CN105178532A - Plastering construction method capable of achieving precise leveling of vertical wall surface whitewash - Google Patents

Plastering construction method capable of achieving precise leveling of vertical wall surface whitewash Download PDF

Info

Publication number
CN105178532A
CN105178532A CN201510497240.1A CN201510497240A CN105178532A CN 105178532 A CN105178532 A CN 105178532A CN 201510497240 A CN201510497240 A CN 201510497240A CN 105178532 A CN105178532 A CN 105178532A
Authority
CN
China
Prior art keywords
metope
whitewashing
wall surface
putty
whitewashes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510497240.1A
Other languages
Chinese (zh)
Other versions
CN105178532B (en
Inventor
张伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN HAIDA DECORATION GROUP Co Ltd
Original Assignee
SHENZHEN HAIDA DECORATION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN HAIDA DECORATION GROUP Co Ltd filed Critical SHENZHEN HAIDA DECORATION GROUP Co Ltd
Priority to CN201510497240.1A priority Critical patent/CN105178532B/en
Publication of CN105178532A publication Critical patent/CN105178532A/en
Application granted granted Critical
Publication of CN105178532B publication Critical patent/CN105178532B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a plastering construction method capable of achieving precise leveling of vertical wall surface whitewash, and solves the problems that the construction period of the wall surface whitewashing technology is long, and controlled by experience of an operator, the construction quality is hard to guarantee. The adopted method comprises the steps of measuring a to-be-whitewashed wall surface to determine a theoretical wall surface position after wall surface whitewashing; smearing guiding rules with putty cream of which the size is larger than the size of the largest thickness of wall surface whitewash, and vertically and parallelly arranging the guiding rules on the to-be-whitewashed wall surface according to a designed interval; measuring and adjusting the guiding rules, so as to enable the planes, with the putty cream, of the guiding rules to be positioned in the theoretical wall surface position after wall surface whitewashing; separating the guiding rules from the putty cream to form putty elevation strips; and carrying out whitewashing, plastering, and leveling on the wall surface among the elevation strips. The plastering construction method has the benefits that the elevation strips provide great convenience for plastering construction leveling, and the construction efficiency and the consistency of construction quality are greatly improved.

Description

Vertical wall whitewashes accurately levelling plastering construction method
Technical field
The invention belongs to the realm of building construction, particularly a kind of vertical wall whitewashes accurately levelling plastering construction method.
Background technology
In recent years, along with the development of real estate, people propose higher requirement to the quality in house, particularly to the requirement of metope redecoration, even require that construction quality is higher than decoration industry national standard, have higher requirement to decorations enterprise operating personnel.
In prior art, metope redecoration Conventional processing methods is, when without any measuring basis, constructor by rule of thumb, according to the quality of metope, carry out arbitrarily repeatedly scraping for the first time smearing to metope, for metope out-of-flatness, what deviation was larger needs plasterer to carry out secondary plaster leveling, the shortcoming of above-mentioned construction method is, first time scrapes to smear and need certain drying time between secondary plaster leveling, increase construction period, once scrape to smear and only control with constructor's experience with the thickness of secondary plaster leveling, also there is floated coat hollowing, the quality problems such as smooth deviation is large, construction quality cannot realize unified due to the experience of constructor and the difference of operant level, speed of application is slow, efficiency is low.
Summary of the invention
Increase construction period, the construction quality of whitewashing technique existence for overcoming prior art metope are controlled by operator's experience, and construction quality is difficult to the technical problem ensured, the present invention discloses a kind of vertical wall and whitewashes accurately levelling plastering construction method.
The technical scheme that the present invention realizes goal of the invention employing is:
Vertical wall whitewashes accurately levelling plastering construction method, and the method realizes by means of measuring instrument and unified standard size guiding ruler, and the method is realized by following steps:
Step 1. is vertical to the metope intending whitewashing, planeness is measured, the minimum thickness whitewashed according to the most concave point determination metope of the most protruding point of the metope intending whitewashing and metope and maximum gauge and metope whitewash after theoretical wall locations.
Step 2. gets one group of guiding ruler, guiding ruler is smeared and is greater than the putty paste that metope whitewashes maximum gauge size;
The guiding ruler putty paste of step 2 contacts bonding with the metope intending whitewashing by step 3., and is arranged in parallel within the metope of plan powdering by design interval vertical.
Step 4. utilizes measuring instrument to measure plane guiding ruler being coated with putty paste, is in the theoretical wall locations after metope powdering by this plane of extruding adjustment.
Guiding ruler and putty paste, after putty paste drying, depart from by step 5., intend the metope whitewashed is formed one group to be arranged in parallel within whitewashing with metope on the metope intending whitewashing by design interval vertical after putty absolute altitude bar corresponding to theoretical wall locations.
The absolute altitude that step 6. is whitewashed for metope with putty absolute altitude bar, is undertaken the metope between absolute altitude bar whitewashing, plaster leveling, completes vertical wall and whitewashes accurately levelling plastering construction.
The present invention realizes goal of the invention beneficial effect, metope is whitewashed construction be divided into: measure--certainly doing absolute altitude bar--plastering construction three process stages, by measuring benchmark and the depth of plastering of determining plastering construction, absolute altitude bar provides great convenience for plastering construction is levelling, greatly improves the uniformity of efficiency of construction and construction quality.
Below in conjunction with accompanying drawing, the present invention is described in detail.
Accompanying drawing 1 to be constructed body of wall side schematic view for the present invention.
The metope absolute altitude bar schematic diagram that accompanying drawing 2 is constructed for the present invention.
In accompanying drawing, 1 intends metope, 2 absolute altitude bars, 3 guiding rulers, 4 horizontal guiding rulers, the rear wall locations reference line of 5 metopes powdering whitewashed.
Detailed description of the invention
Referring to accompanying drawing, vertical wall whitewashes accurately levelling plastering construction method, and the method realizes by means of measuring instrument and unified standard size guiding ruler, and the method is realized by following steps:
Step 1. is vertical to the metope 1 intending whitewashing, planeness is measured, the minimum thickness whitewashed according to the most concave point determination metope of the most protruding point of the metope intending whitewashing and metope and maximum gauge and metope whitewash after theoretical wall locations (after whitewashing see 5 metopes in accompanying drawing wall locations reference line).
Above-mentioned measurement adopts laser measuring apparatus to measure, according to measure numerical computations go out minimum thickness and maximum gauge that metope whitewashes and metope whitewash after theoretical wall locations, according to the benchmark of theoretical wall locations as next construction sequence.
Step 2. gets one group of guiding ruler 3, guiding ruler 3 is smeared and is greater than the putty paste that metope whitewashes maximum gauge size.
The guiding ruler putty paste of step 2 contacts bonding with the metope intending whitewashing by step 3., and is arranged in parallel within the metope of plan powdering by design interval vertical.
Step 4. utilizes measuring instrument to measure plane guiding ruler being coated with putty paste, is in the theoretical wall locations after metope powdering by this plane of extruding adjustment.
Guiding ruler and putty paste, after putty paste drying, depart from by step 5., intend the metope whitewashed is formed one group to be arranged in parallel within whitewashing with metope on the metope intending whitewashing by design interval vertical after putty absolute altitude bar 2 corresponding to theoretical wall locations.
Due to the plane of all putty absolute altitude bars 2 be all controlled in metope whitewash after theoretical wall locations on, so namely one group of putty absolute altitude bar forms the absolute altitude bar 2 of the same absolute altitude at interval on metope.
The absolute altitude that step 6. is whitewashed for metope with putty absolute altitude bar 2, is undertaken the metope between absolute altitude bar whitewashing, plaster leveling, completes vertical wall and whitewashes accurately levelling plastering construction.
Plastering construction is carried out between each absolute altitude bar, greatly improve the efficiency of speed of application and accurately levelling plastering construction, there is the emphasis quality accident of geometric angle distortion between inclination, metope in thorough solution metope, also alleviate difficulty of construction and the technical level requirement to constructor simultaneously after whitewashing.
In the embodiment of the present invention, in the step 1 of the method, to intend whitewash metope carry out vertically, roughness measurement carry out measurement be employing laser measuring apparatus carry out.Laser measuring apparatus is utilized to map out theoretical wall locations reference line.
In the embodiment of the present invention, the putty paste used in the step 2 of the method is the material identical with whitewashing metope.The absolute altitude bar formed due to putty paste needs to be combined into one with the levelling plastering material of body of wall, and has the identical coefficient of expansion, to prevent from occurring slight crack between absolute altitude bar and the levelling plastering material of body of wall.
In the embodiment of the present invention, in the step 4 of the method, the theoretical wall locations after utilizing plane measuring instrument measurement guiding ruler being coated with putty paste to be in metope powdering adopts: horizontal guiding ruler 4 is measured one group of vertical guiding rule 3 and adjusted simultaneously.Greatly improve the efficiency that guiding ruler 3 adjusts.
In the embodiment of the present invention, the guiding ruler 3 used in the step 2 of the method and horizontal guiding ruler 4 are standard-sized aluminium alloy extrusions.Reduce the cost of guiding ruler.
In the embodiment of the present invention, in the step 5 of the method, the design spacing distance that the metope intending powdering is formed one group of putty absolute altitude bar 2 is 0.8-1.5 rice.This size design foundation arranges according to the technical level of general constructor.Along with the increase of absolute altitude bar 2 spacing distance, difficulty of construction is along with increase, and degree of plainness for wall surface error increases.

Claims (6)

1. vertical wall whitewashes accurately levelling plastering construction method, and the method realizes by means of measuring instrument and unified standard size guiding ruler, it is characterized in that: the method is realized by following steps:
Step 1. is vertical to the metope intending whitewashing, planeness is measured, the minimum thickness whitewashed according to the most concave point determination metope of the most protruding point of the metope intending whitewashing and metope and maximum gauge and metope whitewash after theoretical wall locations;
Step 2. gets one group of guiding ruler, guiding ruler is smeared and is greater than the putty paste that metope whitewashes maximum gauge size;
The guiding ruler putty paste of step 2 contacts bonding with the metope intending whitewashing by step 3., and is arranged in parallel within the metope of plan powdering by design interval vertical;
Step 4. utilizes measuring instrument to measure plane guiding ruler being coated with putty paste, is in the theoretical wall locations after metope powdering by this plane of extruding adjustment;
Guiding ruler and putty paste, after putty paste drying, depart from by step 5., intend the metope whitewashed is formed one group to be arranged in parallel within whitewashing with metope on the metope intending whitewashing by design interval vertical after putty absolute altitude bar corresponding to theoretical wall locations;
The absolute altitude that step 6. is whitewashed for metope with putty absolute altitude bar, is undertaken the metope between absolute altitude bar whitewashing, plaster leveling, completes vertical wall and whitewashes accurately levelling plastering construction.
2. vertical wall according to claim 1 whitewashes accurately levelling plastering construction method, it is characterized in that: in the step 1 of the method, carries out vertically, to carry out measurement be that employing laser measuring apparatus carries out to roughness measurement to the metope intending whitewashing.
3. vertical wall according to claim 1 whitewashes accurately levelling plastering construction method, it is characterized in that: the putty paste used in the step 2 of the method is the material identical with whitewashing metope.
4. vertical wall according to claim 1 whitewashes accurately levelling plastering construction method, it is characterized in that: in the step 4 of the method, the theoretical wall locations after utilizing plane measuring instrument measurement guiding ruler being coated with putty paste to be in metope powdering adopts: horizontal guiding ruler is measured one group of vertical guiding rule and adjusted simultaneously.
5. vertical wall according to claim 1 whitewashes accurately levelling plastering construction method, it is characterized in that: the guiding ruler used in the step 2 of the method is standard-sized aluminium alloy extrusions.
6. vertical wall according to claim 1 whitewashes accurately levelling plastering construction method, it is characterized in that: in the step 5 of the method, and the design spacing distance that the metope intending powdering is formed one group of putty absolute altitude bar is 0.8-1.5 rice.
CN201510497240.1A 2015-08-14 2015-08-14 Vertical wall whitewashes accurate levelling plastering construction method Active CN105178532B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510497240.1A CN105178532B (en) 2015-08-14 2015-08-14 Vertical wall whitewashes accurate levelling plastering construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510497240.1A CN105178532B (en) 2015-08-14 2015-08-14 Vertical wall whitewashes accurate levelling plastering construction method

Publications (2)

Publication Number Publication Date
CN105178532A true CN105178532A (en) 2015-12-23
CN105178532B CN105178532B (en) 2017-10-20

Family

ID=54900914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510497240.1A Active CN105178532B (en) 2015-08-14 2015-08-14 Vertical wall whitewashes accurate levelling plastering construction method

Country Status (1)

Country Link
CN (1) CN105178532B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112343272A (en) * 2020-10-22 2021-02-09 中建桥梁有限公司 Arc-shaped section wall plastering method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201649572U (en) * 2010-01-22 2010-11-24 深圳广田装饰集团股份有限公司 Guiding rule for building plastering
CZ26470U1 (en) * 2012-05-14 2014-02-17 Saint-Gobain Construction Products, S.R.O. Building surface with mockery and aid for making building surface with mockery
CN203961227U (en) * 2014-06-19 2014-11-26 江苏嘉明合达工程机械有限公司 Plane floating screed bar for wall plastering
CN204282777U (en) * 2014-11-25 2015-04-22 中建七局第四建筑有限公司 Wall construction is with controlling press strip

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201649572U (en) * 2010-01-22 2010-11-24 深圳广田装饰集团股份有限公司 Guiding rule for building plastering
CZ26470U1 (en) * 2012-05-14 2014-02-17 Saint-Gobain Construction Products, S.R.O. Building surface with mockery and aid for making building surface with mockery
CN203961227U (en) * 2014-06-19 2014-11-26 江苏嘉明合达工程机械有限公司 Plane floating screed bar for wall plastering
CN204282777U (en) * 2014-11-25 2015-04-22 中建七局第四建筑有限公司 Wall construction is with controlling press strip

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
熊维: "《建筑工程施工》", 30 September 2014 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112343272A (en) * 2020-10-22 2021-02-09 中建桥梁有限公司 Arc-shaped section wall plastering method

Also Published As

Publication number Publication date
CN105178532B (en) 2017-10-20

Similar Documents

Publication Publication Date Title
CN109085379B (en) Roadway average wind speed measuring method
JP5354660B2 (en) Substation support interference correction method in subsonic half model wind tunnel test
CN109712190A (en) The outer ginseng scaling method of three-dimensional laser scanner and three-dimensional laser radar
CN105758685A (en) Experimental water tank sediment bed surface leveling method and experimental water tank sediment bed surface leveling device
CN113235856A (en) Leveling method of assembly type triangular keel system
CN105178532A (en) Plastering construction method capable of achieving precise leveling of vertical wall surface whitewash
CN102645149A (en) Dual-purpose square pipe ruler
CN109870290B (en) Method for correcting Reynolds number effect of rounded square super-high-rise structure
CN205296758U (en) Perpendicular wall elevation lath construction equipment
CN112964184B (en) Oil film thickness measuring device and measuring method based on surface friction resistance experiment
CN108072353A (en) Measuring method and measuring device
CN111337000B (en) Rotating curved surface building construction measurement lofting method
CN204007389U (en) A kind of portable supplemental measurement tool
CN204936609U (en) A kind of cable testing bridge slit-scores chi
CN103335905B (en) Method for measuring microhardness of curved surface
CN106441032A (en) Detection method of ultra-thin float glass quantification flexibility value
CN202928515U (en) Dual-use square-tube ruler
CN107270881B (en) A kind of efficient setting out method in tunnel body for wind inner mold surface construction control point
CN202954543U (en) Component for shaping inside corner and outside corner of wall bodies
CN206091238U (en) Instrument of making level of plastering
CN204976607U (en) Marking device is pasted to FRP compression sample foil gage
CN204329963U (en) Laser type parallel relation analyzer
CN210833518U (en) Novel high-precision horizontal measuring instrument
CN204461421U (en) Novel steel column slope measurement instrument
CN103883095A (en) Construction method of heat-insulating decorative integrated plates for external walls

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant