CN103806637A - Hanging basket scaffold device - Google Patents
Hanging basket scaffold device Download PDFInfo
- Publication number
- CN103806637A CN103806637A CN201410078746.4A CN201410078746A CN103806637A CN 103806637 A CN103806637 A CN 103806637A CN 201410078746 A CN201410078746 A CN 201410078746A CN 103806637 A CN103806637 A CN 103806637A
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- vertical rod
- brace table
- stop gear
- gag lever
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention discloses a hanging basket scaffold device which comprises a supporting table (1), an upright tube (2), a travel limiting mechanism (3) and a base (6). The travel limiting mechanism (3) sleeves the upright tube (2) and can move up and down on the upright tube (2); the supporting table (1) is fixed at the top of the upright tube (2); the bottom of the upright tube (2) is fixed on the base (6); the travel limiting mechanism (3) is provided with a transverse regulating rod (4) and a limiting rod (5); the limiting rod (5) is vertically inserted into the center point of the transverse regulating rod (4). By the structure, the hanging basket scaffold device is provided with the special travel limiting mechanism and has strong adjustability for travel limitation; the travel limiting mechanism is difficult to fall off; the hanging basket scaffold device is convenient for later set-up and assembling and is safe and convenient to use.
Description
Technical field
The present invention relates to the realm of building construction, be specifically related to hanging basket pin arm device.
Background technology
Hanging basket is the building machinery of construction work work high above the ground, acts on curtain wall and installs, outside Wall Cleaning.Hanging basket is that one can substitute traditional scaffold, can reduce labor intensity, increase work efficiency, and can reusable novel high-rise working equipment.At present, the use of building hanging basket has become a kind of trend gradually, in external wall construction, curtain wall installation, heat preservation construction and the maintenance cleaning exterior wall etc. of high layer multi-layer high building exceed operation, extensively approved, be can be used for the operation of the engineerings such as large tank, bridge and dam simultaneously.Hanging basket pin arm device is by the strong point of setting at building roofing, utilize the Current Collector Sleave hanging basket of outrigger or builder's jack, because great majority need constantly existing scaffold to be built to assembling in lifting process, be combined into higher bracing frame, be convenient to the work such as external wall construction, curtain wall installation in later stage.Existing scaffold does not arrange special stroke limit parts, or the position-limit mechanism arranging is unreasonable, easily comes off, and is unfavorable for building and being connected of later stage, brings potential safety hazard.
Summary of the invention
The present invention has overcome the deficiencies in the prior art, and hanging basket pin arm device is provided, and special journey stop gear is set, and stroke limit adjustability is strong, and journey stop gear is not easy to come off, and facilitates the assembling of building in later stage, safe and convenient to use.
For solving above-mentioned technical problem, the present invention is by the following technical solutions: hanging basket pin arm device, comprise brace table, vertical rod, journey stop gear and base, described journey stop gear is enclosed within vertical rod and can in vertical rod, moves up and down, top in vertical rod is fixed with brace table, and the bottom of vertical rod is fixed on base; Lateral adjustments bar and gag lever post are set on described journey stop gear, and gag lever post vertically inserts the central point of lateral adjustments bar.
Described vertical rod, lateral adjustments bar and gag lever post is mutually vertical between two.
The length of described journey stop gear is less than the length of vertical rod.
On described brace table, be provided with two symmetrical parallel baffles.
The bottom of described brace table is square plate.
Compared with prior art, the invention has the beneficial effects as follows:
1, in the present invention, journey stop gear passes through the concrete position of lateral adjustments bar adjustment stroke position-limit mechanism in vertical rod, so that carry out according to actual needs the building of differing heights, the design of gag lever post simultaneously can be fixed the position of lateral adjustments bar, be not easy to come off, be more conducive to the effect of building that reaches desirable, safe and convenient to use.
2, lateral adjustments bar and gag lever post are the pipeline of hollow, in the time of overlap joint, bar to be built can be inserted in lateral adjustments bar and gag lever post, and it is fixed, build and can build higher support by the method, and can guarantee the strength and stability of the support of building.
3, at the top of vertical rod, brace table is set, convenient other bracing frame of placing at top, the operation of convenient operation personal security.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
In figure, Reference numeral is expressed as: 1, brace table; 2, vertical rod; 3, journey stop gear; 4, lateral adjustments bar; 5, gag lever post; 6, base.
The specific embodiment
Below in conjunction with accompanying drawing, the present invention is further elaborated, and embodiments of the invention are not limited to this.
Embodiment:
As shown in Figure 1, the present invention includes brace table 1, vertical rod 2, journey stop gear 3 and base 6, described journey stop gear 3 is enclosed within vertical rod 2 and can in vertical rod 2, moves up and down, be fixed with brace table 1 at the top of vertical rod 2, the bottom of vertical rod 2 is fixed on base 6, and vertical rod 2, lateral adjustments bar 4 and gag lever post 5 are mutually vertical between two.The length of journey stop gear 3 is less than the length of vertical rod 2.Lateral adjustments bar 4 and gag lever post 5 are set, the vertical central point that inserts lateral adjustments bar 4 of gag lever post 5 on the journey stop gear 3 of the present embodiment.On the brace table 1 of the present embodiment, be provided with two symmetrical parallel baffles, the bottom of brace table 1 is square plate.
When use, first loosening gag lever post, then moves up and down lateral adjustments bar, changes the position of lateral adjustments bar in vertical rod, after determining, compresses gag lever post, makes to clamp between gag lever post and lateral adjustments bar, realizes location.Now support to be built can be inserted in the hollow pipeline that gag lever post and lateral adjustments pole pair answer, clamp and fix, repeat to build with the method, until build the support of the height needing.The brace table at vertical rod top can be used for placing other support plate simultaneously, owing to being provided with symmetrical parallel baffle on brace table, support plate can be connected in parallel baffle, there will not be and comes off.This device flexible adjustment is convenient, spacing accurately firm, is not easy to come off, and facilitates the assembling of building in later stage, safe and convenient to use.
Just can realize as mentioned above this invention.
Claims (5)
1. hanging basket pin arm device, it is characterized in that: comprise brace table (1), vertical rod (2), journey stop gear (3) and base (6), described journey stop gear (3) is enclosed within vertical rod (2) above and can in vertical rod (2), moves up and down, be fixed with brace table (1) at the top of vertical rod (2), the bottom of vertical rod (2) is fixed on base (6); Lateral adjustments bar (4) and gag lever post (5) are set on described journey stop gear (3), and gag lever post (5) vertically inserts the central point of lateral adjustments bar (4).
2. hanging basket pin arm device according to claim 1, is characterized in that: described vertical rod (2), lateral adjustments bar (4) and gag lever post (5) is mutually vertical between two.
3. hanging basket pin arm device according to claim 1, is characterized in that: the length of described journey stop gear (3) is less than the length of vertical rod (2).
4. hanging basket pin arm device according to claim 1, is characterized in that: on described brace table (1), be provided with two symmetrical parallel baffles.
5. hanging basket pin arm device according to claim 4, is characterized in that: the bottom of described brace table (1) is square plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410078746.4A CN103806637A (en) | 2014-03-06 | 2014-03-06 | Hanging basket scaffold device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410078746.4A CN103806637A (en) | 2014-03-06 | 2014-03-06 | Hanging basket scaffold device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103806637A true CN103806637A (en) | 2014-05-21 |
Family
ID=50703981
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410078746.4A Pending CN103806637A (en) | 2014-03-06 | 2014-03-06 | Hanging basket scaffold device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103806637A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3991964A (en) * | 1974-12-10 | 1976-11-16 | Evan John And Sons (Kenfig Hill) Limited | Self-locking device for telescopic props |
CN2225515Y (en) * | 1994-09-12 | 1996-04-24 | 北京市比尔特施工新技术研究所 | Buckle self-locking multifunctional scaffold |
JPH0913656A (en) * | 1995-06-27 | 1997-01-14 | Yuji Nimura | Built-up scaffolding |
CN2260843Y (en) * | 1996-12-04 | 1997-08-27 | 陈志全 | Hook-tube frame type multi-purpose steel-tube scaffold |
CN2537778Y (en) * | 2002-01-28 | 2003-02-26 | 郑智健 | Inner wall scaffold |
CN2713056Y (en) * | 2004-06-03 | 2005-07-27 | 深圳市特辰升降架工程有限公司 | Wedging scaffold |
CN202031320U (en) * | 2011-01-19 | 2011-11-09 | 阳江市奇正建筑五金有限公司 | Adjustable support for floor template |
CN203238934U (en) * | 2013-05-23 | 2013-10-16 | 中建五局工业设备安装有限公司 | Cross connector for all-round scaffold jack |
-
2014
- 2014-03-06 CN CN201410078746.4A patent/CN103806637A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3991964A (en) * | 1974-12-10 | 1976-11-16 | Evan John And Sons (Kenfig Hill) Limited | Self-locking device for telescopic props |
CN2225515Y (en) * | 1994-09-12 | 1996-04-24 | 北京市比尔特施工新技术研究所 | Buckle self-locking multifunctional scaffold |
JPH0913656A (en) * | 1995-06-27 | 1997-01-14 | Yuji Nimura | Built-up scaffolding |
CN2260843Y (en) * | 1996-12-04 | 1997-08-27 | 陈志全 | Hook-tube frame type multi-purpose steel-tube scaffold |
CN2537778Y (en) * | 2002-01-28 | 2003-02-26 | 郑智健 | Inner wall scaffold |
CN2713056Y (en) * | 2004-06-03 | 2005-07-27 | 深圳市特辰升降架工程有限公司 | Wedging scaffold |
CN202031320U (en) * | 2011-01-19 | 2011-11-09 | 阳江市奇正建筑五金有限公司 | Adjustable support for floor template |
CN203238934U (en) * | 2013-05-23 | 2013-10-16 | 中建五局工业设备安装有限公司 | Cross connector for all-round scaffold jack |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205367454U (en) | Large -size formwork hoisting machine constructs | |
CN208166514U (en) | A kind of crane high altitude operation nacelle device | |
CN203474231U (en) | Steel bar tower safety hoisting device | |
CN211548713U (en) | A suspension type scaffold frame for square chimney | |
CN205132955U (en) | Hoist and mount operation of electric power industry low latitude is with hoist and mount frame | |
CN203531381U (en) | Temporary hanging and supporting device used for steel bar truss formworks | |
CN203269424U (en) | Device for transiting and positioning plate cabinets | |
CN103806637A (en) | Hanging basket scaffold device | |
CN205132926U (en) | Special well word hoist of hydroelectric set tail water ell | |
CN201961968U (en) | Hoisting frame for chemical equipment overhaul | |
CN209874434U (en) | Simple and easy scaffold frame of encorbelmenting of building high latitude | |
CN203903881U (en) | Convenient hoisting device | |
CN107461029B (en) | Lower hanging beam pouring forming device based on hydraulic climbing formwork system setting | |
CN207932954U (en) | A kind of moveable winding support | |
CN203624768U (en) | Construction hoist capable of carrying climbing formwork | |
CN108915279B (en) | Ball node net rack small unit ground welding grabbing and splicing jig | |
CN203701552U (en) | Attached scaffold for lifted through worm, gear and screw rod | |
CN201006826Y (en) | Hanging support | |
CN201671060U (en) | Sliding device for prestress tensioning jack | |
CN205134923U (en) | Adjustable distance of encorbelmenting hang mechanism | |
CN110748140A (en) | Track beam hanging basket special for stepped curtain wall | |
CN205224557U (en) | Lift scaffold pole setting connection structure | |
CN215593688U (en) | Bridge pipeline mounting platform | |
CN217998841U (en) | Concrete pouring workbench for house construction | |
CN204418696U (en) | Vertical reinforcement spreading lifting assistor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140521 |