CN103866867A - 型钢混凝土组合巨柱多排主筋错层封锚结构及其施工工艺 - Google Patents
型钢混凝土组合巨柱多排主筋错层封锚结构及其施工工艺 Download PDFInfo
- Publication number
- CN103866867A CN103866867A CN201410106727.8A CN201410106727A CN103866867A CN 103866867 A CN103866867 A CN 103866867A CN 201410106727 A CN201410106727 A CN 201410106727A CN 103866867 A CN103866867 A CN 103866867A
- Authority
- CN
- China
- Prior art keywords
- sealing
- covering anchorage
- main muscle
- muscle
- main
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000007789 sealing Methods 0.000 title claims abstract description 103
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 26
- 239000010959 steel Substances 0.000 title claims abstract description 26
- 239000011150 reinforced concrete Substances 0.000 title claims abstract description 22
- 238000010276 construction Methods 0.000 title claims description 13
- 238000000034 method Methods 0.000 title claims description 9
- 238000004873 anchoring Methods 0.000 title abstract 10
- 230000002787 reinforcement Effects 0.000 title abstract 10
- 238000003466 welding Methods 0.000 claims abstract description 19
- 239000011229 interlayer Substances 0.000 claims abstract description 12
- 210000003205 muscle Anatomy 0.000 claims description 108
- 230000003014 reinforcing effect Effects 0.000 claims description 27
- 239000010410 layer Substances 0.000 claims description 16
- 210000002435 tendon Anatomy 0.000 claims description 16
- 238000005065 mining Methods 0.000 claims description 3
- 238000009435 building construction Methods 0.000 abstract 1
- 239000004567 concrete Substances 0.000 description 5
- 210000000988 bone and bone Anatomy 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000010415 tropism Effects 0.000 description 1
Images
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
本发明属于建筑施工技术领域。型钢混凝土组合巨柱多排主筋错层封锚结构,涉及多排主筋和钢骨,其特征是:主筋采用四排封锚主筋,四排封锚主筋封锚端弯拐延伸至钢骨表面,并且按照设定层间间距错落布置,封锚主筋与钢骨之间通过连接板搭接焊,形成整体连接构造。本发明多排主筋封锚端弯拐按照不同标高和一定的层间间距,错落布置,并通过预焊连接板与钢骨连接成整体,解决巨柱多排主筋在变截面处的封锚技术难题。
Description
一 技术领域
本发明涉及建筑领域,特别涉及超大截面、内包钢骨的型钢混凝土组合巨柱变截面部位,多排主筋同时封锚施工的技术领域。
二 背景技术
超高层建筑型钢混凝土组合巨柱,钢筋规格大、数量多,钢筋异常密集,巨柱嵌固部位往往存在变截面,多排主筋需进行封锚。因主筋排数多、规格大(达到40mm直径),多排主筋在同一标高封锚存在交叉,又因组合巨柱内包钢骨,封锚钢筋无法贯穿钢骨导致封锚长度不足。上述两种因素,均无法实现组合巨柱多排主筋变截面处的封锚施工。
三 发明内容
本发明的目的是克服上述不足问题,提供一种型钢混凝土组合巨柱多排主筋错层封锚结构,变截面处四排主筋,按照不同标高逐层封锚,层间间距错落布置。本发明的另一目的是提供一种型钢混凝土组合巨柱多排主筋错层封锚结构施工工艺,工艺简单,适用于超大截面、内包钢骨的型钢混凝土组合巨柱变截面部位,多排主筋同时封锚施工。
本发明为实现上述目的所采用的技术方案是:型钢混凝土组合巨柱多排主筋错层封锚结构,涉及多排主筋和钢骨,主筋采用多排封锚主筋,四排封锚主筋封锚端弯拐延伸至钢骨表面,并且按照设定层间间距错落布置,封锚主筋与钢骨之间通过连接板搭接焊,形成整体连接构造。
所述封锚主筋中靠钢骨最近一排封锚主筋弯拐较短,采用底面连接板置于主筋底部,弯拐与底面连接板双面搭接焊连接,其余排采用侧面连接板置于主筋侧面,弯拐与侧面接板双面搭接焊连接。
所述封锚主筋竖直段主筋的连接采用正反丝套筒连接。
所述多排封锚钢筋的封锚端弯拐按照不同标高,按照层间间距100mm错落布置。
所述多排封锚主筋数量为四排。
型钢混凝土组合巨柱多排主筋错层封锚结构施工工艺,首先将封锚主筋的封锚端弯拐延伸至组合巨柱钢骨表面,并且按照设定的层间间距错落布置;再将封锚主筋与钢骨之间通过预焊的连接板进行搭接焊,形成整体连接构造;按照焊接操作需要,设置连接板板面朝向和长度,其中封锚主筋中靠钢骨最近一排封锚端弯拐较短,采用底面连接板置于封锚主筋底部,采用双面搭接焊连接,其他三排封锚端弯拐采用侧面连接板置于封锚主筋侧面,采用双面搭接焊连接。
所述封锚主筋竖直段主筋采用正反丝套筒连接,旋转正反丝套筒,将上、下段主筋同时拉入套筒内最后顶紧,完成竖直段主筋的连接;非封锚主筋竖直段主筋采用正丝套筒连接。
本发明型钢混凝土组合巨柱多排主筋错层封锚结构,适用于超大截面、内包钢骨的型钢混凝土组合巨柱变截面部位,多排主筋同时封锚施工的技术领域;多排主筋封锚端弯拐按照不同标高和一定的层间间距,错落布置,并通过预焊连接板与钢骨连接成整体,解决巨柱多排主筋在变截面处的封锚技术难题。
本发明主筋受顶部封锚端弯拐的限制无法自由旋转,采用正反丝套筒连接方法,利用套筒两端各1/2段对称丝扣的相向性,旋转正反丝套筒,将上、下段主筋同时拉入套筒内最后顶紧,完成竖直段主筋的连接。
四 附图说明
图1是本发明型钢混凝土组合巨柱多排主筋错层封锚结构结构示意图。
图中:1第一排封锚主筋,2第二排封锚主筋,3第三排封锚主筋,4第四排封锚主筋,5侧面连接板,6底部连接板,7正反丝套筒,8正丝套筒,9非封锚主筋,10钢骨,11组合巨柱外包混凝土变截面后的部分,12组合巨柱外包混凝土变截面的部分。
五 具体实施方式
如图1所示的型钢混凝土组合巨柱多排主筋错层封锚结构,涉及多排主筋和钢骨10,主筋采用四排封锚主筋和二排非封锚主筋9,四排封锚主筋封锚端弯拐延伸至钢骨表面,并且按照不同标高,按照层间间距100mm错落布置,封锚主筋中靠钢骨最近一排封锚主筋(图中第四排封锚主筋4)弯拐较短,采用底面连接板6置于主筋底部,采用双面搭接焊连接,其余三排(图中第一排封锚主筋1、第二排封锚主筋2和第三排封锚主筋3)采用侧面连接板5置于主筋侧面,采用双面搭接焊连接,封锚主筋竖直段主筋的连接采用正反丝套筒7连接,非封锚主筋竖起段主筋采用正丝套筒8连接,形成整体连接构造。
施工时,按照下述工艺进行施工:型钢混凝土组合巨柱多排主筋错层封锚结构施工工艺,
1.首先将封锚主筋的封锚端弯拐延伸至组合巨柱钢骨表面,并且按照设定的层间间距错落布置;再将封锚主筋与钢骨之间通过预焊的连接板进行搭接焊,形成整体连接构造;
2.按照焊接操作需要,设置连接板板面朝向和长度,连接板材质为Q345,其中封锚主筋中靠钢骨最近一排封锚端弯拐较短,采用底面连接板置于该封锚主筋下部平放,底面连接板规格缩短为━30×50×250,采取双面搭接焊连接;上部其余三排采用侧面连接板规格为━30×50×450,侧面连接板置于主筋侧面,采用单面搭接焊连接;
3.封锚主筋竖直段主筋采用正反丝套筒连接,旋转正反丝套筒,将上、下段主筋同时拉入套筒内最后顶紧,完成竖直段主筋的连接;非封锚主筋竖直段主筋采用正丝套筒连接。混凝土施工后组合巨柱外包混凝土变截面后的部分11和组合巨柱外包混凝土变截面的部分12如图1所示。
Claims (7)
1.型钢混凝土组合巨柱多排主筋错层封锚结构,涉及多排主筋和钢骨,其特征是:主筋采用多排封锚主筋,多排封锚主筋封锚端弯拐延伸至钢骨表面,并且按照设定层间间距错落布置,封锚主筋与钢骨之间通过连接板搭接焊,形成整体连接构造。
2.根据权利要求1所述的型钢混凝土组合巨柱多排主筋错层封锚结构,其特征是:所述封锚主筋中靠钢骨最近一排封锚主筋弯拐较短,采用底面连接板置于主筋底部,弯拐与底面连接板双面搭接焊连接,其余排采用侧面连接板置于主筋侧面,弯拐与侧面接板单面搭接焊连接。
3.根据权利要求1所述的型钢混凝土组合巨柱多排主筋错层封锚结构,其特征是:所述封锚主筋竖直段主筋的连接采用正反丝套筒连接。
4.根据权利要求1所述的型钢混凝土组合巨柱多排主筋错层封锚结构,其特征是:所述多排封锚钢筋的封锚端弯拐按照不同标高,按照层间间距100mm错落布置。
5.根据权利要求1-4任一所述的型钢混凝土组合巨柱多排主筋错层封锚结构,其特征是:所述多排封锚主筋数量为四排。
6.型钢混凝土组合巨柱多排主筋错层封锚结构施工工艺,其特征是:首先将封锚主筋的封锚端弯拐延伸至组合巨柱钢骨表面,并且按照设定的层间间距错落布置;再将封锚主筋与钢骨之间通过预焊的连接板进行搭接焊,形成整体连接构造;按照焊接操作需要,设置连接板板面朝向和长度,其中封锚主筋中靠钢骨最近一排封锚端弯拐较短,采用底面连接板置于封锚主筋底部,采用双面搭接焊连接,其他三排封锚端弯拐采用侧面连接板置于封锚主筋侧面,采用单面搭接焊连接。
7.根据权利要求5所述的型钢混凝土组合巨柱多排主筋错层封锚结构施工工艺,其特征是:所述封锚主筋竖直段主筋采用正反丝套筒连接,旋转正反丝套筒,将上、下段主筋同时拉入套筒内最后顶紧,完成竖直段主筋的连接;非封锚主筋竖直段主筋采用正丝套筒连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410106727.8A CN103866867B (zh) | 2014-03-21 | 2014-03-21 | 型钢混凝土组合巨柱多排主筋错层封锚结构及其施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410106727.8A CN103866867B (zh) | 2014-03-21 | 2014-03-21 | 型钢混凝土组合巨柱多排主筋错层封锚结构及其施工工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103866867A true CN103866867A (zh) | 2014-06-18 |
CN103866867B CN103866867B (zh) | 2017-11-17 |
Family
ID=50905847
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410106727.8A Active CN103866867B (zh) | 2014-03-21 | 2014-03-21 | 型钢混凝土组合巨柱多排主筋错层封锚结构及其施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103866867B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107035067A (zh) * | 2017-06-12 | 2017-08-11 | 中建局集团第建筑有限公司 | 一种劲性梁的变截面结构及其施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11166267A (ja) * | 1997-12-03 | 1999-06-22 | Shimizu Corp | 柱鉄筋コンクリート造一梁鉄骨造複合構造の柱頭構造 |
JP2001214518A (ja) * | 2000-02-01 | 2001-08-10 | Sumitomo Metal Ind Ltd | 柱梁接合構造 |
JP2003041599A (ja) * | 2001-07-30 | 2003-02-13 | Hitachi Metals Ltd | 露出型柱脚構造 |
CN1970958A (zh) * | 2006-12-05 | 2007-05-30 | 西安建筑科技大学 | 配实腹钢骨架的十形型钢混凝土异形柱 |
CN201351314Y (zh) * | 2009-01-15 | 2009-11-25 | 西安建筑科技大学 | 配实腹钢板的混凝土异形柱——钢筋混凝土梁框架节点 |
CN102322101A (zh) * | 2011-06-30 | 2012-01-18 | 湖北弘毅建筑装饰工程有限公司 | 型钢混凝土梁柱节点施工工法 |
-
2014
- 2014-03-21 CN CN201410106727.8A patent/CN103866867B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11166267A (ja) * | 1997-12-03 | 1999-06-22 | Shimizu Corp | 柱鉄筋コンクリート造一梁鉄骨造複合構造の柱頭構造 |
JP2001214518A (ja) * | 2000-02-01 | 2001-08-10 | Sumitomo Metal Ind Ltd | 柱梁接合構造 |
JP2003041599A (ja) * | 2001-07-30 | 2003-02-13 | Hitachi Metals Ltd | 露出型柱脚構造 |
CN1970958A (zh) * | 2006-12-05 | 2007-05-30 | 西安建筑科技大学 | 配实腹钢骨架的十形型钢混凝土异形柱 |
CN201351314Y (zh) * | 2009-01-15 | 2009-11-25 | 西安建筑科技大学 | 配实腹钢板的混凝土异形柱——钢筋混凝土梁框架节点 |
CN102322101A (zh) * | 2011-06-30 | 2012-01-18 | 湖北弘毅建筑装饰工程有限公司 | 型钢混凝土梁柱节点施工工法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107035067A (zh) * | 2017-06-12 | 2017-08-11 | 中建局集团第建筑有限公司 | 一种劲性梁的变截面结构及其施工方法 |
CN107035067B (zh) * | 2017-06-12 | 2022-06-17 | 中建一局集团第一建筑有限公司 | 一种劲性梁的变截面结构及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103866867B (zh) | 2017-11-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102418424B (zh) | 一种筒仓环向加固方法 | |
CN205532656U (zh) | 一种深井软弱围岩巷道支护装置 | |
CN103993753B (zh) | 传统石砌房屋角箍拉结加固系统及施工工艺 | |
CN204152521U (zh) | 一种隧道用支护结构 | |
CN103615258B (zh) | 巷道交叉点的中间岩柱的支护结构和支护方法 | |
CN202990170U (zh) | 一种配置交叉斜向体内预应力的剪力墙结构 | |
CN104947603A (zh) | 一种钢筋混凝土梁桥主梁加固构造及加固方法 | |
CN104895224A (zh) | 预应力夯土墙及其施工工艺 | |
CN103696514A (zh) | T形边框构件轻质混凝土墙体装配式剪力墙及连接构造 | |
CN102979221A (zh) | 一种配置交叉斜向体内预应力的剪力墙结构及其施工方法 | |
CN103711232B (zh) | L形边框构件轻质混凝土墙体装配式剪力墙及连接构造 | |
CN101962948A (zh) | 多向拉伸塑料土工格栅及其制造方法 | |
CN105507923B (zh) | 大跨度硐室中锚网喷+锚索耦合支护方法 | |
CN202194129U (zh) | 复合预应力挡土桩 | |
CN104088375A (zh) | 一种屈曲约束钢筋构造 | |
CN103866867A (zh) | 型钢混凝土组合巨柱多排主筋错层封锚结构及其施工工艺 | |
CN103696512A (zh) | Z形边框构件轻质混凝土墙体装配式剪力墙及连接构造 | |
CN106522991B (zh) | 一种巷道锚喷支护柔性整体砼喷层及其施工方法 | |
CN103696513A (zh) | 十字形边框构件轻质混凝土墙体装配式剪力墙及连接构造 | |
CN106480880B (zh) | 可回收式土钉及使用可回收土钉的施工方法 | |
CN102518229B (zh) | 一种双向摇摆筒体抗震结构 | |
CN203742020U (zh) | 一种新型框架墙结构 | |
CN209261310U (zh) | 连体式混凝土预制装配组合仓 | |
CN106400960A (zh) | 一种建筑框架 | |
CN204238114U (zh) | 一种基于frp增强型圬工拱桥的拱圈结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: No.235, 237, Golgi Road, Shahekou District, Dalian, Liaoning, 116021 Patentee after: China Construction Eighth Bureau Urban Construction Co.,Ltd. Patentee after: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Co.,Ltd. Address before: No.235, 237, Golgi Road, Shahekou District, Dalian, Liaoning, 116021 Patentee before: DALIAN BRANCH OF CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Corp.,Ltd. Patentee before: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION Co.,Ltd. |