CN103835748A - Method and device for surface well-drilling gas extraction - Google Patents

Method and device for surface well-drilling gas extraction Download PDF

Info

Publication number
CN103835748A
CN103835748A CN201410058059.6A CN201410058059A CN103835748A CN 103835748 A CN103835748 A CN 103835748A CN 201410058059 A CN201410058059 A CN 201410058059A CN 103835748 A CN103835748 A CN 103835748A
Authority
CN
China
Prior art keywords
extraction
well
ground
gas
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410058059.6A
Other languages
Chinese (zh)
Inventor
叶姜
杨世梁
邓鸢
刘勇
何坤雄
娄毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Pan Jiang Cbm Development Utilizes Co Ltd
Original Assignee
Guizhou Pan Jiang Cbm Development Utilizes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Pan Jiang Cbm Development Utilizes Co Ltd filed Critical Guizhou Pan Jiang Cbm Development Utilizes Co Ltd
Priority to CN201410058059.6A priority Critical patent/CN103835748A/en
Publication of CN103835748A publication Critical patent/CN103835748A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention belongs to the technical field of gas extraction and particularly relates to a method and a device for surface well-drilling gas extraction. The method comprises the steps of three time-zone extraction including before extraction, extraction duration and post-extraction. The device comprise a discharge and extraction pipe column assembly and an extraction tool assembly, a casing pipe adopts a casting pipe adjusting connection capable of performing radial and axial adjustment so that the casing pipe can have deflection and telescoping functions to adapt to 'three-zone' rock stratum movement and prevent breakage. The ground coal-bed gas well development and underground gas extraction are combined, so that coal-bed gas well have multiple purposes in one, namely the before extraction, extraction duration and post-extraction, and efficient coal-bed extraction is achieved.

Description

A kind of method of CMM Surface Well Drilling and device
Technical field
The invention belongs to gas pumping technical field, be specifically related to a kind of method and device of CMM Surface Well Drilling.
Background technology
The colliery of current China 95% is underground mining, coal geological exploration complicated condition, and great gas hazard happens occasionally, and coal in China industry death toll accounts for the total death toll of global mine safety accidents 80% left and right according to statistics.According to statistics, from calendar year 2001 to 2010 year China's coal-mine security incident accumulative total occur in the of 27606, occur every year on average 2760.6, add up dead 47905 people, every year on average dead 4790.5 people simultaneously; The security incident accumulative total causing because of gas reason reaches 1495.To sum up, China because of mine safety accidents death toll a lot, and wherein gas is main " guilty person " of Safety of Coal Mine Production accident.Realize coal and coal bed gas resource harmony is adopted altogether, improve construction speed under coal mine, the fundamental way that reduces gas emission on getting working face is mash gas extraction.
Gas pumping is mainly divided into ground extraction and down-hole extraction at present, general ground extraction is mainly that to obtain cbm development commercial interest be target, its investor is mainly conventional oil company and venture capital investor, has proposed the slogan of " resource-safety-environment "; Down-hole extraction is mainly to administer gas on the other hand, and guarantee Safety of Coal Mine Production is target, and its investor is mainly taking colliery as main, advocates the Business concepts of " extraction-utilization-environmental protection ".Therefore, coal mine gas drainage is just paid close attention to the effect of gas control under normal circumstances, and cbm development company only focuses on commercial interest, does not consider the safety problem of colliery downhole production.For example, when colliery face is advanced to the postpone of ground coal bed gas well location, in order to catch up with construction speed, general colliery side can cut ground coal bed gas well and continue coal mining activity at the sleeve pipe of down-hole, bring economic loss so not only to the developer who is carrying out ground coal bed gas extraction, also make work plane push through after the down well placement of coal bed gas well place, very easily induce upper " three bands " strata movement and cause wellbore casing fracture, make ground coal bed gas well cannot extraction on pressure release gas in " three bands ", also cause carrying out goaf extraction.
To sum up, how by ground coal bed gas exploitation with underground gas extraction before adopting, adopt and adopt after three time zones effectively replace, become the key of coal mining gas production integrated technique.
Summary of the invention
The object of the invention is to overcome above-mentioned deficiency, a kind of method and device of taking out, adopt the CMM Surface Well Drilling of taking out after taking out, adopting before carrying out after planning area, colliery ground drilling that a well is multiplex and adopting is provided.
The technical solution adopted for the present invention to solve the technical problems is: a kind of method of CMM Surface Well Drilling, comprise three time zone extractions, it is characterized in that, one, take out before adopting: after planning area, colliery is drilled with well by ground in advance, be lowered to rigid casing 10 to 40-50 rice below the section of coal seam and cement the well, carry out mining operation after then descending rifle to penetrate out coal seam section pressure break; Two, adopt and take out: the first step, in the time that colliery face is advanced to ground coal bed gas well location and puts, the mining tubing string assembly 1 of ground coal bed gas well is extracted out; Second step, enters perforating gun from underground and penetrates out " three bands " district that coal bed gas is covered, and its distance is 35-50 pressure release coal seam, bottom doubly, then is lowered to an extraction instrument assembly 2 with packer 24; The 3rd step, utilizes well head extraction pump to implement " three bands " district's pressure release gas ground extraction; Three, adopting sky takes out: above carry after the interior extraction instrument assembly 2 of well, directly utilize well head gas pumping pump to implement negative pressure extraction.
In " three band " district and geostatic stress changes region employing adjusting sleeve union 9 greatly, described adjusting sleeve union 9 can be in axial and radiai adjustment, make sleeve pipe 10 there is drift angle, flexible function, to adapt to the movement of " three bands " rock stratum, prevent that sleeve pipe 10 from rupturing.
A device for CMM Surface Well Drilling, comprises mining tubing string assembly 1 and extraction instrument assembly 2, it is characterized in that, adopts the adjusting sleeve union 9 that can carry out radial and axial adjusting on sleeve pipe 10.
The described tubing string assembly 1 of adopting comprises oil pipe component 11, pump 12, screen casing 13 and plug 14, and pump 12 is connected to oil pipe component 11 lower ends, and screen casing 13 is connected to pump 12 belows, and oil pipe component 11 is positioned at 10 inside pipe casings, and screen casing 13 bottoms are used plug 14 to stop up.
Described extraction instrument assembly 2 comprises wellhead assembly 21, oil pipe 22, screen casing 23, packer 24 and plug 25, wellhead assembly 21 is positioned at ground, oil pipe 22 is positioned at below wellhead assembly 21, screen casing 23 is positioned at below oil pipe 22, plug 25 is positioned at below screen casing 23, and packer 24 is between screen casing 23 and plug 25.
Mining tubing string assembly 1 can carry out efficient gas-water separation, significantly extends pump detection period, meets the needs of adopting front ground coal bed gas steady production; Extraction instrument assembly 2 can seal pressure release coal seam section, ensures the high concentration extraction of pressure release gas; Adjusting sleeve union 9 can carry out radial and axial adjusting, prevents that geostatic stress effect setting of casing 10 from rupturing.
Beneficial effect of the present invention: combine with underground gas extraction by ground coal bed gas well development, take out before making that coal bed gas well one well is multiplex and adopting, adopt and take out, take out after adopting, realize the efficient extraction of coal bed gas, set up advanced person's Green Mine safely and efficiently; Can the make overall plans demand of interests separately of cbm development company and coal production side, the gas production of accomplishing to mine is integrated; Improve ground coal bed gas well capacity, reduced the risk of coal bed gas business development.
Below in conjunction with drawings and Examples, the invention will be further described.
Brief description of the drawings
Fig. 1 is the underground structure schematic diagram that the present invention adopts front extraction;
Fig. 2 is the mining tubing string assembly structure schematic diagram in apparatus of the present invention;
Fig. 3 is the underground structure schematic diagram that the present invention adopts extraction;
Fig. 4 is the structural representation of the extraction instrument assembly in apparatus of the present invention;
Fig. 5 is the underground structure schematic diagram that the present invention adopts sky extraction.
In figure 1, mining tubing string assembly, 2, extraction instrument assembly, 3, face, 4, working seam, 5, caving zone, 6, fissure zone, 7, bending subsidence band, 8, pressure release coal seam, 9, adjusting sleeve union, 10, sleeve pipe, 11, oil pipe component, 12, pump, 13, screen casing, 14, plug, 21, wellhead assembly, 22, oil pipe, 23, screen casing, 24, packer, 25, plug.
Detailed description of the invention
Referring to Fig. 1~Fig. 5, the method of a kind of CMM Surface Well Drilling that the present invention proposes, comprise three time zone extractions, it is characterized in that, one, take out before adopting: after planning area, colliery is drilled with well by ground in advance, be lowered to rigid casing to 40-50 rice below the section of coal seam and cement the well, carry out mining operation after then descending rifle to penetrate out coal seam section pressure break; Two, adopt and take out: the first step, in the time that colliery face is advanced to ground coal bed gas well location and puts, the mining tubing string assembly 1 of ground coal bed gas well is extracted out; Second step, enters perforating gun from underground and penetrates out " three bands " district that coal bed gas is covered, and its distance is the pressure release coal seam, bottom of 35-50 times, then is lowered to an extraction instrument assembly 2 with packer 24; The 3rd step, utilizes well head extraction pump to implement " three bands " district's pressure release gas ground extraction; Three, adopting sky takes out: above carry after the interior extraction instrument assembly 2 of well, directly utilize well head gas pumping pump to implement negative pressure extraction.
In " three band " district and geostatic stress changes region employing adjusting sleeve union 9 greatly, described adjusting sleeve union 9 can be in axial and radiai adjustment, make sleeve pipe 10 there is drift angle, flexible function, to adapt to the movement of " three bands " rock stratum, prevent that sleeve pipe 10 from rupturing.
A device for CMM Surface Well Drilling, comprises mining tubing string assembly 1 and extraction instrument assembly 2, it is characterized in that, adopts the adjusting sleeve union 9 that can carry out radial and axial adjusting on sleeve pipe 10.
The described tubing string assembly 1 of adopting comprises oil pipe component 11, pump 12, screen casing 13 and plug 14, and pump 12 is connected to oil pipe component 11 lower ends, and screen casing 13 is connected to pump 12 belows, and oil pipe component 11 is positioned at 10 inside pipe casings, and screen casing 13 bottoms are used plug 14 to stop up.
Described extraction instrument assembly 2 comprises wellhead assembly 21, oil pipe 22, screen casing 23, packer 24 and plug 25, wellhead assembly 21 is positioned at ground, oil pipe 22 is positioned at below wellhead assembly 21, screen casing 23 is positioned at below oil pipe 22, plug 25 is positioned at below screen casing 23, and packer 24 is between screen casing 23 and plug 25.
Fig. 1 is the underground structure schematic diagram that the present invention adopts front extraction, faced down by ground in planning area, colliery and punch finishing drilling after 40-50 rice below working seam 4, be lowered to the sleeve pipe 10 of adjusting sleeve union 9 and implement well cementation, implement again working seam 4 fracturing works, be finally lowered to mining tubing string assembly 1 and carry out the mining operation of working seam 4.
Mine from the bottom up in colliery, drive up to pressure release coal seam 8 from working seam 4, in the middle of it area distribution caving zone 5, fissure zone 6 and bending subsidence band 7.
Described pressure release coal seam 8 is not because the reason such as thickness, Coal Pore Structure is as coalbed methane reservoir development object.
Fig. 3 is the underground structure schematic diagram that the present invention adopts extraction, in the time that colliery face 3 is advanced to ground coal bed gas well location and puts, first the mining tubing string assembly 1 of ground coal bed gas well is extracted out, then from underground enter perforating gun penetrate out pressure release coal seam 8 and " three band " district, its distance is pressure release coal seam 8 thickness of 35-50 times, finally be lowered to extraction instrument assembly 2, utilize well head extraction pump to implement " three bands " district's pressure release gas ground extraction.Its extraction principle: due to extraction on mining face under mine a large amount of coal, thereby after face, form a huge goaf adopting, and in goaf, form a continuous pressure release region, the Direction distortion in pressure release region and displacement, on making at a distance, cover 8 pressure releases of pressure release coal seam, final under the effect of negative pressure on ground extraction, collect to pit shaft along the crack of covering each coal seam in pressure release, and can also carry out gas pumping to covering each pressure release coal seam at a distance.
Described extraction instrument assembly 2 concrete construction methods, first utilize and be lowered to hollow bridging plug to caving zone 5 bottoms on ground, and pitching suppresses and set, be then lowered to the screen casing 23 of bottom with plug 25, wellhead assembly 21 is finally installed on ground, is utilized extraction pump to carry out gas pumping.
Described perforated zone be pressure release coal seam 8 and under " three band " district, while noting perforation, need to avoid the position of adjusting sleeve union 9.
As shown in Figure 5, after the pressure release gas pumping in " three bands " district, above carry extraction instrument assembly 2 in pit shaft, ground is loaded onto extraction pump and is implemented goaf gas extraction.
In addition, it should be noted that, if colliery exploit from top to bottom, can be directly from ground toward down-hole coal column or the drilling well of work plane edge zone, before can implementing that a well is multiplex and adopting, take out, adopt and take out and adopt sky and take out, wherein adopting the pressure release gas of taking out is mainly not by the interval of pressure break.
Above-mentioned gas pumping technique is to illustrate simultaneously, and the not restriction to embodiment.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here without also giving exhaustive to all embodiments.And the apparent variation of being amplified out thus or variation are still among the protection domain in patent of the present invention.

Claims (5)

1. a method for CMM Surface Well Drilling, comprises three time zone extractions, it is characterized in that,
One, take out before adopting: after planning area, colliery is drilled with well by ground in advance, be lowered to rigid casing (10) to the following 40-50 rice well cementation of coal seam section, carry out mining operation after then descending rifle to penetrate out coal seam section pressure break;
Two, adopt and take out: the first step, in the time that colliery face is advanced to ground coal bed gas well location and puts, the mining tubing string assembly (1) of ground coal bed gas well is extracted out; Second step, enters perforating gun from underground and penetrates out " three bands " district that coal bed gas is covered, and its distance is 35-50 pressure release coal seam, bottom doubly, then is lowered to the extraction instrument assembly (2) of a band packer (24); The 3rd step, utilizes well head extraction pump to implement " three bands " district's pressure release gas ground extraction;
Three, adopting sky takes out: above carry after the interior extraction instrument assembly (2) of well, directly utilize well head gas pumping pump to implement negative pressure extraction.
2. the method for a kind of CMM Surface Well Drilling according to claim 1, it is characterized in that, change region employing adjusting sleeve union (9) greatly in " three bands " district and geostatic stress, described adjusting sleeve union (9) can be in axial and radiai adjustment, makes sleeve pipe (10) have drift angle, flexible function.
3. a device for CMM Surface Well Drilling, comprises mining tubing string assembly (1) and extraction instrument assembly (2), it is characterized in that the adjusting sleeve union (9) that the upper employing of sleeve pipe (10) can be carried out radial and axial adjusting.
4. the device of a kind of CMM Surface Well Drilling according to claim 3, it is characterized in that, the described tubing string assembly (1) of adopting comprises oil pipe component (11), pump (12), screen casing (13) and plug (14), pump (12) is connected to oil pipe component (11) lower end, screen casing (13) is connected to pump (12) below, and oil pipe component (11) is positioned at (10) inside pipe casing, and screen casing (13) bottom is used plug (14) to stop up.
5. the device of a kind of CMM Surface Well Drilling according to claim 3, it is characterized in that, described extraction instrument assembly (2) comprises wellhead assembly (21), oil pipe (22), screen casing (23), packer (24) and plug (25), wellhead assembly (21) is positioned at ground, oil pipe (22) is positioned at wellhead assembly (21) below, screen casing (23) is positioned at oil pipe (22) below, plug (25) is positioned at screen casing (23) below, and packer (24) is positioned between screen casing (23) and plug (25).
CN201410058059.6A 2014-02-20 2014-02-20 Method and device for surface well-drilling gas extraction Pending CN103835748A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410058059.6A CN103835748A (en) 2014-02-20 2014-02-20 Method and device for surface well-drilling gas extraction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410058059.6A CN103835748A (en) 2014-02-20 2014-02-20 Method and device for surface well-drilling gas extraction

Publications (1)

Publication Number Publication Date
CN103835748A true CN103835748A (en) 2014-06-04

Family

ID=50799601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410058059.6A Pending CN103835748A (en) 2014-02-20 2014-02-20 Method and device for surface well-drilling gas extraction

Country Status (1)

Country Link
CN (1) CN103835748A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884673A (en) * 2017-02-25 2017-06-23 太原理工大学 A kind of method that goaf coal bed gas pinpoints efficient extraction
CN110939407A (en) * 2018-09-25 2020-03-31 山西省煤炭地质勘查研究院 Double-deck overlapping goaf ground drainage well structure and recovery unit
CN114293926A (en) * 2022-01-12 2022-04-08 淮北工业建筑设计院有限责任公司 Anti-breaking well protection pipe

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
UA26265U (en) * 2007-05-11 2007-09-10 State Makiivka Scient Res I Fo Method for degassing outburst-dangerous and gas-bearing coal beds
CN102080518A (en) * 2011-01-17 2011-06-01 河南理工大学 Method for extracting gas from coal seam roof complex branched well
CN102182426A (en) * 2011-04-08 2011-09-14 中煤科工集团西安研究院 Method for pumping coal bed gas from long-distance pressure-relieved coal bed
CN102226412A (en) * 2011-05-24 2011-10-26 中国矿业大学 Underground dark mining drilling well gas extraction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
UA26265U (en) * 2007-05-11 2007-09-10 State Makiivka Scient Res I Fo Method for degassing outburst-dangerous and gas-bearing coal beds
CN102080518A (en) * 2011-01-17 2011-06-01 河南理工大学 Method for extracting gas from coal seam roof complex branched well
CN102182426A (en) * 2011-04-08 2011-09-14 中煤科工集团西安研究院 Method for pumping coal bed gas from long-distance pressure-relieved coal bed
CN102226412A (en) * 2011-05-24 2011-10-26 中国矿业大学 Underground dark mining drilling well gas extraction method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
周昀涵: "地面钻井抽采瓦斯的技术研究和发展", 《能源技术与管理》, no. 2, 28 April 2011 (2011-04-28), pages 32 - 34 *
张国荣: "地面井用可调节套管接头的设计与研究", 《中国优秀硕士学位论文全文数据库》, 15 April 2012 (2012-04-15), pages 36 *
莫日和等: "柳林地区煤层气排采工艺技术初探", 《2011年煤层气学术研讨会论文集》, 15 August 2012 (2012-08-15), pages 352 - 358 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884673A (en) * 2017-02-25 2017-06-23 太原理工大学 A kind of method that goaf coal bed gas pinpoints efficient extraction
CN106884673B (en) * 2017-02-25 2019-11-12 太原理工大学 A kind of method that goaf coal bed gas pinpoints efficient extraction
CN110939407A (en) * 2018-09-25 2020-03-31 山西省煤炭地质勘查研究院 Double-deck overlapping goaf ground drainage well structure and recovery unit
CN114293926A (en) * 2022-01-12 2022-04-08 淮北工业建筑设计院有限责任公司 Anti-breaking well protection pipe

Similar Documents

Publication Publication Date Title
CN107044289B (en) A kind of bored grouting blocks the water damage control method of overlying strata water producing fractures main channel
CA2614569C (en) Method of increasing reservoir permeability
WO2020113870A1 (en) Method for cooperatively draining roof separation water and mining coal-measure gas
CN104131831B (en) A kind of coal bed gas well three-dimensional associating pumping method up and down
CN109736805A (en) A kind of method of the modified release watershed management bump of thick-layer tight roof
CN112593936B (en) Advanced comprehensive control method for multi-disaster area of deep mine
CN102392677A (en) Permeability improvement technology for coal bed gas reservoir cap by using three-dimensional fracture network modification
RU2526937C1 (en) Method of low-permeable oil deposit development
CN102086774A (en) Drainage method of gas in coal bed
CN102493833A (en) Depressurized extraction method for cutting through roof or floor of coal seam by abrasive water jet
WO2015103861A1 (en) Method for extracting gas by drilling hole in gob-side entry retaining y-type ventilation high-position return airway
CN108301866B (en) Mining of closed distance coal seam group adjacent layer gas pressure relief directional drilling stops pumping method
CN101936153A (en) Method for exploiting coal bed gas by water power spray drilling for releasing pressure
CN108894813B (en) Gas outburst elimination method combining underground drilling, ground fracturing and underground extraction
CN113404534B (en) Method for preventing rock burst by staged fracturing of L-shaped ground horizontal well
CN111946307A (en) Method for layered pressure control combined extraction of coal bed gas of goaf and underlying coal reservoir
CN102162367A (en) Arrangement method for gas drainage drill sites of highly-gassy fully-mechanized top-coal caving surface
CN104895531A (en) Single thick coal seam ground mining well extraction process
CN107620581B (en) Construction method of one-well dual-purpose coal mine shaft inspection hole
CN114294046B (en) Coal mine area full-coverage underground three-dimensional extraction method
CN103835748A (en) Method and device for surface well-drilling gas extraction
CN109322696B (en) Method for extracting gas resources of inverted F-shaped ground well in mining area
CN106014345A (en) Extraction method for mining formed composite goaf coalbed methane through lower caving method
CN207761705U (en) Gas drainage system based on roof horizontal drilling
CN112360397B (en) Method for co-mining underlying coal and coal bed gas in over-goaf

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Lin Cheng Xi Lu Lake District 550081 Guizhou city of Guiyang province No. 95 seven floor

Applicant after: Guizhou Pan Jiang cbm development utilizes Co., Ltd

Address before: 550081 Guizhou Province, Guiyang City Lake District century Jin Yuan shopping center business building D block 15 layer

Applicant before: Guizhou Pan Jiang cbm development utilizes Co., Ltd

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140604