CN103790579B - Method and device for determining distance between drill bit and stratum interface in while-drilling geological steering - Google Patents

Method and device for determining distance between drill bit and stratum interface in while-drilling geological steering Download PDF

Info

Publication number
CN103790579B
CN103790579B CN201410003509.1A CN201410003509A CN103790579B CN 103790579 B CN103790579 B CN 103790579B CN 201410003509 A CN201410003509 A CN 201410003509A CN 103790579 B CN103790579 B CN 103790579B
Authority
CN
China
Prior art keywords
drilling
drill bit
distance
gamma ray
curve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410003509.1A
Other languages
Chinese (zh)
Other versions
CN103790579A (en
Inventor
袁超
周灿灿
张锋
程相志
胡松
李华阳
宋连腾
孔强夫
高斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201410003509.1A priority Critical patent/CN103790579B/en
Publication of CN103790579A publication Critical patent/CN103790579A/en
Application granted granted Critical
Publication of CN103790579B publication Critical patent/CN103790579B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The embodiment of the invention provides a method and a device for determining the distance between a drill bit and a stratum interface in while-drilling geosteering, wherein the method comprises the following steps: acquiring information of natural gamma logging while drilling orientation in real time, and predicting a relative included angle between an interface of a stratum to be drilled and a drilling direction; acquiring the vertical distance between a preset position in the drilling direction and the stratum interface to be drilled and met, wherein the preset position is the position of a detector at the position of a natural gamma curve which changes firstly when a drill bit drills to the stratum interface to be drilled and met; and determining the distance between the drill bit and the stratum interface to be met in the drilling direction according to the relative included angle and the vertical distance. The embodiment of the invention realizes that the distance between the drill bit and the stratum interface to be met by drilling is quantitatively determined by utilizing the information of the natural gamma logging while drilling, thereby being beneficial to better serving for geological guidance by the natural gamma logging while drilling.

