CN103883119A - Building formwork installation method used for early-detached system - Google Patents

Building formwork installation method used for early-detached system Download PDF

Info

Publication number
CN103883119A
CN103883119A CN201410144653.7A CN201410144653A CN103883119A CN 103883119 A CN103883119 A CN 103883119A CN 201410144653 A CN201410144653 A CN 201410144653A CN 103883119 A CN103883119 A CN 103883119A
Authority
CN
China
Prior art keywords
early
taper pin
open
tear
brace summer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410144653.7A
Other languages
Chinese (zh)
Inventor
王超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Jinjianqiao Green Building Technology Co Ltd
Original Assignee
Harbin Jinjianqiao Green Building Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Jinjianqiao Green Building Technology Co Ltd filed Critical Harbin Jinjianqiao Green Building Technology Co Ltd
Priority to CN201410144653.7A priority Critical patent/CN103883119A/en
Publication of CN103883119A publication Critical patent/CN103883119A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a building formwork installation method used for an early-detached system. A wooden formwork is a construction technology which is most commonly used, wastes materials and is largest in manual work, and the error probability of construction of operators is the highest. The building formwork installation method used for the early-detached system comprises a wall body formwork 1 which is connected with a wall body and floor connection corner mold 2 through a taper pin, and the wall body and floor connection corner mold is connected with an early-detached supporting beam 3 through a taper pin. The early-detached supporting beam is connected with an early-detached supporting head 4, and the early-detached supporting beam is connected with a floor mold erecting formwork 5. The building formwork installation method is used for producing building formworks.

Description

The construction formwork mounting method that early removing system uses
technical field:
the present invention relates to the construction formwork mounting method that a kind of early removing system uses.
background technology:
at present, the template construction of Industrial and Civil Engineering remains the construction method of the wooden form following for many years, little punching block and steel large form, and aforesaid template and construction method all exist that operator's labour intensity is large, waste of material is obvious and the corresponding shortcoming such as versatility is poor.Although external template advanced technology, cost is high, and construction unit amortization is excessive.
wooden form is construction technology the most frequently used, that waste material, artificial maximum, and the wrong probability of operator's construction is the highest.Little punching block faded out at present industry with civilian construction template market, only in municipal infrastructure, use.Large form is the construction formwork often using at present, makes by design drawing, lifts, and the construction period is very fast, but because just designing for certain engineering, versatility is poor, and steel using amount is larger.Although external template advanced technology, cost is high, and construction unit amortization is excessive.
above-mentioned template is all failed to realize wall form and is early torn brace summer and effective connection of early tearing the realization of supporting member junction plate open open.The steel frame plywood formwork number of turnover is 40-50 time, and the number of turnover of wood plywood template is 8-10 time.According to the statistics of German PERI company, in the expense of Europe reinforced concrete work, labour cost and the cost of materials of form work engineering account for 52.7%, labour cost and the cost of materials of concrete work account for 29.6%, labour cost and the cost of materials of reinforced bar engineering account for 17.7%, and the expense of visible form work engineering accounts for over half, and wherein the labour cost of form work engineering will account for 46.7% of concrete structure expense, labour cost is very high, and cost of materials only accounts for 6.0%.”
summary of the invention:
the object of this invention is to provide a kind of batch production design that has realized template, wall form and early tear the construction formwork mounting method of the early removing system use of brace summer and being effectively connected of early tearing supporting member junction plate open, arbitrarily assembled large form and the early removing system that matches with it open.
above-mentioned object realizes by following technical scheme:
the construction formwork mounting method that a kind of early removing system uses, its composition comprises: wall form, described wall form connects by four block constructions: described wall form is connected angle mould by taper pin connecting wall with floor, described body of wall is connected angle mould and is connected and early torn open brace summer by taper pin with floor, tear brace summer connection described morning open and early tear supporting member open, tear brace summer described morning open and connect floor slab formerecting template.
the construction formwork mounting method that described early removing system uses, described wall form is connected between angle mould and connects by vertical taper pin with described body of wall and floor, described body of wall is connected angle mould and described early tears open between brace summer and is connected by horizontal taper pin with floor, the tapering of described taper pin is 1:100.
the construction formwork mounting method that described early removing system uses, tear brace summer described morning open and connect and early tear brace summer open and early tear one end of supporting member junction plate open and fix with taper pin, tear brace summer described morning open and tear brace summer the morning described in being connected with the other end of early tearing supporting member junction plate open open and fix with taper pin.
the construction formwork mounting method that described early removing system uses, described angle mould comprises connection inner corner trim mould, the two ends of described connection inner corner trim mould respectively connecting wall flat formwork are also fixed with described taper pin.
the construction formwork mounting method that described early removing system uses, one end of described connection inner corner trim mould connects slab form and fixes with described taper pin, and the other end connecting wall template of described connection inner corner trim mould is also fixed with described taper pin.
the construction formwork mounting method that described early removing system uses, one end of described connection inner corner trim mould connects slab form and fixes with described taper pin, and the other end tie-beam side template of described connection inner corner trim mould is also fixed with described taper pin.
beneficial effect:
1. the present invention is by four nodes of the different parts in building, and remainder adopts prior art, finally forms overall technical architecture.
steel framework in unit one of the present invention has been realized the effective protection to veneer, has improved the number of turnover of veneer, and has substituted traditional wood or steel by distracted; Steel framework has connection hole, can realize the exchange of taper pin and double-screw bolt.
2. in unit two of the present invention, use again inner corner trim and external angle formwork, realize the fixing connection of level and vertical all angle moulds.
3. the horizontal support beam forms of unit three of the present invention, is a part for template, substitutes flitch or the rectangular steel pipe of horizontal support, is one of elementary cell realizing whole early-dismantlings.
4. unit four of the present invention is early to tear supporting member template open, makes supporting member become the part of template, realizes in the situation that whole supports all can not tear open flat formwork complete removal.
5. of the present inventionly realize template batch production and produce, carry out stencil design by template manufacturer, job site, without processing, makes workmanship substantially reach clear water rank, has reduced the requirement to woodcraft level is installed, and has improved the speed that template is installed.
6. the present invention has stopped the use of flitch and plank at the construction field (site), engineering experiment certification, 28 layers of short-shear wall structure of this project, use one deck wall form, one deck flat formwork, three layers of support, drop into 350,000 yuan of formwork costs, this product wall form turnover 28 times, early tear brace summer open and early tear supporting member junction plate turnover 14 times open, also can have enough to meet the need same number of times by template present situation, counting 17.5 ten thousand yuan of this engineering template expenses, and steel framework can use forever, greatly reduce the input of engineering template cost.
7. the present invention is from social benefit, and the every 10,000 square metres of building areas of the present invention are saved nearly 150,000 yuan of timber; Calculate as 2000 myriametres that go into operation by somewhere year, will save 300,000,000 yuan, timber, calculate by every 1 myriametre surplus labour 6 people, by surplus labour 12000 people, reduced to a great extent building costs.
the present invention formed 63.5 serial steel frame plywood formworks realize batch production design, the wall form of template by necessary assembly and technology and early tear open brace summer with early tear open supporting member junction plate realize be effectively fixedly connected with, any assembled large form and the early removing system that matches with it.
use wooden form, need to drop into 18.7 ten thousand yuan of formwork costs, using the labour cost of wooden form is 39.2 ten thousand yuan; And the labour cost that uses this product is 23.5 ten thousand yuan, 15.7 ten thousand yuan of surplus, surplus labour 6 people, use the every floor of this product can save 1 day duration, and integrated engineering can be saved duration 25-28 days.
brief description of the drawings:
accompanying drawing 1 is the structural representation of this product unit one.
accompanying drawing 2 is structural representations of this product unit two.
accompanying drawing 3 is structural representations of this product unit three.
accompanying drawing 4 is structural representations of this product unit four.
accompanying drawing 5 is slab form, the syndeton schematic diagram of early tearing supporting member, beam type support shuttering open.
in figure: Fig. 1 early tears brace summer open and tear supporting member, wall connecting schematic diagram open with morning, in figure: 1: wall form 2: body of wall is connected angle mould with floor; 3: early tear brace summer open; 4: early tear brace summer open and early tear supporting member junction plate, 5 open: early tearing supporting member, 6 and 7 open: early tearing brace summer, 8 open: floor slab formerecting template.Fig. 2 is body of wall corner template connection diagram, in figure: 9: connect inner corner trim mould, 10: wall plane template; Fig. 3 is body of wall and floor connection diagram, 11: internal corner formwork; Fig. 4 is beam side and floor connection diagram, 12: side template.Accompanying drawing 6: promote and lock plate structure figure.
detailed description of the invention:
embodiment 1:
the construction formwork mounting method that a kind of early removing system uses, its composition comprises: wall form 1, described wall form connects by four block constructions: described wall form is connected angle mould 2 by taper pin connecting wall with floor, described body of wall is connected angle mould and is connected and early torn open brace summer 3 by taper pin with floor, tear brace summer connection described morning open and early tear supporting member 4 open, tear brace summer described morning open and connect floor slab formerecting template 5.
embodiment 2:
the construction formwork mounting method that early removing system described in embodiment 1 uses,: described wall form is connected between angle mould and connects by vertical taper pin 6 with described body of wall and floor, described body of wall is connected angle mould and described early tears open between brace summer and is connected by horizontal taper pin 7 with floor, the tapering of described taper pin is 1:100.
embodiment 3:
the construction formwork mounting method that early removing system described in embodiment 1 or 2 uses, tear brace summer described morning open and connect and early tear brace summer open and early tear one end of supporting member junction plate 8 open and fix with taper pin, tear brace summer described morning open and tear brace summer the morning described in being connected with the other end of early tearing supporting member junction plate open open and fix with taper pin.For the structure of unit one.
embodiment 4:
the construction formwork mounting method that early removing system described in embodiment 1 or 2 or 3 uses, described angle mould comprises connection inner corner trim mould 9, the two ends of described connection inner corner trim mould respectively connecting wall flat formwork 10 are also fixed with described taper pin.For the structure of unit two.
embodiment 5:
the construction formwork mounting method that early removing system described in embodiment 1 or 2 or 3 or 4 uses, one end of described connection inner corner trim mould connects slab form 11 and fixes with described taper pin, and the other end connecting wall template of described connection inner corner trim mould is also fixed with described taper pin.For the structure of unit three.
embodiment 6:
the construction formwork mounting method that early removing system described in embodiment 1 or 2 or 3 or 4 or 5 uses, one end of described connection inner corner trim mould connects slab form and fixes with described taper pin, and the other end tie-beam side template 12 of described connection inner corner trim mould is also fixed with described taper pin.For the structure of unit four.

Claims (6)

1. the construction formwork mounting method that early removing system uses, its composition comprises: wall form, it is characterized in that: described wall form connects and composes system by four block constructions: taper pin connecting wall is connected angle mould with floor, described body of wall is connected angle mould and is connected and early torn open brace summer by taper pin with floor, tear brace summer connection described morning open and early tear supporting member open, tear brace summer described morning open and connect floor slab formerecting template.
2. the construction formwork mounting method that early removing system according to claim 1 uses, it is characterized in that: described wall form is connected between angle mould and connects by vertical taper pin with described body of wall and floor, described body of wall is connected angle mould and described early tears open between brace summer and is connected by horizontal taper pin with floor, the tapering of described taper pin is 1:100.
3. the construction formwork mounting method that early removing system according to claim 1 and 2 uses, it is characterized in that: tear brace summer described morning open and connect and early tear brace summer open and early tear one end of supporting member junction plate open and fix with taper pin, tear brace summer described morning open and tear brace summer the morning described in being connected with the other end of early tearing supporting member junction plate open open and fix with taper pin.
4. the construction formwork mounting method using according to the early removing system described in claim 1 or 2 or 3, is characterized in that: described angle mould comprises connection inner corner trim mould, and the two ends of described connection inner corner trim mould respectively connecting wall flat formwork are also fixed with described taper pin.
5. the construction formwork mounting method that early removing system according to claim 4 uses, it is characterized in that: one end of described connection inner corner trim mould connects slab form and fixes with described taper pin, and the other end connecting wall template of described connection inner corner trim mould is also fixed with described taper pin.
6. the construction formwork mounting method that early removing system according to claim 4 uses, it is characterized in that: one end of described connection inner corner trim mould connects slab form and fixes with described taper pin, and the other end tie-beam side template of described connection inner corner trim mould is also fixed with described taper pin.
CN201410144653.7A 2014-04-11 2014-04-11 Building formwork installation method used for early-detached system Pending CN103883119A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410144653.7A CN103883119A (en) 2014-04-11 2014-04-11 Building formwork installation method used for early-detached system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410144653.7A CN103883119A (en) 2014-04-11 2014-04-11 Building formwork installation method used for early-detached system

Publications (1)

Publication Number Publication Date
CN103883119A true CN103883119A (en) 2014-06-25

Family

ID=50952218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410144653.7A Pending CN103883119A (en) 2014-04-11 2014-04-11 Building formwork installation method used for early-detached system

Country Status (1)

Country Link
CN (1) CN103883119A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013796A (en) * 2016-07-26 2016-10-12 中国建筑第八工程局有限公司 Early-disassembling formwork system and construction method thereof
CN106968431A (en) * 2017-02-01 2017-07-21 金美华 Beam bottom mother plate
CN107090974A (en) * 2017-07-03 2017-08-25 北京城建六建设集团有限公司 A kind of top plate Quick Release support system and its construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2849027Y (en) * 2005-09-18 2006-12-20 邝艳兰 High efficiency environmental protection plastic steel mould
KR20110008008U (en) * 2010-02-06 2011-08-12 (주)블루폼 Inconer panel with advanced dimensional control
CN202187547U (en) * 2011-06-17 2012-04-11 深圳汇林达科技有限公司 Light and high-strength alloy early-removed template system
CN202882410U (en) * 2012-11-15 2013-04-17 福建安厦新型建筑模板制造有限公司 Steel frame template assembly
CN103276891A (en) * 2013-06-08 2013-09-04 广东台澳特种铝材有限公司 Aluminum template system for building
CN203361627U (en) * 2013-06-08 2013-12-25 广东一百建筑科技有限公司 System capable of rapidly detaching aluminum alloy wall formwork

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2849027Y (en) * 2005-09-18 2006-12-20 邝艳兰 High efficiency environmental protection plastic steel mould
KR20110008008U (en) * 2010-02-06 2011-08-12 (주)블루폼 Inconer panel with advanced dimensional control
CN202187547U (en) * 2011-06-17 2012-04-11 深圳汇林达科技有限公司 Light and high-strength alloy early-removed template system
CN202882410U (en) * 2012-11-15 2013-04-17 福建安厦新型建筑模板制造有限公司 Steel frame template assembly
CN103276891A (en) * 2013-06-08 2013-09-04 广东台澳特种铝材有限公司 Aluminum template system for building
CN203361627U (en) * 2013-06-08 2013-12-25 广东一百建筑科技有限公司 System capable of rapidly detaching aluminum alloy wall formwork

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013796A (en) * 2016-07-26 2016-10-12 中国建筑第八工程局有限公司 Early-disassembling formwork system and construction method thereof
CN106013796B (en) * 2016-07-26 2019-01-04 中国建筑第八工程局有限公司 Early-dismantling formwork system and its construction method
CN106968431A (en) * 2017-02-01 2017-07-21 金美华 Beam bottom mother plate
CN107090974A (en) * 2017-07-03 2017-08-25 北京城建六建设集团有限公司 A kind of top plate Quick Release support system and its construction method

Similar Documents

Publication Publication Date Title
CN100469995C (en) Construction method for after-pouring band beam-slab template
CN102535682B (en) Replaceable connecting joint for wallboard components of precast concrete shear wall structures
CN204531376U (en) Wood grain clear water gang form system
CN203613792U (en) Parapet wall formwork pouring structure
CN205840317U (en) A kind of assembled architecture prefabricated post, beam cast-in-place node template
CN203441100U (en) Formwork structure of constructional column
CN106968435A (en) A kind of formwork reinforcement system of L-type shear wall with short piers one-piece casting construction
CN201671331U (en) Internal angle die and steel frame template structure with the same
CN103883119A (en) Building formwork installation method used for early-detached system
CN204728694U (en) A kind of concrete component template fixation kit
CN204475850U (en) Clear-water concrete balcony template
CN203856195U (en) Building template system used for early dismantling system
CN106088579B (en) The erection method of reinforced concrete wall template
CN203066099U (en) Combined steel formwork used for cup foundation construction
CN204898612U (en) Mould with adjustable be used for pouring ditch
CN104074354A (en) Plate-insertion type cast-in-place staircase template and use method of plate-insertion type cast-in-place staircase template
CN104912327B (en) Inner corner trim angle mould
CN105804396A (en) Precast stair flight manufactured by non-established and circularly-used template system and construction method
CN104047421B (en) Finished product assembly type plastic composition turnover mould board construction method
CN207999071U (en) A kind of wall column root concrete capping tools
CN205476468U (en) Non - design, can all rotary die plate bodys be prefabricated staircase bench template
CN109208799B (en) Construction method for early formwork removal in structure hole of waffle slab
CN104612394B (en) A kind of multi-purpose type Combined formwork
CN209907927U (en) Assembled beam column node mold sealing system capable of being installed and dismantled quickly
CN203188469U (en) Square column of steel structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140625