CN103883095B - A kind of construction method of external wall thermal insulating decoration integrated sheet material - Google Patents

A kind of construction method of external wall thermal insulating decoration integrated sheet material Download PDF

Info

Publication number
CN103883095B
CN103883095B CN201110459517.3A CN201110459517A CN103883095B CN 103883095 B CN103883095 B CN 103883095B CN 201110459517 A CN201110459517 A CN 201110459517A CN 103883095 B CN103883095 B CN 103883095B
Authority
CN
China
Prior art keywords
sheet material
paste
stickup
plate
planeness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110459517.3A
Other languages
Chinese (zh)
Other versions
CN103883095A (en
Inventor
顾振良
孙召龙
唐永峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGSHU ANCIENT STYLE GARDEN CONSTRUCTION Corp
Original Assignee
CHANGSHU ANCIENT STYLE GARDEN CONSTRUCTION Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGSHU ANCIENT STYLE GARDEN CONSTRUCTION Corp filed Critical CHANGSHU ANCIENT STYLE GARDEN CONSTRUCTION Corp
Priority to CN201110459517.3A priority Critical patent/CN103883095B/en
Publication of CN103883095A publication Critical patent/CN103883095A/en
Application granted granted Critical
Publication of CN103883095B publication Critical patent/CN103883095B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The invention discloses a kind of construction method of external wall thermal insulating decoration integrated sheet material, optimization is segmented to this link of stickup sheet material of prior art, make some rubber moulding template, before stickup, temporary basis is set, craft in taping process is rubbed pressure and is constantly checked verticality and planeness, paste recession except temporary basis, the surface finish after outer wall pasting heat preservation plate material and seam straightness accuracy are very significantly improved, practicality also has concurrently attractive in appearance.