Description

With the method and device for boring determination drill bit and bed boundary distance in geosteering
Technical field
It is more particularly to a kind of to be bored with determination in boring geosteering the present invention relates to geosteering and technical field of geological exploration Head and the method and device of bed boundary distance.
Background technology
Geosteering is one of forward position drilling technology that the nineties in 20th century grows up, and is using in drilling process Geologic parameter or the engineering parameter such as the natural gamma of measurement, density of earth formations, formation resistivity, ring pressure, temperature and pressure, sentence in real time Breaking of rod head bores the stratum met, and drilling trace is adjusted in time.Using geosteering drill bit can be ensured as far as possible in Favorable Reservoir Interior drilling, reaches the purpose for improving yield and recovery ratio.With being continuously increased for present horizontal well and directional well, geosteering is A new and high technology essential in drilling process.
It is a kind of important geosteering with orientation gamma ray log is bored in horizontal well and high angle hole drilling process Technology, is that multiple gamma detectors are placed in drill collar during well logging, the natural gamma radioactivity of measurement stratum, its Measurement data has azimuth characteristic, can real-time adjustment drill bit by the upper and lower orientation gamma ray curve for uploading to ground in real time Drilling trace, keep drill bit crept into reservoir.But in current technology, upload to ground in real time with orientation gamma ray log is bored The upper and lower orientation gamma curve in face is only used for qualitatively judging whether drill bit creeps into reservoir, and bit course is adjusted, it is impossible to The distance of rational judgment drill bit and bed boundary.
The content of the invention
The embodiment of the invention provides a kind of with the method and dress of boring determination drill bit and bed boundary distance in geosteering Put, solve the technical problem of the distance for being unable to rational judgment drill bit and bed boundary in the prior art.
The embodiment of the invention provides a kind of method with determination drill bit and bed boundary distance in geosteering is bored, the party Method includes:Obtain in real time with the data for boring orientation gamma ray log, prediction will drilling strata interface and drilling direction phase To angle;Obtain predeterminated position on drilling direction with it is described will drilling strata interface vertical range, wherein, it is described pre- If position be drill bit bore to it is described will drilling strata interface when, orientation where the gamma ray curve that changes first The position of detector;Determine that drill bit will bore chance on drilling direction with described according to the relative angle and the vertical range The distance of bed boundary.
In one embodiment, the data includes described bent with the upper position natural gamma for boring orientation gamma ray log Line and lower orientation gamma ray curve.
In one embodiment, using well-log information prediction will drilling strata interface and drilling direction relative folder Angle, including:The drill bit bore to it is described will drilling strata interface when, using occurring first on upper position gamma ray curve Distance of the change point changed first on the change point of change and lower orientation gamma ray curve on drilling direction, prediction It is described will drilling strata interface and drilling direction relative angle.
In one embodiment, using the change point changed first on upper position gamma ray curve with lower orientation certainly Distance of the change point changed first on right gamma curve on drilling direction, prediction it is described will drilling strata interface with The relative angle of drilling direction, including:Using Monte Carlo Calculation modeling calculation result data, upper position nature gal is obtained The change point changed first on the change point changed first on horse curve and lower orientation gamma ray curve is in drilling Distance on direction;By below equation determine it is described will drilling strata interface and drilling direction relative angle:Wherein, RD be it is described will drilling strata interface and drilling direction relative angle Circular measure value, Δ P be the change point that is changed first on upper position gamma ray curve with lower orientation gamma ray curve on Distance of the change point for changing first on drilling direction, a, b, c, d are respectively constant.
In one embodiment, the natural gamma of the change point for being changed first on the upper position gamma ray curve The variable quantity of the natural gamma value of former point is in the first values in value and upper position gamma ray curve;The lower section The natural gamma value and former point on lower orientation gamma ray curve of the change point changed first on the gamma ray curve of position Natural gamma value variable quantity in the second values.
In one embodiment, first values be on the upper position gamma ray curve former point from The 10% to 15% of right gamma value;Second values are the natural gals of former point on the lower orientation gamma ray curve The 10% to 15% of horse value.
In one embodiment, determine the drill bit on drilling direction according to the relative angle and the vertical range With it is described will drilling strata interface distance, including:According to the ratio of the vertical range and the sine value of the relative angle Value, determine the drill bit on drilling direction with it is described will drilling strata interface distance.
In one embodiment, by below equation determine the drill bit on drilling direction with it is described will drilling strata The distance at interface:Wherein, L be the drill bit on drilling direction with institute State will drilling strata interface distance,Be it is described will drilling strata interface and drilling side To relative angle Circular measure value, d0The distance between be the detector with the drill bit, DOI is on drilling direction Predeterminated position with it is described will drilling strata interface vertical range.
In one embodiment, it is determined that drill bit on drilling direction with it is described will drilling strata interface distance it Afterwards, also include:According to the drill bit rate of penetration track the drill bit with it is described will drilling strata interface distance.
The embodiment of the present invention additionally provides a kind of device stated with determination drill bit in brill geosteering with bed boundary distance, The device includes:Angle prediction module, for obtaining in real time with the data for boring orientation gamma ray log, prediction will bore chance ground Bed boundary and the relative angle of drilling direction;Apart from acquisition module, for obtain the predeterminated position on drilling direction with it is described Will drilling strata interface vertical range, wherein, the predeterminated position be the drill bit bore to it is described will drilling strata During interface, the position of the detector in orientation where the gamma ray curve for changing first;Apart from determining module, for basis The relative angle and the vertical range determine drill bit on drilling direction with it is described will drilling strata interface distance.
