CN103850417A - 一种石材干挂法施工工艺 - Google Patents
一种石材干挂法施工工艺 Download PDFInfo
- Publication number
- CN103850417A CN103850417A CN201410070836.9A CN201410070836A CN103850417A CN 103850417 A CN103850417 A CN 103850417A CN 201410070836 A CN201410070836 A CN 201410070836A CN 103850417 A CN103850417 A CN 103850417A
- Authority
- CN
- China
- Prior art keywords
- slabstone
- metope
- glue
- scaffold
- stone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
本发明公开了一种石材干挂法施工工艺,采用钢管扣件搭设双排脚手架,架体与主体结构连接锚固牢固,架子上下满铺跳板;先将要干挂石材用特制大线坠或经纬仪从上至下找出垂直,钻孔开槽,在墙面相对于石板开槽钻孔的位置钻直径8~10mm的孔,将不锈钢膨胀螺栓一端插入孔中固定,在柱或墙面上躲开钢筋位置,待钻孔及固定好膨胀螺栓锚固件后,再在石板的相应位置钻孔开槽;先往插销孔内注入嵌固胶,进行表面清洁和清除缝隙中的灰尘,靠缝粘贴10~15mm宽塑料胶带,用打胶枪填满封胶,清洁石板表面,打蜡抛光,拆除脚手架。该工艺通过合理地操作步骤,能够保证石材的完整度,同时石材安装牢固度高,不容易脱落,提高使用寿命。
Description
技术领域
本发明涉及一种工艺,尤其是涉及一种石材干挂法施工工艺,属于建筑施工领域。
背景技术
建筑,通常指的是对那些为人类活动提供空间的、或者说拥有内部空间的构造物进行规划、设计、施工而后使用的行为过程的全体或一部分。另外,它也可指通过这一系列行为而成的构造物。后者的更准确的称呼为建筑物。前者意义上的“建筑”主要并不指具体的构造物,而是重在指创造建造物的行为(过程、技术)等。石材是以天然岩石为原材料加工制作成的具有一定的物理、化学性能和规格、形状的工业产品。石材作为一种高档建筑装饰材料,多数人对可用于装饰的石材的种类、性能都不甚了了。目前市场上常见的石材主要有大理石、花岗岩、水磨石、合成石四种,其中,大理石中又以汉白玉为上品;花岗岩比大理石坚硬;水磨石是以水泥、混凝土等原料锻压而成;合成石是以天然石的碎石为原料,加上粘合剂等经加压、抛光而成。后两者因为是人工制成,所以强度没有天然石材高。现有建筑中使用石材时,由于安装工艺的粗糙,造成石材出现损坏以及脱落,影响安装质量。
发明内容
本发明的目的在于克服上述现有建筑中使用石材时,由于安装工艺的粗糙,造成石材出现损坏以及脱落的问题,设计了一种石材干挂法施工工艺,该工艺通过合理地操作步骤,能够保证石材的完整度,同时石材安装牢固度高,不容易脱落,提高使用寿命。
本发明的目的通过下述技术方案实现:一种石材干挂法施工工艺,包括以下步骤:
(a)搭设脚手架:采用钢管扣件搭设双排脚手架,立杆距墙面净距不小于500mm,短横杆距墙面净距不小于300mm,架体与主体结构连接锚固牢固,架子上下满铺跳板,外侧设置安全防护网;
(b)测量放线:先将要干挂石材的墙面、柱面、门窗套用特制大线坠或经纬仪从上至下找出垂直,同时应该考虑石材厚度及石材内皮距结构表面的间距,一般以60~80mm为宜,根据石材的高度用水准仪测定水平线并标注在墙上,一般板缝为6~10mm,弹线要从外墙饰面中心向两侧及上下分格,误差要匀开;
(c)钻孔开槽:安装石板前先测量准确位置,然后再进行钻孔开槽,对于钢筋混凝土或砖墙面,先在石板的两端距孔中心80~100mm处开槽钻孔,孔深20~25mm,然后在墙面相对于石板开槽钻孔的位置钻直径8~10mm的孔,将不锈钢膨胀螺栓一端插入孔中固定,另一端挂好锚固件,对于钢筋混凝土柱梁,由于构件配筋率高,钢筋面积较大,在有些部位很难钻孔开槽,在测量弹线时,应该先在柱或墙面上躲开钢筋位置,准确标出钻孔位置,待钻孔及固定好膨胀螺栓锚固件后,再在石板的相应位置钻孔开槽;
(d)底层石板安装:安装底层石板,应根据固定的墙面上的不锈钢锚固件位置进行安装,具体操作是将石板孔槽和锚固件固定销对位安装好,利用锚固件的长方形螺栓孔,调节石板的平整,及方尺找阴阳角方正,拉通线找石板上口平直,然后用锚固件将石板固定牢固,将用嵌固胶将锚固件填堵固定。
(e)上行石板安装:先往下一行石板的插销孔内注入嵌固胶,擦净残余胶液后,将上行石板按照安装底石板的操作方法就位,对于檐口等石板上边不易固定的部位,可用同样方法对石板的两侧进行固定;
(f)密封填缝:待石板挂贴完毕,进行表面清洁和清除缝隙中的灰尘,先用直径8~10mm的泡沫塑料条填板内侧,留5~6mm深缝,在缝两侧的石板上,靠缝粘贴10~15mm宽塑料胶带,以防打胶嵌缝时污染板面,然后用打胶枪填满封胶,若密封胶污染板面,必须立即擦净,最后揭掉胶带,清洁石板表面,打蜡抛光,达到质量标准后,拆除脚手架。
综上所述,本发明的有益效果是:该工艺通过合理地操作步骤,能够保证石材的完整度,同时石材安装牢固度高,不容易脱落,提高使用寿命。
具体实施方式
下面结合实施例,对本发明作进一步的详细说明,但本发明的实施方式不仅限于此。
实施例1:
一种石材干挂法施工工艺,包括以下步骤:
(a)搭设脚手架:采用钢管扣件搭设双排脚手架,立杆距墙面净距不小于500mm,短横杆距墙面净距不小于300mm,架体与主体结构连接锚固牢固,架子上下满铺跳板,外侧设置安全防护网;
(b)测量放线:先将要干挂石材的墙面、柱面、门窗套用特制大线坠或经纬仪从上至下找出垂直,同时应该考虑石材厚度及石材内皮距结构表面的间距,一般以60~80mm为宜,根据石材的高度用水准仪测定水平线并标注在墙上,一般板缝为6~10mm,弹线要从外墙饰面中心向两侧及上下分格,误差要匀开;
(c)钻孔开槽:安装石板前先测量准确位置,然后再进行钻孔开槽,对于钢筋混凝土或砖墙面,先在石板的两端距孔中心80~100mm处开槽钻孔,孔深20~25mm,然后在墙面相对于石板开槽钻孔的位置钻直径8~10mm的孔,将不锈钢膨胀螺栓一端插入孔中固定,另一端挂好锚固件,对于钢筋混凝土柱梁,由于构件配筋率高,钢筋面积较大,在有些部位很难钻孔开槽,在测量弹线时,应该先在柱或墙面上躲开钢筋位置,准确标出钻孔位置,待钻孔及固定好膨胀螺栓锚固件后,再在石板的相应位置钻孔开槽;
(d)底层石板安装:安装底层石板,应根据固定的墙面上的不锈钢锚固件位置进行安装,具体操作是将石板孔槽和锚固件固定销对位安装好,利用锚固件的长方形螺栓孔,调节石板的平整,及方尺找阴阳角方正,拉通线找石板上口平直,然后用锚固件将石板固定牢固,将用嵌固胶将锚固件填堵固定。
(e)上行石板安装:先往下一行石板的插销孔内注入嵌固胶,擦净残余胶液后,将上行石板按照安装底石板的操作方法就位,对于檐口等石板上边不易固定的部位,可用同样方法对石板的两侧进行固定;
(f)密封填缝:待石板挂贴完毕,进行表面清洁和清除缝隙中的灰尘,先用直径8~10mm的泡沫塑料条填板内侧,留5~6mm深缝,在缝两侧的石板上,靠缝粘贴10~15mm宽塑料胶带,以防打胶嵌缝时污染板面,然后用打胶枪填满封胶,若密封胶污染板面,必须立即擦净,最后揭掉胶带,清洁石板表面,打蜡抛光,达到质量标准后,拆除脚手架。
饰面石板的品种、防腐、规格、形状、平整度、几何尺寸、光洁度、颜色和图案必须符合设计要求,并有产品合格证。面层与基层应安装牢固,粘贴料、干挂配件必须符合设计要求和国家现行有关标准的规定,钢配件需做好防锈、防腐处理。
要保证石材的表面洁净、平整;拼花正确、纹理清晰、通顺,颜色均匀一致;非整板部位安装适宜,阴阳角处的石板压向正确。缝格均匀,板缝通顺,接缝嵌填密实、宽窄一致,无错台、错位等缺陷。 突出物周围的板采取整板套割,尺寸准确,边缘吻合整齐、平顺,墙裙、贴脸等上口平直。
滴水线顺直,流水坡向正确,清晰美观。 科学地安排施工顺序,对水、电、暖、通风、设备安装等施工应提前做好,以防止损坏、污染外挂石材饰面板。要及时认真地清擦干净残留在门窗框、玻璃和金属饰面板上的密封胶、尘土、胶粘剂、油污、手印、水等杂物;宜粘贴保护膜,预防污染、锈蚀。
在拆架子或上料时,严禁碰撞干挂石板饰面。饰面完活后,易破损部分的棱角处要用木板做成护角保护,其它配合工种操作时,严防划伤漆面的碰石板。在室外刷罩面剂未干时,严禁往下倒垃圾、渣土或翻脚手板等。已完工的外挂石材饰面,应派专人看管,以防有在饰面板上乱写乱画等危害成品的行为。为了防止出现外饰面石材颜色不一致,施工时应事先对石材板进行认真的挑选和试拼。为防止线角不顺直,缝隙格不匀不直,施工前应认真按设计图纸尺寸核对结构施工实际尺寸,分段分块弹线要精确细致,并经常拉水平线和吊垂直线检查校正。
为了防止渗漏,增强美观,施工时操作人员要认真细致打胶嵌缝。尤其要注意外窗套口的周边、立面凸凹变化的节点;不同材料交接处、伸缩缝、披水坡度和窗台及挑檐与墙面等交接处。为了避免弄脏墙面和减少残留在墙面的胶痕,施工时应确定好施工工艺。
为了避免弄脏墙面和减少残留在墙面的胶痕,施工时应该确定好施工工艺,注意先后程序和上下左右层次,同时也要加强成品保护;施工操作人员必须养成随干随清擦的良好习惯,并加强成品保护管理教育工作,使操作人员或者其他人不要破坏表面。
以上所述,仅是本发明的较佳实施例,并非对本发明做任何形式上的限制,凡是依据本发明的技术、方法实质上对以上实施例所作的任何简单修改、等同变化,均落入本发明的保护范围之内。
Claims (1)
1.一种石材干挂法施工工艺,其特征在于,包括以下步骤:
(a)搭设脚手架:采用钢管扣件搭设双排脚手架,立杆距墙面净距不小于500mm,短横杆距墙面净距不小于300mm,架体与主体结构连接锚固牢固,架子上下满铺跳板,外侧设置安全防护网;
(b)测量放线:先将要干挂石材的墙面、柱面、门窗套用特制大线坠或经纬仪从上至下找出垂直,同时应该考虑石材厚度及石材内皮距结构表面的间距,一般以60~80mm为宜,根据石材的高度用水准仪测定水平线并标注在墙上,一般板缝为6~10mm,弹线要从外墙饰面中心向两侧及上下分格,误差要匀开;
(c)钻孔开槽:安装石板前先测量准确位置,然后再进行钻孔开槽,对于钢筋混凝土或砖墙面,先在石板的两端距孔中心80~100mm处开槽钻孔,孔深20~25mm,然后在墙面相对于石板开槽钻孔的位置钻直径8~10mm的孔,将不锈钢膨胀螺栓一端插入孔中固定,另一端挂好锚固件,对于钢筋混凝土柱梁,由于构件配筋率高,钢筋面积较大,在有些部位很难钻孔开槽,在测量弹线时,应该先在柱或墙面上躲开钢筋位置,准确标出钻孔位置,待钻孔及固定好膨胀螺栓锚固件后,再在石板的相应位置钻孔开槽;
(d)底层石板安装:安装底层石板,应根据固定的墙面上的不锈钢锚固件位置进行安装,具体操作是将石板孔槽和锚固件固定销对位安装好,利用锚固件的长方形螺栓孔,调节石板的平整,及方尺找阴阳角方正,拉通线找石板上口平直,然后用锚固件将石板固定牢固,将用嵌固胶将锚固件填堵固定;
(e)上行石板安装:先往下一行石板的插销孔内注入嵌固胶,擦净残余胶液后,将上行石板按照安装底石板的操作方法就位,对于檐口等石板上边不易固定的部位,可用同样方法对石板的两侧进行固定;
(f)密封填缝:待石板挂贴完毕,进行表面清洁和清除缝隙中的灰尘,先用直径8~10mm的泡沫塑料条填板内侧,留5~6mm深缝,在缝两侧的石板上,靠缝粘贴10~15mm宽塑料胶带,以防打胶嵌缝时污染板面,然后用打胶枪填满封胶,若密封胶污染板面,必须立即擦净,最后揭掉胶带,清洁石板表面,打蜡抛光,达到质量标准后,拆除脚手架。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410070836.9A CN103850417A (zh) | 2014-02-28 | 2014-02-28 | 一种石材干挂法施工工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410070836.9A CN103850417A (zh) | 2014-02-28 | 2014-02-28 | 一种石材干挂法施工工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103850417A true CN103850417A (zh) | 2014-06-11 |
Family
ID=50858526
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410070836.9A Pending CN103850417A (zh) | 2014-02-28 | 2014-02-28 | 一种石材干挂法施工工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103850417A (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104314267A (zh) * | 2014-11-05 | 2015-01-28 | 山东莱州金声隆节能建材科技有限公司 | 一种断桥结构件及保温一体化板、生产方法 |
CN105113747A (zh) * | 2015-09-25 | 2015-12-02 | 连云港杰瑞自动化有限公司 | 一种超薄石材真空绝热一体板及其安装方式 |
CN105332490A (zh) * | 2015-11-04 | 2016-02-17 | 刘卫东 | 室内墙面石材干挂 |
CN107386568A (zh) * | 2017-07-29 | 2017-11-24 | 无为县鑫品石业有限公司 | 一种大理石墙面干挂施工工艺 |
CN108916183A (zh) * | 2018-09-13 | 2018-11-30 | 小狗电器互联网科技(北京)股份有限公司 | 安装贴纸及安装方法 |
CN110984502A (zh) * | 2019-10-25 | 2020-04-10 | 陈大军 | 一种电梯公共区域石材干挂施工方法 |
CN111395680A (zh) * | 2020-03-24 | 2020-07-10 | 浙江世贸装饰股份有限公司 | 一种用于解决墙面陶瓷板安装缝隙的安装方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2739278Y (zh) * | 2004-09-17 | 2005-11-09 | 林敏琦 | 石板材干挂结构 |
KR20070050122A (ko) * | 2005-11-10 | 2007-05-15 | 주식회사 대경에스앤씨티 | 건축물 외장용 석재 판넬의 시공구조 |
CN102116062A (zh) * | 2009-12-30 | 2011-07-06 | 程银河 | 一种干挂石材幕墙的制作方法 |
CN103526866A (zh) * | 2013-11-06 | 2014-01-22 | 上海市建筑装饰工程集团有限公司 | 干挂石材幕墙及其安装方法 |
-
2014
- 2014-02-28 CN CN201410070836.9A patent/CN103850417A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2739278Y (zh) * | 2004-09-17 | 2005-11-09 | 林敏琦 | 石板材干挂结构 |
KR20070050122A (ko) * | 2005-11-10 | 2007-05-15 | 주식회사 대경에스앤씨티 | 건축물 외장용 석재 판넬의 시공구조 |
CN102116062A (zh) * | 2009-12-30 | 2011-07-06 | 程银河 | 一种干挂石材幕墙的制作方法 |
CN103526866A (zh) * | 2013-11-06 | 2014-01-22 | 上海市建筑装饰工程集团有限公司 | 干挂石材幕墙及其安装方法 |
Non-Patent Citations (1)
Title |
---|
孙凯: "干挂石材的施工工艺", 《应用能源技术》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104314267A (zh) * | 2014-11-05 | 2015-01-28 | 山东莱州金声隆节能建材科技有限公司 | 一种断桥结构件及保温一体化板、生产方法 |
CN105113747A (zh) * | 2015-09-25 | 2015-12-02 | 连云港杰瑞自动化有限公司 | 一种超薄石材真空绝热一体板及其安装方式 |
CN105332490A (zh) * | 2015-11-04 | 2016-02-17 | 刘卫东 | 室内墙面石材干挂 |
CN107386568A (zh) * | 2017-07-29 | 2017-11-24 | 无为县鑫品石业有限公司 | 一种大理石墙面干挂施工工艺 |
CN108916183A (zh) * | 2018-09-13 | 2018-11-30 | 小狗电器互联网科技(北京)股份有限公司 | 安装贴纸及安装方法 |
CN110984502A (zh) * | 2019-10-25 | 2020-04-10 | 陈大军 | 一种电梯公共区域石材干挂施工方法 |
CN111395680A (zh) * | 2020-03-24 | 2020-07-10 | 浙江世贸装饰股份有限公司 | 一种用于解决墙面陶瓷板安装缝隙的安装方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103850417A (zh) | 一种石材干挂法施工工艺 | |
CN105888179A (zh) | 面砖干挂结构以及面砖干挂工艺 | |
CN204531102U (zh) | 一种承插式玻璃幕墙框架及玻璃幕墙 | |
CN106284706A (zh) | 外墙外保温岩棉板的施工方法 | |
Chew | Maintainability of Facilities: Green FM for Building Professionals Second Edition | |
CN104153588A (zh) | 一种内隔墙轻质墙板安装方法 | |
Lin | Maintainability of facilities: for building professionals | |
CN204511159U (zh) | 一种一体化全塑门窗附框 | |
CN104599045A (zh) | 工程实景验收方法 | |
CN113006397A (zh) | 一种厨卫空间规方找平的施工方法 | |
CN106223566A (zh) | 一种用于室内轻质砌块墙石材干挂的施工方法 | |
CN104818822A (zh) | 室内大版面墙砖丝挂粘接施工工艺 | |
CN106639247A (zh) | 一种铺设陶瓷地砖施工工艺 | |
CN107143104A (zh) | 一种钢构保温装饰一体板外墙的施工工艺 | |
KR102063361B1 (ko) | 건물 외벽 리모델링 시공방법 | |
CN107905497A (zh) | 一种门槛与地板收口及其制作工艺 | |
CN205976290U (zh) | 一种复合保温一体板锚固托挂结构 | |
AU2013375539A1 (en) | Interior decoration method | |
CN103628602A (zh) | 建筑幕墙玻璃纤维增强复合板安装组件及安装方法 | |
CN106639224A (zh) | 能够提高家具厂房中干挂面石材施工质量的工艺 | |
CN109487951B (zh) | 一种蒙古包墙板的安装方法 | |
CN110439312A (zh) | 点挂式保温一体板外墙改造的施工方法 | |
CN204081104U (zh) | 一种保温系统 | |
CN109779255A (zh) | 一种加气混凝土墙面粉刷石膏抹灰施工方法 | |
CN204491912U (zh) | 建筑物管道间的隔墙结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140611 |