CN103806916A - Process for constructing shield rapid inspection shaft - Google Patents

Process for constructing shield rapid inspection shaft Download PDF

Info

Publication number
CN103806916A
CN103806916A CN201210439972.1A CN201210439972A CN103806916A CN 103806916 A CN103806916 A CN 103806916A CN 201210439972 A CN201210439972 A CN 201210439972A CN 103806916 A CN103806916 A CN 103806916A
Authority
CN
China
Prior art keywords
vertical shaft
shield
shaft
construction
snap close
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210439972.1A
Other languages
Chinese (zh)
Inventor
刘其铎
陈希林
姜雪强
史磊磊
卢常亘
史亚军
胡建军
郭彩霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing No 4 Municipal Construction Engineering Co Ltd
Original Assignee
Beijing No 4 Municipal Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing No 4 Municipal Construction Engineering Co Ltd filed Critical Beijing No 4 Municipal Construction Engineering Co Ltd
Priority to CN201210439972.1A priority Critical patent/CN103806916A/en
Publication of CN103806916A publication Critical patent/CN103806916A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention relates to a process for constructing a shield rapid inspection shaft. The process includes the following steps that firstly, a lock catch ring beam with steel bars reserved at the bottom is constructed; secondly, expanding excavation of a vertical shaft is carried out according to the standard that the vertical included angle of expanding excavation surfaces is smaller than or equal to 45 degrees; thirdly, the shaft body of the vertical shaft is constructed, wherein the retaining wall of the vertical shaft is formed by steel bar gratings and concrete in an anchoring and shotcreting mode and is 300 mm in thickness, and the steel bar gratings are connected with the reserved steel bars of the lock catch ring beam; fourthly, an ingate is constructed in the vertical shaft, wherein the arch-crown-gate-type ingate is constructed on the vertical shaft side wall along the tunneling axis of a shield; fifthly, the bottom of the vertical shaft is sealed through a steel bar truss to be prevented from hunching. The process for constructing the shield rapid inspection shaft is suitable for shield inspection shaft construction under various geological and hydrologic conditions, thereby bringing convenience to inspection of the shield under the shaft. The shield inspection shaft has the advantages of being safe and stable in structure, flexible in space layout, convenient to construct and operate, high in construction speed, small in occupied area and the like.

Description

A kind of construction technology of shield structure Quick overhaul well
[technical field]
The present invention relates to a kind of building structure and construction method thereof, be specifically related to a kind of shield structure inspection-pit and modularization construction process thereof.
[background technology]
Carry out Shield Tunneling under the geological conditions of large particle diameter sand gravel and the large erratic boulder of part time, cutterhead wearing and tearing certainly will be serious.Maintenance cutterhead, cutter if shield structure does not open a position, construction can not be carried out smoothly.
The maintenance that opens a position in hole is a kind of way wherein, but risk is also larger.And as adopted ground excavation staple, can make to overhaul Risk Reduction, meanwhile, vertical shaft can expand inner diameter volume, increases work efficiency, and accelerates inspection speed.
Therefore,, for solving the problems of the technologies described above, necessary a kind of shield structure inspection-pit and the modularization construction process thereof of providing, to overcome described defect of the prior art.
[summary of the invention]
For addressing the above problem, the first object of the present invention is to provide a kind of construction technology that is applicable to the shield structure Quick overhaul well of constructing under all geological hydrology conditions.
The second object of the present invention is to provide little, the well-set shield structure of a kind of perforate scope inspection-pit.
For realizing above-mentioned the first object, the technical scheme that the present invention takes is: a kind of construction technology of shield structure Quick overhaul well, and it comprises following processing step: 1), the construction of snap close collar tie beam, at the bottom of snap close collar tie beam reserved steel bar; 2), vertical shaft digs: the standard that is not more than 45 ° to dig the vertical angle of face digs; 3), vertical shaft well bore construction: vertical shaft retaining wall adopts reinforcing bar grid to add concrete shotcrete, and the thickness of retaining wall is 300mm; The reserved steel bar of described reinforcing bar grid and snap close collar tie beam is connected firmly; 4), horse-head ingate in vertical shaft: apply arching roof door type ingate on the vertical shaft sidewall of shield driving axis; 5), vertical shaft back cover: at reinforcing bar Pin frame back cover for silo bottom, protuberance at the bottom of control well.
The construction technology of shield structure Quick overhaul well of the present invention is further: the reserved steel bar of described reinforcing bar grid and snap close collar tie beam adopts and is welded to connect.
The construction technology of shield structure Quick overhaul well of the present invention is further: before the construction of snap close collar tie beam, need ground to carry out grouting and reinforcing.
For realizing above-mentioned the second object, the technical scheme that the present invention takes is: a kind of shield structure inspection-pit, and it comprises the snap close collar tie beam, vertical shaft well bore and the vertical shaft back cover that set gradually from top to bottom; On described vertical shaft well bore, be furnished with reinforcing bar grid; Be provided with vault door type ingate in described vertical shaft well bore sidewall.
Compared with prior art, the present invention has following beneficial effect: the construction technology of shield structure Quick overhaul well of the present invention is applicable to the shield structure inspection-pit construction under all geological hydrology conditions, thereby has facilitated the maintenance of Suporting structure in down-hole; Meanwhile, this shield structure inspection-pit has that structural safety is stable, grasp flexibly in space, convenient construction operation, and speed of application is very fast, take the advantages such as ground is less.
[accompanying drawing explanation].
Fig. 1 is the construction technology of shield structure Quick overhaul well of the present invention schematic diagram after snap close collar tie beam construction.
Fig. 2 is the construction technology of shield structure Quick overhaul well of the present invention schematic diagram after vertical shaft digs.
Fig. 3 be shield structure Quick overhaul well of the present invention construction technology vertical shaft well bore be shaped after schematic diagram.
Fig. 4 is the schematic diagram of shield structure inspection-pit of the present invention.
[specific embodiment]
Refer to Figure of description 1 to shown in accompanying drawing 4, the present invention is a kind of construction technology of shield structure Quick overhaul well, and it comprises following processing step:
1), snap close collar tie beam 1 is constructed, at the bottom of snap close collar tie beam 1 reserved steel bar (not shown);
2), vertical shaft digs: the standard that is not more than 45 ° to dig the vertical angle of face digs;
3), vertical shaft well bore 2 is constructed: vertical shaft retaining wall adopts reinforcing bar grid 3 to add concrete shotcrete, and the thickness of retaining wall is 300mm; The reserved steel bar of described reinforcing bar grid 3 and snap close collar tie beam is connected firmly, and both connected modes are welding;
4), horse-head ingate in vertical shaft: apply arching roof door type ingate 4 on the vertical shaft sidewall of shield driving axis;
5), vertical shaft back cover 5: at reinforcing bar Pin frame back cover for silo bottom, protuberance at the bottom of control well.
Further, before 1 construction of snap close collar tie beam, need ground to carry out grouting and reinforcing.
The shield structure inspection-pit that adopts above-mentioned technique to make, it comprises the snap close collar tie beam 1, vertical shaft well bore 2 and the vertical shaft back cover 5 that set gradually from top to bottom; On described vertical shaft well bore 2, be furnished with reinforcing bar grid 3; Be provided with vault door type ingate 4 in described vertical shaft well bore 2 sidewalls.
Shield structure inspection-pit of the present invention and modularization construction process thereof have the features such as easy construction, speed is fast, structural stability is strong, floor space is little, and being applicable to provides space for maintenance for shield machine tool changing operation.
The above specific embodiment is only the preferred embodiment of this creation, not in order to limit this creation, any modification of making, is equal to replacement, improvement etc., within all should being included in the protection domain of this creation within all spirit in this creation and principle.

Claims (4)

1. a construction technology for shield structure Quick overhaul well, is characterized in that: comprise following processing step:
1), the construction of snap close collar tie beam, at the bottom of snap close collar tie beam reserved steel bar;
2), vertical shaft digs: the standard that is not more than 45 ° to dig the vertical angle of face digs;
3), vertical shaft well bore construction: vertical shaft retaining wall adopts reinforcing bar grid to add concrete shotcrete, and the thickness of retaining wall is 300mm; The reserved steel bar of described reinforcing bar grid and snap close collar tie beam is connected firmly;
4), horse-head ingate in vertical shaft: apply arching roof door type ingate on the vertical shaft sidewall of shield driving axis;
5), vertical shaft back cover: at reinforcing bar Pin frame back cover for silo bottom, protuberance at the bottom of control well.
2. the construction technology of shield structure Quick overhaul well as claimed in claim 1, is characterized in that: the reserved steel bar of described reinforcing bar grid and snap close collar tie beam adopts and is welded to connect.
3. the construction technology of shield structure Quick overhaul well as claimed in claim 1, is characterized in that: before the construction of snap close collar tie beam, need ground to carry out grouting and reinforcing.
4. a shield structure Quick overhaul well that adopts construction technology claimed in claim 1 to make, is characterized in that: comprise the snap close collar tie beam, vertical shaft well bore and the vertical shaft back cover that set gradually from top to bottom; On described vertical shaft well bore, be furnished with reinforcing bar grid; Be provided with vault door type ingate in described vertical shaft well bore sidewall.
CN201210439972.1A 2012-11-07 2012-11-07 Process for constructing shield rapid inspection shaft Pending CN103806916A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210439972.1A CN103806916A (en) 2012-11-07 2012-11-07 Process for constructing shield rapid inspection shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210439972.1A CN103806916A (en) 2012-11-07 2012-11-07 Process for constructing shield rapid inspection shaft

Publications (1)

Publication Number Publication Date
CN103806916A true CN103806916A (en) 2014-05-21

Family

ID=50704245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210439972.1A Pending CN103806916A (en) 2012-11-07 2012-11-07 Process for constructing shield rapid inspection shaft

Country Status (1)

Country Link
CN (1) CN103806916A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643917A (en) * 2018-05-16 2018-10-12 北京中地盾构工程技术研究院有限公司 Half backfill formula shield cutter inspection-pit assembly construction method
CN108678751A (en) * 2018-05-16 2018-10-19 北京中地盾构工程技术研究院有限公司 The shield cutter inspection-pit assembly construction method excavated after first jacking
CN108708736A (en) * 2018-05-16 2018-10-26 北京中地盾构工程技术研究院有限公司 Shield cutter inspection-pit assembly construction method
CN108708727A (en) * 2018-05-16 2018-10-26 北京中地盾构工程技术研究院有限公司 The shield cutter inspection-pit assembly construction method of jacking after half excavation
CN110748354A (en) * 2019-12-10 2020-02-04 中铁十四局集团隧道工程有限公司 Construction method of assembled shield maintenance well
CN110924949A (en) * 2019-12-10 2020-03-27 中铁十四局集团隧道工程有限公司 Assembled shield structure manhole system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101251016A (en) * 2008-04-02 2008-08-27 上海隧道工程股份有限公司 Method for forming shield tunnel construction maintenance surroundings
JP4806370B2 (en) * 2007-04-06 2011-11-02 飛島建設株式会社 Vertical shaft construction method
CN102239309A (en) * 2009-05-08 2011-11-09 海瑞克股份公司 Method for erecting an underground construction
CN102305082A (en) * 2011-07-23 2012-01-04 中铁十二局集团第二工程有限公司 Method for relieving and cutterhead repairing of shield machine in weathering groove

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4806370B2 (en) * 2007-04-06 2011-11-02 飛島建設株式会社 Vertical shaft construction method
CN101251016A (en) * 2008-04-02 2008-08-27 上海隧道工程股份有限公司 Method for forming shield tunnel construction maintenance surroundings
CN102239309A (en) * 2009-05-08 2011-11-09 海瑞克股份公司 Method for erecting an underground construction
CN102305082A (en) * 2011-07-23 2012-01-04 中铁十二局集团第二工程有限公司 Method for relieving and cutterhead repairing of shield machine in weathering groove

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张兆军等: "复杂条件下盾构改造竖井的设计与施工", 《隧道建设》, vol. 29, no. 6, 31 December 2009 (2009-12-31) *
杨保琦等: "盾构检修井快速施工方法探讨", 《铁道建筑技术》, no. 2, 31 December 2011 (2011-12-31), pages 72 - 73 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643917A (en) * 2018-05-16 2018-10-12 北京中地盾构工程技术研究院有限公司 Half backfill formula shield cutter inspection-pit assembly construction method
CN108678751A (en) * 2018-05-16 2018-10-19 北京中地盾构工程技术研究院有限公司 The shield cutter inspection-pit assembly construction method excavated after first jacking
CN108708736A (en) * 2018-05-16 2018-10-26 北京中地盾构工程技术研究院有限公司 Shield cutter inspection-pit assembly construction method
CN108708727A (en) * 2018-05-16 2018-10-26 北京中地盾构工程技术研究院有限公司 The shield cutter inspection-pit assembly construction method of jacking after half excavation
CN108708736B (en) * 2018-05-16 2019-12-27 北京中地盾构工程技术研究院有限公司 Shield cutter head manhole assembly type construction method
CN108708727B (en) * 2018-05-16 2019-12-31 北京中地盾构工程技术研究院有限公司 Half-excavation rear-jacking shield cutter head manhole assembly type construction method
CN108678751B (en) * 2018-05-16 2020-04-07 北京中地盾构工程技术研究院有限公司 Assembly type construction method of shield cutter head manhole by jacking and excavating firstly
CN110748354A (en) * 2019-12-10 2020-02-04 中铁十四局集团隧道工程有限公司 Construction method of assembled shield maintenance well
CN110924949A (en) * 2019-12-10 2020-03-27 中铁十四局集团隧道工程有限公司 Assembled shield structure manhole system

Similar Documents

Publication Publication Date Title
CN103806916A (en) Process for constructing shield rapid inspection shaft
CN105317459B (en) A kind of subregion placement method for being used to control tight roof large area caving disaster
CN100487224C (en) Rapid-construction method for rapid change of small-section into large-section tunnel
CN106401645B (en) A kind of deep high stress tunnel pressure relief support control method for coordinating based on drilling release
CN106522963A (en) Stuck machine extricating method for TBM during tunnel construction
CN109736827B (en) Method for excavating urban subway hard rock stratum communication channel by high-pressure gas expansion fracturing
CN102926757A (en) Construction method of two-sidestep and four-step excavation support of weak large-span tunnel of mountain ridge
CN101545376A (en) Execution method for feeding tiny tunnel into ultra heavy section tunnel transversally
CN106869936A (en) It is a kind of to be suitable to the surface mining new method of steep slope topography
CN207934910U (en) A kind of newly built tunnels closely on across existing tunnel anti-floating reinforcement system
CN105239598A (en) Integral sinking construction method for well-type full-automatic stereo garage
CN104141500B (en) One hardens sand and gravel stratum cavern con struction method
CN103643958A (en) Construction method for excavating weak surrounding rock tunnel by hydraulic breaking hammer
CN103244143B (en) A kind of underground construction excavating construction method and underground station
CN102797468B (en) Minimum over-burden originating method for shield tunnel
CN102410031B (en) Underground space structure constructed by pile wall construction method
CN110905536A (en) Construction method for receiving complex stratum earth pressure shield in underground excavation tunnel
Guo et al. Fracturing mechanisms and deformation characteristics of rock surrounding the gate during gob-side entry retention through roof pre-fracturing
CN104612722B (en) Tunnel gate strengthening method for starting and arriving of annular shield or annular pushing pipe
CN104863183B (en) Damping pilework and construction method is isolated in large cross-section tunnel proximity architecture construction
Fan et al. Opencast to underground iron ore mining method
CN106522972A (en) Tunnel boring machine (TBM) cutterhead and shield jamming processing method
CN104453915A (en) Large-section vertical shaft pre-grouting reinforcement quick excavation method
CN202187735U (en) Bored pile tubular drill for fishing residue
CN102493436A (en) Novel manual tunneling construction method of rectangular anti-slide pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Guo Caixia

Inventor after: Ma Fuli

Inventor after: Shi Leilei

Inventor after: Yang Baoqi

Inventor after: Zhang Chunjie

Inventor after: Zhang Jianglong

Inventor before: Liu Qiduo

Inventor before: Chen Xilin

Inventor before: Jiang Xueqiang

Inventor before: Shi Leilei

Inventor before: Lu Changgen

Inventor before: Shi Yajun

Inventor before: Hu Jianjun

Inventor before: Guo Caixia

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU QIDUO CHEN XILIN JIANG XUEQIANG SHI LEILEI LU CHANGGEN SHI YAJUN HU JIANJUN GUO CAIXIA TO: GUO CAIXIA MA FULI SHI LEILEI YANG BAOQI ZHANG CHUNJIE ZHANG JIANGLONG

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140521