In one embodiment, the data includes described bent with the upper position natural gamma for boring orientation gamma ray log Line and lower orientation gamma ray curve.
In one embodiment, the angle prediction module, for the drill bit bore to it is described will drilling strata circle During face, using being sent out first on the change point changed first on upper position gamma ray curve and lower orientation gamma ray curve Distance of the change point of changing on drilling direction, prediction it is described will drilling strata interface and drilling direction relative folder Angle.
In one embodiment, the angle prediction module includes:Distance acquiring unit, for utilizing Monte Carlo Calculation Modeling calculation result data, obtains the change point and lower orientation nature changed first on upper position gamma ray curve Distance of the change point changed first on gamma curve on drilling direction;Angle predicting unit, for by following public affairs Formula determine it is described will drilling strata interface and drilling direction relative angle:Wherein, RD be it is described will drilling strata interface and drilling direction relative angle Circular measure value, Δ P is bent upper position natural gamma The change point changed first on the change point changed first on line and lower orientation gamma ray curve is in drilling direction On distance, a, b, c, d are respectively constant.
In one embodiment, the natural gamma of the change point for being changed first on the upper position gamma ray curve The variable quantity of the natural gamma value of former point is in the first values in value and upper position gamma ray curve;The lower section The natural gamma value and former point on lower orientation gamma ray curve of the change point changed first on the gamma ray curve of position Natural gamma value variable quantity in the second values.
In one embodiment, first values be on the upper position gamma ray curve former point from The 10% to 15% of right gamma value;Second values are the natural gals of former point on the lower orientation gamma ray curve The 10% to 15% of horse value.
In one embodiment, it is described apart from determining module, for according to the vertical range and the relative angle The ratio of sine value, determine the drill bit on drilling direction with it is described will drilling strata interface distance.
In one embodiment, it is described apart from determining module by below equation determine the drill bit on drilling direction with It is described will drilling strata interface distance:Wherein, L is the drill bit On drilling direction with it is described will drilling strata interface distance,It is that described will bore chance The Circular measure value of the relative angle of bed boundary and drilling direction, d0The distance between be the detector with the drill bit, DOI Predeterminated position on drilling direction with it is described will drilling strata interface vertical range.
In one embodiment, also include with the device of bed boundary distance with determination drill bit in boring geosteering:Distance Tracing module, for it is determined that drill bit on drilling direction with it is described will be after the distance at drilling strata interface, according to described Drill bit rate of penetration track the drill bit with it is described will drilling strata interface distance.
In embodiments of the present invention, will be bored to predict with the data for boring orientation gamma ray log by acquisition in real time Meet the relative angle of bed boundary and drilling direction, and obtain the predeterminated position on drilling direction with it is described will drilling strata The vertical range at interface, the predeterminated position be drill bit bore to it is described will drilling strata interface when, change first from The position of the detector in orientation where right gamma curve, finally, the vertical range of relative angle and acquisition according to prediction is come really Determine drill bit on drilling direction with it is described will drilling strata interface distance, realize using with bore orientation gamma ray log Data come quantitatively determine drill bit with it is described will drilling strata interface distance, it is to avoid in the prior art, with bore orientation from The data of gemma ray logging be only used for qualitatively judge drill bit whether in reservoir drilling and to bit course adjustment defect so that Help preferably to serve geosteering with brill orientation gamma ray log.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, not Constitute limitation of the invention.In the accompanying drawings:
Fig. 1 is a kind of method with determination drill bit and bed boundary distance in geosteering is bored provided in an embodiment of the present invention Flow chart;
Fig. 2 be it is provided in an embodiment of the present invention it is a kind of determine drill bit on drilling direction with will drilling strata interface distance Schematic diagram;
Fig. 3 be it is provided in an embodiment of the present invention it is a kind of with bore orientation gamma ray log upload to the upper and lower of ground in real time The schematic diagram of orientation gamma ray curve;
Fig. 4 is a kind of schematic diagram of three-dimensional Monte Carlo Calculation model provided in an embodiment of the present invention;
Fig. 5 is the change changed first on a kind of upper and lower orientation gamma ray curve provided in an embodiment of the present invention The relation curve schematic diagram of distance and relative angle of the point on drilling direction;
Fig. 6 is provided in an embodiment of the present invention a kind of with the device for boring determination drill bit and bed boundary distance in geosteering Structured flowchart.
Specific embodiment
It is right with reference to implementation method and accompanying drawing to make the object, technical solutions and advantages of the present invention become more apparent The present invention is described in further details.Here, exemplary embodiment of the invention and its illustrating for explaining the present invention, but simultaneously It is not as a limitation of the invention.
In embodiments of the present invention, there is provided a kind of with the side for boring determination drill bit and bed boundary distance in geosteering Method, as shown in figure 1, the method includes:
Step 101:Obtain in real time with the data for boring orientation gamma ray log, prediction will drilling strata interface and drilling The relative angle in direction;
Step 102:Obtain predeterminated position on drilling direction with it is described will drilling strata interface vertical range, its In, the predeterminated position be drill bit bore to it is described will drilling strata interface when, the gamma ray curve for changing first The position of the detector in place orientation;
Step 103:According to the relative angle and the vertical range determine the drill bit on drilling direction with it is described Will drilling strata interface distance.
Flow as shown in Figure 1 understands, in embodiments of the present invention, by obtaining in real time with brill orientation gamma ray log Data come predict will drilling strata interface and drilling direction relative angle, and obtain the default position on drilling direction Put with it is described will drilling strata interface vertical range, the predeterminated position be drill bit bore to it is described will drilling strata interface When, the position of the detector in orientation where the gamma ray curve that changes first, finally, relative angle according to prediction and The vertical range of acquisition come determine drill bit on drilling direction with it is described will drilling strata interface distance, realize using with Bore the data of orientation gamma ray log quantitatively determine drill bit with it is described will drilling strata interface distance, it is to avoid it is existing In having a technology, with the data for boring orientation gamma ray log be only used for qualitatively judging drill bit whether in reservoir drilling and to drill bit The defect of track adjustment, so as to help preferably to serve geosteering with brill orientation gamma ray log.
Using with bore orientation gamma ray log data, prediction will drilling strata interface it is relative with drilling direction During angle, the above-mentioned natural gamma value that can measure different azimuth in drilling course with brill orientation gamma ray log, And export the Natural Gamma-ray Logging Curves of different azimuth.During specific implementation, the above-mentioned data with brill orientation gamma ray log is Upper position in the Natural Gamma-ray Logging Curves with the different azimuth for boring measurement in orientation gamma ray log for obtaining in real time is certainly Right gamma curve and lower orientation gamma ray curve.
Obtain with after the data for boring orientation gamma ray log, can predict in the following manner will drilling strata circle The relative angle of face and drilling direction, for example, the drill bit bore to it is described will drilling strata interface when, using upper position from The change point changed first on the change point changed first on right gamma curve and lower orientation gamma ray curve exists Distance on drilling direction, i.e., on drilling direction, the change point changed first on upper position gamma ray curve is with The distance between change point changed first on orientation gamma ray curve, prediction is described will drilling strata interface and brill Enter the relative angle in direction.
During specific implementation, it is as shown in Figure 2 quantitatively determine drill bit on drilling direction with will drilling strata interface distance Schematic diagram, 201 be low-activity stratum;202 is high radioactivity stratum;203 for will drilling strata interface;204 is drill collar; 205 is drill bit;206 is upper position gamma detector;207 is lower orientation gamma detector;208 are drill bit in drilling direction and are By the relative angle at drilling strata interface;209 be bore to it is described will drilling strata interface when, with bore orientation natural gamma survey Well uploads to the gamma on the change point correspondence position changed first on the upper and lower orientation gamma ray curve on ground in real time Detector with will drilling strata interface vertical range;210 be drill bit on drilling direction with will drilling strata interface Distance.If drilling direction with will drilling strata interface 203 relative angle 208, it is known that and default position on drilling direction Put with it is described will drilling strata interface vertical range 209 understand, then can determine that drill bit 205 on drilling direction with will The distance 210 at drilling strata interface 203.In embodiments of the present invention, drill bit 205 bore chance will drilling strata interface 203, also Do not get into will drilling strata interface 203 when, it is possible to use the change point changed first on upper position gamma ray curve Predicted with distance of the change point changed first on lower orientation gamma ray curve on drilling direction drilling direction with Will drilling strata interface 203 relative angle 208.
Specifically, it is bent with lower orientation natural gamma to obtain the change point changed first on upper position gamma ray curve The process of distance of the change point changed first on line on drilling direction is as shown in figure 3, shown in Fig. 3 be drill bit 205 are bored to the upper position gamma ray curve 301 on high radioactivity stratum 202 and lower orientation nature gal from low-activity stratum 201 Horse curve 302, when drill bit 205 creeps into low-activity stratum 201, upper position gamma detector 206 and lower orientation gamma Detector 207 is in same stratum, therefore, upper position gamma ray curve 301 and the weight of lower orientation gamma ray curve 302 Close;When 205 drilling strata interface 203 of drill bit, high radioactivity stratum 202 enters the detection model of upper position gamma detector 206 Enclose, upper position gamma ray curve 301 and the priority of lower orientation gamma ray curve 302 change, what it changed first Change point is respectively 303 and 304, the distance between change point 303 and 304 be exactly on upper position gamma ray curve 301 first The change point 304 changed first on the change point 303 for changing and lower orientation gamma ray curve 302 is in drilling direction On distance 305(It is designated as Δ P).
In the specific implementation, the natural gamma value of the change point for being changed first on the upper position gamma ray curve With the variable quantity of the natural gamma value of former point on upper position gamma ray curve in the first values;The lower orientation The natural gamma value of the change point changed first on gamma ray curve and former point on lower orientation gamma ray curve In the second values, first values are the bent upper position natural gammas to the variable quantity of natural gamma value The 10% to 15% of the natural gamma value of former point on line;Second values are on the lower orientation gamma ray curve The 10% to 15% of the natural gamma value of former point.I.e. up on the gamma ray curve of position, the change point for changing first In the first values, first values are the variable quantity of the natural gamma value of natural gamma value and its former point The 10% to 15% of the natural gamma value of the former point;On lower orientation gamma ray curve, the change point for changing first In the second values, second values are the variable quantity of the natural gamma value of natural gamma value and its former point The 10% to 15% of the natural gamma value of the former point.
On upper position gamma ray curve is obtained on the change point that changes first and lower orientation gamma ray curve During distance of the change point for changing first on drilling direction, in order to exactly predict drilling direction with ground The relative angle of bed boundary, in the present embodiment, sets up Monte Carlo Calculation model, according to Monte Carlo Calculation modeling meter Result data is calculated to obtain the change point changed first on upper position gamma ray curve with lower orientation gamma ray curve On the distance of the change point that changes first on drilling direction, and determine will drilling strata interface and drilling direction phase To the formula of angle.
