CN103790539A - 一种水力正压冲击解堵工艺 - Google Patents
一种水力正压冲击解堵工艺 Download PDFInfo
- Publication number
- CN103790539A CN103790539A CN201310231469.1A CN201310231469A CN103790539A CN 103790539 A CN103790539 A CN 103790539A CN 201310231469 A CN201310231469 A CN 201310231469A CN 103790539 A CN103790539 A CN 103790539A
- Authority
- CN
- China
- Prior art keywords
- pressure
- sand
- meters
- well
- oil reservoir
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明提供了一种水力正压冲击解堵工艺,属于一种油田生产用工艺,所述的工艺步骤是,a,准备;b,探砂面并冲砂;c,套管试压;d,通井;e,刮管;f,挤防膨剂:正洗井至出口见液后,关闭套管闸门,正挤粘土稳定剂液,排量400L/min,关井24小时;g,水力正压冲击:下入高压管柱,安装压裂井口,连接地面管汇,进行试压,试压压力高出施工限压1—2MPa;试压合格后,从套管内向井内泵入流体,控制流体压力平稳上升至油层破裂压力临界点,降低泵速;h,返排。这种水力正压冲击解堵工艺,将高粘度的流体以大大超过地层吸收能力的排量注入井筒,解除射孔附近的污染,提高了解堵效果,且操作方便,成功率高,作业成本低。
Description
技术领域
本发明提供了一种油田生产用工艺,尤其是一种油井解堵工艺。
背景技术
长时间采油生产后的油井近井地带油层污染、堵塞严重,造成产量降低,因此需要找到有效的解堵方法。现有的解堵方法有水力压裂、酸化解堵等,操作繁琐,解堵费用较高;还有超声波、水力振荡解堵、高压旋转水射流、负压解堵等,解堵效果差,有效期短。
发明内容
本发明所要解决的技术问题是,提供一种水力正压冲击解堵工艺,以提高解堵效果。
本发明是这样实现的,一种水力正压冲击解堵工艺,所述的工艺步骤是,
a,准备:起出油井内的抽油杆、油管及井下工具;
b,探砂面并冲砂:用不带其他井下工具的冲砂管柱探砂面,笔尖距油层30米时,下放速度应小于1.2米/min,大钩悬重下降10—20KN时,则表明遇到砂面,上提冲砂管柱重新试探,两次误差不超过0.5米时,探得原始砂面,记录砂面位置;使冲砂管柱位于砂面3米以上开泵循环,泵工作正常后下放冲砂管柱冲砂,冲砂至人工井底后,保持循环至出口排量400L/min,出口含砂量按重量计小于0.2%时,冲砂合格,将冲砂管柱起出;
c,套管试压:下入套管封隔器,在油层上界10米处座封, 在15MPa压力下试压15分钟,压力不下降为合格;
d,通井:下入带有通井规的光油管通井至人工井底,通井时,下放速度控制在10—20米/min,下到距人工井底100米后,下放速度不超过5—10米/min;
e,刮管:下入带有刮管器的光油管至人工井底,刮去套管内壁的污垢,刮削至井底后,进行大排量洗井,然后,起出带有刮管器的光油管;刮管时,下放速度控制在20—30米/min,下至距油层上界50米后,下放速度控制在5—10米/min,在油层部位反复多次刮削;
f,挤防膨剂:下入光油管至油层上界10—30米,地面管线试压25MPa,正洗井至出口见液后,关闭套管闸门,正挤粘土稳定剂液,排量400L/min,关井24小时; 在粘土稳定剂液中,每30立方米粘土稳定剂液中含有粘土稳定剂SL3.0吨,其余为水;
g、水力正压冲击:下入高压管柱,安装压裂井口,连接地面管汇,进行试压,试压压力高出施工限压1—2MPa;试压合格后,从套管内向井内泵入流体,控制流体压力平稳上升至油层破裂压力临界点,降低泵速;
h,返排:从套管加入液氮助返;根据地层矿化度及离子类型选择合适气体助排,使地层液快速排出。
这种水力正压冲击解堵工艺,将高粘度的流体以大大超过地层吸收能力的排量注入井筒,在射孔油层附近憋起高压,在射孔孔眼处形成高速射流,冲击油井生产过程中形成的滤饼及堵塞胶结物。当压力大于滤饼破裂压力时,形成裂缝,同时形成微裂缝与次生裂缝,然后利用液氮加速返排,从而解除射孔附近的污染,提高了解堵效果,达到了增产目的,且操作方便,成功率高,有效期长,作业成本低。
具体实施方式
下面进一步说明本发明。
在探砂面并冲砂步骤中,冲砂管柱位于砂面3米以上,一般为3.1—4米。
在水力正压冲击步骤中,高压管柱最好是压裂管柱。
在水力正压冲击步骤中,油层破裂压力临界点为预先测试获得的数据。
在所述的挤膨胀剂步骤中,粘土稳定剂液所用的水为本区块的采出水。
在返排步骤中,从套管加入的液氮为液氮泡沫液。
以下说明本发明之工艺的实验效果。
该油井为滨648-13井。该井完井日期为1994年4月,油层为砂三下,井段为2200—2286米,共8层26米。初期日产液7.4吨、日产油5.65吨。自2009年以后,产量储层孔隙度9.27%,渗透率5.65X10-3μm2,日产液降低至2.4吨,为低孔、低渗油藏,产量低,实行间开。该井在2010年利用本发明之工艺进行解堵实验。地层的破裂压力临界点为64MPa。控制流体压力平稳上升至64MPa,逐渐降低压力,泵入本区块的采出水94立方米,加入液氮泡沫液8.5立方米。采用本发明之工艺进行解堵后,日产液从解堵前的2.4—2.5吨增加到4.9—5.2吨,日产油增加到3.0—3.2吨。动液面也从解堵前的1408—1420米提高到927—937米。说明本发明之方法解堵效果良好。
本发明之解堵工艺与水力压裂、水力震荡解堵的区别:水力压裂主要是在地层中形成裂缝并向前延伸,然后将支撑剂沉降在裂缝中,在地层中形成具有高导流能力的支撑裂缝。水力震荡解堵是在射孔部位下入水力震荡器,通过产生的水力震荡波解除堵塞的方法。而本发明之解堵工艺主要是利用在射孔孔眼部位形成射流冲击,配合高压在滤饼处形成的裂缝及次生裂缝,解除射孔孔眼附近的堵塞。
Claims (1)
1.一种水力正压冲击解堵工艺,其特征在于,所述的工艺步骤是,
a,准备:起出油井内的抽油杆、油管及井下工具;
b,探砂面并冲砂:用不带其他井下工具的冲砂管柱探砂面,笔尖距油层30米时,下放速度应小于1.2米/min,大钩悬重下降10—20KN时,则表明遇到砂面,上提冲砂管柱重新试探,两次误差不超过0.5米时,探得原始砂面,记录砂面位置;使冲砂管柱位于砂面3米以上开泵循环,泵工作正常后下放冲砂管柱冲砂,冲砂至人工井底后,保持循环至出口排量400L/min,出口含砂量按重量计小于0.2%时,冲砂合格,将冲砂管柱起出;
c,套管试压:下入套管封隔器,在油层上界10米处座封, 在15MPa压力下试压15分钟,压力不下降为合格;
d,通井:下入带有通井规的光油管通井至人工井底,通井时,下放速度控制在10—20米/min,下到距人工井底100米后,下放速度不超过5—10米/min;
e,刮管:下入带有刮管器的光油管至人工井底,刮去套管内壁的污垢,刮削至井底后,进行大排量洗井,然后,起出带有刮管器的光油管;刮管时,下放速度控制在20—30米/min,下至距油层上界50米后,下放速度控制在5—10米/min,在油层部位反复多次刮削;
f,挤防膨剂:下入光油管至油层上界10—30米,地面管线试压25MPa,正洗井至出口见液后,关闭套管闸门,正挤粘土稳定剂液,排量400L/min,关井24小时; 在粘土稳定剂液中,每30立方米粘土稳定剂液中含有粘土稳定剂SL3.0吨,其余为水;
g、水力正压冲击:下入高压管柱,安装压裂井口,连接地面管汇,进行试压,试压压力高出施工限压1—2MPa;试压合格后,从套管内向井内泵入流体,控制流体压力平稳上升至油层破裂压力临界点,降低泵速;
h,返排:从套管加入液氮助返;根据地层矿化度及离子类型选择合适气体助排,使地层液快速排出。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310231469.1A CN103790539A (zh) | 2013-06-13 | 2013-06-13 | 一种水力正压冲击解堵工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310231469.1A CN103790539A (zh) | 2013-06-13 | 2013-06-13 | 一种水力正压冲击解堵工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103790539A true CN103790539A (zh) | 2014-05-14 |
Family
ID=50666551
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310231469.1A Pending CN103790539A (zh) | 2013-06-13 | 2013-06-13 | 一种水力正压冲击解堵工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103790539A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105350932A (zh) * | 2015-11-03 | 2016-02-24 | 辽河石油勘探局 | 一种气井带压诱喷解堵排液工艺 |
CN109138874A (zh) * | 2018-10-08 | 2019-01-04 | 大庆荣氏采油技术开发有限公司 | 一种注水井结垢清洗方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1472418A (zh) * | 2003-06-26 | 2004-02-04 | 辽宁天意实业股份有限公司 | 一种高温高压人工防砂井壁及其施工工艺 |
CN101016828A (zh) * | 2007-02-02 | 2007-08-15 | 中国石油大学(华东) | 泡沫负压混排解堵方法 |
CN102330545A (zh) * | 2011-10-17 | 2012-01-25 | 中国石油天然气股份有限公司 | 一种稠油油藏油井防砂方法 |
US8330304B2 (en) * | 2009-03-27 | 2012-12-11 | Dell Products L.P. | System and method for assembly of component devices into an information handling system |
-
2013
- 2013-06-13 CN CN201310231469.1A patent/CN103790539A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1472418A (zh) * | 2003-06-26 | 2004-02-04 | 辽宁天意实业股份有限公司 | 一种高温高压人工防砂井壁及其施工工艺 |
CN101016828A (zh) * | 2007-02-02 | 2007-08-15 | 中国石油大学(华东) | 泡沫负压混排解堵方法 |
US8330304B2 (en) * | 2009-03-27 | 2012-12-11 | Dell Products L.P. | System and method for assembly of component devices into an information handling system |
CN102330545A (zh) * | 2011-10-17 | 2012-01-25 | 中国石油天然气股份有限公司 | 一种稠油油藏油井防砂方法 |
Non-Patent Citations (2)
Title |
---|
姚亦华著: "《提高聚合物驱效果及三次采油产出液处理技术》", 31 January 2009, article "提高聚合物驱效果及三次采油产出液处理技术", pages: 169-178 * |
覃忠校: "高压喷砂水射流深穿透解堵技术的研究与应用", 《石油钻探技术》, vol. 31, no. 2, 30 April 2003 (2003-04-30), pages 49 - 51 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105350932A (zh) * | 2015-11-03 | 2016-02-24 | 辽河石油勘探局 | 一种气井带压诱喷解堵排液工艺 |
CN105350932B (zh) * | 2015-11-03 | 2017-10-03 | 辽河石油勘探局 | 一种气井带压诱喷解堵排液工艺 |
CN109138874A (zh) * | 2018-10-08 | 2019-01-04 | 大庆荣氏采油技术开发有限公司 | 一种注水井结垢清洗方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102777138B (zh) | 连续油管超临界co2射流冲砂解堵的方法 | |
CN108979569A (zh) | 一种不动管柱三层解堵的方法 | |
CN102720453B (zh) | 油、气井井筒欠平衡机械除砂、排液方法及装置 | |
CN105239963A (zh) | 一种节能环保防蜡防垢超强降粘器 | |
CN103696720A (zh) | 一种复合解堵方法 | |
CN111140200A (zh) | 一种正负耦合脉冲化学物理解堵系统及解堵方法 | |
CN103937475A (zh) | 二氧化碳酸化解堵剂及酸化后残液不返排工艺 | |
CN109723399A (zh) | 一种油气井液氮射流解堵增渗的方法 | |
CN103306645B (zh) | 水平井一趟钻压裂完井管柱及其工艺 | |
CN112343560A (zh) | 低渗透储层天然气水合物开采压裂与防砂联作工艺方法 | |
CN104806219A (zh) | 油气储层增渗解堵装置及其增渗解堵方法 | |
CN103104203A (zh) | 钻井液固控控制工艺 | |
CN103790539A (zh) | 一种水力正压冲击解堵工艺 | |
CN112360368B (zh) | 油井堵水方法 | |
CN202645526U (zh) | 一种射流喷砂压裂器 | |
CN201953333U (zh) | 一种油水井防垢增注声波器 | |
RU2720038C1 (ru) | Способ разрушения пробки в скважине | |
CN103790529A (zh) | 煤层气排采反洗装置及方法 | |
CN205823208U (zh) | 一种油田油水井新型返排解堵系统 | |
CN204041042U (zh) | 一种连续油管拖动压裂管柱 | |
CN112302605B (zh) | 一种页岩气水平井分段重复压裂的方法 | |
CN103924957A (zh) | 油井酸化负压返排解堵工艺 | |
CN203430446U (zh) | 一种水平井涡轮清沙装置 | |
CN103821492A (zh) | 油井酸化负压返排解堵工艺 | |
RU2444620C1 (ru) | Способ обработки прискважинной зоны пласта |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140514 |