CN103835512A - 定型化可拼装式防护棚安装方法 - Google Patents
定型化可拼装式防护棚安装方法 Download PDFInfo
- Publication number
- CN103835512A CN103835512A CN201410072559.5A CN201410072559A CN103835512A CN 103835512 A CN103835512 A CN 103835512A CN 201410072559 A CN201410072559 A CN 201410072559A CN 103835512 A CN103835512 A CN 103835512A
- Authority
- CN
- China
- Prior art keywords
- secondary beam
- girder
- column
- color steel
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
本发明公开了一种定型化可拼装式防护棚安装方法,包括如下步骤:1)先连接承重柱和主梁;2)连接四根连接梁;3)在主梁上架设并固定底层次梁;4)在底层次梁上铺设彩钢板;5)在主梁和连接梁上分别安装立柱;6)在立柱距底部600mm处架设中层次梁;7)安装中间立柱,在中层次梁上满铺木模板;8)安装上层次梁,在上层次梁上铺设防护板。本发明简化了拼装步骤,提高了安装速度,使定型化可拼装式防护棚的安装施工流程化,可有效降低施工成本。
Description
技术领域
本发明涉及一种定型化可拼装式防护棚安装方法。
技术背景
建设工地通常需要搭设大量的临时简易房用于临时工人住宿休息或存放建筑材料,然而普通简易房搭建速度慢,施工过程复杂,耗费了大量的人力物力,也造成了材料的浪费。
发明内容
本发明所要解决的技术问题就是提供一种定型化可拼装式防护棚安装方法,将防护棚的拼装步骤简化和流程化,大大缩短了施工周期,降低了施工成本。
为解决上述技术问题,本发明采用如下技术方案:
定型化可拼装式防护棚安装方法,包括如下步骤:
1)先将承重柱和主梁使用M12×30的螺丝连接好;
2)使用M12×70的螺丝将四根连接梁分别与承重柱和主梁相连;
3)在主梁上架设若干根6米长的底层次梁,然后用抱箍和M10×100的螺丝将底层次梁与主梁进行固定;
4)在底层次梁上铺设彩钢板,采用平行长边方向铺设且每块彩钢板要重合,重合长度不小于3cm,彩钢板上方用方木压顶;
5)按间距2米在主梁和连接梁上分别安装立柱,并用直角扣件将立柱下端与主梁、连接梁固定;
6)在立柱距底部600mm处架设若干根6米长的中层次梁,并用直角扣件将 中层次梁两端与立柱固定;
7)按间距2米安装中间立柱,中间立柱底部垫设在彩钢板上,并用直角扣件将中间立柱与中层次梁相交处固定,在中层次梁上满铺木模板;
8)在立柱和中间立柱上端安装若干根6米长的上层次梁,并用直角扣件将上层次梁两端与立柱和中间立柱固定,在上层次梁上铺设防护板。
优选的,在底层次梁上铺设彩钢板时,采用平行长边方向铺设彩钢板且每块彩钢板要重合,重合长度不小于3cm,彩钢板上方用方木压顶。
本发明采用上述技术方案,将防护棚由下至上安装,立柱、主梁和连接梁之间采用螺丝相连,底层次梁采用抱箍紧固,层层安装中层次梁和上层次梁并用直角扣件紧固,简化了拼装步骤,提高了安装速度,使定型化可拼装式防护棚的安装施工流程化,可有效降低施工成本。
附图说明
以下结合附图和具体实施方式对本发明进行进一步描述:
图1是本发明的结构示意图。
具体实施方式
下面结合附图对本发明的具体实施方式作详细说明。
如图1所示,本发明中定型化可拼装式防护棚包括至少四根承重柱1,所述承重柱上端架设主梁2,所述承重柱上部和主梁端部设有连接梁3,所述主梁之间架设若干根底层次梁4,所述主梁和连接梁上分别设有若干根立柱6,所述立柱的各个中间段和上端分别架设若干根中层次梁7和上层次梁8,所述底层次梁、中层次梁和上层次梁上分别铺设有彩钢板5、木模板9和防护板10。所述主梁2和底层次梁4以及立柱6和中层次梁7、上层次梁8的结合处分别设有抱箍将结合处连接紧固。所述承重柱1和主梁2、连接梁3,主梁和连接梁3以及底层次 梁4和立柱6分别通过直角扣件相连接。所述防护板10为彩钢复合板。所述彩钢板5上设有若干根中间立柱11,所述中间立柱与中层次梁7连接且上端与上层次梁8相连。
本发明的一种实施例:采用四根承重柱1,两根主梁2和四根连接梁3。
本发明包括如下步骤:
1)先将承重柱1和主梁2使用M12×30的螺丝连接好;
2)使用M12×70的螺丝将四根连接梁3分别与承重柱和主梁相连;
3)在主梁上架设若干根6米长的底层次梁4,然后用抱箍和M10×100的螺丝将底层次梁4与主梁2进行固定;
4)在底层次梁上铺设彩钢板5,采用平行长边方向铺设彩钢板且每块彩钢板要重合,重合长度不小于3cm,彩钢板上方用方木压顶;
5)按间距2米在主梁和连接梁上分别安装立柱6,并用直角扣件将立柱6下端与主梁、连接梁固定;
6)在立柱距底部600mm处架设若干根6米长的中层次梁7,并用直角扣件将中层次梁两端与立柱固定;
7)按间距2米安装中间立柱,中间立柱底部垫设在彩钢板上,并用直角扣件将中间立柱与中层次梁7相交处固定,在中层次梁7上满铺木模板9;
8)在立柱和中间立柱上端安装若干根6米长的上层次梁8,并用直角扣件将上层次梁两端与立柱和中间立柱固定,在上层次梁上铺设防护板10。
以上就本发明较佳的实施例做了说明,但不能理解为是对权利要求的限制。本发明不仅局限于以上实施例,其具体结构允许有变化,本领域技术人员可以根据本发明作出各种改变和变形,只要不脱离本发明的精神,均属于本发明所附权利要求所定义的范围。
Claims (2)
1.定型化可拼装式防护棚安装方法,其特征在于:包括如下步骤:
1)先将承重柱和主梁使用M12×30的螺丝连接好;
2)使用M12×70的螺丝将四根连接梁分别与承重柱和主梁相连;
3)在主梁上架设若干根6米长的底层次梁,然后用抱箍和M10×100的螺丝将底层次梁与主梁进行固定;
4)在底层次梁上铺设彩钢板;
5)按间距2米在主梁和连接梁上分别安装立柱,并用直角扣件将立柱下端与主梁、连接梁固定;
6)在立柱距底部600mm处架设若干根6米长的中层次梁,并用直角扣件将中层次梁两端与立柱固定;
7)按间距2米安装中间立柱,中间立柱底部垫设在彩钢板上,并用直角扣件将中间立柱与中层次梁相交处固定,在中层次梁上满铺木模板;
8)在立柱和中间立柱上端安装若干根6米长的上层次梁,并用直角扣件将上层次梁两端与立柱和中间立柱固定,在上层次梁上铺设防护板。
2.根据权利要求1所述的定型化可拼装式防护棚安装方法,其特征在于:在底层次梁上铺设彩钢板时,采用平行长边方向铺设彩钢板且每块彩钢板要重合,重合长度不小于3cm,彩钢板上方用方木压顶。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410072559.5A CN103835512B (zh) | 2014-02-28 | 2014-02-28 | 定型化可拼装式防护棚安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410072559.5A CN103835512B (zh) | 2014-02-28 | 2014-02-28 | 定型化可拼装式防护棚安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103835512A true CN103835512A (zh) | 2014-06-04 |
CN103835512B CN103835512B (zh) | 2016-03-02 |
Family
ID=50799372
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410072559.5A Active CN103835512B (zh) | 2014-02-28 | 2014-02-28 | 定型化可拼装式防护棚安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103835512B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105888249A (zh) * | 2016-04-27 | 2016-08-24 | 杨毅 | 一种山区工地少刷坡沿公路布置的临时场地扩展施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003013621A (ja) * | 2001-06-29 | 2003-01-15 | Toshiba Corp | 発電プラント建設工法 |
CN102174856A (zh) * | 2011-03-23 | 2011-09-07 | 中天建设集团有限公司 | 定型化钢筋加工棚 |
CN202100020U (zh) * | 2011-05-18 | 2012-01-04 | 山西四建集团有限公司 | 建筑施工现场用防护棚 |
CN202755678U (zh) * | 2012-08-07 | 2013-02-27 | 中建三局建设工程股份有限公司 | 具有临时堆场功能的型钢安全通道 |
-
2014
- 2014-02-28 CN CN201410072559.5A patent/CN103835512B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003013621A (ja) * | 2001-06-29 | 2003-01-15 | Toshiba Corp | 発電プラント建設工法 |
CN102174856A (zh) * | 2011-03-23 | 2011-09-07 | 中天建设集团有限公司 | 定型化钢筋加工棚 |
CN202100020U (zh) * | 2011-05-18 | 2012-01-04 | 山西四建集团有限公司 | 建筑施工现场用防护棚 |
CN202755678U (zh) * | 2012-08-07 | 2013-02-27 | 中建三局建设工程股份有限公司 | 具有临时堆场功能的型钢安全通道 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105888249A (zh) * | 2016-04-27 | 2016-08-24 | 杨毅 | 一种山区工地少刷坡沿公路布置的临时场地扩展施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103835512B (zh) | 2016-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101769008B (zh) | 利用预制构造柱圈梁建造抗震砌体房屋的方法 | |
CN102691411A (zh) | 梁板后浇带模板支撑体系及其施工方法 | |
CN204983662U (zh) | 一种对拉螺杆与钢管排架组合单侧支模装置 | |
CN106368245A (zh) | 一种易清理的后浇带支模施工方法 | |
CN103276893A (zh) | 新型刚性建筑模板支撑组合结构及施工方法 | |
CN104818772A (zh) | 一种大跨度长悬臂连体结构及施工工艺 | |
CN203923922U (zh) | 具备整体横移功能的箱型梁现浇支撑架 | |
CN103578346B (zh) | 一种简支梁桥教学仿真结构体 | |
CN103835512B (zh) | 定型化可拼装式防护棚安装方法 | |
CN205000463U (zh) | 一种大跨度长悬臂连体结构 | |
CN104314103A (zh) | 后张法有粘结预应力地下车库防水板设计及施工工法 | |
CN204825945U (zh) | 一种用于固定预埋螺栓的卡具 | |
CN203701627U (zh) | 定型化可拼装式防护棚 | |
CN204059420U (zh) | 后浇带支撑结构 | |
CN107299596B (zh) | 混凝土支撑栈桥板下支撑梁模板系统及其施工方法 | |
CN102418414A (zh) | 大板跨预制梁楼板支模体系 | |
CN103835518A (zh) | 定型化可拼装式防护棚 | |
CN102454298B (zh) | 大型钢筋混凝土框架梁施工方法 | |
CN205445125U (zh) | 快速施工型装配式围墙 | |
CN204590261U (zh) | 一种新型预制装配式框架结构 | |
CN102418417A (zh) | 大板跨现浇梁密肋楼板早拆模板支模体系 | |
CN203755165U (zh) | 钢管桩支架结构 | |
CN205399827U (zh) | 混凝土柱、梁、板交接处用预制整体装配式钢筋架 | |
CN204343641U (zh) | 吊顶专用脚手架 | |
CN109667222A (zh) | 滴水檐及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190102 Address after: 430000 No. 1 Luohan Street Industrial Park, Huangpi District, Wuhan City, Hubei Province Patentee after: Zhongtian Construction Group Sixth Construction Co., Ltd. Address before: 322100 No. 65 Wuning East Road, Dongyang City, Jinhua City, Zhejiang Province Patentee before: Zhongtian Construction Group Co., Ltd. |
|
TR01 | Transfer of patent right |