CN103821343A - 悬挂脚手架拉杆快速装拆连接头装置 - Google Patents
悬挂脚手架拉杆快速装拆连接头装置 Download PDFInfo
- Publication number
- CN103821343A CN103821343A CN201310509569.6A CN201310509569A CN103821343A CN 103821343 A CN103821343 A CN 103821343A CN 201310509569 A CN201310509569 A CN 201310509569A CN 103821343 A CN103821343 A CN 103821343A
- Authority
- CN
- China
- Prior art keywords
- tie bar
- pull bar
- connector
- connector device
- scaffold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Reinforcement Elements For Buildings (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种悬挂脚手架拉杆快速装拆连接头装置,包括:拉杆(6)、套管(3)、调节丝杆(2)、连接块(1),套管前后端部固定装有连接板(4、5),后连接板固定连接拉杆一端,前连接板中部开有螺纹孔,调节丝杆依次由顶部的连接头(21)、前部的连接杆(22)、把手(23)、中后部的螺杆(24)组成并连成一体,连接头与固定于脚手架横梁(7)上的连接块相配合,螺杆旋入套管前连接板螺纹孔后塞入套管内,拉杆另一端经螺栓连接于上层结构梁(8)上。所述连接杆靠近头部处开有一个销孔,销孔内插入锁定销(9)。本发明的连接头装置对拉杆装拆便捷、快速,长度调节自由,拉杆受力合理,从而使悬挑脚手架安全可靠。
Description
技术领域
本发明涉及一种建筑工程施工辅助工具,尤其涉及一种悬挑脚手架固定装置。
背景技术
现在建筑施工中所用的悬挑脚手架是利用其较长的型材在结构板上悬挑的,该结构板可以是墙体或建筑框架梁,型材为脚手架横梁,横梁通过螺栓固定在结构板上,再在横梁上搭设大横杆、立杆和小横杆后经螺栓固定成一体组成脚手架向上延伸。根据建筑施工规范要求,采用悬挑结构的横梁,其脚手架的搭设高度最多只有一至二层,在建筑物施工到上一层后,需对支撑脚手架的悬挑横梁进行加固,使脚手架的悬挑横梁变成悬挂横梁。
现有技术是,脚手架横梁需很长,其大部分伸向建筑物内的框架梁内作为锚固部分,伸出部分作为脚手架的悬挑横梁,施工完成后将很长的横梁从建筑物框架梁内抽出,这个施工过程复杂,其费时费力,并且横梁的锚固部分又严重影响建筑物内部结构的施工。另一种加固技术是,在悬挑横梁和上层结构梁(或称上层钢筋砼主体结构梁)之间加装加强拉杆,将悬挑横梁与上层结构梁联结为一体,从而加强悬挑横梁的支撑力,满足脚手架向上搭设的受力要求。加强拉杆与悬挑横梁与上层结构梁联结是采用螺栓螺母组件,首先是在悬挑横梁和上层结构梁上分别通过螺栓固定一根螺杆的一端,再将两根螺杆的另一端通过套筒装置将两根螺杆连接起来,最后将两根螺杆收紧固定。但该结构在安装和拆卸时操作复杂和麻烦,所需部件较多,调整时间长,并且套筒装置与两根螺杆的连接部分暴露在外,容易受到混凝土侵蚀。
发明内容
本发明的目的在于提供一种悬挂脚手架拉杆快速装拆连接头装置,该拉杆快速装拆连接头装置对拉杆装拆便捷,拉杆长度调节自由,受力合理,从而使脚手架安全可靠。
为了实现上述技术目的,本发明采用如下技术方案:
一种悬挂脚手架拉杆快速装拆连接头装置,包括:拉杆、套管、调节丝杆、连接块,套管前后端部固定装有连接板,后连接板固定连接拉杆一端,前连接板中部开有螺纹孔,调节丝杆依次由顶部的连接头、前部的连接杆、把手、中后部的螺杆组成并连成一体,把手位于连接杆和螺杆之间,连接头与固定于脚手架横梁上的连接块相配合,螺杆旋入套管前连接板螺纹孔后塞入套管内,拉杆另一端经螺栓连接于上层结构梁上。
所述连接块由两块长短板成垂直状相交组成,长短板另一端边固定于横梁上,形成向上凸出状,长板上开有一条纵向槽,该纵向槽延长至短板上,并且短板上还开有一个横向槽,纵向槽和横向槽构成T形槽,该横向槽的长度大于调节丝杆连接头的宽度,连接头从T形槽的横向槽插入至连接块内。
所述调节丝杆的连接杆靠近头部处沿连接杆轴线的垂直方向开有一个销孔,在销孔内插入锁定销。
本发明悬挂脚手架拉杆快速装拆连接头装置采用固定于悬挑横梁或简支支撑横梁上的连接块,通过采用套管和头部带有连接头的调节丝杆将原有的固定拉杆变为可变动拉杆,与上层结构梁固定连接,从而将悬挑横梁与上层结构梁联结成一体,并且拉杆的装拆快速简便,拉杆长度调节自由,拉杆受力合理。本发明的拉杆快速装拆连接头装置各部件都能循环使用,由于悬挑横梁一端是通过螺栓固定于建筑物墙体或建筑框架梁上,能较方便的拆下重复使用,因此能够节约大量钢材,降低工程造价。
本发明的拉杆快速装拆连接头装置制作造价低,操作简便、快捷,安全可靠,能节约材料和节约人工,推广性强。
附图说明
图1为本发明悬挂脚手架拉杆快速装拆连接头装置的结构示意图;
图2为连接块结构示意图。
图中:1连接块,11长板,12短板,2调节丝杆,21连接头,22连接杆,23把手,24螺杆,3套管,4前连接板,5后连接板,6拉杆,7横梁,8上层结构梁(上层钢筋砼主体结构梁),9锁定销,10脚手架,101立杆,102小横杆。
具体实施方式
下面结合附图和具体实施例对本发明作进一步说明。
参见图1,一种悬挂脚手架拉杆快速装拆连接头装置,包括:拉杆6、套管3、调节丝杆2、连接块1,套管3前后端部经焊接固定装有连接板4、5,后连接板5经焊接固定连接拉杆6一端,前连接板4中部开有螺纹孔,前连接板4俗称活灵。调节丝杆2依次由顶部的连接头21、前部的连接杆22、把手23、中后部的螺杆24组成并连成一体,把手23位于连接杆22和螺杆24之间,调节丝杆的螺杆24旋入套管3前连接板4螺纹孔后塞入套管3内,拉杆6另一端与钢板焊接后经螺栓连接于上层结构梁8或结构墙上。所述调节丝杆2的制作,将单根螺杆24头部焊接螺母后,再在螺母上焊接圆钢条,在圆钢条头部焊接圆钢块,圆钢块作为连接头21,圆钢条作为连接杆22,螺母作为把手23,把手23供操作者转动调节丝杆2,便于旋转把手23来控制螺杆24在套管3内的伸缩调节,从而调节拉杆长度。连接头21与固定于脚手架横梁7上的连接块1相配合。
所述连接块1由两块长短板11、12成垂直状相交组成,参见图2,长短板11、12另一端边经焊接固定于横梁7上,形成向上凸出状,长板11上沿纵向开有一条纵向槽,该纵向槽延长至短板12上,并且短板12上还开有一个横向槽,纵向槽和横向槽构成T形槽,该横向槽的长度大于调节丝杆2连接头21的宽度,连接头21从T形槽的横向槽插入后滑至纵向槽内,至连接块1内。连接块1可采用不等边角钢制成,如角钢90×140×10,在两角钢面上开T形槽,便于与调节丝杆连接头21快速连接和锁紧,不等边角钢两边与下部由工字钢、槽钢等型材制成的横梁7焊接固定。
所述调节丝杆2的连接杆22靠近头部处沿连接杆22轴线的垂直方向开有一个销孔,在销孔内插入锁定销9,销定销9是为了调节丝杆2上紧后,为安全起见,将调节丝杆2连接头22相对固定于连接块1内,不让调节丝杆2移动至连接块1上的T形槽横向槽口。
本发明悬挂脚手架拉杆快速装拆连接头装置使用过程为:
参见图1,悬挑横梁7是通过螺栓固定于建筑物墙体或建筑框架梁上,脚手架10是在悬挑横梁7上搭设大横杆(图1中未示出)、立杆101和小横杆102后经螺栓固定成一体后再向上延伸。在建筑物施工到上一层后,需对支撑脚手架10的悬挑横梁7进行加固,使脚手架10的悬挑横梁变成悬挂横梁,以承受不断上升的脚手架重力。本发明的拉杆快速装拆连接头装置通过固定于悬挑横梁7或简支支撑横梁7上的连接块1,采用套管3和头部带有连接头21的调节丝杆2将拉杆6变为可变动拉杆,与上层结构梁8固定连接,从而将悬挑横梁7与上层结构梁8联结成一体。当施工完成后需拆卸脚手架时,旋转把手23将螺杆24移出套管3,将连接头21从连接块1横向槽口拿出,调节丝杆2与连接块1分离,其余部件快速拆下,从而实现对拉杆的快速简便装拆,并且各个部件以后还能循环使用。
本发明的套管3后端部由后连接板5焊接封住,能防止混凝土杂质侵蚀,连接块T形槽装卸方便,可靠。
以上仅为本发明的较佳实施例而已,并非用于限定本发明的保护范围,因此,凡在本发明的精神和原则之内所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (3)
1.一种悬挂脚手架拉杆快速装拆连接头装置,其特征是:包括:拉杆(6)、套管(3)、调节丝杆(2)、连接块(1),套管(3)前后端部固定装有连接板(4、5),后连接板(5)固定连接拉杆(6)一端,前连接板(4)中部开有螺纹孔,调节丝杆(2)依次由顶部的连接头(21)、前部的连接杆(22)、把手(23)、中后部的螺杆(24)组成并连成一体,把手(23)位于连接杆(22)和螺杆(24)之间,连接头(21)与固定于脚手架横梁(7)上的连接块(1)相配合,螺杆(24)旋入套管(3)前连接板(4)螺纹孔后塞入套管(3)内,拉杆(6)另一端经螺栓连接于上层结构梁(8)上。
2.根据权利要求1所述的悬挂脚手架拉杆快速装拆连接头装置,其特征是:所述连接块(1)由两块长短板(11、12)成垂直状相交组成,长短板(11、12)另一端边固定于横梁(7)上,形成向上凸出状,长板(11)上开有一条纵向槽,该纵向槽延长至短板(12)上,并且短板(12)上还开有一个横向槽,纵向槽和横向槽构成T形槽,该横向槽的长度大于调节丝杆(2)连接头(21)的宽度,连接头(21)从T形槽的横向槽插入至连接块(1)内。
3.根据权利要求1或2所述的悬挂脚手架拉杆快速装拆连接头装置,其特征是:所述调节丝杆的连接杆(22)靠近头部处沿连接杆(22)轴线的垂直方向开有一个销孔,在销孔内插入锁定销(9)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310509569.6A CN103821343B (zh) | 2013-10-25 | 2013-10-25 | 悬挂脚手架拉杆快速装拆连接头装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310509569.6A CN103821343B (zh) | 2013-10-25 | 2013-10-25 | 悬挂脚手架拉杆快速装拆连接头装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103821343A true CN103821343A (zh) | 2014-05-28 |
CN103821343B CN103821343B (zh) | 2016-08-17 |
Family
ID=50756608
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310509569.6A Active CN103821343B (zh) | 2013-10-25 | 2013-10-25 | 悬挂脚手架拉杆快速装拆连接头装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103821343B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114427287A (zh) * | 2022-02-23 | 2022-05-03 | 中建八局第二建设有限公司 | 一种用于框架梁的三角型悬挑脚手架支座及其使用方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201241463Y (zh) * | 2008-05-26 | 2009-05-20 | 方远建设集团股份有限公司 | 悬挑架工具式圆钢筋斜拉杆 |
JP2012082658A (ja) * | 2010-10-14 | 2012-04-26 | Alinco Inc | 壁つなぎ取付金具 |
CN202248820U (zh) * | 2011-10-24 | 2012-05-30 | 上海浦东程达五金有限公司 | 组合式悬挑脚手架 |
CN202627474U (zh) * | 2012-04-14 | 2012-12-26 | 安徽省舒城三乐童车有限责任公司 | 建筑脚手架的连墙装置 |
CN203097259U (zh) * | 2013-01-25 | 2013-07-31 | 开平市优赢金属制品有限公司 | 一种脚手架的顶墙装置 |
CN203531364U (zh) * | 2013-10-25 | 2014-04-09 | 南通市达欣工程股份有限公司 | 悬挂脚手架拉杆快速装拆连接头装置 |
-
2013
- 2013-10-25 CN CN201310509569.6A patent/CN103821343B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201241463Y (zh) * | 2008-05-26 | 2009-05-20 | 方远建设集团股份有限公司 | 悬挑架工具式圆钢筋斜拉杆 |
JP2012082658A (ja) * | 2010-10-14 | 2012-04-26 | Alinco Inc | 壁つなぎ取付金具 |
CN202248820U (zh) * | 2011-10-24 | 2012-05-30 | 上海浦东程达五金有限公司 | 组合式悬挑脚手架 |
