CN103823666A - Smart substation equipment visualized programming method - Google Patents

Smart substation equipment visualized programming method Download PDF

Info

Publication number
CN103823666A
CN103823666A CN201310542955.5A CN201310542955A CN103823666A CN 103823666 A CN103823666 A CN 103823666A CN 201310542955 A CN201310542955 A CN 201310542955A CN 103823666 A CN103823666 A CN 103823666A
Authority
CN
China
Prior art keywords
visual
programming
node
aov
adjacency list
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310542955.5A
Other languages
Chinese (zh)
Other versions
CN103823666B (en
Inventor
张静
李先波
杨继高
余晓明
倪辉
吴锦婵
单超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nari Technology Co Ltd
Original Assignee
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nari Technology Co Ltd filed Critical Nari Technology Co Ltd
Priority to CN201310542955.5A priority Critical patent/CN103823666B/en
Publication of CN103823666A publication Critical patent/CN103823666A/en
Application granted granted Critical
Publication of CN103823666B publication Critical patent/CN103823666B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Stored Programmes (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a smart substation equipment visualized programming method which is characterized by including visualized programming and imaging and visualized debugging. The visualized programming includes the steps of 11), designing an operation logic diagram of a relay protecting device according to the protecting control requirements of smart substation equipment, and checking the completeness of the logic diagram; 12), designing a visualized programming project describing the function of each equipment of a whole substation according to the operation requirements of different equipment; 13), using a component diagram drawing device to operate the logic diagram so as to complete the programming of a device operation program; 14), using cross-indexing to verify data input-output validity among diagrams in visualized programming; 15), using a coding code generating method to generate a program source code C file; 16), using a development tool compiler to generate the final target program. By the method, imaging programming of the relay protecting device, a measuring and control device and other smart equipment can be achieved.

Description

A kind of intelligent substation device visualization programmed method
technical field
The present invention relates to a kind of intelligent substation device visualization programmed method, belong to electrical technology field.
background technology
Transformer station is the hub node of Operation of Electric Systems, and higher grade of transformer substation voltage, and the effect of transformer station is just larger, and its safe reliability also requires higher, and substation secondary device is the basis of electrical network and transforming plant primary equipment safe and stable operation.
At present; along with deepening continuously of intelligent grid construction; user has proposed the requirements such as intellectual analysis, intelligent alarm, orderization operation, intellectual analysis to protective relaying device, measure and control device and other smart machines, domestic each producer and scientific research institution have also all dropped into a large amount of manpowers and carried out intelligent grid protection research.Meanwhile, for each producer, the software development division of labor is more and more thinner, and developer's technical ability is difficult to cover all major fields, and part software developer is more thorough to computer technology research, but sets foot in not dark to relay protection and control principle; Part Development personnel are the experts in relay protection field, but few to software development research.Therefore, no matter to the familiar developer of computer programming, or to the familiar developer of protection philosophy, all cannot check on to developed program code comprehensively, can not fundamentally guarantee the correctness of software logic.Along with the development of computer hardware technology and the communication technology, in programming process, the restriction of various resources no longer becomes the bottleneck of software development in addition, and programming language directly perceived, understandable and that be convenient to identify will become the first-selection of protective relaying device exploitation.Visual programming language adopts the mode of graphical symbol, and presentation program module and operation logic visually meets people's thinking habit, greatly promoted developer's work efficiency, reduced the risk that exploitation makes mistakes.In addition, visual programming language also provides technical guarantee for the enterprise development refinement division of labor, and advantage is separately brought into play in the field that developer can be good at oneself.Along with networking and the intelligent development of electric system, the application demand of visual programming this respect also will be more and more extensive.
Summary of the invention
Technical matters to be solved by this invention is to provide a kind of visual development method of intelligent substation device program; can realize the visualized graphs programming to protective relaying device, measure and control device and other smart machines, solve the technical barriers such as protective relaying device visual programming and visual debugging.
In order to solve the problems of the technologies described above, the technical solution adopted in the present invention is:
A visual development method for intelligent substation device program, is characterized in that being: comprise visual programming and graphical visual debugging, described visual programming comprises the following steps:
11) according to the protection control requirement of substation IED, the operation logic figure of design protective relaying device, and the completeness of examining logical diagram;
Audit for completeness comprises: whether all figures are connected; All inputs and output can be corresponding etc.;
12) for dissimilar equipment operation demand, the visual programming engineering of each functions of the equipments of the whole transformer station of design description, described programming engineering is by tree-shaped structure, the logical diagram of describing each functions of the equipments is organized, and the level of tree structure comprises three levels of equipment plate, application (a normally complete defencive function) and assembly;
13) use block component diagram drawing apparatus operation logic figure, the programming of finishing device working procedure;
14) utilize in cross-index method validation visual programming data input and output legitimacy between figure;
15) use code generation method, generator program source code C file;
16) application development tool compiler, compiling generates final goal program;
Described graphical visual debugging, comprises the following steps:
21) for the visual integrated programming debugging acid VICT(Visual Integrated Coding & Configure Tool of intelligent substation equipment development), open visual programming Graphics Engineering file;
22) according to device programming process, generating apparatus target program;
23) lower dress visual programming target program is to operational outfit;
24) connect running gear by definition regular net region;
25) in the mode of employing " title "+" numerical value ", send on-line operation state value;
26) compute mode of the each connecting line of interface figure visual presentation, implement device operation is visual.
The visual development method of aforesaid a kind of intelligent substation device program, it is characterized in that: in described step 12), graphical format is the FBD (function block diagram) of graphic programming, each functional block components represents an arithmetic element, described functional block components is realized by program code, or by various visual programming page pools, described functional block components is stateless component, identical input arbitrarily, will obtain identical operation result.
The visual development method of aforesaid a kind of intelligent substation device program, it is characterized in that: in described step 14), straddle part, across the page, across application data directory, adopt the GUID (abbreviation of Globally Unique Identifier, Chinese implication be Globally Unique Identifier) mode unique identification software in program variable, when cross-index verification, adopt GUID unique identification to carry out data referencing.
The visual development method of aforesaid a kind of intelligent substation device program, is characterized in that: the analytic process for logical diagram adopts the topological sorting algorithm based on digraph, and detailed process comprises the following steps:
A, from page configuration, read the connecting line between all component and assembly;
B, assembly is converted into digraph summit, connecting line is converted into the arc of digraph, generate AOV net (abbreviation of Activity On Vertex Network, Chinese implication is the movable net in summit);
C, according to the syntople of AOV net, generate all in-degrees in the adjacency list B, search adjacency list of AOV (in-degree be in digraph certain point as the number of times sum of the terminal on limit in figure) and be zero node, this node is carried out to output function;
D, from adjacency list, to delete in-degree be zero node and coupled directed edge;
E, repetition C, D step, until delete the node that in adjacency list, all in-degrees are zero;
If the node number of the last output of F equates with the node number of original AOV network, AOV net topology sorts successfully, otherwise AOV net exists directed circuit, and topological sorting unsuccessfully.
The visual development method of aforesaid a kind of intelligent substation device program, is characterized in that: the analytical approach of the oriented logical diagram of device winding, if winding logical diagram sorts unsuccessfully, introduce winding assembly topological sorting algorithm, detailed process following steps:
A, from page configuration, read the connecting line between all component and assembly;
B, assembly is converted into digraph summit, connecting line is converted into the arc of digraph, generate AOV net;
C, the syntople of netting according to AOV, the adjacency list of generation AOV;
Feedback component node in D, search adjacency list, adds feedback component in feedback node list to;
E, from adjacency list, delete the feedback node of current operation and directed edge associated with it;
F, repetition D, E step, until delete the node of all feedback component in adjacency list;
The node that in G, search adjacency list, all in-degrees are zero is that zero ordinary node adds list afterbody by in-degree;
H, from adjacency list, to delete current in-degree be zero ordinary node and directed edge associated with it;
I, repetition G, H step, until delete the node that in adjacency list, all in-degrees are zero;
If the node that the last in-degree of J is zero equates with the node number of original AOV network with feedback component interstitial content sum, AOV net topology sorts successfully, increases all feedback component nodes after ordinary node list, exports topological sorting sequentially; Otherwise still there is directed circuit in AOV net, topological sorting failure.
The beneficial effect that the present invention reaches is: technical solution of the present invention makes full use of visual pattern exhibiting; employing pulls the method for programming; utilize pattern analysis and code analysis techniques; realize the graphic programming of protective relaying device, measure and control device and other smart machines; the automatic generation of finishing device working procedure; promote on the one hand the Programming's quality of device, also realized the visual debugging of protection, observing and controlling and other smart machines, thereby improved the reliability of intelligent substation electrical secondary system.Method of the present invention, is fully used computer graphics techniques, computer graphic technologically and the technology Principles & Technology of Compiler Design such as intelligent crossover index, adopts Componentized computing assembly, principle is clear, and method is simple, is convenient to realize, easy to operate, have a good application prospect.
Accompanying drawing explanation
Fig. 1 is the process flow diagram of the visual development method of intelligent substation device program of the present invention;
Fig. 2 is the logical diagram of mother segmentation dead zone protection.
embodiment
Below in conjunction with Figure of description, the present invention is further illustrated.
As shown in Figure 1 ,a visual development method for intelligent substation device program, is characterized in that being: comprise visual programming and graphical visual debugging, described visual programming comprises the following steps:
11) according to the protection control requirement of substation IED, the operation logic figure of design protective relaying device, and the completeness of examining logical diagram.Take mother segmentation dead zone protection as example, shown in logical diagram 2,
Audit for completeness comprises: whether all figures are connected; All inputs and output can be corresponding etc.;
12) for dissimilar equipment operation demand, the visual programming engineering of each functions of the equipments of the whole transformer station of design description, this engineering, by tree-shaped structure, is organized the logical diagram of describing each functions of the equipments.The level of tree structure comprises three levels of equipment plate, application (a normally complete defencive function) and assembly;
13) use block component diagram drawing apparatus operation logic figure, the programming of finishing device working procedure;
14) utilize in cross-index method validation visual programming data input and output legitimacy between figure;
15) use code generation method, generator program source code C file;
16) application development tool compiler, compiling generates final goal program;
Described graphical visual debugging, comprises the following steps:
21) for the visual integrated programming debugging acid VICT(Visual Integrated Coding & Configure Tool of intelligent substation equipment development), open visual programming Graphics Engineering file;
22) according to device programming process, generating apparatus target program;
23) lower dress visual programming target program is to operational outfit;
24) connect running gear by definition regular net region;
25) in the mode of employing " title "+" numerical value ", send on-line operation state value;
26) compute mode of the each connecting line of interface figure visual presentation, implement device operation is visual.
The visual development method of aforesaid a kind of intelligent substation device program, it is characterized in that: in described step 12), graphical format is the FBD (function block diagram) of graphic programming, each functional block components represents an arithmetic element, described functional block components is realized by program code, or by various visual programming page pools, described functional block components is stateless component, identical input arbitrarily, will obtain identical operation result.
The visual development method of aforesaid a kind of intelligent substation device program, it is characterized in that: in described step 14), straddle part, across the page, across application data directory, adopt the GUID (abbreviation of Globally Unique Identifier, Chinese implication be Globally Unique Identifier) mode unique identification software in program variable, when cross-index verification, adopt GUID unique identification to carry out data referencing.
The visual development method of aforesaid a kind of intelligent substation device program, is characterized in that: the analytic process for logical diagram adopts the topological sorting algorithm based on digraph, and detailed process comprises the following steps:
A, from page configuration, read the connecting line between all component and assembly;
B, assembly is converted into digraph summit, connecting line is converted into the arc of digraph, generate AOV net (abbreviation of Activity On Vertex Network, Chinese implication is the movable net in summit);
C, according to the syntople of AOV net, generate all in-degrees (in digraph, certain point is as the number of times sum of the terminal on limit in figure) in the adjacency list B, search adjacency list of AOV and be zero node, this node is carried out to output function;
D, from adjacency list, to delete in-degree be zero node and coupled directed edge;
E, repetition C, D step, until delete the node that in adjacency list, all in-degrees are zero;
If the node number of the last output of F equates with the node number of original AOV network, AOV net topology sorts successfully, otherwise AOV net exists directed circuit, and topological sorting unsuccessfully.
The visual development method of aforesaid a kind of intelligent substation device program, is characterized in that: the analytical approach of the oriented logical diagram of device winding, if winding logical diagram sorts unsuccessfully, introduce winding assembly topological sorting algorithm, detailed process following steps:
A, from page configuration, read the connecting line between all component and assembly;
B, assembly is converted into digraph summit, connecting line is converted into the arc of digraph, generate AOV net;
C, the syntople of netting according to AOV, the adjacency list of generation AOV;
Feedback component node in D, search adjacency list, adds feedback component in feedback node list to;
E, from adjacency list, delete the feedback node of current operation and directed edge associated with it;
F, repetition D, E step, until delete the node of all feedback component in adjacency list;
The node that in G, search adjacency list, all in-degrees are zero is that zero ordinary node adds list afterbody by in-degree;
H, from adjacency list, to delete current in-degree be zero ordinary node and directed edge associated with it;
I, repetition G, H step, until delete the node that in adjacency list, all in-degrees are zero;
If the node that the last in-degree of J is zero equates with the node number of original AOV network with feedback component interstitial content sum, AOV net topology sorts successfully, increases all feedback component nodes after ordinary node list, exports topological sorting sequentially; Otherwise still there is directed circuit in AOV net, topological sorting failure.
The visual development method of aforesaid a kind of intelligent substation device program, it is characterized in that: assembly unit application visual programming logic diagram, or quote coding code unit, assembly unit is the minimum analytic unit of visual programming, for visual programming provides configuration module flexibly.
The visual development method of aforesaid intelligent substation device program, it is characterized in that: the operation variable load mode in visual debug process is: when device debugging, Adoption Network communication modes and debugging software carry out communication, and data communication form adopts the mode of " title "+" value " to transmit; Debugging software unification is carried out data management by the indexed format of GUID, and the different same data variables of logical diagram interface phase are quoted identical internal memory pointer, guarantee data synchronization updating and real time data synchronization.
More than show and described ultimate principle of the present invention, principal character and advantage.The technician of the industry should understand; the present invention is not restricted to the described embodiments; that in above-described embodiment and instructions, describes just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention.The claimed scope of the present invention is defined by appending claims and equivalent thereof.

Claims (7)

1. a visual development method for intelligent substation device program, is characterized in that being: comprise visual programming and graphical visual debugging, described visual programming comprises the following steps:
11) according to the protection control requirement of substation IED, the operation logic figure of design protective relaying device, and the completeness of examining logical diagram;
12) for dissimilar equipment operation demand, the visual programming engineering of each functions of the equipments of the whole transformer station of design description, described programming engineering is by tree-shaped structure, the logical diagram of describing each functions of the equipments is organized, and the level of tree structure comprises three levels of equipment plate, application and assembly;
13) use block component diagram drawing apparatus operation logic figure, the programming of finishing device working procedure;
14) utilize in cross-index method validation visual programming data input and output legitimacy between figure;
15) use code generation method, generator program source code C file;
16) application development tool compiler, compiling generates final goal program;
Described graphical visual debugging, comprises the following steps:
21) for the visual integrated programming debugging acid VICT of intelligent substation equipment development, open visual programming Graphics Engineering file;
22) according to device programming process, generating apparatus target program;
23) lower dress visual programming target program is to operational outfit;
24) connect running gear by definition regular net region;
25) in the mode of employing " title "+" numerical value ", send on-line operation state value;
26) compute mode of the each connecting line of interface figure visual presentation, implement device operation is visual.
2. the visual development method of a kind of intelligent substation device program according to claim 1, it is characterized in that: in described step 12), graphical format is the FBD (function block diagram) of graphic programming, each functional block components represents an arithmetic element, described functional block components is realized by program code, or by various visual programming page pools, described functional block components is stateless component, identical input arbitrarily, will obtain identical operation result.
3. the visual development method of a kind of intelligent substation device program according to claim 1, it is characterized in that: in described step 14), straddle part, across the page, across application data directory, program variable in the mode unique identification software of employing GUID, when cross-index verification, adopt GUID unique identification to carry out data referencing.
4. the visual development method of a kind of intelligent substation device program according to claim 1, it is characterized in that: in described step 12), analytic process for logical diagram adopts the topological sorting algorithm based on digraph, and detailed process comprises the following steps:
A, from page configuration, read the connecting line between all component and assembly;
B, assembly is converted into digraph summit, connecting line is converted into the arc of digraph, generate AOV net;
C, according to the syntople of AOV net, generate the node that in the adjacency list B, search adjacency list of AOV, all in-degrees are zero, this node is carried out to output function;
D, from adjacency list, to delete in-degree be zero node and coupled directed edge;
E, repetition C, D step, until delete the node that in adjacency list, all in-degrees are zero;
If the node number of the last output of F equates with the node number of original AOV network, AOV net topology sorts successfully, otherwise AOV net exists directed circuit, and topological sorting unsuccessfully.
5. the visual development method of a kind of intelligent substation device program according to claim 4, it is characterized in that: the analytical approach of the oriented logical diagram of device winding, if winding logical diagram sorts unsuccessfully, introduce winding assembly topological sorting algorithm, detailed process following steps:
A, from page configuration, read the connecting line between all component and assembly;
B, assembly is converted into digraph summit, connecting line is converted into the arc of digraph, generate AOV net;
C, the syntople of netting according to AOV, the adjacency list of generation AOV;
Feedback component node in D, search adjacency list, adds feedback component in feedback node list to;
E, from adjacency list, delete the feedback node of current operation and directed edge associated with it;
F, repetition D, E step, until delete the node of all feedback component in adjacency list;
The node that in G, search adjacency list, all in-degrees are zero is that zero ordinary node adds list afterbody by in-degree;
H, from adjacency list, to delete current in-degree be zero ordinary node and directed edge associated with it;
I, repetition G, H step, until delete the node that in adjacency list, all in-degrees are zero;
If the node that the last in-degree of J is zero equates with the node number of original AOV network with feedback component interstitial content sum, AOV net topology sorts successfully, increases all feedback component nodes after ordinary node list, exports topological sorting sequentially; Otherwise still there is directed circuit in AOV net, topological sorting failure.
6. the visual development method of a kind of intelligent substation device program according to claim 1, it is characterized in that: assembly unit application visual programming logic diagram or quote coding code unit, assembly unit is the minimum analytic unit of visual programming, for visual programming provides configuration module flexibly.
7. the visual development method of intelligent substation device program according to claim 1, it is characterized in that: the operation variable load mode in visual debug process is: when device debugging, Adoption Network communication modes and debugging software carry out communication, and data communication form adopts the mode of " title "+" value " to transmit; Debugging software unification is carried out data management by the indexed format of GUID, and the different same data variables of logical diagram interface phase are quoted identical internal memory pointer, guarantee data synchronization updating and real time data synchronization.
CN201310542955.5A 2013-11-05 2013-11-05 Smart substation equipment visualized programming method Active CN103823666B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310542955.5A CN103823666B (en) 2013-11-05 2013-11-05 Smart substation equipment visualized programming method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310542955.5A CN103823666B (en) 2013-11-05 2013-11-05 Smart substation equipment visualized programming method

Publications (2)

Publication Number Publication Date
CN103823666A true CN103823666A (en) 2014-05-28
CN103823666B CN103823666B (en) 2017-02-01

Family

ID=50758753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310542955.5A Active CN103823666B (en) 2013-11-05 2013-11-05 Smart substation equipment visualized programming method

Country Status (1)

Country Link
CN (1) CN103823666B (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104698935A (en) * 2015-03-02 2015-06-10 国电南瑞科技股份有限公司 Method for developing optimal protection measuring control device
CN104866319A (en) * 2015-06-04 2015-08-26 南京国电南自城乡电网自动化工程有限公司 Logic diagram execution sequence and feedback decoupling method based on adjacency matrix
CN106200541A (en) * 2015-05-08 2016-12-07 杭州电子科技大学 A kind of method that FBD is converted to AOV structure
CN106933566A (en) * 2017-01-24 2017-07-07 北京广利核系统工程有限公司 Graphic configuration language transfer method and device
CN108228173A (en) * 2018-01-16 2018-06-29 北明软件有限公司 A kind of visual data-interface development system and method
CN109446718A (en) * 2018-11-15 2019-03-08 紫光测控有限公司 A kind of visual development method and system of protective device and control device
CN109634561A (en) * 2018-10-16 2019-04-16 阿里巴巴集团控股有限公司 A kind of online visual programming method and device
CN109800024A (en) * 2017-11-13 2019-05-24 深圳市创客工场科技有限公司 Realize the method and device of the publication of physical hardware control program, physical hardware control
CN109917689A (en) * 2017-12-12 2019-06-21 亚旭电脑股份有限公司 Embedded system
CN110244944A (en) * 2019-08-12 2019-09-17 中国人民解放军国防科技大学 Network security scanning function implementation method based on graphical programming
CN112328233A (en) * 2020-10-29 2021-02-05 许继集团有限公司 Visual logic graphical code interpretation and execution method and device
CN112634591A (en) * 2020-12-14 2021-04-09 湖南顶立科技有限公司 Alarm processing method and system
CN112783913A (en) * 2021-03-17 2021-05-11 中广核工程有限公司 Database updating method, device, equipment and storage medium
CN112987606A (en) * 2021-01-22 2021-06-18 中央民族大学 Visual programming tool system based on artificial intelligence and Internet of things
CN113050932A (en) * 2021-03-15 2021-06-29 西安热工研究院有限公司 Automatic sequencing improvement method for graphical program with multi-stage feedback loop
CN113238748A (en) * 2021-06-17 2021-08-10 南方电网科学研究院有限责任公司 Method, device, terminal and medium for modifying and checking direct current control security program page
CN113778402A (en) * 2021-01-06 2021-12-10 北京沃东天骏信息技术有限公司 Node detection method and device based on visual programming
CN114461198A (en) * 2021-12-27 2022-05-10 上海交通大学四川研究院 Program generation method, device, equipment and medium based on visual low code
CN111090419B (en) * 2019-11-26 2023-04-07 广东工业大学 Tree structure visualization method based on node introductivity change
CN117075885A (en) * 2023-10-18 2023-11-17 东方电子股份有限公司 Visual task execution method of relay protection equipment

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1737755A (en) * 2005-06-13 2006-02-22 浙江大学 Modeling and code generating method of embedded real-time operating system
CN103136406B (en) * 2011-12-03 2015-12-16 南京南瑞继保电气有限公司 The method of visualization applications simulations function code
CN102622259B (en) * 2012-02-17 2015-08-12 南京南瑞继保电气有限公司 A kind of functional block function modelling method for visual programming
CN202771416U (en) * 2012-08-23 2013-03-06 上海创图网络科技发展有限公司 Visual three-dimensional (3D) programming device

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104698935A (en) * 2015-03-02 2015-06-10 国电南瑞科技股份有限公司 Method for developing optimal protection measuring control device
CN106200541A (en) * 2015-05-08 2016-12-07 杭州电子科技大学 A kind of method that FBD is converted to AOV structure
CN104866319A (en) * 2015-06-04 2015-08-26 南京国电南自城乡电网自动化工程有限公司 Logic diagram execution sequence and feedback decoupling method based on adjacency matrix
CN104866319B (en) * 2015-06-04 2018-05-01 南京国电南自城乡电网自动化工程有限公司 The method of logic chart execution sequence and feedback decoupling based on adjacency matrix
CN106933566A (en) * 2017-01-24 2017-07-07 北京广利核系统工程有限公司 Graphic configuration language transfer method and device
CN109800024A (en) * 2017-11-13 2019-05-24 深圳市创客工场科技有限公司 Realize the method and device of the publication of physical hardware control program, physical hardware control
CN109800024B (en) * 2017-11-13 2022-04-12 深圳市创客工场科技有限公司 Method and device for realizing physical hardware control program release and physical hardware control
CN109917689A (en) * 2017-12-12 2019-06-21 亚旭电脑股份有限公司 Embedded system
CN108228173A (en) * 2018-01-16 2018-06-29 北明软件有限公司 A kind of visual data-interface development system and method
CN109634561B (en) * 2018-10-16 2022-03-04 创新先进技术有限公司 Online visual programming method and device
CN109634561A (en) * 2018-10-16 2019-04-16 阿里巴巴集团控股有限公司 A kind of online visual programming method and device
CN109446718A (en) * 2018-11-15 2019-03-08 紫光测控有限公司 A kind of visual development method and system of protective device and control device
CN110244944A (en) * 2019-08-12 2019-09-17 中国人民解放军国防科技大学 Network security scanning function implementation method based on graphical programming
CN111090419B (en) * 2019-11-26 2023-04-07 广东工业大学 Tree structure visualization method based on node introductivity change
CN112328233A (en) * 2020-10-29 2021-02-05 许继集团有限公司 Visual logic graphical code interpretation and execution method and device
CN112328233B (en) * 2020-10-29 2024-04-16 许继集团有限公司 Visual logic graphical code interpretation execution method and device
CN112634591A (en) * 2020-12-14 2021-04-09 湖南顶立科技有限公司 Alarm processing method and system
CN113778402A (en) * 2021-01-06 2021-12-10 北京沃东天骏信息技术有限公司 Node detection method and device based on visual programming
CN112987606A (en) * 2021-01-22 2021-06-18 中央民族大学 Visual programming tool system based on artificial intelligence and Internet of things
CN113050932A (en) * 2021-03-15 2021-06-29 西安热工研究院有限公司 Automatic sequencing improvement method for graphical program with multi-stage feedback loop
CN112783913A (en) * 2021-03-17 2021-05-11 中广核工程有限公司 Database updating method, device, equipment and storage medium
CN113238748A (en) * 2021-06-17 2021-08-10 南方电网科学研究院有限责任公司 Method, device, terminal and medium for modifying and checking direct current control security program page
CN113238748B (en) * 2021-06-17 2023-05-23 南方电网科学研究院有限责任公司 Direct current control and protection program page modification and verification method, device, terminal and medium
CN114461198A (en) * 2021-12-27 2022-05-10 上海交通大学四川研究院 Program generation method, device, equipment and medium based on visual low code
CN114461198B (en) * 2021-12-27 2024-05-28 上海交通大学四川研究院 Program generation method, device, equipment and medium based on visual low code
CN117075885A (en) * 2023-10-18 2023-11-17 东方电子股份有限公司 Visual task execution method of relay protection equipment
CN117075885B (en) * 2023-10-18 2024-01-30 东方电子股份有限公司 Visual task execution method of relay protection equipment

Also Published As

Publication number Publication date
CN103823666B (en) 2017-02-01

Similar Documents

Publication Publication Date Title
CN103823666B (en) Smart substation equipment visualized programming method
CN102662644B (en) Method for generating test case by using flow chart
CN104765914A (en) Logical configuration method of relay protecting device
CN109344476B (en) CIM model-based power distribution network single line diagram line branch structure generation method and device
Yang et al. Ontology driven approach to generate distributed automation control from substation automation design
Weaver et al. Cyber-physical models for power grid security analysis: 8-substation case
De Souza et al. A co-simulation platform for evaluating cyber security and control applications in the smart grid
CN103761413A (en) Substation anti-misoperation logic intelligent generating method based on topology analysis
Santodomingo et al. Using semantic web resources to translate existing files between CIM and IEC 61850
CN104407577A (en) Intelligent check anti-maloperation method based on real-time trend
Andrén et al. Applying the SGAM methodology for rapid prototyping of smart Grid applications
He et al. Fast identification of vulnerable set for cascading failure analysis in power grid
CN105205039A (en) Customizable SCD (substation configuration description) file verification method
Melo et al. Novel IEC 61850-based off-site engineering and validation methodology for protection, automation, and control systems
Chen A Petri net design of FPGA-based controller for a class of nuclear I&C systems
CN109976797B (en) Algorithm configuration and management method and system based on SCD file information object model
Krausser et al. An IEC-61131-based rule system for integrated automation engineering: concept and case study
Strasser et al. Engineering and validating cyber-physical energy systems: Needs, status quo, and research trends
Thomas et al. Auto-tuned Solution to Wide Area Coordination Issues of Distance and Directional Time Overcurrent Relay Settings
Egert et al. On the simulation of smart grid environments
Yang et al. Modelling of IEC 61850 message passing for automatic generation of distributed control
Okolnishnikov et al. Monitoring system development using simulation
Li et al. Automatic test generation of large boolean expressions in computer based interlocking system
CN113469556B (en) Method and device for generating work ticket, electronic equipment and storage medium
Zhabelova Software architecture and design methodology for distributed agent-based automation of Smart Grid

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant