CN103867016A - Super-large building-block reinforced concrete silo structure and mounting process - Google Patents
Super-large building-block reinforced concrete silo structure and mounting process Download PDFInfo
- Publication number
- CN103867016A CN103867016A CN201210544777.5A CN201210544777A CN103867016A CN 103867016 A CN103867016 A CN 103867016A CN 201210544777 A CN201210544777 A CN 201210544777A CN 103867016 A CN103867016 A CN 103867016A
- Authority
- CN
- China
- Prior art keywords
- reinforced concrete
- silo
- steel reinforced
- steel
- bulkhead
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Storage Of Harvested Produce (AREA)
Abstract
The invention discloses a super-large building-block reinforced concrete silo structure. The super-large building-block reinforced concrete silo structure is characterized by being composed of a silo top structure, a silo body cylinder and a silo bottom foundation, wherein the silo top structure comprises a rain shelter, a central dropping cylinder, a spoke and a rotary bridge; the silo body cylinder comprises a silo wall steel plate, a reinforced concrete pillar as well as annular rigid and elastic connecting pieces, longitudinal reinforced concrete steel channels outside the silo wall, annular reinforced concrete steel channels outside the silo wall. Connecting accessories and the like; the silo bottom foundation comprises a foundation pile and a connected foundation. In order to well implement the structure, the invention also provides a mounting process of the super-large building-block reinforced concrete silo structure; the mounting process comprises fabricating a foundation embedded reinforced concrete pillar, connecting an annular tie bar with the reinforced concrete pillar so as to strengthen the reinforced concrete pillar, lifting the silo wall steel plate which is divided into a plurality of sections previously to a designed position one by one by using a hydraulic jacking system, next, welding the silo wall steel plate with the longitudinal reinforced concrete steel channels outside the silo wall, the annular reinforced concrete steel channels and reinforced concrete uprights, and finally, pouring concrete into the cavity of the whole silo body such as a top annular beam, spraying an anticorrosive layer, and then finishing the work.
Description
Technical field
The present invention relates to storage field, be specifically related to a kind of ultra-large type building blocks steel reinforced concrete silo structure and mounting process.
Background technology
Current large-scale silo agent structure mainly contains prestressed reinforced concrete structure and steel plates of steel structure chamber structure.
Prestressed reinforced concrete structure silo: all adopt overall pile foundation, site operation difficulty is large, and foundation cost is large, and concrete consumption is large, long in time limit, and overall cost is high, and build up after rear threading material, base plate can be perplexed by the long-term internal stress that unbalance loading is brought.
Steel plates of steel structure chamber structure silo: steel silo structure barrel is thin, stand to stressed poor, easily unstability, generally be only applicable to silo, oil depot, in the time storing caking property material, easily produce knot wall, vertical load sharply strengthens, very easily UNSTABLE FAILURE, steel plates of steel structure chamber structure silo adopts overall endless belt shape pile foundation sometimes, pile foundation processing is not done in inside, cost reduces, but build up after rear threading material, the pressure that interior ring base plate and overall endless belt shape pile foundation are brought by material can, produce larger distortion, and distortion is uneven, and then cause bottom gallery distortion, have a strong impact on use.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of ultra-large type building block type steel reinforced concrete silo structure and mounting process, fully combination utilizes bearing property and the strong feature of concrete crushing resistance of steel plate, and tires out and push away lifting from bottom to up, and mounting process is simple, high safety, good economy performance, not only can the reduction of erection time, improves construction speed, also avoid silo to build up rear threading material groundwork because of material unbalance loading, and the inequality producing distortion, the problems such as impact use, thus overcome the deficiencies in the prior art.
In order to solve the problems of the technologies described above, the present invention has adopted following technical scheme: a kind of ultra-large type building blocks steel reinforced concrete silo structure is characterized as: be mainly made up of storehouse roof construction, storehouse body cylindrical shell, storehouse base plinth, wherein storehouse roof construction comprises: awning structure, central blanking barrel, spoke architecture, revolution crane span structure; Storehouse body cylindrical shell comprises: warehouse is steel reinforced concrete pillar, steel reinforced concrete pillar annular tie-beam, bulkhead outer longitudinally steel reinforced concrete channel-section steel, bulkhead outer ring steel reinforced concrete channel-section steel, bulkhead steel plate, connector etc. around; Warehouse basis comprises: basic pile, disjunctor basis etc.
Wherein, bulkhead outer longitudinally steel reinforced concrete channel-section steel, bulkhead outer ring steel reinforced concrete channel-section steel can be standard channel-section steels, can be also semicircle or other cavity structures; Steel reinforced concrete pillar can be cylinder steel pipe or rectangular steel tube or other cavity structures; Bulkhead steel plate is connected with steel reinforced concrete pillar and can also can connects with bolt with connector welding.
For by fine said structure enforcement, the present invention also provides a kind of ultra-large type building block type steel reinforced concrete silo structure mounting process: first excavation pit, do basis, border pile, pre-buried steel reinforced concrete pillar, be connected steel reinforced concrete pillar with two kinds of annular lacing wires of rigidity and elasticity respectively, top annular beam is installed, interim spoke reinforcing ring is installed, install top hydraulic jacking system simultaneously, to ready awning structure be installed in advance in bottom afterwards, revolution crane span structure, central blanking barrel, spoke architecture, annular bracket etc. carries out integral hoisting as first segment, lift while being second section height to built on stilts distance ready, second section is continued to upwards lifting after welding with first segment at the bottom of storehouse, by that analogy, by Section three, section four, wait to the last joint rigging out after silo bottom welding, so far push away on its setting position tired first segment, final section and bulkhead composite foundation plate weld, by after steel reinforced concrete pillar annular lacing wire tension, pretension, annular bracket beam fixing collar and top annular beam are welded, simultaneously by bulkhead outer ring steel reinforced concrete channel-section steel for steel reinforced concrete pillar, the outer longitudinally steel reinforced concrete channel-section steel of bulkhead and steel reinforced concrete post coupler are connected with bulkhead steel plate, after Steel Structure Installation, finally by barrel hoop, longitudinally cavity, column inner chamber, the filling concrete in cavity place such as top ring beam, spary corrosion-inhibiting coating, completion of works.
Cordwood mounting process, has saved coming into operation of on-the-spot Large-scale Hoisting equipment, has reduced the time of work high above the ground, has reduced installation cost, has shortened the duration, has strengthened construction safety guarantee.
Compared with prior art, the invention has the beneficial effects as follows:
1. overcome prestressed reinforced concrete structure silo and all adopted overall pile foundation, site operation difficulty is large, and foundation cost is large, concrete consumption is large, long in time limit, overall cost is high, and steel silo structure barrel is thin, stand to stressed poor, easily unstability, in the time that silo stores caking property material, easily produces knot wall, vertical load sharply strengthens, very easily the shortcoming of UNSTABLE FAILURE;
2. foundation excavation amount is little, reduces cost, has improved construction speed, has reduced the duration;
3. in structure: combine with steel reinforced concrete pillar and steel plate bulkhead, connect with bulkhead outer ring steel reinforced concrete channel-section steel, the outer longitudinally steel reinforced concrete channel-section steel of bulkhead, simple in structure, it is convenient to install, and greatly reduces material cost and cost of labor;
4. mounting process: bulkhead steel plate is divided into more piece, start lifting from bottom, one joint lifting one joint is installed, progressively tired pushing away, welded and installed is all carried out at the bottom of storehouse, has saved the expense that uses Large-scale Hoisting instrument, reduce the time of work high above the ground, no matter be economic performance, or safety guarantee, all gain to some extent.
Accompanying drawing explanation
Fig. 1 is that a kind of ultra-large type building blocks steel reinforced concrete silo structure is always schemed;
Fig. 2 is that a kind of ultra-large type building blocks steel reinforced concrete silo structure is always schemed E-E sectional drawing;
Fig. 3 is that a kind of ultra-large type building blocks steel reinforced concrete silo structure is always schemed A place enlarged drawing;
Fig. 4 is that a kind of ultra-large type building blocks steel reinforced concrete silo structure is always schemed B place enlarged drawing;
Fig. 5 is that a kind of ultra-large type building blocks steel reinforced concrete silo structure is always schemed C place enlarged drawing;
Fig. 6 is that a kind of ultra-large type building blocks steel reinforced concrete silo structure is always schemed E-E sectional drawing D place enlarged drawing;
Fig. 7 is that a kind of ultra-large type building blocks steel reinforced concrete silo structure is always schemed D enlarged drawing F to view;
Fig. 8 is that a kind of ultra-large type building blocks steel reinforced concrete silo structure is always schemed F to view G-G sectional view;
Fig. 9 is that a kind of ultra-large type building blocks steel reinforced concrete silo structure is always schemed F to view H-H sectional view;
Figure 10 is a kind of ultra-large type building blocks steel reinforced concrete silo structure lifting bulkhead steel plate first segment schematic diagram;
Figure 11 is the process schematic diagrames such as a kind of ultra-large type building blocks steel reinforced concrete silo structure lifting bulkhead steel plate interstitial segment;
Figure 12 is a kind of ultra-large type building blocks steel reinforced concrete silo structure lifting bulkhead steel plate final section process schematic diagram;
Figure 13 is that after the lifting of a kind of ultra-large type building blocks steel reinforced concrete silo structure, prestressing force adds and tries hard to;
Figure 14 is that after the lifting of a kind of ultra-large type building blocks steel reinforced concrete silo structure, prestressing force adds and tries hard to I place enlarged drawing;
The specific embodiment
Below the specific embodiment of the present invention is described in further detail, but the embodiment of this explanation is not limited to this.
A kind of ultra-large type building block type steel reinforced concrete silo structure and mounting process are: excavation ground, lay warehouse ring foundation 22, and pre-buried bulkhead composite foundation plate 20 simultaneously, connection warehouse is steel reinforced concrete pillar 13 around, as shown in Figure 5.
At steel reinforced concrete pillar 13 installation storehouse, top apical ring ellbeams 21, hydraulic jacking system 23 and interim spoke reinforcing ring 25 are installed on storehouse apical ring ellbeam 21, as shown in Fig. 3, Figure 10.
Evenly to install that steel reinforced concrete pillar 13 is rigidly connected be steel reinforced concrete pillar adpting flange 16 and the lacing wire 17 of steel reinforced concrete pillar annular at interval, and elasticity to connect be flower basket bolt 26 and hinged reinforcing bar 27, by fixed steel reinforced concrete pillar 13 borders, as shown in Fig. 2, Fig. 6, Fig. 7.
At the bottom of storehouse, central blanking barrel 8 is connected with central upper portion spoke 1, lower central spoke 3 and spoke middle studdle 2, awning crossbeam 5, revolution crane span structure 9, after revolution crane span structure support wheel group 10 is positioned on the track of annular bracket beam 11, awning crossbeam articulated joint 6 and silo annular bracket beam fixing collar 7 are articulated and connected, at the bottom of being placed in storehouse as lifting barrel first segment, as shown in Fig. 4, Figure 10.
When bulkhead steel plate 12 first segments arrive design attitude, first bulkhead steel plate final section bottom and bulkhead composite foundation plate 20 are welded, again by the annular lacing wire tension of steel reinforced concrete column 13 use, apply pretightning force, after silo annular bracket beam fixing collar 7 is welded with storehouse apical ring ellbeam 21, silo wall outer ring steel reinforced concrete channel-section steel 18, the outer longitudinally steel reinforced concrete channel-section steel 19 of bulkhead are welded with bulkhead steel plate 12 simultaneously, bulkhead steel plate 12 welds with border steel reinforced concrete pillar 13, warehouse has been assembled, as shown in Fig. 3, Fig. 5, Figure 13, Figure 14.
The finally filling concrete 24 in cavity place such as outer longitudinally steel reinforced concrete channel-section steel 19, steel reinforced concrete pillar 13, storehouse apical ring ellbeam 21 of silo wall outer ring steel reinforced concrete channel-section steel 18, bulkhead just, after solidifying, spary corrosion-inhibiting coating, completion of works.As shown in Fig. 1, Fig. 3, Fig. 8, Fig. 9.
The above, only better enforcement of the present invention, not the present invention is done to any pro forma restriction, any those skilled in the art, every technical solution of the present invention that do not depart from, any simple modification, variation and the modification above embodiment done according to technical spirit of the present invention, all still belong in the scope of technical solution of the present invention.
Claims (8)
1. a ultra-large type building blocks steel reinforced concrete silo structure and mounting process are characterized as: be mainly made up of storehouse roof construction, storehouse body barrel, storehouse base plinth, steel reinforced concrete pillar is installed, and steel reinforced concrete pillar is carried out to reinforcement by connection with storehouse apical ring ellbeam, use hydraulic jacking system, by bulkhead steel plate, from bottom, tired padding connects lifting section by section, afterwards steel reinforced concrete pillar and warehouse steel plate are welded to connect, all structural cavities are carried out filling concrete.
2. a kind of ultra-large type building blocks steel reinforced concrete silo structure according to claim 1 and mounting process, is characterized in that: bottom disjunctor ring foundation, pre-buried composite foundation plate, connects warehouse border steel reinforced concrete pillar.
3. a kind of ultra-large type building blocks steel reinforced concrete silo structure according to claim 1 and mounting process, is characterized in that: warehouse border steel reinforced concrete pillar storehouse apical ring ellbeam and rigidity, two kinds of lacing wire forms of elasticity are carried out reinforcement by connection.
4. a kind of ultra-large type building blocks steel reinforced concrete silo structure according to claim 1 and mounting process, is characterized in that: bulkhead steel plate is provided with annular and the longitudinal cavity muscle shape steel reinforced concrete channel-section steel with bulkhead one.
5. a kind of ultra-large type building blocks steel reinforced concrete silo structure according to claim 1 and mounting process, it is characterized in that: awning structure, revolution crane span structure, central blanking barrel, spoke architecture, annular bracket etc., as first segment pre-installation moulding at the bottom of storehouse, carry out integral hoisting.
6. a kind of ultra-large type building blocks steel reinforced concrete silo structure according to claim 1 and mounting process, is characterized in that: bulkhead steel plate be divided into more piece, start lifting from bottom, joint lifting one joint is installed, and progressively tired pushing away, welded and installed is all carried out at the bottom of storehouse.
7. a kind of ultra-large type building blocks steel reinforced concrete silo structure according to claim 1 and mounting process, it is characterized in that: after bulkhead hoisting steel plate puts in place, apply vertical prestressing force, further tension steel reinforced concrete pillar hoop lacing wire simultaneously, is welded to connect bulkhead steel plate and steel reinforced concrete pillar with bulkhead outer ring steel reinforced concrete channel-section steel and the outer longitudinally steel reinforced concrete channel-section steel of bulkhead.
8. a kind of ultra-large type building blocks steel reinforced concrete silo structure according to claim 1 and mounting process, is characterized in that: after installing, by filling concrete in cavity place such as barrel hoop, longitudinal cavity, column inner chamber, top ring beams.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210544777.5A CN103867016A (en) | 2012-12-17 | 2012-12-17 | Super-large building-block reinforced concrete silo structure and mounting process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210544777.5A CN103867016A (en) | 2012-12-17 | 2012-12-17 | Super-large building-block reinforced concrete silo structure and mounting process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103867016A true CN103867016A (en) | 2014-06-18 |
Family
ID=50905992
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210544777.5A Pending CN103867016A (en) | 2012-12-17 | 2012-12-17 | Super-large building-block reinforced concrete silo structure and mounting process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103867016A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109881958A (en) * | 2019-03-23 | 2019-06-14 | 中国二十二冶集团有限公司 | The construction method of spiral curl steel plate storehouse |
CN112012545A (en) * | 2020-08-18 | 2020-12-01 | 上海建工四建集团有限公司 | Construction method of steel plate silo |
CN113734640A (en) * | 2021-09-06 | 2021-12-03 | 华电重工股份有限公司 | Steel plate bin |
-
2012
- 2012-12-17 CN CN201210544777.5A patent/CN103867016A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109881958A (en) * | 2019-03-23 | 2019-06-14 | 中国二十二冶集团有限公司 | The construction method of spiral curl steel plate storehouse |
CN112012545A (en) * | 2020-08-18 | 2020-12-01 | 上海建工四建集团有限公司 | Construction method of steel plate silo |
CN113734640A (en) * | 2021-09-06 | 2021-12-03 | 华电重工股份有限公司 | Steel plate bin |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104746422B (en) | A kind of hollow pier stud delay-pour joint structure of bridge prefabrication and construction method | |
JP6329702B2 (en) | Assembling-type reinforced concrete pier column member | |
CN201972237U (en) | Section prefabricated rectangular steel pipe concrete truss | |
CN201148730Y (en) | Super large diameter cylindrical silo hydraulic slip mold construction operating platform | |
CN103243961B (en) | Titanium plate steel inner tank reversed construction device for chimney of thermal power station | |
CN104251066B (en) | Steel tube tower column with reinforcing structures on inner wall and manufacturing method thereof | |
CN103935911B (en) | Tower crane attached wall supporting construction and construction method thereof | |
CN107269085B (en) | A kind of construction method of large-diameter concrete silo top conical shell structure | |
CN105544593A (en) | Wind power generation tower foundation with prefabricated foundation prestressed beams and slab | |
CN106988333B (en) | Prefabricated bearing platform with dowel bar filling core and construction process thereof | |
CN203222809U (en) | Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line | |
CN103510469B (en) | Construction method for manufacturing thin-walled hollow pier | |
CN204097864U (en) | A kind of bridge prefabrication hollow pier stud delay-pour joint structure | |
CN103867016A (en) | Super-large building-block reinforced concrete silo structure and mounting process | |
CN102953385A (en) | Construction method for changing support of foundation pit at irregular place of rampway | |
CN113062199B (en) | Construction method for anti-corrosion concrete outer cladding layer of wading section of arched beam | |
CN202164621U (en) | Tower crane foundation capable of being arranged and assembled | |
CN102251521A (en) | Reinforced prestressed tubular pile and construction method thereof | |
CN103993739B (en) | The construction method of granulation tower spraying layer stiff beam | |
CN103526772A (en) | Construction method of steel-structure combined base of tower crane | |
CN203640061U (en) | Node connecting structure of reinforced concrete column of basement | |
CN204139694U (en) | Inner wall belt strengthens the steel pipe king-post of structure | |
CN116517592A (en) | Large-section horsehead door supporting structure of subway tunnel and construction method thereof | |
CN108277817B (en) | Construction method of high-pile bearing platform tower crane foundation reinforcing structure | |
CN106640146B (en) | Three-dimensional reinforced bar net frame and concrete combined lining structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
DD01 | Delivery of document by public notice |
Addressee: Zhu Yaoping Document name: Notification of Publication of the Application for Invention |
|
DD01 | Delivery of document by public notice |
Addressee: Zhu Yaoping Document name: Notification of before Expiration of Request of Examination as to Substance |
|
DD01 | Delivery of document by public notice |
Addressee: Zhu Yaoping Document name: Notification that Application Deemed to be Withdrawn |
|
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140618 |