CN105178532A - Plastering construction method capable of achieving precise leveling of vertical wall surface whitewash - Google Patents
Plastering construction method capable of achieving precise leveling of vertical wall surface whitewash Download PDFInfo
- Publication number
- CN105178532A CN105178532A CN201510497240.1A CN201510497240A CN105178532A CN 105178532 A CN105178532 A CN 105178532A CN 201510497240 A CN201510497240 A CN 201510497240A CN 105178532 A CN105178532 A CN 105178532A
- Authority
- CN
- China
- Prior art keywords
- metope
- whitewashing
- wall surface
- putty
- whitewashes
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Finishing Walls (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a plastering construction method capable of achieving precise leveling of vertical wall surface whitewash, and solves the problems that the construction period of the wall surface whitewashing technology is long, and controlled by experience of an operator, the construction quality is hard to guarantee. The adopted method comprises the steps of measuring a to-be-whitewashed wall surface to determine a theoretical wall surface position after wall surface whitewashing; smearing guiding rules with putty cream of which the size is larger than the size of the largest thickness of wall surface whitewash, and vertically and parallelly arranging the guiding rules on the to-be-whitewashed wall surface according to a designed interval; measuring and adjusting the guiding rules, so as to enable the planes, with the putty cream, of the guiding rules to be positioned in the theoretical wall surface position after wall surface whitewashing; separating the guiding rules from the putty cream to form putty elevation strips; and carrying out whitewashing, plastering, and leveling on the wall surface among the elevation strips. The plastering construction method has the benefits that the elevation strips provide great convenience for plastering construction leveling, and the construction efficiency and the consistency of construction quality are greatly improved.
Description
Technical field
The invention belongs to the realm of building construction, particularly a kind of vertical wall whitewashes accurately levelling plastering construction method.
Background technology
In recent years, along with the development of real estate, people propose higher requirement to the quality in house, particularly to the requirement of metope redecoration, even require that construction quality is higher than decoration industry national standard, have higher requirement to decorations enterprise operating personnel.
In prior art, metope redecoration Conventional processing methods is, when without any measuring basis, constructor by rule of thumb, according to the quality of metope, carry out arbitrarily repeatedly scraping for the first time smearing to metope, for metope out-of-flatness, what deviation was larger needs plasterer to carry out secondary plaster leveling, the shortcoming of above-mentioned construction method is, first time scrapes to smear and need certain drying time between secondary plaster leveling, increase construction period, once scrape to smear and only control with constructor's experience with the thickness of secondary plaster leveling, also there is floated coat hollowing, the quality problems such as smooth deviation is large, construction quality cannot realize unified due to the experience of constructor and the difference of operant level, speed of application is slow, efficiency is low.
Summary of the invention
Increase construction period, the construction quality of whitewashing technique existence for overcoming prior art metope are controlled by operator's experience, and construction quality is difficult to the technical problem ensured, the present invention discloses a kind of vertical wall and whitewashes accurately levelling plastering construction method.
The technical scheme that the present invention realizes goal of the invention employing is:
Vertical wall whitewashes accurately levelling plastering construction method, and the method realizes by means of measuring instrument and unified standard size guiding ruler, and the method is realized by following steps:
Step 1. is vertical to the metope intending whitewashing, planeness is measured, the minimum thickness whitewashed according to the most concave point determination metope of the most protruding point of the metope intending whitewashing and metope and maximum gauge and metope whitewash after theoretical wall locations.
Step 2. gets one group of guiding ruler, guiding ruler is smeared and is greater than the putty paste that metope whitewashes maximum gauge size;
The guiding ruler putty paste of step 2 contacts bonding with the metope intending whitewashing by step 3., and is arranged in parallel within the metope of plan powdering by design interval vertical.
Step 4. utilizes measuring instrument to measure plane guiding ruler being coated with putty paste, is in the theoretical wall locations after metope powdering by this plane of extruding adjustment.
Guiding ruler and putty paste, after putty paste drying, depart from by step 5., intend the metope whitewashed is formed one group to be arranged in parallel within whitewashing with metope on the metope intending whitewashing by design interval vertical after putty absolute altitude bar corresponding to theoretical wall locations.
The absolute altitude that step 6. is whitewashed for metope with putty absolute altitude bar, is undertaken the metope between absolute altitude bar whitewashing, plaster leveling, completes vertical wall and whitewashes accurately levelling plastering construction.
The present invention realizes goal of the invention beneficial effect, metope is whitewashed construction be divided into: measure--certainly doing absolute altitude bar--plastering construction three process stages, by measuring benchmark and the depth of plastering of determining plastering construction, absolute altitude bar provides great convenience for plastering construction is levelling, greatly improves the uniformity of efficiency of construction and construction quality.
Below in conjunction with accompanying drawing, the present invention is described in detail.
Accompanying drawing 1 to be constructed body of wall side schematic view for the present invention.
The metope absolute altitude bar schematic diagram that accompanying drawing 2 is constructed for the present invention.
In accompanying drawing, 1 intends metope, 2 absolute altitude bars, 3 guiding rulers, 4 horizontal guiding rulers, the rear wall locations reference line of 5 metopes powdering whitewashed.
Detailed description of the invention
Referring to accompanying drawing, vertical wall whitewashes accurately levelling plastering construction method, and the method realizes by means of measuring instrument and unified standard size guiding ruler, and the method is realized by following steps:
Step 1. is vertical to the metope 1 intending whitewashing, planeness is measured, the minimum thickness whitewashed according to the most concave point determination metope of the most protruding point of the metope intending whitewashing and metope and maximum gauge and metope whitewash after theoretical wall locations (after whitewashing see 5 metopes in accompanying drawing wall locations reference line).
Above-mentioned measurement adopts laser measuring apparatus to measure, according to measure numerical computations go out minimum thickness and maximum gauge that metope whitewashes and metope whitewash after theoretical wall locations, according to the benchmark of theoretical wall locations as next construction sequence.
Step 2. gets one group of guiding ruler 3, guiding ruler 3 is smeared and is greater than the putty paste that metope whitewashes maximum gauge size.
The guiding ruler putty paste of step 2 contacts bonding with the metope intending whitewashing by step 3., and is arranged in parallel within the metope of plan powdering by design interval vertical.
Step 4. utilizes measuring instrument to measure plane guiding ruler being coated with putty paste, is in the theoretical wall locations after metope powdering by this plane of extruding adjustment.
Guiding ruler and putty paste, after putty paste drying, depart from by step 5., intend the metope whitewashed is formed one group to be arranged in parallel within whitewashing with metope on the metope intending whitewashing by design interval vertical after putty absolute altitude bar 2 corresponding to theoretical wall locations.
Due to the plane of all putty absolute altitude bars 2 be all controlled in metope whitewash after theoretical wall locations on, so namely one group of putty absolute altitude bar forms the absolute altitude bar 2 of the same absolute altitude at interval on metope.
The absolute altitude that step 6. is whitewashed for metope with putty absolute altitude bar 2, is undertaken the metope between absolute altitude bar whitewashing, plaster leveling, completes vertical wall and whitewashes accurately levelling plastering construction.
Plastering construction is carried out between each absolute altitude bar, greatly improve the efficiency of speed of application and accurately levelling plastering construction, there is the emphasis quality accident of geometric angle distortion between inclination, metope in thorough solution metope, also alleviate difficulty of construction and the technical level requirement to constructor simultaneously after whitewashing.
In the embodiment of the present invention, in the step 1 of the method, to intend whitewash metope carry out vertically, roughness measurement carry out measurement be employing laser measuring apparatus carry out.Laser measuring apparatus is utilized to map out theoretical wall locations reference line.
In the embodiment of the present invention, the putty paste used in the step 2 of the method is the material identical with whitewashing metope.The absolute altitude bar formed due to putty paste needs to be combined into one with the levelling plastering material of body of wall, and has the identical coefficient of expansion, to prevent from occurring slight crack between absolute altitude bar and the levelling plastering material of body of wall.
In the embodiment of the present invention, in the step 4 of the method, the theoretical wall locations after utilizing plane measuring instrument measurement guiding ruler being coated with putty paste to be in metope powdering adopts: horizontal guiding ruler 4 is measured one group of vertical guiding rule 3 and adjusted simultaneously.Greatly improve the efficiency that guiding ruler 3 adjusts.
In the embodiment of the present invention, the guiding ruler 3 used in the step 2 of the method and horizontal guiding ruler 4 are standard-sized aluminium alloy extrusions.Reduce the cost of guiding ruler.
In the embodiment of the present invention, in the step 5 of the method, the design spacing distance that the metope intending powdering is formed one group of putty absolute altitude bar 2 is 0.8-1.5 rice.This size design foundation arranges according to the technical level of general constructor.Along with the increase of absolute altitude bar 2 spacing distance, difficulty of construction is along with increase, and degree of plainness for wall surface error increases.
Claims (6)
1. vertical wall whitewashes accurately levelling plastering construction method, and the method realizes by means of measuring instrument and unified standard size guiding ruler, it is characterized in that: the method is realized by following steps:
Step 1. is vertical to the metope intending whitewashing, planeness is measured, the minimum thickness whitewashed according to the most concave point determination metope of the most protruding point of the metope intending whitewashing and metope and maximum gauge and metope whitewash after theoretical wall locations;
Step 2. gets one group of guiding ruler, guiding ruler is smeared and is greater than the putty paste that metope whitewashes maximum gauge size;
The guiding ruler putty paste of step 2 contacts bonding with the metope intending whitewashing by step 3., and is arranged in parallel within the metope of plan powdering by design interval vertical;
Step 4. utilizes measuring instrument to measure plane guiding ruler being coated with putty paste, is in the theoretical wall locations after metope powdering by this plane of extruding adjustment;
Guiding ruler and putty paste, after putty paste drying, depart from by step 5., intend the metope whitewashed is formed one group to be arranged in parallel within whitewashing with metope on the metope intending whitewashing by design interval vertical after putty absolute altitude bar corresponding to theoretical wall locations;
The absolute altitude that step 6. is whitewashed for metope with putty absolute altitude bar, is undertaken the metope between absolute altitude bar whitewashing, plaster leveling, completes vertical wall and whitewashes accurately levelling plastering construction.
2. vertical wall according to claim 1 whitewashes accurately levelling plastering construction method, it is characterized in that: in the step 1 of the method, carries out vertically, to carry out measurement be that employing laser measuring apparatus carries out to roughness measurement to the metope intending whitewashing.
3. vertical wall according to claim 1 whitewashes accurately levelling plastering construction method, it is characterized in that: the putty paste used in the step 2 of the method is the material identical with whitewashing metope.
4. vertical wall according to claim 1 whitewashes accurately levelling plastering construction method, it is characterized in that: in the step 4 of the method, the theoretical wall locations after utilizing plane measuring instrument measurement guiding ruler being coated with putty paste to be in metope powdering adopts: horizontal guiding ruler is measured one group of vertical guiding rule and adjusted simultaneously.
5. vertical wall according to claim 1 whitewashes accurately levelling plastering construction method, it is characterized in that: the guiding ruler used in the step 2 of the method is standard-sized aluminium alloy extrusions.
6. vertical wall according to claim 1 whitewashes accurately levelling plastering construction method, it is characterized in that: in the step 5 of the method, and the design spacing distance that the metope intending powdering is formed one group of putty absolute altitude bar is 0.8-1.5 rice.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510497240.1A CN105178532B (en) | 2015-08-14 | 2015-08-14 | Vertical wall whitewashes accurate levelling plastering construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510497240.1A CN105178532B (en) | 2015-08-14 | 2015-08-14 | Vertical wall whitewashes accurate levelling plastering construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105178532A true CN105178532A (en) | 2015-12-23 |
CN105178532B CN105178532B (en) | 2017-10-20 |
Family
ID=54900914
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510497240.1A Active CN105178532B (en) | 2015-08-14 | 2015-08-14 | Vertical wall whitewashes accurate levelling plastering construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105178532B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112343272A (en) * | 2020-10-22 | 2021-02-09 | 中建桥梁有限公司 | Arc-shaped section wall plastering method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201649572U (en) * | 2010-01-22 | 2010-11-24 | 深圳广田装饰集团股份有限公司 | Guiding rule for building plastering |
CZ26470U1 (en) * | 2012-05-14 | 2014-02-17 | Saint-Gobain Construction Products, S.R.O. | Building surface with mockery and aid for making building surface with mockery |
CN203961227U (en) * | 2014-06-19 | 2014-11-26 | 江苏嘉明合达工程机械有限公司 | Plane floating screed bar for wall plastering |
CN204282777U (en) * | 2014-11-25 | 2015-04-22 | 中建七局第四建筑有限公司 | Wall construction is with controlling press strip |
-
2015
- 2015-08-14 CN CN201510497240.1A patent/CN105178532B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201649572U (en) * | 2010-01-22 | 2010-11-24 | 深圳广田装饰集团股份有限公司 | Guiding rule for building plastering |
CZ26470U1 (en) * | 2012-05-14 | 2014-02-17 | Saint-Gobain Construction Products, S.R.O. | Building surface with mockery and aid for making building surface with mockery |
CN203961227U (en) * | 2014-06-19 | 2014-11-26 | 江苏嘉明合达工程机械有限公司 | Plane floating screed bar for wall plastering |
CN204282777U (en) * | 2014-11-25 | 2015-04-22 | 中建七局第四建筑有限公司 | Wall construction is with controlling press strip |
Non-Patent Citations (1)
Title |
---|
熊维: "《建筑工程施工》", 30 September 2014 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112343272A (en) * | 2020-10-22 | 2021-02-09 | 中建桥梁有限公司 | Arc-shaped section wall plastering method |
Also Published As
Publication number | Publication date |
---|---|
CN105178532B (en) | 2017-10-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109085379B (en) | Roadway average wind speed measuring method | |
JP5354660B2 (en) | Substation support interference correction method in subsonic half model wind tunnel test | |
CN109712190A (en) | The outer ginseng scaling method of three-dimensional laser scanner and three-dimensional laser radar | |
CN105758685A (en) | Experimental water tank sediment bed surface leveling method and experimental water tank sediment bed surface leveling device | |
CN113235856A (en) | Leveling method of assembly type triangular keel system | |
CN105178532A (en) | Plastering construction method capable of achieving precise leveling of vertical wall surface whitewash | |
CN102645149A (en) | Dual-purpose square pipe ruler | |
CN109870290B (en) | Method for correcting Reynolds number effect of rounded square super-high-rise structure | |
CN205296758U (en) | Perpendicular wall elevation lath construction equipment | |
CN112964184B (en) | Oil film thickness measuring device and measuring method based on surface friction resistance experiment | |
CN108072353A (en) | Measuring method and measuring device | |
CN111337000B (en) | Rotating curved surface building construction measurement lofting method | |
CN204007389U (en) | A kind of portable supplemental measurement tool | |
CN204936609U (en) | A kind of cable testing bridge slit-scores chi | |
CN103335905B (en) | Method for measuring microhardness of curved surface | |
CN106441032A (en) | Detection method of ultra-thin float glass quantification flexibility value | |
CN202928515U (en) | Dual-use square-tube ruler | |
CN107270881B (en) | A kind of efficient setting out method in tunnel body for wind inner mold surface construction control point | |
CN202954543U (en) | Component for shaping inside corner and outside corner of wall bodies | |
CN206091238U (en) | Instrument of making level of plastering | |
CN204976607U (en) | Marking device is pasted to FRP compression sample foil gage | |
CN204329963U (en) | Laser type parallel relation analyzer | |
CN210833518U (en) | Novel high-precision horizontal measuring instrument | |
CN204461421U (en) | Novel steel column slope measurement instrument | |
CN103883095A (en) | Construction method of heat-insulating decorative integrated plates for external walls |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |