CN103866782A - Foundation bolt eccentric connecting structure of power transmission line iron tower foundation - Google Patents

Foundation bolt eccentric connecting structure of power transmission line iron tower foundation Download PDF

Info

Publication number
CN103866782A
CN103866782A CN201210547281.3A CN201210547281A CN103866782A CN 103866782 A CN103866782 A CN 103866782A CN 201210547281 A CN201210547281 A CN 201210547281A CN 103866782 A CN103866782 A CN 103866782A
Authority
CN
China
Prior art keywords
foundation
stone bolt
foundation bolt
main post
iron tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210547281.3A
Other languages
Chinese (zh)
Other versions
CN103866782B (en
Inventor
郭咏华
王恒
邓锦辉
蔡武军
郭杰
聂旭初
王苗苗
文永庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Henan Electric Power Survey and Design Institute Co Ltd
Original Assignee
Hennan Electric Power Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hennan Electric Power Survey and Design Institute filed Critical Hennan Electric Power Survey and Design Institute
Priority to CN201210547281.3A priority Critical patent/CN103866782B/en
Publication of CN103866782A publication Critical patent/CN103866782A/en
Application granted granted Critical
Publication of CN103866782B publication Critical patent/CN103866782B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

A foundation bolt eccentric connecting structure of a power transmission line iron tower foundation comprises foundation bolt bars located in a foundation main post. The foundation bolt bars are connected through foundation bolt stirrups. Foundation bolts fix a tower foot plate on the top surface of the foundation main post through a base plate, the outer sides of the foundation bolts are covered with a protecting cap, the center of a foundation bolt group and the enter of the top surface of the foundation main post do not coincide, anchoring short ribs are welded to the inner side of the lower end of every foundation bolt bar, and the upper portions of the two foundation bolt bars in the diagonal direction of an iron tower are in sleeved connection together through a foundation bolt pulling rib. The anchoring short ribs are welded to one side of the lower end of every foundation bolt; after the short ribs are placed towards the inner side of the foundation bolt group, space occupied by traditional anchoring parts at the lower ends can be saved and serve as a newly increased deviation value, four corners of the tower foot plate are subjected to corner cutting, the round protecting cap is used, the interval between the protecting cap and the edge of the foundation main post becomes large, and an increased value of the interval between the protecting cap and the edge of the foundation main post is the newly increased deviation value. The limit offset of the foundation bolt group is increased on the premise that the size of an original main post is kept unchanged.

Description

The stone bolt eccentric connecting structure of power transmission line iron tower foundation
Technical field
The present invention relates to a kind of eccentric pattern that connects of stone bolt of power transmission line iron tower foundation.
Background technology
As shown in Fig. 1-3, when power transmission line iron tower foundation adopts stone bolt to connect, traditional approach is all that stone bolt group is placed in to basic principal post center, i.e. stone bolt group center and basic principal post center superposition.In recent years, along with the development of technology, iron tower foundation starts to adopt the eccentric connection of stone bolt gradually.
As shown in Fig. 4-6, be connected and compare with traditional Di Luo center, stone bolt group center departs from basic central point along steel tower diagonal, is equivalent to vertical and applies a reverse bending moment at basic capital, and offset by the level of active force is on basic impact to a certain extent.Appear compared with large and class basis and bored concrete pile foundation are dug in less the drawing of principal post sectional dimension for some principal posts, horizontal force generally plays the effect of controlling key dimension, adopts this kind of mode, can effectively reduce key dimension, can not increase difficulty of construction, there is considerable economic and social profit simultaneously.
Existing iron tower foundation adopts when stone bolt is eccentric to be connected; because conventional tower sole and protective cap are generally square; its diagonal is identical with steel tower and stone bolt group's diagonal; therefore; when eccentric placement, stone bolt group and column foot plate, protective cap are all along the skew of steel tower diagonal, and its critical distance that can be offset is generally subject to the control of the factor such as stone bolt bar and the interior stirrup distance of basic principal post, foot bolt fastening end and the main muscle distance of basic principal post, protective cap and basic principal post Edge Distance.
For saving base concrete amount, when basic engineering, all reduce as far as possible foundation main column dimension, therefore, be subject to the impact of above-mentioned governing factor, hour, the actual distance that can be offset of stone bolt group is also smaller, is difficult to bring into play the advantage of stone bolt group bias for foundation main column dimension.Increase ground spiral shell eccentricity value if want, need to strengthen foundation main column dimension, but increasing principal post size certainly will cause the increase of base concrete amount, produces waste.
Summary of the invention
The object of this invention is to provide a kind of when foundation main column dimension hour, keeping, under the prerequisite of original principal post size constancy, further increasing the connection pattern of stone bolt group limit side-play amount.
For achieving the above object, the present invention is by the following technical solutions:
A stone bolt eccentric connecting structure for power transmission line iron tower foundation, it comprises the stone bolt bar that is positioned at basic principal post, between stone bolt bar, fixes with stone bolt stirrup; Described stone bolt is fixed on foundation main capital face by backing plate by column foot plate, and the outside of stone bolt covers with protective cap; Described stone bolt group center does not overlap with foundation main capital face center, the short muscle of inner side, each stone bolt bar lower end welding anchoring; Two stone bolt bar tops along steel tower diagonal connect together by stone bolt lacing wire.
Described column foot plate is rectangle, and carries out corner cut at rectangle four jiaos; Described protective cap is circular protective cap.
Described stone bolt lacing wire is S type or O type.
Adopt the present invention of technique scheme, stone bolt lower end one side is welded short muscle anchoring, and after short muscle is placed towards stone bolt group inner side, tradition anchoring piece shared space in lower end can be saved out, as newly-increased deviant; Four jiaos of column foot plates carried out corner cut and use circular protective cap, make the spacing at protective cap and basic principal post edge become large, being newly-increased deviant apart from increase value between the two.The present invention is keeping under the prerequisite of original principal post size constancy, increases stone bolt group limit side-play amount, meanwhile, does not substantially increase difficulty of construction, has considerable economic and social profit.
Brief description of the drawings
Fig. 1 is the top view that foot bolt center connects traditionally.
Fig. 2 be in Fig. 1 A-A to view.
Fig. 3 be in Fig. 2 B-B to view.
Fig. 4 is the eccentric top view connecting of existing stone bolt.
Fig. 5 be in Fig. 4 C-C to view.
Fig. 6 be in Fig. 5 D-D to view.
Fig. 7 is the eccentric top view connecting of stone bolt of the present invention.
Fig. 8 be in Fig. 7 E-E to view.
Fig. 9 be in Fig. 8 F-F to view.
Detailed description of the invention
As shown in Fig. 7-9, basis principal post 1 should be made up of stirrup 10, the outer stirrup of principal post and concrete in the main muscle 9 of principal post, principal post, at the interior stone bolt bar 6 that arranges of basic principal post 1, stone bolt bar 6 is generally four, and fixing with stone bolt stirrup 7 between stone bolt bar 6, the quantity of stone bolt stirrup 7 is depending on the length of stone bolt bar 6.Stone bolt 2 is fixed on basic principal post 1 end face by backing plate 3 by column foot plate 5, and the outside of stone bolt 2 covers with protective cap 4.
In the present invention, stone bolt group center does not overlap with basic principal post 1 end face center, i.e. eccentric connection.For increasing stone bolt group's limit side-play amount, at the short muscle 12 of each stone bolt bar 6 inner side, lower end welding anchoring, space shared traditional anchoring piece can be saved out like this, as newly-increased side-play amount., connect together by stone bolt lacing wire 11 along two stone bolt bar 6 tops of steel tower diagonal, stone bolt lacing wire 11 can be S type or O type meanwhile.
In addition, in the present invention, column foot plate 5 is rectangle, and carries out corner cut at rectangle four jiaos; And protective cap 4 is circular protective cap.Make like this protective cap 4 and the spacing at basic principal post 1 edge increase, be newly-increased offset value delta apart from increase value between the two.

Claims (3)

1. a stone bolt eccentric connecting structure for power transmission line iron tower foundation, it comprises the stone bolt bar (6) that is positioned at basic principal post (1), between stone bolt bar (6), connects with stone bolt stirrup (7); Described stone bolt (2) is fixed on basic principal post (1) end face by backing plate (3) by column foot plate (5), and the protective cap for outside (4) of stone bolt (2) covers; It is characterized in that: described stone bolt group center does not overlap with basic principal post (1) end face center each stone bolt bar (6) lower end inner side welding short muscle of anchoring (12); Two stone bolt bars (6) top along steel tower diagonal connects together by stone bolt lacing wire (11).
2. the stone bolt eccentric connecting structure of power transmission line iron tower foundation according to claim 1, is characterized in that: described column foot plate (5) is rectangle, and carries out corner cut at rectangle four jiaos; Described protective cap (4) is circular protective cap.
3. the stone bolt eccentric connecting structure of power transmission line iron tower foundation according to claim 1, is characterized in that: described stone bolt lacing wire (11) is S type or O type.
CN201210547281.3A 2012-12-17 2012-12-17 The stone bolt eccentric connecting structure of power transmission line iron tower foundation Expired - Fee Related CN103866782B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210547281.3A CN103866782B (en) 2012-12-17 2012-12-17 The stone bolt eccentric connecting structure of power transmission line iron tower foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210547281.3A CN103866782B (en) 2012-12-17 2012-12-17 The stone bolt eccentric connecting structure of power transmission line iron tower foundation

Publications (2)

Publication Number Publication Date
CN103866782A true CN103866782A (en) 2014-06-18
CN103866782B CN103866782B (en) 2016-01-20

Family

ID=50905763

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210547281.3A Expired - Fee Related CN103866782B (en) 2012-12-17 2012-12-17 The stone bolt eccentric connecting structure of power transmission line iron tower foundation

Country Status (1)

Country Link
CN (1) CN103866782B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109588912A (en) * 2019-01-30 2019-04-09 盐城可理斯机械制造有限公司 A kind of display shelf of agricultural machinery and implement model machine
CN114136189A (en) * 2021-11-29 2022-03-04 广东电网有限责任公司 Overhead transmission line iron tower basis eccentric measuring device
CN114775674A (en) * 2022-03-28 2022-07-22 国网新疆电力有限公司经济技术研究院 Modularized eccentric assembly type foundation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0270828A (en) * 1988-09-07 1990-03-09 Hitachi Metals Ltd Pedestal construction
CN102031790A (en) * 2009-09-25 2011-04-27 山东电力集团公司日照供电公司 Construction process for rock enlarged toe anchor pile foundation of overhead power transmission line
CN202117071U (en) * 2011-06-08 2012-01-18 宁夏回族自治区电力设计院 Eccentric plate type column foundation of power transmission line iron tower
CN202265832U (en) * 2011-09-20 2012-06-06 中国电力工程顾问集团公司 +/-800kV extra-high voltage direct current straight excavation inclined insertion type eccentric foundation structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0270828A (en) * 1988-09-07 1990-03-09 Hitachi Metals Ltd Pedestal construction
CN102031790A (en) * 2009-09-25 2011-04-27 山东电力集团公司日照供电公司 Construction process for rock enlarged toe anchor pile foundation of overhead power transmission line
CN202117071U (en) * 2011-06-08 2012-01-18 宁夏回族自治区电力设计院 Eccentric plate type column foundation of power transmission line iron tower
CN202265832U (en) * 2011-09-20 2012-06-06 中国电力工程顾问集团公司 +/-800kV extra-high voltage direct current straight excavation inclined insertion type eccentric foundation structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
韩崇等: "偏心基础施工", 《架空输电线路施工使用手册》, 31 December 2008 (2008-12-31), pages 361 - 366 *
高振华等: "输电线路铁塔地脚螺栓的设计探讨", 《华北电力技术》, no. 12, 31 December 2008 (2008-12-31), pages 11 - 12 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109588912A (en) * 2019-01-30 2019-04-09 盐城可理斯机械制造有限公司 A kind of display shelf of agricultural machinery and implement model machine
CN114136189A (en) * 2021-11-29 2022-03-04 广东电网有限责任公司 Overhead transmission line iron tower basis eccentric measuring device
CN114136189B (en) * 2021-11-29 2023-05-30 广东电网有限责任公司 Overhead transmission line iron tower foundation eccentricity measuring device
CN114775674A (en) * 2022-03-28 2022-07-22 国网新疆电力有限公司经济技术研究院 Modularized eccentric assembly type foundation

Also Published As

Publication number Publication date
CN103866782B (en) 2016-01-20

Similar Documents

Publication Publication Date Title
CN202012088U (en) Foundation structure of tower crane
CN206815329U (en) A kind of corrosion-resistant hollow corner cut square pile of pretensioning prestressed concrete
CN103866782A (en) Foundation bolt eccentric connecting structure of power transmission line iron tower foundation
CN203440919U (en) Shape steel concrete beam column joint core area steel plate hoop construction structure with anti-seismic property
CN203174621U (en) Tower crane foundation
CN204174634U (en) A kind of wind-driven generator tower frame foundation structure
CN102704624A (en) Engineered cementitious composite (ECC)-reinforced concrete (RC) combination column and novel connection mode thereof
CN106121220B (en) Face the template of side reinforced column, the construction method of reinforcing bar
CN107339010A (en) A kind of novel protective fence with baffle plate
CN204343318U (en) A kind of novel pillar crane steel platform base
CN201546237U (en) Connection structure of storage tank overhead high-pile foundation
CN206220359U (en) A kind of support heel for reinforced bar and support system
CN103882808A (en) Ramp bridge and main bridge connecting and erecting prefabricated beam supply system and construction method thereof
CN207260375U (en) A kind of steel plate concrete combined shear wall
CN203684102U (en) Supporting system for precast beam formed by connecting span erection of ramp bridge and main line bridge
CN205296173U (en) Utilize structure of foundation ditch support system bearing tower crane
CN205604283U (en) Building bar planting concrete column
CN211113674U (en) Double-row column supporting structure of foundation pit
CN211472002U (en) Highway soft soil layer stake composite foundation
CN204126295U (en) Outsourcing reinforcing bar ruggedized construction at the bottom of a kind of beam
CN206971228U (en) A kind of double-row pile foundation pit support structure
CN210288354U (en) Pile foundation reinforcement cage device
CN207314332U (en) A kind of cement mixing pile building enclosure
CN206736912U (en) A kind of surfacecti proteon damping device of steel pile casting
CN206052756U (en) Elevated footing on piles

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 450007 Zhengzhou Zhongyuan Road, Henan, No. 212

Patentee after: China Electric Power Construction Group Henan electric survey and Design Institute Co., Ltd.

Address before: 450007 Zhengzhou Zhongyuan Road, Henan, No. 212

Patentee before: Hennan Electric Power Survey & Design Institute

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120

Termination date: 20191217

CF01 Termination of patent right due to non-payment of annual fee