CN202627474U (zh) * | 2012-04-14 | 2012-12-26 | 安徽省舒城三乐童车有限责任公司 | 建筑脚手架的连墙装置 |
CN203097259U (zh) * | 2013-01-25 | 2013-07-31 | 开平市优赢金属制品有限公司 | 一种脚手架的顶墙装置 |
CN203531364U (zh) * | 2013-10-25 | 2014-04-09 | 南通市达欣工程股份有限公司 | 悬挂脚手架拉杆快速装拆连接头装置 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114427287A (zh) * | 2022-02-23 | 2022-05-03 | 中建八局第二建设有限公司 | 一种用于框架梁的三角型悬挑脚手架支座及其使用方法 |
CN114427287B (zh) * | 2022-02-23 | 2023-04-07 | 中建八局第二建设有限公司 | 一种用于框架梁的三角型悬挑脚手架支座及其使用方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103821343B (zh) | 2016-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203531364U (zh) | 悬挂脚手架拉杆快速装拆连接头装置 | |
CN202937005U (zh) | 现浇混凝土梁侧模板加固装置 | |
CN112696012A (zh) | 一种可拼接墙柱模板装置 | |
CN103967508A (zh) | 一种可伸式应力快速补偿型钢架联接构造 | |
CN205444456U (zh) | 一种预制混凝土莲藕梁钢筋定位板 | |
CN205444889U (zh) | 一种水平预制构件的支撑装置 | |
CN204531341U (zh) | 一种用于建筑物与施工升降机间的过道平台 | |
CN109208393A (zh) | 一种轨道梁钢筋笼螺栓预埋结构 | |
CN103821343A (zh) | 悬挂脚手架拉杆快速装拆连接头装置 | |
CN210563352U (zh) | 一种爬架连墙装置 | |
CN103696567A (zh) | 用专用支撑装置浇筑装配式大体积混凝土梁的施工方法 | |
CN207268078U (zh) | 预埋螺母工具式连墙件 | |
CN103321407A (zh) | 一种用于支撑建筑横梁侧板的斜撑 | |
CN212428032U (zh) | 一种用于承插式钢管支架上的水平杆 | |
CN201802071U (zh) | 一种用于加固建筑支模架系统的斜拉架 | |
CN209989702U (zh) | 一种新形式托架 | |
CN206829589U (zh) | 一种可回收的脚手架连墙件 | |
CN207295716U (zh) | 一种悬臂组合式钢模板 | |
CN103628685B (zh) | 一种防止混凝土泵管侧向位移的方法及混凝土泵管加固装置 | |
CN112031390A (zh) | 一种用于承插式钢管支架上的水平杆 | |
CN107055353B (zh) | 一种空间挂壁式塔吊支撑体系 | |
CN216920417U (zh) | 一种风力发电风机锚栓基础高强灌浆专用模具 | |
CN104481127A (zh) | 一种刚性连接高强模板支承体系 | |
CN203867590U (zh) | 一种可伸式应力快速补偿型钢架联接构造 | |
CN219841160U (zh) | 一种便携式管道固定构件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Chen Yuanguo Inventor after: Hang Xiaojian Inventor after: Xu Qin Inventor after: Ding Guodong Inventor after: Xie Youqia Inventor after: Wang Yufei Inventor before: Chen Yuanguo Inventor before: Hang Xiaojian Inventor before: Xie Youqia Inventor before: Wang Yufei |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |