CN103821353B - The compound split bolt method for arranging of fixing prestressing tendon - Google Patents

The compound split bolt method for arranging of fixing prestressing tendon Download PDF

Info

Publication number
CN103821353B
CN103821353B CN201410080544.3A CN201410080544A CN103821353B CN 103821353 B CN103821353 B CN 103821353B CN 201410080544 A CN201410080544 A CN 201410080544A CN 103821353 B CN103821353 B CN 103821353B
Authority
CN
China
Prior art keywords
split bolt
prestressing tendon
position coordinates
coordinate system
prestressed girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410080544.3A
Other languages
Chinese (zh)
Other versions
CN103821353A (en
Inventor
贾杨
姬中华
王晓琴
李兆龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongqing Jianan Construction Group Co Ltd
Original Assignee
Qingdao Jianan Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Jianan Construction Group Co Ltd filed Critical Qingdao Jianan Construction Group Co Ltd
Priority to CN201410080544.3A priority Critical patent/CN103821353B/en
Publication of CN103821353A publication Critical patent/CN103821353A/en
Application granted granted Critical
Publication of CN103821353B publication Critical patent/CN103821353B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of technical field of building construction, specifically, relate to a kind of compound split bolt method for arranging of fixing prestressing tendon, this split bolt is primarily of Screw arbor with nut at both-ends and prestressing tendon clip composition, by arranging plane coordinate system in prestressed girder side, confirm compound split bolt and prestressing tendon position coordinates in the coordinate system in work progress respectively, with the position coordinates of prestressing tendon for benchmark, in the coordinate system the compound split bolt closed on is adjusted to the position coincided with the position coordinates of prestressing tendon, and other node location is set to conventional split bolt in the coordinate system, conventional split bolt can be set up as required when compound split bolt adjustment spacing is excessive, ensure the reliability that in work progress, prestressing tendon and prestressed girder are fixed.

Description

The compound split bolt method for arranging of fixing prestressing tendon
Technical field
The present invention relates to a kind of technical field of building construction, specifically, relate to a kind of compound split bolt method for arranging of fixing prestressing tendon.
Background technology
In urban construction, along with people are to the demand of large space using function, large span, large spatial structure system increase gradually, usually adopt the prestressed structure form of large span to meet this requirement.In the prestressed girder structure construction procedure of traditional approach, beam side adopts split bolt to be fixed, prestressing tendon adopts special-purpose fixing support to be fixed, and due to reinforcing bar comparatively dense in beam, fixed support is fixing more difficult, easy dislocation, and not easily discover and rectify and improve, this traditional prestressing tendon fixed form not only consumes a large amount of artificial and steel, and prestressing tendon is once displacement, cause prestressed girder stress performance to change, cause structural hidden danger.
Summary of the invention
The object of the invention is for existing prestressing tendon and split bolt fixed form complex procedures, waste time and energy, the shortcoming of poor reliability, a kind of compound split bolt method for arranging of fixing prestressing tendon is provided.
Technical scheme of the present invention is: a kind of compound split bolt of fixing prestressing tendon, it is characterized in that: this split bolt is primarily of Screw arbor with nut at both-ends and prestressing tendon clip composition, Screw arbor with nut at both-ends is connected by spot welding mode with prestressing tendon clip, described prestressing tendon clip has 2, prestressing tendon clip is U-shaped clip, and the internal diameter of U-shaped clip is greater than the diameter of prestressing tendon.
Preferably, the Template Location card to Template Location is provided with between described U-shaped clip and the screw thread of Screw arbor with nut at both-ends.
Preferably, described U-shaped clip employing model is the reinforcing bar of HPB235 Φ 6.
Preferably, the two ends of described split bolt are provided with clamp nut split bolt and template fixed.
Preferably, the centre of described split bolt is provided with square split bolt sealing piece.
Preferably, the connected mode of described split bolt and split bolt sealing piece is for being welded to connect.
A compound split bolt method for arranging for fixing prestressing tendon, is characterized in that, comprise following methods step:
(1) plane coordinate system is set in prestressed girder side, is set to X-axis along prestressed girder span direction, is set to Y-axis along prestressed girder short transverse;
(2) according to the diameter of the design section size of prestressed girder, scaffolding height, template and support system material type selecting parameter determination split bolt, arrangement pitch and layout quantity, obtain the position coordinates of split bolt on prestressed girder lateral plane coordinate system, and in this plane coordinate system, mark split bolt layout node;
(3) according to design and the code requirement of prestressing tendon, determine the installation site of prestressing tendon in prestressed girder, obtain the position coordinates in the plane coordinate system that prestressing tendon arranges in prestressed girder side further;
(4) in this plane coordinate system, the position coordinates of prestressing tendon and the position coordinates of split bolt are compared, the position coordinates of the split bolt closed on by the position coordinates with prestressing tendon is temporary fixed is compound split bolt;
(5) position coordinates in the plane coordinate system arranged in prestressed girder side with prestressing tendon is for benchmark, regulate the position coordinates of the compound split bolt closed on this position coordinates, the position coordinates of the compound split bolt after adjustment and the prestressing tendon position coordinates in plane coordinate system with overlap.
The present invention's beneficial effect is compared with prior art:
(1) this compound split bolt is applicable to large span, high heavy in section prestressed girder work progress is fixed prestressing tendon, primarily of Screw arbor with nut at both-ends and prestressing tendon clip composition, this prestressing tendon clip is U-shaped clip, the internal diameter of U-shaped clip is greater than the diameter of prestressing tendon, Screw arbor with nut at both-ends top is welded in by spot welding mode, whole component adopts the prefabricated processing of batch production, split bolt and prestressing force clip are united two into one, can not only good fixed form support, and presstressed reinforcing steel and split bolt fixed form operation in saving work progress, save a large amount of manpowers, material resources and financial resources,
(2) this compound split bolt method for arranging, in prestressed girder side, plane coordinate system is set, confirm compound split bolt and prestressing tendon position coordinates in the coordinate system in work progress respectively, with the position coordinates of prestressing tendon for benchmark, in the coordinate system the compound split bolt closed on is adjusted to the position coincided with the position coordinates of prestressing tendon, and other node location is set to conventional split bolt in the coordinate system, conventional split bolt can be set up as required when compound split bolt adjustment spacing is excessive, ensure the reliability that in work progress, prestressing tendon and prestressed girder are fixed.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the initial placement schematic diagram of split bolt;
Fig. 3 is the layout schematic diagram after the adjustment of compound split bolt.
In figure, 1-Screw arbor with nut at both-ends, 2-prestressing tendon clip, 3-Template Location card, 4-split bolt sealing piece, 5-prestressing tendon
Detailed description of the invention
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described:
Embodiment 1, see Fig. 1, a kind of compound split bolt of fixing prestressing tendon, this split bolt is primarily of Screw arbor with nut at both-ends and prestressing tendon clip composition, Screw arbor with nut at both-ends is connected by spot welding mode with prestressing tendon clip, prestressing tendon clip has 2, prestressing tendon clip is U-shaped clip, the internal diameter of U-shaped clip is greater than the diameter of prestressing tendon, be convenient to prestressing tendon pass and fix this U-shaped clip, U-shaped clip employing model is the reinforcing bar of HPB235 Φ 6, and the Template Location card be provided with between U-shaped clip and the screw thread of Screw arbor with nut at both-ends Template Location, whole component adopts the prefabricated processing of batch production, split bolt and prestressing force clip are united two into one, can not only good fixed form support, and presstressed reinforcing steel and split bolt fixed form operation in saving work progress, save a large amount of manpowers, material resources and financial resources.
The two ends of this compound split bolt are provided with clamp nut, for by this split bolt and dies plate tap, the centre of split bolt is provided with split bolt sealing piece, this split bolt sealing piece is square, be fixed on the centre position of Screw arbor with nut at both-ends by welding manner, in practice of construction process, this split bolt sealing piece can water-swellable, by the gap between self intumescent filler concrete and compound split bolt, play sealing effect.
The present embodiment discloses a kind of compound split bolt method for arranging of fixing prestressing tendon, comprises following methods step:
(1) plane coordinate system is set in prestressed girder side, is set to X-axis along prestressed girder span direction, is set to Y-axis along prestressed girder short transverse;
(2) according to the diameter of the design section size of prestressed girder, scaffolding height, template and support system material type selecting parameter determination split bolt, arrangement pitch and layout quantity, obtain the position coordinates of split bolt on prestressed girder lateral plane coordinate system further, and in this plane coordinate system, marking split bolt layout node, Fig. 2 is the initial placement schematic diagram of split bolt;
(3) according to design and the code requirement of prestressing tendon, determine the installation site of prestressing tendon in prestressed girder, obtain the position coordinates in the plane coordinate system that prestressing tendon arranges in prestressed girder side further;
(4) in this plane coordinate system, the position coordinates of prestressing tendon and the position coordinates of split bolt are compared, the position coordinates of the split bolt closed on by the position coordinates with prestressing tendon is placed as compound split bolt;
(5) position coordinates in the plane coordinate system arranged in prestressed girder side with prestressing tendon is for benchmark, regulate the position coordinates of the compound split bolt closed on this position coordinates, the position coordinates of the compound split bolt after adjustment and the prestressing tendon position coordinates in plane coordinate system with overlap, Fig. 3 is the layout schematic diagram after the adjustment of compound split bolt.
This compound split bolt method for arranging, in prestressed girder side, plane coordinate system is set, confirm compound split bolt and prestressing tendon position coordinates in the coordinate system in work progress respectively, with the position coordinates of prestressing tendon for benchmark, in the coordinate system the compound split bolt closed on is adjusted to the position coincided with the position coordinates of prestressing tendon, and other node location is set to conventional split bolt in the coordinate system, compound split bolt is as the installation bracket of prestressing tendon, conventional split bolt can be set up as required when compound split bolt adjustment spacing is excessive, simultaneously can according to design parameters requirement, the position of prestressing tendon in prestressed girder is checked, to occurring that the compound split bolt of skew is finely tuned, the reliability that in guarantee work progress, prestressing tendon and prestressed girder are fixed and the accuracy of installation.

Claims (1)

1. a compound split bolt method for arranging for fixing prestressing tendon, is characterized in that, comprise following methods step:
(1) plane coordinate system is set in prestressed girder side, is set to X-axis along prestressed girder span direction, is set to Y-axis along prestressed girder short transverse;
(2) according to the diameter of the design section size of prestressed girder, scaffolding height, template and support system material type selecting parameter determination split bolt, arrangement pitch and layout quantity, obtain the position coordinates of split bolt on prestressed girder lateral plane coordinate system, and in this plane coordinate system, mark split bolt layout node;
(3) according to design and the code requirement of prestressing tendon, determine the installation site of prestressing tendon in prestressed girder, obtain the position coordinates in the plane coordinate system that prestressing tendon arranges in prestressed girder side further;
(4) in this plane coordinate system, the position coordinates of prestressing tendon and the position coordinates of split bolt are compared, the position coordinates of the split bolt closed on by the position coordinates with prestressing tendon is temporary fixed is compound split bolt;
(5) position coordinates in the plane coordinate system arranged in prestressed girder side with prestressing tendon is for benchmark, regulate the position coordinates of the compound split bolt closed on this position coordinates, the position coordinates of the compound split bolt after adjustment and the prestressing tendon position coordinates in plane coordinate system with overlap.
CN201410080544.3A 2014-03-07 2014-03-07 The compound split bolt method for arranging of fixing prestressing tendon Active CN103821353B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410080544.3A CN103821353B (en) 2014-03-07 2014-03-07 The compound split bolt method for arranging of fixing prestressing tendon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410080544.3A CN103821353B (en) 2014-03-07 2014-03-07 The compound split bolt method for arranging of fixing prestressing tendon

Publications (2)

Publication Number Publication Date
CN103821353A CN103821353A (en) 2014-05-28
CN103821353B true CN103821353B (en) 2015-11-18

Family

ID=50756618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410080544.3A Active CN103821353B (en) 2014-03-07 2014-03-07 The compound split bolt method for arranging of fixing prestressing tendon

Country Status (1)

Country Link
CN (1) CN103821353B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005264597A (en) * 2004-03-19 2005-09-29 Yuji Ishikawa Mounting method for bottom plate of base-isolating device
CN202787983U (en) * 2012-09-21 2013-03-13 莱西市建筑总公司 Split bolt
CN103061505A (en) * 2013-01-14 2013-04-24 河北省第四建筑工程公司 Multifunctional split bolt and application thereof
CN103206081A (en) * 2013-04-15 2013-07-17 清华大学建筑设计研究院有限公司 Sandwich formwork fixing device and sandwich formwork construction method
CN203783144U (en) * 2014-03-07 2014-08-20 青岛建安建设集团有限公司 Composite split bolt for fixing prestressing tendon

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005264597A (en) * 2004-03-19 2005-09-29 Yuji Ishikawa Mounting method for bottom plate of base-isolating device
CN202787983U (en) * 2012-09-21 2013-03-13 莱西市建筑总公司 Split bolt
CN103061505A (en) * 2013-01-14 2013-04-24 河北省第四建筑工程公司 Multifunctional split bolt and application thereof
CN103206081A (en) * 2013-04-15 2013-07-17 清华大学建筑设计研究院有限公司 Sandwich formwork fixing device and sandwich formwork construction method
CN203783144U (en) * 2014-03-07 2014-08-20 青岛建安建设集团有限公司 Composite split bolt for fixing prestressing tendon

Also Published As

Publication number Publication date
CN103821353A (en) 2014-05-28

Similar Documents

Publication Publication Date Title
CN102926504A (en) Connecting steel construction member for steel and concrete overlapped beam combined part and construction method thereof
CN203270599U (en) Foundation bolt pre-buried die
CN204781970U (en) Template fixing device with adjustable
CN204960289U (en) Builder's jack is encorbelmented whole combination of girder steel and can be had enough to meet need anchor assembly
CN204825945U (en) A fixture for fixing buried bolt in advance
CN202689546U (en) Special fastening clamp for building wall body ring beam template
CN206091355U (en) Post structure is taken out to concrete plant's pillars of a house
CN103821353B (en) The compound split bolt method for arranging of fixing prestressing tendon
CN203783144U (en) Composite split bolt for fixing prestressing tendon
CN204551936U (en) A kind of steel external staircase
CN204162998U (en) Pot rubber bearing mortar template system
CN103669566B (en) The construction method of the steel reinforced concrete pedestal on large span grid roof
CN203546745U (en) Civil engineering installation levelness control device for punching equipment
CN202706540U (en) Adjustable oblique circular column steel template
CN204728475U (en) A kind of secondary structure steel tie bar embedded part device
CN204238443U (en) A kind of detachable suspension column fastening devices
CN203430027U (en) Adjustable large steel formwork
CN203684703U (en) Assembly jig frame for main truss spare parts of large-span steel structure roof cover
CN203403576U (en) Assembly-type parking lot floor plate of full steel structure
CN205874988U (en) Case back board prestressing tendons positioner
CN204826194U (en) Higher huge steel construction of security
CN204456449U (en) A kind of simple and easy callable pre-buried wall-connecting piece
CN205637265U (en) Xenogenesis profiled sheet fixing device on strength nature roof beam
CN105625711A (en) Construction-purpose roof template
CN203030798U (en) Steel bar simple and easy alignment machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Jia Yang

Inventor after: Ji Zhonghua

Inventor after: Wang Xiaoqin

Inventor after: Jia Yang, Ji Zhonghua, Wang Xiaoqin, Li Zhaolong

Inventor before: Li Zhaolong

Inventor before: Jia Yang

Inventor before: Duan Liangyou

Inventor before: Guan Cheng

Inventor before: Li Zhaolong Jia Yang Duan Liangyou Guan Cheng Wang Xiaoqin

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 266000 Shandong province Qingdao City, Shandong Road No. 168

Patentee after: ZHONGQING JIANAN CONSTRUCTION GROUP Co.,Ltd.

Address before: 266000 Shandong Province, Qingdao city Shandong Road No. 16 building 26 floor TAIDING sunshine

Patentee before: QINGDAO JIANAN CONSTRUCTION GROUP Co.,Ltd.