Description

A kind of construction method of external wall thermal insulating decoration integrated sheet material
Technical field
The present invention relates to construction engineering technical field, particularly the construction method of external wall thermal insulating decoration integrated sheet material.
Background technology
Along with socioeconomic development, in modern construction engineering, there is certain requirement to energy-conservation, the heat insulating ability of building body.External-wall heat-insulation material has had to be applied widely, and has widely applied in some external wall outer insulation engineerings and have insulation, heat insulation, waterproof and decorative building material.Chinese patent CN101725227B discloses a kind of external wall thermal insulating decoration integrated construction method, comprise following sequential steps: basal plane process, cellular snap line, sanction plate, bottom bracket is installed, rearmounted support bracket is installed, paste sheet material, reinforcings of mechanical fixings part, filleting, dividing joint does waterproof sealing and colouring, dividing joint are repaired, entirety is repaired, solve architectural coating hollowing, ftracture, come off, the difficult problem such as immersion, synchronously reach the building effect such as insulation, heat insulation, waterproof, decoration.But in practice of construction process, some glue and the fixing link of pasting sheet material process are difficult to control, often make outer wall pasting sheet material rear surface planeness and seam straightness accuracy poor, have impact on the overall appearance of exterior wall.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, provides a kind of construction method making to paste sheet material rear surface planeness and the good external wall thermal insulating decoration integrated sheet material of seam straightness accuracy.
Technical scheme: prior art comprises following sequential steps: basal plane process, cellular snap line, sanction plate, bottom bracket is installed, rearmounted support bracket is installed, paste sheet material, reinforcings of mechanical fixings part, filleting, dividing joint does waterproof sealing and colouring, dividing joint are repaired, entirety is repaired.For achieving the above object, the construction method of external wall thermal insulating decoration integrated sheet material of the present invention is segmented optimization to this link of stickup sheet material on the basis of existing technology.
A, a making point rubber moulding template: adopt plank, make the some rubber moulding template of 600 × 600mm, 600 × 900mm according to sheet material modulus specification respectively, some glue is apart from edges of boards 50mm, and putting glue Φ 100,600 × 600mm mould plate is 5 points, and 600 × 900mm mould plate is 8 points;
Prepare before b, stickup: after cellular snap line, the temporary basis that usual flitch controls the horizontal absolute altitude in decorative board bottom surface is set according to surveying the bottom horizon established;
C, paste fixing: first paste two boards material on bottom both sides, after correcting verticality and planeness, draw a horizontal linear two boards material is suitable for reading; > 30mm place above paste position, by sheet material pressure on the wall after, be depressed into paste position with rubbing down on hand; As jumped a queue on base plate limit adjustment levelness with stopper time out-of-level, and detecting verticality and planeness with guiding ruler, ensureing that plate seam is consistent;
D, stickup post processing: remove the temporary basis arranged before pasting.
Beneficial effect: the present invention is by a utilization for rubber moulding template, the temporary basis arranged before pasting, craft in taping process is rubbed pressure and is constantly checked verticality and planeness, surface finish after outer wall pasting heat preservation plate material and seam straightness accuracy are very significantly improved, and practicality also has concurrently attractive in appearance.
Accompanying drawing explanation
Accompanying drawing 1 is the schematic diagram of 600 × 600mm point rubber moulding template;
Accompanying drawing 2 is the schematic diagram of 600 × 900mm point rubber moulding template.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is further described.
Prior art comprises following sequential steps: basal plane process, cellular snap line, sanction plate, bottom bracket is installed, rearmounted support bracket is installed, paste sheet material, reinforcings of mechanical fixings part, filleting, dividing joint does waterproof sealing and colouring, dividing joint are repaired, entirety is repaired.The construction method of external wall thermal insulating decoration integrated sheet material of the present invention is segmented optimization to this link of stickup sheet material on the basis of existing technology, and the detailed description of the invention of other links can be implemented by prior art.
A, a making point rubber moulding template: adopt 20mm plank, the point rubber moulding template of 600 × 600mm, 600 × 900mm is made respectively according to sheet material modulus specification, point glue is apart from edges of boards 50mm, point glue Φ 100,600 × 600mm mould plate is 5 points, and 600 × 900mm mould plate is 8 points, if any other small-sized plates, determine according to actual conditions, as this ensure that the uniformity of a glue point and area;
Prepare before b, stickup: after cellular snap line, the temporary basis that usual flitch controls the horizontal absolute altitude in decorative board bottom surface is set according to surveying the bottom horizon established;
C, stickup are fixed: each construction section of heat preservation and decoration integrated plate is pasted fixing by bottom to higher slice, first two boards material is pasted on bottom both sides during construction, draw a horizontal linear two boards material is suitable for reading after correction position (verticality, planeness), eligible rear daub starts to paste from left to right; During stickup above paste position > 30mm place, by sheet material pressure on the wall after, be depressed into paste position with rubbing down on hand; As jumped a queue on base plate limit adjustment levelness with stopper time out-of-level during stickup, remain that decorative board is suitable for reading on a horizontal linear, and detect verticality and planeness with spirit level (guiding ruler), two plate surface error < 1mm, ensure that plate seam is consistent, after calibrated, paste next block sheet material again; Every layer of decoration panel has been pasted, and after vertical, planeness and plate seam width calibration, aluminium alloys angle steel in strap bolt hole, decorative board reservation suitable for reading position is first fixed with pre-buried dovetail groove aluminium alloys bolt in insulation layer, then fixes with bolt and base course wall after metope boring; Every layer of decorative board is pasted and is all repeated above method, until end face;
D, stickup post processing: decorative board is removed after installing and pasted the front temporary basis arranged.
The construction method of this improvement is full of International Square first phase 3# and 4# engineering and is used in Changshu City, now the defect that the construction method of prior art and this improvements construction method are done is carried out investigation contrasts, and acquisition is two groups of data below:
Table 1: existing method constructional deficiency application form
Sequence number Mass defect Inspection is counted (point) Defective frequency (point)
1 Surface finish 50 24
2 Seam straightness accuracy 50 16
Table 2: the inventive method constructional deficiency application form
Sequence number Mass defect Inspection is counted (point) Defective frequency (point)
1 Surface finish 50 5
2 Seam straightness accuracy 50 4
By above defect inspection table can find out improvement construction method of the present invention make outer wall pasting heat preservation plate material after surface finish and seam straightness accuracy be very significantly improved, metope more has concurrently attractive in appearance.

Claims (1)

1. the construction method of an external wall thermal insulating decoration integrated sheet material, comprise following sequential steps: basal plane process, cellular snap line, sanction plate, bottom bracket is installed, rearmounted support bracket is installed, paste sheet material, reinforcings of mechanical fixings part, filleting, dividing joint does waterproof sealing and colouring, dividing joint are repaired, entirety is repaired, it is characterized in that: described stickup sheet material comprises the following steps:
A, a making point rubber moulding template: adopt plank to make a some rubber moulding template according to sheet material modulus specification;
Prepare before b, stickup: after cellular snap line, the temporary basis that usual flitch controls the horizontal absolute altitude in decorative board bottom surface is set according to surveying the bottom horizon established;
C, paste fixing: first paste two boards material on bottom both sides, after correcting verticality and planeness, draw a horizontal linear two boards material is suitable for reading; > 30mm place above paste position, by sheet material pressure on the wall after, be depressed into paste position with rubbing down on hand; As jumped a queue on base plate limit adjustment levelness with stopper time out-of-level, and detecting verticality and planeness with guiding ruler, ensureing that plate seam is consistent;
D, stickup post processing: remove the temporary basis arranged before pasting,
Described some rubber moulding template specification is 600 × 600mm, 600 × 900mm, and some glue, apart from edges of boards 50mm, puts glue Φ 100,600 × 600mm mould plate is 5 points, 600 × 900mm mould plate is 8 points, when guiding ruler detects verticality and planeness, and two plate surface error < 1mm.
CN201110459517.3A 2014-04-22 2014-04-22 A kind of construction method of external wall thermal insulating decoration integrated sheet material Active CN103883095B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110459517.3A CN103883095B (en) 2014-04-22 2014-04-22 A kind of construction method of external wall thermal insulating decoration integrated sheet material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110459517.3A CN103883095B (en) 2014-04-22 2014-04-22 A kind of construction method of external wall thermal insulating decoration integrated sheet material

Publications (2)

Publication Number Publication Date
CN103883095A CN103883095A (en) 2014-06-25
CN103883095B true CN103883095B (en) 2016-03-09

Family

ID=50952194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110459517.3A Active CN103883095B (en) 2014-04-22 2014-04-22 A kind of construction method of external wall thermal insulating decoration integrated sheet material

Country Status (1)

Country Link
CN (1) CN103883095B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110439312A (en) * 2019-08-12 2019-11-12 贵州建工集团第六建筑工程有限责任公司 The construction method of the hanging integrated plate for heat insulation external wall reconstruction of point

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2126161U (en) * 1992-05-07 1992-12-30 秦立新 Multifunctional figure drawing board
CN2227008Y (en) * 1995-07-28 1996-05-15 嘉荫县嘉林人造板厂 Embossing mould for plywood
CN2578458Y (en) * 2002-11-12 2003-10-08 全寿益 Template for wall decorative boss
CN101503041A (en) * 2008-12-11 2009-08-12 陈国文 Production of stencil plate as well as construction method for producing flat colored drawing pattern and three-dimensional colored drawing relief sculpture on surface of object
CN201411894Y (en) * 2009-05-25 2010-02-24 沈阳 Hollow template for surface spraying and batch scraping of building wall body

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2126161U (en) * 1992-05-07 1992-12-30 秦立新 Multifunctional figure drawing board
CN2227008Y (en) * 1995-07-28 1996-05-15 嘉荫县嘉林人造板厂 Embossing mould for plywood
CN2578458Y (en) * 2002-11-12 2003-10-08 全寿益 Template for wall decorative boss
CN101503041A (en) * 2008-12-11 2009-08-12 陈国文 Production of stencil plate as well as construction method for producing flat colored drawing pattern and three-dimensional colored drawing relief sculpture on surface of object
CN201411894Y (en) * 2009-05-25 2010-02-24 沈阳 Hollow template for surface spraying and batch scraping of building wall body

Also Published As

Publication number Publication date
CN103883095A (en) 2014-06-25

Similar Documents

Publication Publication Date Title
CN102864932B (en) Construction method of hanging type transparent and implicit combined glass curtain wall
CN105696789A (en) Vertical aluminum mould building system and construction method thereof
CN107264724A (en) It is used for the baseline design method that fitting-out piping is installed in the anti-state segmentation of cabin curved surface
CN107882220A (en) A kind of construction method of L-shaped biplane hyperbolic aluminum facade
JP2010243400A (en) Building berth support interference correcting method in subsonic half model wind tunnel test
CN103883095B (en) A kind of construction method of external wall thermal insulating decoration integrated sheet material
CN205777567U (en) A kind of bar spacing regulation instrument
CN110788918A (en) Leveling type film cutting equipment for coating machine
CN110700510A (en) Construction method for adjustable dry hanging stone
CN105298054A (en) AEPS (class-A expandable polystyrene) zinc-magnesium steel plate fireproof insulation decorative integrated board and construction process thereof
CN206158021U (en) Metal roofing element modelled after an antique
CN203514799U (en) Back arris clamp for combined aluminum formwork
CN104457696B (en) Non-leveling type horizontal measuring method
CN204789113U (en) Edge of a knife stop device and have its extensometer for extensometer
CN105604303A (en) Wall leveling piece installation auxiliary device
CN106677495B (en) A kind of multi-functional charge veins device of automatically calibrating verticality
CN204881445U (en) Inspection groove of roofing tile size
CN209296431U (en) A kind of molding die of finishing mucilage crack resistance, flexibility test
CN203334489U (en) Glass curtain wall with strip-shaped locating unit
CN108867955A (en) A kind of metal curtain wall structure and its installation method
CN105064643A (en) Method for precisely installing R-shaped dry hanging stone plate hanging element
CN111519857A (en) Special landscape wall stone-grain-imitating polished brick dry-hanging construction technology
CN101871258A (en) Implement for quickly and accurately pasting sanitary wall tiles and method of reserving gaps, arranging tiles, filling mortar and pasting tiles
CN105178532A (en) Plastering construction method capable of achieving precise leveling of vertical wall surface whitewash
CN104374292A (en) Straight edge downwarping correction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant