CN103850351A - Connecting device of concrete filled steel tubular column and reinforced concrete beam - Google Patents

Connecting device of concrete filled steel tubular column and reinforced concrete beam Download PDF

Info

Publication number
CN103850351A
CN103850351A CN201210496195.4A CN201210496195A CN103850351A CN 103850351 A CN103850351 A CN 103850351A CN 201210496195 A CN201210496195 A CN 201210496195A CN 103850351 A CN103850351 A CN 103850351A
Authority
CN
China
Prior art keywords
steel
concrete beam
reinforced concrete
column
tubular column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210496195.4A
Other languages
Chinese (zh)
Inventor
陈宇陵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry 22 Construction Co Ltd
Original Assignee
China Nuclear Industry 22 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry 22 Construction Co Ltd filed Critical China Nuclear Industry 22 Construction Co Ltd
Priority to CN201210496195.4A priority Critical patent/CN103850351A/en
Publication of CN103850351A publication Critical patent/CN103850351A/en
Pending legal-status Critical Current

Links

Images

Abstract

Disclosed is a connecting device of a concrete filled steel tubular column and a reinforced concrete beam. The connecting device comprises steel corbels which are welded to the concrete filled steel tubular column, one ends of the steel corbels are provided with extension sleeves, and the reinforced concrete beam is fixed to the steel corbels through the extension sleeves. According to the connecting device of the concrete filled steel tubular column and the reinforced concrete beam, the extension sleeves are arranged on the connecting portions of the steel corbels and the reinforcing steel bars inside the reinforced concrete beam, and the concrete filled steel tubular column is provided with the structures of reinforcing outer ring plates and concentric inner ring plates, so that installation and fixed welding of the reinforcing steel bars in the concrete beam and the steel corbels can be achieved conveniently, safely and rapidly; the extension sleeves are welded to the steel corbels before construction, so that the quality safety of welding points can be effectively guaranteed and the field construction speed can be effectively increased; by means of the ring plates and the steel corbels, worry on cracks generated at the contact positions between the reinforced concrete beam and the wall of the concrete filled steel tubular column due to contact between concrete and the concrete filled steel tubular column can be avoided, and secondary treatment through other construction measures can be omitted, so that the construction cost can be saved.

Description

A kind of linkage for steel core concrete column and reinforced concrete beam
Technical field
The present invention relates to a kind of linkage for steel core concrete column and reinforced concrete beam, relate in particular to a kind of in engineering construction the linkage for steel core concrete column and reinforced concrete beam.
Background technology
The Shear force within the beam end transmission of cast-in-situ concrete beam column junction, steel corbel on available welding and steel pipe is realized, should not have component to pass steel pipe, in order to avoid affect building of pipe inner concrete, the reinforcing bar in concrete beam need adopt with reinforcing ring steel plate on steel corbel the method welding of downhand welding or overhead welding like this.Because it is sagging that the thawing metal under high temperature is easy to produce under Action of Gravity Field, under high temperature, the surface tension in molten bath is less, easily produces positive overlap, lack of fusion, slag inclusion, molten bath and watches the problems such as unclear, so overhead welding is a kind of welding method of very difficult grasp.If bar diameter is larger in the concrete beam being connected with steel column, upper and lower skin reinforcing bar row is many, and gap is little, the problem that exists like this welding difficulty greatly even cannot weld.
Summary of the invention
Technical problem to be solved by this invention is for above-mentioned the deficiencies in the prior art, and a kind of linkage for steel core concrete column and reinforced concrete beam providing, and it can solve the problem that concrete reinforcing steel and steel corbel are difficult to weld together.
The object of the present invention is achieved like this:
For a linkage for steel core concrete column and reinforced concrete beam, comprise steel corbel, steel corbel is welded on steel column, and the other end of steel corbel is provided with nigger, and concrete beam is fixed by nigger and steel corbel.
Described steel column is provided with reinforcement outer ring plate, strengthens outer ring plate and extends to above steel corbel.
Multiple niggers shape that linearly misplaces combines and forms nigger bond pads on steel corbel.
Described steel column is provided with interior concentric circles ring flat-plate.
Described concrete beam epithelium one placing of reinforcement is directly the two-sided welding in place at steel corbel.
Described nigger group and the two placing of reinforcement welding of concrete beam epithelium.
The present invention has obtained following technique effect:
First the present invention has adopted at steel corbel and concrete reinforcing steel junction and has been provided with nigger, and on steel column, be provided with the structure of strengthening outer ring plate and interior concentric circles ring flat-plate, can realize the installation of concrete reinforcing steel and steel corbel convenient, safely, quickly and be welded and fixed; Secondly nigger first welded with steel corbel before construction, can effectively ensure the quality safety of contact and improve on-the-spot speed of application; Due to the setting of ring flat-plate and bracket, concrete beam needn't worry that with steel pipe walls contact position concrete contacts the crack producing with steel column, does not need to do other construction measure and after-treatment again, has saved construction costs again; In addition it also has advantages of that molding effect is attractive in appearance, applied widely, node region is without other extra process.
Brief description of the drawings
Below in conjunction with drawings and Examples, the invention will be further described:
Fig. 1 is the structure chart after the present invention is connected with steel column;
Fig. 2 is the structure chart after the present invention is connected with steel column and reinforcing bar.
Detailed description of the invention
For a linkage for steel core concrete column and reinforced concrete beam, comprise steel corbel 1 as shown in Figure 1-2, steel corbel 1 is welded on steel column 2, and the other end of steel corbel 1 is provided with nigger 3, and concrete beam 5 is fixing with steel corbel 1 by nigger 3.Steel column 2 is provided with strengthens outer ring plate 4, strengthens outer ring plate 4 and extends to above steel corbel 1.Multiple niggers 3 shape that linearly misplaces combines and forms nigger group 8 and be welded on steel corbel.Steel column 2 is provided with interior concentric circles ring flat-plate 6.Concrete beam 5 epithelium one placing of reinforcements 7 are directly the two-sided welding in place at steel corbel 1.Nigger group 8 is welded with concrete beam 5 epithelium two placing of reinforcements 9.
While adopting said structure, the connected node of steel corbel welding nigger, arranges at concrete beam reinforcing epithelium reinforcing bar place in steel column process and strengthens outer ring plate and extend to steel corbel, and concrete beam hypodermis reinforcing bar place arranges interior concentric circles ring flat-plate.
Treat steel column size by drawing, after factory's roll bending completes, according to the position of concrete beam, sectional dimension, floor absolute altitude, and according to the row of concrete beam reinforcing, at steel column correspondence position weldable steel bracket (bracket steel plate thickness is according to calculative determination), and the long straight screw sleeve that directly welding processing factory customizes on steel corbel, in the situation that concrete beam reinforcing radical is more, the shape that multiple niggers linearly can be misplaced combines and forms nigger group.
Steel column is transported to behind scene, according to steel corbel location and the compound location of on-the-spot axis, and adjusts the absolute altitude of steel column according to the position of strengthening outer ring plate, after adjusting, field by using fixing steel plate is temporary fixed, wait check and accept by after carry out the welding of steel column butt joint weld seam.
Concrete beam two placing of reinforcements (except concrete beam epithelium one placing of reinforcement) with lengthen straight screw sleeve is connected, concrete beam is transmission internal force reliably, the rigidity within the scope of beam length is constant, structure stress analysis with reality just as.In the situation that concrete beam reinforcing radical is more, for ensureing welding quality, concrete beam reinforcing and nigger group are welded and fixed mutually.Concrete beam epithelium one placing of reinforcement is directly in the two-sided welding in steel corbel place, and with steel corbel lap length > 5d, weld bead height is controlled at 10mm.
After structural beams reinforcement installation completes, adopt the lumps of wood that structural beams hypodermis reinforcing bar is paved, pave height according to in-situ determination, be convenient to stirrup installation, and according to drawing requirement location colligation, then disturbing concrete.

Claims (6)

1. the linkage for steel core concrete column and reinforced concrete beam, comprise steel corbel (1), it is characterized in that: steel corbel (1) is welded on steel column (2), the other end of steel corbel (1) is provided with nigger (3), and concrete beam (5) is fixing by nigger (3) and steel corbel (1).
2. a kind of linkage for steel core concrete column and reinforced concrete beam according to claim 1, is characterized in that: described steel column (2) is provided with strengthens outer ring plate (4), strengthens outer ring plate (4) and extends to steel corbel (1) above.
3. a kind of linkage for steel core concrete column and reinforced concrete beam according to claim 1, is characterized in that: multiple niggers (3) linearly misplace shape combine form nigger group (8) be welded on steel corbel.
4. a kind of linkage for steel core concrete column and reinforced concrete beam according to claim 1 and 2, is characterized in that: described steel column (2) is provided with interior concentric circles ring flat-plate (6).
5. according to a kind of linkage for steel core concrete column and reinforced concrete beam described in claim 1 or 3, it is characterized in that: described concrete beam (5) epithelium one placing of reinforcement (7) is directly the two-sided welding in place at steel corbel (1).
6. a kind of linkage for steel core concrete column and reinforced concrete beam according to claim 3, is characterized in that: described nigger group (8) and concrete beam (5) epithelium two placing of reinforcements (9) welding.
CN201210496195.4A 2012-11-29 2012-11-29 Connecting device of concrete filled steel tubular column and reinforced concrete beam Pending CN103850351A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210496195.4A CN103850351A (en) 2012-11-29 2012-11-29 Connecting device of concrete filled steel tubular column and reinforced concrete beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210496195.4A CN103850351A (en) 2012-11-29 2012-11-29 Connecting device of concrete filled steel tubular column and reinforced concrete beam

Publications (1)

Publication Number Publication Date
CN103850351A true CN103850351A (en) 2014-06-11

Family

ID=50858461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210496195.4A Pending CN103850351A (en) 2012-11-29 2012-11-29 Connecting device of concrete filled steel tubular column and reinforced concrete beam

Country Status (1)

Country Link
CN (1) CN103850351A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086487A (en) * 2017-12-29 2018-05-29 中铁第四勘察设计院集团有限公司 Profile steel concrete column and reinforced beam connection structure and its construction method
CN108442509A (en) * 2018-05-18 2018-08-24 上海建工二建集团有限公司 A kind of concrete steel pipe congruent column beam-to-column joint device and attaching method thereof
CN110206141A (en) * 2019-04-23 2019-09-06 江苏省建筑设计研究院有限公司 The staggered joint of rectangular steel-tube concrete column and beams of concrete
CN112538867A (en) * 2020-11-16 2021-03-23 上海建工四建集团有限公司 Reverse construction method and structure of beam column joint in foundation pit
CN113529934A (en) * 2021-06-23 2021-10-22 广东省建筑设计研究院有限公司 Beam column node of combination of steel bar area anchor plate and steel-pipe column shaped steel bracket
CN115262778A (en) * 2022-08-08 2022-11-01 中国建筑第七工程局有限公司 Novel connection construction method for box steel column and reinforced concrete beam

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086487A (en) * 2017-12-29 2018-05-29 中铁第四勘察设计院集团有限公司 Profile steel concrete column and reinforced beam connection structure and its construction method
CN108442509A (en) * 2018-05-18 2018-08-24 上海建工二建集团有限公司 A kind of concrete steel pipe congruent column beam-to-column joint device and attaching method thereof
CN110206141A (en) * 2019-04-23 2019-09-06 江苏省建筑设计研究院有限公司 The staggered joint of rectangular steel-tube concrete column and beams of concrete
CN112538867A (en) * 2020-11-16 2021-03-23 上海建工四建集团有限公司 Reverse construction method and structure of beam column joint in foundation pit
CN113529934A (en) * 2021-06-23 2021-10-22 广东省建筑设计研究院有限公司 Beam column node of combination of steel bar area anchor plate and steel-pipe column shaped steel bracket
CN115262778A (en) * 2022-08-08 2022-11-01 中国建筑第七工程局有限公司 Novel connection construction method for box steel column and reinforced concrete beam

Similar Documents

Publication Publication Date Title
CN103850351A (en) Connecting device of concrete filled steel tubular column and reinforced concrete beam
CN104775516B (en) Field connecting method among prefabricated reinforced concrete columns
CN107299683B (en) Compound concrete-filled tubular column assembled docks node and connection method
CN103850363B (en) Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
CN212866536U (en) Concrete wall department steel bar truss floor carrier plate side supporting device
CN103306493B (en) The reinforcement means of fabric structure
CN103452304B (en) Exempt from foot trick plug-in type outrigger L-type steel wall-connecting piece structure and construction method thereof
CN108952014A (en) A kind of shear force wall reinforcing steel bar positioning device
CN103821280A (en) Construction method for steel tube confined concrete composite columns
CN204804057U (en) Beam column connecting device of prefabricated frame
CN103122696B (en) Cast-in-place concrete floor gage controller and method thereof
CN108625477A (en) A kind of assembled beam-column node and its construction method
CN203361354U (en) Beam column pitch point connecting device
CN104294920B (en) The node component of a kind of U-shaped steel-concrete combination beam and special-shaped steel pipe concrete post and preparation method
CN103669720A (en) Precast beam and reinforced concrete structure with tenon anchor system
CN103603494B (en) A kind of ultra-thin steel truss sloping core construction method and formwork structure
CN203066251U (en) Connecting device used for concrete-filled steel tube column and reinforced concrete beam
CN208023713U (en) A kind of prefabrication and assembly construction steel reinforced concrete beam column connection structure
CN104196023B (en) A kind of using method of the concrete precast pipe pile pile top of band mechanical connecting device
KR101673287B1 (en) Methods of increasing the sectional resisting force for negative moment acting at the end part of beam in case of repair or remodeling
CN204781443U (en) Device for connecting precast shear wall concatenation about being used for
CN207919761U (en) A kind of built-in groove steel construction
CN103291080A (en) Movable sizing runway for floor slab concrete pouring
CN206319597U (en) A kind of cantilever steel girder erecting device
CN104929320A (en) Rebar connecting structure and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140611