During specific implementation, using three-dimensional Monte Carlo Calculation model as shown in Figure 4, the Monte Carlo Calculation model is used Following setting, the sandstone formation 401 of low-activity is the sandstone formation for being full of fresh water in porosity 15%, hole, stratum natural gal Horse radioactive intensity is 0;The shale content of the mudstone stratum 402 of high radioactivity is 60%, and the radioactive element in stratum is 5ppm Uranium, the thorium of 10ppm and 5% potassium;Borehole diameter is 20cm, and wellbore fluid 404 is fresh water;Drill collar 405 is a diameter of Fresh water is full of in 17.145cm, slurry channel 406,407 is upper position gamma detector;408 is lower orientation gamma detector.It is logical Cross the angle 208 changed between drilling direction and bed boundary 203 as shown in Figure 2 and be respectively 40 °, 50 °, 60 °, 70 °, 80 ° With 85 °, it is as shown in Figure 3 when simulating 205 drill-through bed boundary 203 of drill bit using Monte Carlo simulation calculation result data Upper position gamma ray curve 301 and lower orientation gamma ray curve 302, so the drill bit bore to it is described will bore chance ground During bed boundary, the change point 303 and lower orientation natural gamma changed first on upper position gamma ray curve 301 are determined Distance, delta P of the change point 304 changed first on curve 302 on drilling direction.
Using Monte Carlo simulation calculation result data, by what is changed first on upper position gamma ray curve 301 Distance, delta of the change point 304 changed first on change point 303 and lower orientation gamma ray curve 302 on drilling direction Relative angle 208 between P and drilling direction and bed boundary 203 is depicted as curve map as shown in Figure 5, wherein, show in Fig. 5 The RD for showing is the Circular measure value of the relative angle 208 between drilling direction and bed boundary 203, and the relation according to Fig. 5 is bent Line can determine the equation of the relative angle 208 between drilling direction and bed boundary 203:
Wherein, RD be it is described will drilling strata interface and drilling direction relative angle Circular measure value, Δ P is top The change changed first on the change point that changes first and lower orientation gamma ray curve on the gamma ray curve of position Distance of the point on drilling direction, a, b, c, d are respectively constant.
Will in the present embodiment be obtained after the relative angle of drilling strata interface and drilling direction predicting Predeterminated position on drilling direction with it is described will drilling strata interface vertical range, in order to it is easy, accurately determine out brill Head on drilling direction with it is described will drilling strata interface distance, above-mentioned predeterminated position be the drill bit bore to it is described i.e. During by drilling strata interface, the position of the detector in orientation, that is, work as upper and lower where the gamma ray curve for changing first When position gamma ray curve changes, if first there is the change point for changing first in upper position gamma ray curve, When the predeterminated position is that upper position gamma ray curve the change point for changing first occurs, top is gamma detector place Position;If the change point for changing first first occurs in lower orientation gamma ray curve, the predeterminated position is lower orientation When the change point for changing first occurs in gamma ray curve, lower section is the position where gamma detector.As shown in Fig. 2 Occur in high radioactivity stratum 202 has just enter into the investigative range of upper position gamma detector 206, upper position gamma ray curve first During the change point for first changing, above-mentioned vertical range be exactly the change point upper position gamma detector 206 with will bore Meet the vertical range 209 of bed boundary 203, the referred to as investigation depth of gamma ray log(It is designated as DOI).
Predict will drilling strata interface and drilling direction relative angle, get predeterminated position with it is described will After the vertical range at drilling strata interface, as shown in Fig. 2 can be according to the sine of above-mentioned vertical range and above-mentioned relative angle The ratio of value come determine drill bit on drilling direction with it is described will drilling strata interface distance.
During specific implementation, can also determine that the drill bit will bore chance ground on drilling direction with described by below equation The distance of bed boundary:
Wherein, L be the drill bit on drilling direction with it is described will drilling strata interface distance,Be it is described will drilling strata interface and drilling direction relative angle Circular measure value, d0 The distance between be the detector with the drill bit, DOI is that the predeterminated position on drilling direction will bore chance ground with described The vertical range of bed boundary.
Determine drill bit on drilling direction with it is described will be after the distance at drilling strata interface, with the brill of drill bit Enter, can also track in real time drill bit on drilling direction with it is described will drilling strata interface current distance, for example, according to The drill bit rate of penetration track the drill bit with it is described will drilling strata interface distance, specifically, can be according to following Formula come track the drill bit with it is described will drilling strata interface distance:
V is drill bit rate of penetration;T is the change point that drill bit changes first by upper position gamma ray curve 301 Time afterwards.It is worth to show drill bit drill-through bed boundary if negative if L ', the absolute value of its value is drill bit in drilling direction The distance of upper and bed boundary.
Describe above-mentioned with the side for boring determination drill bit and bed boundary distance in geosteering below in conjunction with specific embodiment Method, the method comprises the following steps:
Step 1:Obtain in real time with the data for boring orientation gamma ray log.
Step 2:Obtain it is described upload in real time in the well-log information on ground upper position gamma ray curve and lower orientation from Right gamma curve.
Step 3:Drill bit bore to will drilling strata interface when, it is bent using the upper position natural gamma in the well-log information Line and lower orientation gamma ray curve, prediction drilling direction and relative angle that will be between drilling strata interface.Specific real Shi Shi, the relative angle is with the upper position gamma ray curve and lower orientation nature that bore orientation gamma ray log using described Distance of the change point changed first on gamma curve on drilling direction is obtained.
Step 4:Drill bit bore to will drilling strata interface when, the gamma ray curve place side that changes first of acquisition The gamma detector of position and the vertical range of the bed boundary.In a specific embodiment, the vertical range is nature gal Horse well logging investigation depth.
Step 5:Quantitatively determine drill bit on drilling direction with the distance of bed boundary.
Determination drill bit and ground in a kind of geosteering with brill are additionally provided based on same inventive concept, in the embodiment of the present invention The device of bed boundary distance, as described in the following examples.Due to determination drill bit and bed boundary distance in brill geosteering The principle of device solve problem determine that drill bit is similar to the method for bed boundary distance in geosteering to boring, therefore with brill Determine in geosteering the device of drill bit and bed boundary distance implementation may refer to bore determine in geosteering drill bit with The implementation of the method for bed boundary distance, repeats part and repeats no more.Used below, term " unit " or " module " can To realize the combination of the software and/or hardware of predetermined function.Although the device described by following examples is preferably come with software Realize, but hardware, or the realization of the combination of software and hardware is also that may and be contemplated.
Fig. 6 is a kind of being tied with the of the device of bed boundary distance with determination drill bit in boring geosteering for the embodiment of the present invention Structure block diagram, as shown in fig. 6, including:Angle prediction module 601, apart from acquisition module 602, apart from determining module 603, below it is right The structure is illustrated.
Angle prediction module 601, for obtaining in real time with the data for boring orientation gamma ray log, prediction will bore chance ground Bed boundary and the relative angle of drilling direction;Apart from acquisition module 602, it is connected with angle prediction module 601, is being bored for obtaining The predeterminated position entered on direction with it is described will drilling strata interface vertical range, wherein, the predeterminated position is described Drill bit bore to it is described will drilling strata interface when, the position of the detector in orientation where the gamma ray curve that changes first Put;Apart from determining module 603, it is connected with apart from acquisition module 602, for true according to the relative angle and the vertical range Determine drill bit on drilling direction with it is described will drilling strata interface distance.
In one embodiment, the data includes described bent with the upper position natural gamma for boring orientation gamma ray log Line and lower orientation gamma ray curve.
In one embodiment, the angle prediction module 601, for the drill bit bore to it is described will drilling strata During interface, using on the change point changed first on upper position gamma ray curve and lower orientation gamma ray curve first Distance of the change point for changing on drilling direction, prediction it is described will drilling strata interface and drilling direction relative folder Angle.
In one embodiment, the angle prediction module 601 includes:Distance acquiring unit, for utilizing Monte Carlo Computation model simulates calculation result data, obtains the change point and lower orientation changed first on upper position gamma ray curve Distance of the change point changed first on gamma ray curve on drilling direction;Angle predicting unit, for by with Lower formula determine it is described will drilling strata interface and drilling direction relative angle: Wherein, RD be it is described will drilling strata interface and drilling direction relative angle Circular measure value, Δ P is upper position nature gal The change point changed first on the change point changed first on horse curve and lower orientation gamma ray curve is in drilling Distance on direction, a, b, c, d are respectively constant.
In one embodiment, the natural gamma of the change point for being changed first on the upper position gamma ray curve The variable quantity of the natural gamma value of former point is in the first values in value and upper position gamma ray curve;The lower section The natural gamma value and former point on lower orientation gamma ray curve of the change point changed first on the gamma ray curve of position Natural gamma value variable quantity in the second values.
In one embodiment, first values be on the upper position gamma ray curve former point from The 10% to 15% of right gamma value;Second values are the natural gals of former point on the lower orientation gamma ray curve The 10% to 15% of horse value.
In one embodiment, it is described apart from determining module 603, for according to the vertical range and the relative angle Sine value ratio, determine drill bit on drilling direction with it is described will drilling strata interface distance.
In one embodiment, it is described to determine the drill bit in drilling direction by below equation apart from determining module 603 On with it is described will drilling strata interface distance:Wherein, bored described in L Head on drilling direction with it is described will drilling strata interface distance,It is that described will bore Meet the Circular measure value of bed boundary and the relative angle of drilling direction, d0The distance between be the detector with the drill bit, DOI be predeterminated position on drilling direction with it is described will drilling strata interface vertical range.
In one embodiment, also include with the device of bed boundary distance with determination drill bit in boring geosteering:Distance Tracing module, for it is determined that drill bit on drilling direction with it is described will be after the distance at drilling strata interface, according to described Drill bit rate of penetration track the drill bit with it is described will drilling strata interface distance.
In embodiments of the present invention, will be bored to predict with the data for boring orientation gamma ray log by acquisition in real time Meet the relative angle of bed boundary and drilling direction, and obtain the predeterminated position on drilling direction with it is described will drilling strata The vertical range at interface, the predeterminated position be the drill bit bore to it is described will drilling strata interface when, change first Gamma ray curve where orientation detector position, finally, according to prediction relative angle and obtain vertical range Come determine drill bit on drilling direction with it is described will drilling strata interface distance, realize using with bore orientation natural gamma The data of well logging come quantitatively determine drill bit with it is described will drilling strata interface distance, it is to avoid in the prior art, with brill side Position gamma ray log data be only used for qualitatively judge drill bit whether in reservoir drilling and to bit course adjustment defect, So as to help preferably to serve geosteering with brill orientation gamma ray log.
Obviously, those skilled in the art should be understood that each module or each step of the above-mentioned embodiment of the present invention can be with Realized with general computing device, they can be concentrated on single computing device, or be distributed in multiple computing devices On the network for being constituted, alternatively, the program code that they can be can perform with computing device be realized, it is thus possible to by it Store and performed by computing device in the storage device, and in some cases, can be held with different from order herein The shown or described step of row, or they are fabricated to each integrated circuit modules respectively, or by the multiple in them Module or step are fabricated to single integrated circuit module to realize.So, the embodiment of the present invention is not restricted to any specific hard Part and software are combined.
The preferred embodiments of the present invention are the foregoing is only, is not intended to limit the invention, for the skill of this area For art personnel, the embodiment of the present invention can have various modifications and variations.It is all within the spirit and principles in the present invention, made Any modification, equivalent substitution and improvements etc., should be included within the scope of the present invention.

Claims (8)

1. a kind of method that drill bit and bed boundary distance are determined in geosteering with brill, it is characterised in that including:
Obtain in real time with the data for boring orientation gamma ray log, prediction will drilling strata interface and drilling direction relative folder Angle;
Obtain predeterminated position on drilling direction with it is described will drilling strata interface vertical range, wherein, it is described default Position be drill bit bore to it is described will drilling strata interface when, the spy in orientation where the gamma ray curve that changes first Survey the position of device;
According to the relative angle and the vertical range determine the drill bit on drilling direction with it is described will drilling strata The distance at interface;
The data includes described with the upper position gamma ray curve and lower orientation natural gamma that bore orientation gamma ray log Curve;
Using data prediction will drilling strata interface and drilling direction relative angle, including:
The drill bit bore to it is described will drilling strata interface when, using being changed first on upper position gamma ray curve Change point and lower orientation gamma ray curve on the distance of the change point that changes first on drilling direction, prediction is described Will drilling strata interface and drilling direction relative angle;
The natural gamma value of the change point changed first on the upper position gamma ray curve and upper position natural gamma The variable quantity of the natural gamma value of former point is in the first values on curve;
The natural gamma value of the change point changed first on the lower orientation gamma ray curve and lower orientation natural gamma The variable quantity of the natural gamma value of former point is in the second values on curve;
First values be the natural gamma value of former point on the upper position gamma ray curve 10% to 15%;
Second values be the natural gamma value of former point on the lower orientation gamma ray curve 10% to 15%;
Using being sent out first on the change point changed first on upper position gamma ray curve and lower orientation gamma ray curve Distance of the change point of changing on drilling direction, prediction it is described will drilling strata interface and drilling direction relative folder Angle, including:
Using Monte Carlo Calculation modeling calculation result data, obtain and changed first on upper position gamma ray curve Change point and lower orientation gamma ray curve on the distance of the change point that changes first on drilling direction;
By below equation determine it is described will drilling strata interface and drilling direction relative angle:
R D = a - b 1 + exp [ ( Δ P - c ) / d ] ,
Wherein, RD be it is described will drilling strata interface and drilling direction relative angle Circular measure value, Δ P be upper position from The change point changed first on the change point changed first on right gamma curve and lower orientation gamma ray curve exists Distance on drilling direction, a, b, c, d are respectively constant.
2. as claimed in claim 1 with the method for boring determination drill bit and bed boundary distance in geosteering, it is characterised in that root According to the relative angle and the vertical range determine the drill bit on drilling direction with it is described will drilling strata interface Distance, including:
According to the ratio of the vertical range and the sine value of the relative angle, determine the drill bit on drilling direction with institute State will drilling strata interface distance.
3. as claimed in claim 2 with the method for boring determination drill bit and bed boundary distance in geosteering, it is characterised in that logical Cross below equation determine the drill bit on drilling direction with it is described will drilling strata interface distance:
L = D O I s i n ( a - b 1 + exp [ ( Δ P - c ) / d ) ) - d 0 ,
Wherein, L be the drill bit on drilling direction with it is described will drilling strata interface distance, Be it is described will drilling strata interface and drilling direction relative angle Circular measure value, d0It is the detector and the drill bit The distance between, DOI be predeterminated position on drilling direction with it is described will drilling strata interface vertical range.
4. as claimed in claim 1 with the method for boring determination drill bit and bed boundary distance in geosteering, it is characterised in that Determine that drill bit will also include after the distance at drilling strata interface on the drilling direction with described:
According to the drill bit rate of penetration track the drill bit with it is described will drilling strata interface distance.
5. a kind of with the device for boring determination drill bit and bed boundary distance in geosteering, it is characterised in that including:
Angle prediction module, for obtaining with the data for boring orientation gamma ray log in real time, prediction will drilling strata interface With the relative angle of drilling direction;
Apart from acquisition module, for obtain the predeterminated position on drilling direction with it is described will drilling strata interface it is vertical away from From, wherein, the predeterminated position be the drill bit bore to it is described will drilling strata interface when, the nature for changing first The position of the detector in orientation where gamma curve;
Apart from determining module, for according to the relative angle and the vertical range determine the drill bit on drilling direction with It is described will drilling strata interface distance;
The data includes described with the upper position gamma ray curve and lower orientation natural gamma that bore orientation gamma ray log Curve;
The angle prediction module, for the drill bit bore to it is described will drilling strata interface when, using upper position nature The change point changed first on the change point changed first on gamma curve and lower orientation gamma ray curve is being bored The distance entered on direction, prediction it is described will drilling strata interface and drilling direction relative angle;
The natural gamma value of the change point changed first on the upper position gamma ray curve and upper position natural gamma The variable quantity of the natural gamma value of former point is in the first values on curve;
The natural gamma value of the change point changed first on the lower orientation gamma ray curve and lower orientation natural gamma The variable quantity of the natural gamma value of former point is in the second values on curve;
First values be the natural gamma value of former point on the upper position gamma ray curve 10% to 15%;
Second values be the natural gamma value of former point on the lower orientation gamma ray curve 10% to 15%;
The angle prediction module includes:
Distance acquiring unit, for utilizing Monte Carlo Calculation modeling calculation result data, obtains upper position natural gamma The change point changed first on the change point changed first on curve and lower orientation gamma ray curve is in drilling side Upward distance;
Angle predicting unit, for by below equation determine it is described will drilling strata interface and drilling direction relative folder Angle:
R D = a - b 1 + exp [ ( Δ P - c ) / d ] ,
Wherein, RD be it is described will drilling strata interface and drilling direction relative angle Circular measure value, Δ P be upper position from The change point changed first on the change point changed first on right gamma curve and lower orientation gamma ray curve exists Distance on drilling direction, a, b, c, d are respectively constant.
6. as claimed in claim 5 with the device for boring determination drill bit and bed boundary distance in geosteering, it is characterised in that institute State apart from determining module, for according to the vertical range and the ratio of the sine value of the relative angle, determining the drill bit On drilling direction with it is described will drilling strata interface distance.
7. as claimed in claim 6 with the device for boring determination drill bit and bed boundary distance in geosteering, it is characterised in that institute State apart from determining module by below equation determine the drill bit on drilling direction with it is described will drilling strata interface away from From:
L = D O I s i n ( a - b 1 + exp [ ( Δ P - c ) / d ) ) - d 0 ,
Wherein, L be the drill bit on drilling direction with it is described will drilling strata interface distance, Be it is described will drilling strata interface and drilling direction relative angle Circular measure value, d0It is the detector and the drill bit The distance between, DOI be predeterminated position on drilling direction with it is described will drilling strata interface vertical range.
8. as claimed in claim 5 with the device for boring determination drill bit and bed boundary distance in geosteering, it is characterised in that also Including:
Track in range module, for it is determined that the drill bit on drilling direction with it is described will drilling strata interface distance it Afterwards, according to the drill bit rate of penetration track the drill bit with it is described will drilling strata interface distance.
CN201410003509.1A 2014-01-03 2014-01-03 Method and device for determining distance between drill bit and stratum interface in while-drilling geological steering Active CN103790579B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410003509.1A CN103790579B (en) 2014-01-03 2014-01-03 Method and device for determining distance between drill bit and stratum interface in while-drilling geological steering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410003509.1A CN103790579B (en) 2014-01-03 2014-01-03 Method and device for determining distance between drill bit and stratum interface in while-drilling geological steering

Publications (2)

Publication Number Publication Date
CN103790579A CN103790579A (en) 2014-05-14
CN103790579B true CN103790579B (en) 2017-07-07

Family

ID=50666590

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410003509.1A Active CN103790579B (en) 2014-01-03 2014-01-03 Method and device for determining distance between drill bit and stratum interface in while-drilling geological steering

Country Status (1)

Country Link
CN (1) CN103790579B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10995604B2 (en) 2015-12-01 2021-05-04 Schlumberger Technology Corporation Closed loop control of drilling curvature
CN108625842A (en) * 2017-03-22 2018-10-09 中国石油化工股份有限公司 A kind of wellbore trace control method and system
CN108952569B (en) * 2017-05-26 2020-12-01 中国石油天然气股份有限公司 Drilling track control method for horizontal well of bottom water layer oil and gas reservoir
CN111737868A (en) * 2020-06-16 2020-10-02 中国石油集团渤海钻探工程有限公司 Natural gamma curve prediction while drilling method based on time series algorithm
CN112983385B (en) * 2021-05-12 2021-08-10 中煤科工集团西安研究院有限公司 Broken soft low-permeability coal seam roof or bottom plate segmented fracturing horizontal well coal seam gas extraction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1676874A (en) * 2005-04-14 2005-10-05 中国石化集团胜利石油管理局钻井工艺研究院 Well deflection and position gamma measuring nistrument during drilling
CN101476463A (en) * 2009-01-23 2009-07-08 丛山 Drill-following natural gamma geosteering method for horizontal well
CN102707325A (en) * 2012-05-28 2012-10-03 中国石油大学(华东) Azimuth gamma measuring method and equipment
CN103109040A (en) * 2010-07-30 2013-05-15 国际壳牌研究有限公司 Monitoring of drilling operations with flow and density measurement
CN103174413A (en) * 2013-04-19 2013-06-26 中国石油集团钻井工程技术研究院 Drilling tool and method for detecting reservoir stratum boundary and thickness while drilling

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7191850B2 (en) * 2004-10-28 2007-03-20 Williams Danny T Formation dip geo-steering method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1676874A (en) * 2005-04-14 2005-10-05 中国石化集团胜利石油管理局钻井工艺研究院 Well deflection and position gamma measuring nistrument during drilling
CN101476463A (en) * 2009-01-23 2009-07-08 丛山 Drill-following natural gamma geosteering method for horizontal well
CN103109040A (en) * 2010-07-30 2013-05-15 国际壳牌研究有限公司 Monitoring of drilling operations with flow and density measurement
CN102707325A (en) * 2012-05-28 2012-10-03 中国石油大学(华东) Azimuth gamma measuring method and equipment
CN103174413A (en) * 2013-04-19 2013-06-26 中国石油集团钻井工程技术研究院 Drilling tool and method for detecting reservoir stratum boundary and thickness while drilling

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
近钻头方位伽马射线成像工具在超薄油藏中的地质导向新技术;吴振华等;《国外测井技术》;20110415(第2期);全文 *

Also Published As

Publication number Publication date
CN103790579A (en) 2014-05-14

Similar Documents

Publication Publication Date Title
US11782741B2 (en) Modeling of fluid introduction and/or fluid extraction elements in simulation of coreflood experiment
US8762118B2 (en) Modeling hydraulic fractures
US20150370934A1 (en) Completion design based on logging while drilling (lwd) data
US20210332690A1 (en) Method and system of combined support for a well drilling process
CN103790579B (en) Method and device for determining distance between drill bit and stratum interface in while-drilling geological steering
WO2016037168A1 (en) Well survivability in multidimensional geomechanical space
CN106154322B (en) Log curve correction method and apparatus
CN107784159B (en) Method for determining anisotropic coefficient of reservoir resistivity
CN103774988A (en) Real-time while-drilling gamma forward modeling geo-steering drilling method
US10386523B2 (en) Subsurface formation modeling with integrated stress profiles
BRPI1004697B1 (en) method and system for directing well drilling operations, and computer readable medium storing instructions for such drilling
EP3911837B1 (en) Well planning using geomechanics nudge
BRPI1005003A2 (en) Method of Guiding Well Drilling Operation Using Accidental Measurements, System for Guiding Well Drilling Operation Using Rock Stress Measurements, and Computer Readable Storing Instructions for Guiding a Well Drilling Operation Using Accurate Well Measurements
CN104948176A (en) Method for identifying carbonate reservoir fractures based on permeability increasing rate
CN106249300B (en) Method and device for determining TOC content and heterogeneity of source rock based on well-seismic combination
WO2020153972A1 (en) Evaluating anisotropic effective permeability in rock formations having natural fracture networks
EP3274552A1 (en) Formation pressure determination
US11320565B2 (en) Petrophysical field evaluation using self-organized map
Luthi et al. The application of outcrop-based research boreholes for reservoir modelling: potential, challenges and pitfalls
US11391860B2 (en) Anisotropic formation modeling
US20240035366A1 (en) Use of self-organizing-maps with logging-while-drilling data to delineate reservoirs in 2d and 3d well placement models
CN113767210B (en) Real-time productivity assessment of sidetracking for construction decisions
Hassan et al. Refactoring Carbonate Reservoir Architecture through Real-Time LWD Measurement
Lee et al. The importance of borehole image logs analysis in shale gas reservoirs development
BR112020012900B1 (en) COMPUTER-IMPLEMENTED METHOD TO GENERATE A HIGH-RESOLUTION LITHOLOGY MODEL AND SYSTEM

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant