测设计研究院有限公司 一种连通泄水建筑物的竖井结构及泄洪方法

Similar Documents

Publication Publication Date Title
CN209053164U (zh) 引水隧洞进水口分层取水结构
CN104631396A (zh) 叠套式取水闸门
CN203559405U (zh) 一种大坝泄水结构
CN104234013B (zh) 一种水库大坝
CN204023501U (zh) 一种用于土石坝的除险加固防渗处理结构
CN211571646U (zh) 一种用于泄流消能洞的补气坎结构
CN104499463A (zh) 一种多级伸缩钢坝
CN204326026U (zh) 一种多级伸缩式钢坝
CN203795388U (zh) 土坝+重力坝混合坝型的布置结构
CN104452666A (zh) 一种可升降潜坝
CN103938585A (zh) 土坝+重力坝混合坝型的布置结构
CN206784329U (zh) 一种土坝防渗及排渗结构
CN204000796U (zh) 河床式水电站结构
CN203113359U (zh) 土石围堰结构
CN103526732A (zh) 一种大坝泄水结构
CN203808019U (zh) 深厚软基高水头多功能坝的布置结构
CN204370370U (zh) 一种可升降潜坝
CN104480907B (zh) 一种液压型可升降箱式挡水坝
CN102644261B (zh) 阻抗与溢流相结合的调压井建造方法
CN208685572U (zh) 高外水竖井减压排水结构
CN205369185U (zh) 一种布置在隧洞中的前池
CN109267549A (zh) 一种引水隧洞结构
CN204326024U (zh) 一种液压型可升降箱式挡水坝
CN104452683B (zh) 一种可控挡水钢面板坝
CN103614986B (zh) 一种适用于尾矿库排洪的无压流进水方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA POWER GROUP ZHONGNAN INVESTIGATION DESIGN +

Free format text: FORMER NAME: HYDROCHINA ZHONGNAN ENGINEERING CORPORATION

CP03 Change of name, title or address

Address after: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16

Patentee after: Company limited of Central-South survey and design research institute of electricity Jian group of China

Address before: 410014, 9 camphor Road, Yuhua District, Hunan, Changsha

Patentee before: Co., Ltd of Zhongnan Prospecting Design Inst. China Hydrauelectric Consultant Group