CN103879384A - Hot air supply device for quick deicing and snow removing system at bottom of high-speed rail train - Google Patents
Hot air supply device for quick deicing and snow removing system at bottom of high-speed rail train Download PDFInfo
- Publication number
- CN103879384A CN103879384A CN201410142187.9A CN201410142187A CN103879384A CN 103879384 A CN103879384 A CN 103879384A CN 201410142187 A CN201410142187 A CN 201410142187A CN 103879384 A CN103879384 A CN 103879384A
- Authority
- CN
- China
- Prior art keywords
- air
- air supply
- supply
- ice
- hot blast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Ventilation (AREA)
Abstract
The invention discloses a hot air supply device for a quick deicing and snow removing system at the bottom of a high-speed rail train. The hot air supply device comprises air supply columns arranged on one side of a deicing and snow removing station of the train, the air supply columns are lined up on the ground and evenly arranged, and 11-13 air supply columns are arranged corresponding to each section of train body. The air supply columns are fixed to the ground, communicated with an underground civil engineering delivery conduit and connected with a hot air unit in a hot air machine room through the underground civil engineering delivery conduit. Each air supply column of the hot air supply device comprises a column body, an air supply port, an air supply angle four-way regulating and locking device and an air quantity regulating valve, the air supply port is arranged on the top of the air supply column, and the air supply angle four-way regulating and locking device is arranged in the air supply port. According to the hot air supply device, hot air at a certain speed is blown out towards the bottom of the train through the air supply columns, heat exchange between ice and snow and the train body can be enhanced and the overall environment temperature of a garage can be improved through the air supply temperature and flowing of the hot air, and the functions of quick deicing and snow removing can be achieved. According to the hot air supply device, it can be guaranteed that the longest deicing operating time at the bottom of the compartment of the train is less than one hour, and technological requirements can be met.
Description
Technical field
The present invention relates to high ferro train overhaul device, particularly the hot blast air-supply arrangement of railway car bottom ice-melt snow removal system.
Background technology
Winter, high ferro train was run at high speed in process in ice and snow region, can entrainment a large amount of ice and snow and be attached to car bottom, formed more closely knit ice and snow layer, and thickness is conventionally more than 8cm.4000 kilometers of the every operations of high ferro train or operation 48 hours, need to get back to Motor Car Institute and carry out an one-level maintenance, each one-level maintenance will complete in 3 and a half hours, first need to remove fast the ice and snow that car bottom adheres to, reach the ice-melt library standard that removes the snow out, must not there be residual accumulated ice and accumulated snow in the each position of train traveling portion, ensures normally carrying out of lower order upkeep operation.Therefore, on time and one-level of having guaranteed the quality maintenance be starved of quick ice-melt snow removal system be set, car bottom freezes the removal problem of ice and snow when solving high ferro train winter operation.
The mode of existing high ferro train bottom ice-melt snow removing mainly contains two kinds: a kind of mode is the temperature that the radiator heat-dissipation by arranging in train overhaul ditch improves train bottom local environment, accelerate the thawing speed of train bottom ice and snow, and in conjunction with the manually mode deicing of snow shovel ice.Which subject matter is: be difficult to ensure the requirement of 1 hour of car bottom ice-melt snow removing maximum duration, affect maintenance, the servicing work of train; The radiator arranging in service pit is not obvious to the effect of raising local ambient temperature, and the effect of ice-melt snow removing is slow, falls flat; And main deicing work is by manually completing, labour intensity is large, efficiency is low, and shovel snow is improper also easily to cause damage to car body.Another kind of mode is by adopting hot blast ice-melt snow removal system that hot blast higher temperature is delivered to train bottom, improve the speed of ice-melt snow removing, but because its hot blast air-supply arrangement does not have special design, just in train lower space, common air outlet is set, the thermal current of this air supply mode does not directly brush the ice and snow of train bottom, can not effectively cover train bottom ice and snow, or even do not cover at all, can not fully improve the heat exchange efficiency between hot blast and ice and snow, although the front a kind of mode of train peripheral temperature promotes higher, ice-melt speed increases, but do not give play to the optimum efficiency of hot blast ice-melt, cause thermal waste, the problem identical with front a kind of mode still exists in various degree.
Summary of the invention
The problem existing for the ice-melt snow removing of existing high ferro train bottom, the present invention releases a kind of for the high ferro train bottom hot blast air-supply arrangement of ice-melt snow removal system fast, by in a row with air outlet, the air-supply post of volume damper and air port wind direction four-way regulation locking device is arranged on a side of train ice-melt snow removing station, directly brush hot blast to train bottom, and make hot blast cover ice and snow comprehensively, the abundant contact heat-exchanging of hot blast and ice and snow, realize closely ice-melt snow removing fast, improve reliability and the validity of hot blast ice-melt snow removal system, promote the efficiency of hot blast ice-melt snow removal system, realize the requirement of technique, improve energy utilization rate.
What the present invention relates to is a kind of for the high ferro train bottom hot blast air-supply arrangement of ice-melt snow removal system fast, comprise the air-supply post that is arranged on train ice-melt snow removing station one side, air-supply post on the ground in one line, be evenly arranged, corresponding every joint train body arranges 11~13 air-supply posts.Air-supply post is fixed on ground and communicates with underground civil engineering air delivery duct, is connected with the hot blast unit in hot blast machine room by underground civil engineering air delivery duct.Hot blast unit in underground civil engineering supply air duct and hot blast machine room is the high ferro train bottom component part of ice-melt snow removal system fast, and ice-melt snow removal system also includes blowpipe backwind tube, return air inlet fast.
The air-supply post of described hot blast air-supply arrangement comprises cylinder, air outlet, wind direction four-way regulation locking device, volume damper, and air-supply column top arranges air outlet, and wind direction four-way regulation locking device is set in air outlet.
Dash drainage channel is set in the cylindrical shell of air-supply post and discharges water pipe.
The air outlet of air-supply post is bar shaped spout, and air outlet longitudinal center is provided with rotating shaft, is laterally symmetrical set angle adjustable breather vane in air outlet.
Wind direction four-way regulation locking device in air-supply post air outlet is made up of adjusting knob, drive link, gear, tooth bar, half moon fixed mount, lock screw.Wind direction four-way regulation locking device interlock air outlet, the adjusting of angle is spread in the left and right air-supply that realizes breather vane in the adjusting of the upper and lower wind direction of air outlet and air port.
The hot blast air-supply arrangement for the quick ice-melt snow removal system in high ferro train bottom the present invention relates to, hot blast by from air-supply post to train bottom ejection certain speed, mobile the increasing and the heat exchange of ice and snow and car body that utilizes wind pushing temperature and hot blast, and improve garage integrated environment temperature, realize the function of quick ice-melt snow.Train is stopped by fixing station after entering ice-melt storehouse, start the quick ice-melt snow removal system of hot blast, high temperature air directly brushes by hot blast air-supply arrangement and effectively covers bottom train, further improve the efficiency of hot blast ice-melt snow removing, shorten the ice-melt snow removing time, and then improve energy utilization rate, can significantly reduce artificial Snow removing amount, ensure that the longest ice-melt production time in railway car bottom is no more than 1 hour, meets technological requirement.
Brief description of the drawings
Fig. 1 is the high ferro train bottom ice-melt snow removal system composition schematic diagram fast the present invention relates to;
Fig. 2 is that the air-supply post of the hot blast air-supply arrangement for the quick ice-melt snow removal system in high ferro train bottom of the present invention arranges situation schematic diagram;
Fig. 3 is the air-supply rod structure front elevation of hot blast air-supply arrangement of the present invention;
Fig. 4 is the air-supply rod structure lateral plan of hot blast air-supply arrangement of the present invention.
Description of symbols in figure:
1. air-supply post 2. cylinders
3. air outlet 4. angle adjustable breather vanes
5. dash drainage channel 6. drain hoses
7. volume damper 8. wind direction four-way regulation locking devices
9. blowpipe 10. supply air ducts
11. hot blast unit 12. backwind tubes
13. return air inlet 14. train bodies
Detailed description of the invention
By reference to the accompanying drawings technical scheme of the present invention is further illustrated.
Fig. 2 shows the situation that arranges of the air-supply post of the hot blast air-supply arrangement the present invention relates to.As shown in Figure 2,
The air-supply post 1 of the hot blast air-supply arrangement for the quick ice-melt snow removal system in high ferro train bottom the present invention relates to is arranged on the high ferro train body 14 1 side ground that dock at ice-melt snow removing station, a corresponding joint train body is in one line, 11~13 air-supply posts 1 are evenly set, air-supply post 1 is controlled between 1200mm~1400mm apart from orbit centre distance, and the blowpipe 9 of air-supply post 1 uncovered position, bottom and underground civil engineering supply air duct 10 is connected and fixed by flange at the opening on ground.These corresponding air-supply posts once joint train body form a set of hot blast air-supply arrangement.
Fig. 1 shows the high ferro train bottom basic structure of ice-melt snow removal system fast the present invention relates to.As shown in Figure 1, air-supply post 1, blowpipe 9, supply air duct 10, hot blast unit 11, backwind tube 12, return air inlet 13 form high ferro train bottom ice-melt snow removal system fast.Hot blast unit 11 passes through return air inlet 13, backwind tube 12 by air heating to 60 DEG C in the ice-melt storehouse sucking, again by supply air duct 10, blowpipe 9, deliver to train set through hot blast air-supply arrangement, at the bottom of hot air covers whole car, hot air is avenged fully with car anchor ice and is contacted, heat exchange control certain wind speed and ensure suitable density of heat flow rate, improves ice-melt speed.
Fig. 3 and Fig. 4 show the basic structure of the hot blast air-supply arrangement air-supply post the present invention relates to, and as shown in Figure 3 and Figure 4, air-supply post 1 comprises cylinder 2, air outlet 3, volume damper 7, air port wind direction regulation locking device 8.Air outlet 3 is arranged on cylinder 2 dip plane, top, and air port wind direction four-way regulation locking device 8 is fixed on linkage air port on cylinder 2 dip plane, top, and volume damper 7 is connected in the bottom of cylinder 2.Air-supply post 1 bottom-to-top-height 500~550mm.
Air port wind direction four-way regulation locking device 8 is mainly made up of adjusting knob, drive link, gear, tooth bar, half moon fixed mount, lock screw etc.Twisting adjusting knob, by breather vane in drive link, gear, tooth bar interlock air outlet, realizes the adjusting of left and right air-supply diffusion angle; Adjusting knob is moved in front and back, by the rotating shaft at drive link, two ends, air port, realizes the adjusting of the upper and lower wind direction in air port, after each wind direction is adjusted, by tightening lock screw lock adjustment.
What volume damper 7 adopted finished product manually splits multi-clack control valve, valve body height 50mm.Volume damper is connected to air-supply post cylindrical shell bottom by flange, and the hot blast mean allocation that is mainly used in that hot blast unit is sent arrives each air-supply post of air-supply arrangement.
Claims (7)
1. the hot blast air-supply arrangement for the quick ice-melt snow removal system in high ferro train bottom, it is characterized in that: comprise the air-supply post that is arranged on train ice-melt snow removing station one side, air-supply post on the ground in one line, be evenly arranged, corresponding every joint train body arranges 11~13 air-supply posts; Described air-supply post is fixed on ground and communicates with underground civil engineering air delivery duct, is connected with the hot blast unit in hot blast machine room by underground civil engineering air delivery duct; Described air-supply post comprises cylinder, air outlet, wind direction four-way regulation locking device, volume damper, and air-supply column top arranges air outlet, and wind direction four-way regulation locking device is set in air outlet.
2. the hot blast air-supply arrangement for the quick ice-melt snow removal system in high ferro train bottom according to claim 1, is characterized in that: described air-supply post height is 500~550mm, and air-supply post is apart from train rail line of centers 1200~1400mm.
3. according to claim 1 for the high ferro train bottom hot blast air-supply arrangement of ice-melt snow removal system fast, it is characterized in that: described air-supply capital is towards lopsidedness, horizontal by 30 ° of angles, air-supply arranges air outlet on dip plane, column top, and wind direction four-way regulation locking device is fixed on linkage air port on air-supply dip plane, column top.
4. according to claim 3 for the high ferro train bottom hot blast air-supply arrangement of ice-melt snow removal system fast, it is characterized in that: described air outlet adopts the upper and lower Adjustable air port of wind direction, formed by housing and rotatable bar shaped spout, air port longitudinal center is provided with rotating shaft, in air port, be laterally symmetrical set angle adjustable breather vane, the air-out diffusion angle of adjustable left and right.
5. according to claim 3 for the high ferro train bottom hot blast air-supply arrangement of ice-melt snow removal system fast, it is characterized in that: described wind direction four-way regulation locking device comprises adjusting knob, drive link, gear, tooth bar, half moon fixed mount, lock screw; Twisting adjusting knob, by breather vane in drive link, gear, tooth bar interlock air port, is realized the adjusting of left and right air-supply diffusion angle; Adjusting knob is moved in front and back, by drive link, air port rotating shaft, realizes the adjusting of the upper and lower wind direction in air port, after each wind direction is adjusted, by tightening lock screw lock adjustment.
6. according to claim 1 for the high ferro train bottom hot blast air-supply arrangement of ice-melt snow removal system fast, it is characterized in that: it is 10 ‰ U-shaped dash drainage channel that described air-supply post inner wind outlet below arranges the gradient, the low side of tank is established drain hose, and drain hose is established the S shape drain trap water seal that is highly not less than 50mm.
7. according to claim 1 for the high ferro train bottom hot blast air-supply arrangement of ice-melt snow removal system fast, it is characterized in that: described air-supply post housing bottom flange connection volume damper, volume damper adopts manually splits multi-clack control valve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410142187.9A CN103879384A (en) | 2014-04-10 | 2014-04-10 | Hot air supply device for quick deicing and snow removing system at bottom of high-speed rail train |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410142187.9A CN103879384A (en) | 2014-04-10 | 2014-04-10 | Hot air supply device for quick deicing and snow removing system at bottom of high-speed rail train |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103879384A true CN103879384A (en) | 2014-06-25 |
Family
ID=50948607
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410142187.9A Pending CN103879384A (en) | 2014-04-10 | 2014-04-10 | Hot air supply device for quick deicing and snow removing system at bottom of high-speed rail train |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103879384A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104108405A (en) * | 2014-06-30 | 2014-10-22 | 南车青岛四方机车车辆股份有限公司 | Snow removal device and method for bogies of railway vehicles in extremely cold regions |
CN105021408A (en) * | 2015-08-12 | 2015-11-04 | 山东科大微机应用研究所有限公司 | Heating-device-contained roller opposite-force type loading brake check-out console and using method thereof |
CN105083229A (en) * | 2015-09-02 | 2015-11-25 | 铁道第三勘察设计院集团有限公司 | Outdoor closed type high-speed train ice melting and snow removing system |
CN105973582A (en) * | 2016-05-26 | 2016-09-28 | 北京强度环境研究所 | High-and-low-temperature current-carrying fatigue testing apparatus for air flue of air conditioner |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090188989A1 (en) * | 2006-02-03 | 2009-07-30 | Nordic Ground Support Equipment Ip Ab | Method and device for de-icing of trains |
CN102259573A (en) * | 2011-03-11 | 2011-11-30 | 浙江吉利汽车研究院有限公司 | Air outlet device of rotary type automobile air conditioner |
CN202229345U (en) * | 2011-09-14 | 2012-05-23 | 深圳市永洁净化工程有限公司 | Ventilation structure of dust-free workshop |
EP2641787A1 (en) * | 2012-03-23 | 2013-09-25 | Karl-Erik Lind | A device for removal of ice from a railway vehicle |
CN203766720U (en) * | 2014-04-10 | 2014-08-13 | 铁道第三勘察设计院集团有限公司 | Hot air supply device used for rapid ice melting and snow removing system at bottom of high-speed train |
-
2014
- 2014-04-10 CN CN201410142187.9A patent/CN103879384A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090188989A1 (en) * | 2006-02-03 | 2009-07-30 | Nordic Ground Support Equipment Ip Ab | Method and device for de-icing of trains |
CN102259573A (en) * | 2011-03-11 | 2011-11-30 | 浙江吉利汽车研究院有限公司 | Air outlet device of rotary type automobile air conditioner |
CN202229345U (en) * | 2011-09-14 | 2012-05-23 | 深圳市永洁净化工程有限公司 | Ventilation structure of dust-free workshop |
EP2641787A1 (en) * | 2012-03-23 | 2013-09-25 | Karl-Erik Lind | A device for removal of ice from a railway vehicle |
CN203766720U (en) * | 2014-04-10 | 2014-08-13 | 铁道第三勘察设计院集团有限公司 | Hot air supply device used for rapid ice melting and snow removing system at bottom of high-speed train |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104108405A (en) * | 2014-06-30 | 2014-10-22 | 南车青岛四方机车车辆股份有限公司 | Snow removal device and method for bogies of railway vehicles in extremely cold regions |
CN105021408A (en) * | 2015-08-12 | 2015-11-04 | 山东科大微机应用研究所有限公司 | Heating-device-contained roller opposite-force type loading brake check-out console and using method thereof |
CN105021408B (en) * | 2015-08-12 | 2017-08-08 | 山东科大微机应用研究所有限公司 | Drum reaction type loading brake test bench and its application method with heater |
CN105083229A (en) * | 2015-09-02 | 2015-11-25 | 铁道第三勘察设计院集团有限公司 | Outdoor closed type high-speed train ice melting and snow removing system |
CN105083229B (en) * | 2015-09-02 | 2018-10-09 | 中国铁路设计集团有限公司 | Outdoor closed high ferro train ice-melt snow removal system |
CN105973582A (en) * | 2016-05-26 | 2016-09-28 | 北京强度环境研究所 | High-and-low-temperature current-carrying fatigue testing apparatus for air flue of air conditioner |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203766720U (en) | Hot air supply device used for rapid ice melting and snow removing system at bottom of high-speed train | |
CN103879384A (en) | Hot air supply device for quick deicing and snow removing system at bottom of high-speed rail train | |
CN102011604B (en) | Movable mine ice-storage air conditioner | |
CN104019507B (en) | The multi fan Evaporative Cooling Air-conditioning System that tubular type is combined with vaporizing type air conditioner indirectly | |
CN203518100U (en) | Vertical tube type indirect evaporative cooling air conditioner | |
CN103512386B (en) | Crossfolw open type cooling tower | |
CN103776276A (en) | Counter-flow closed-type cooling tower | |
CN100513963C (en) | Underground cooling device | |
EP1243875B1 (en) | Geothermal pile having a cavity through which a fluid can flow | |
CN104511445A (en) | Steel ball drying and cleaning device | |
CN203785483U (en) | Double-spraying reverse flow closed cooling tower containing pre-cooling filler | |
CN107215467A (en) | A kind of plant protection unmanned plane flusher | |
CN110332003B (en) | System and method for directly applying mine exhaust waste heat to wellhead heat preservation | |
CN106017129A (en) | Cooling tower applicable to interior of underground one-way airflow space | |
CN202623005U (en) | Precooling and preheating integrated device for concrete aggregate | |
CN102363446B (en) | Pipeline spraying ice and snow removing device for aerostat | |
CN205919700U (en) | Cooling tower suitable for in one -way air current space in underground | |
CN201964560U (en) | Cooling and ventilating system of steam turbine house | |
RU105635U1 (en) | SNOW MELTING INSTALLATION | |
CN204718433U (en) | A kind of adjustable annular water distribution Hyperbolic cooling tower | |
CN105674762A (en) | Underground cross-flow cooling tower | |
CN211950648U (en) | Automobile radiator | |
CN205192283U (en) | Brick is used for radiating wind channel when producing futilely | |
CN207185480U (en) | A kind of city irrigation device | |
CN204854459U (en) | Receive basin self - cleaning's frame -type cooling tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140625 |