CN103790168A - 一种土钉墙在深基坑支护中的应用方法 - Google Patents
一种土钉墙在深基坑支护中的应用方法 Download PDFInfo
- Publication number
- CN103790168A CN103790168A CN201410021662.7A CN201410021662A CN103790168A CN 103790168 A CN103790168 A CN 103790168A CN 201410021662 A CN201410021662 A CN 201410021662A CN 103790168 A CN103790168 A CN 103790168A
- Authority
- CN
- China
- Prior art keywords
- soil
- foundation pit
- deep foundation
- soil nailing
- application process
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
一种土钉墙在深基坑支护中的应用,其实施过程是:土方开挖→土钉成孔→安装土钉→注浆→挂钢筋网片→焊加强筋→喷射砼。有益效果是:(1)形成土钉复合体、显著提高边坡整体稳 定性和承受边坡超载的能力。(2)施工设备简单,由于钉长一般比锚杆的长度小的多,不加预应力所以设备简单。(3)随基坑开挖逐层分段开挖作业,不占或少占单独作业时间,施工效率高,占用工期短。(4)施工不需单独占用场地,对现场狭小,放坡困难,有相邻建筑物时显示其优越性。(5)土钉墙成本费用较其他支护结构显著降低。(6)施工噪音、振动小,不影响环境。(7)土钉墙本身变形很小,对相邻建筑物影响不大。
Description
技术领域
本发明涉及一种深基坑支护方法,尤其是一种土钉墙在深基坑支护中的应用方法。
背景技术
土钉墙是由天然土体通过土钉就地加固并与喷射砼面板相结合,形成一个类似重力挡墙以此来抵抗墙后的土压力,从而保持开挖面的稳定,这个土挡墙称为土钉墙。土钉墙是通过钻孔、插筋、注浆来设置的,也可以直接打人角钢、粗钢筋形成土钉。
发明内容
由于土钉墙再深基坑支护中具有显著提高边坡在整体稳定性和承受能力,施工设备简单,效率高,成本低,对环境的影响小的特点,本发明提出了一种土钉墙在深基坑支护中的应用方法。
本发明实现所采用的技术方案是:土方开挖→土钉成孔→安装土钉→注浆→挂钢筋网片→焊加强筋→喷射砼。
上述土方开挖采用的方法是:土方分四层开挖,第一层3.0米,以下每层1.5~2.0米。
上述土钉成孔的方法是:使用洛阳铲人工成孔,按照设计师的要求测量划线,然后按照设计要求的孔深、孔的俯角和孔径进行成孔。
上述安装土钉的方法是:安放土钉时,为使土钉处于孔的中心位置,每隔2.0m焊接一个居中支架,将土钉安放在孔内。
上述注浆的方法是:安装好土钉的孔内注入水灰比为0.45~ 0.5的纯水泥浆,其强度等级不低于C20。
上述挂网的方法是:在修好的边坡坡面上,按设计要求,铺上一层φ6300×300钢筋网,网筋之间用扎丝绑扎牢固。
上述加强筋焊接的方法是:用φl2圆钢将土钉头部连接起来,焊在杆体上,各焊接点必须牢固。
上述喷砼的方法是:砼的配比为水泥:石:砂=1:2:2,水泥选用32.5普硅水泥,强度达到C20,砼厚度80—l00mm,要求表面平整。
本发明的有益效果是:(1)形成土钉复合体、显著提高边坡整体稳 定性和承受边坡超载的能力。(2)施工设备简单,由于钉长一般比锚杆的长度小的多,不加预应力所以设备简单。(3)随基坑开挖逐层分段开挖作业,不占或少占单独作业时间,施工效率高,占用工期短。(4)施工不需单独占用场地,对现场狭小,放坡困难,有相邻建筑物时显示其优越性。(5)土钉墙成本费用较其他支护结构显著降低。(6)施工噪音、振动小,不影响环境。 (7)土钉墙本身变形很小,对相邻建筑物影响不大。
具体实施方式
本发明的具体实施方式如下:
1、土方开挖方式
土钉墙支护要与基坑开挖紧密配合,土方分四层开挖,第一层3.0米,以下每层开挖1.5—2.0m。各道工序实行交叉作业,依次有序地进行。
2、土钉成孔
采用洛阳铲人工成孔,按设计布置的孔位进行测量画线,标出准确的孔位,然后按设计要求的孔深、孔的俯角和孔径进行成孔。成孔要顺直避免倾斜,确保成孔的质量,成孔后应逐孔进行验收。
3、土钉安放
首先对成孔质量进行验收合格后方可安放土钉。土钉即钢筋,按设计要求的长度、直径,加工成合格的杆体。安放土钉时,为使土钉处于孔的中心位置,每隔2.0m焊接一个居中支架,将土钉安放在孔内。
4、注浆
土钉安放完成并经检查合格后即可注浆。在安装好土钉的孔内注入水灰比为0.45~ 0.5的纯水泥浆,其强度等级不低于C20。注浆时应确保土钉与孔壁之间注满水泥浆,注浆应由里向外注,即把注浆管插入孔内距孔底约0.5~l.0m处,用编织袋等物堵住孔口,然后再开始注浆,防止浆液外流。
5、挂网
在修好的边坡坡面上,按设计要求,铺上一层φ6300×300钢筋网,网筋之间用扎丝绑扎牢固。
6、加强筋焊接
注浆、绑扎钢筋网片施工完成后,用φ12圆钢将土钉头部连接起来,焊在杆体上,各焊接点必须牢固。
7、喷砼
在上述工序完成后,即可喷射砼,砼厚度80—l00mm。配合比为水泥:石:砂=1:2:2,水泥选用32.5普硅水泥,强度达到C20,要求表面基本平整。
8、后期养护
由于喷射混凝土的含砂率高,水泥用量也相对较多并掺有速凝剂,其收缩变形必然要比普通混凝土大,在喷射混凝土终凝2h后应进行喷水养护,养护时间不得少于14天。
Claims (8)
1.一种土钉墙在深基坑支护中的应用方法,其特征在于施工流程为:土方开挖→土钉成孔→安装土钉→注浆→挂钢筋网片→焊加强筋→喷射砼。
2.根据权利要求1所述的一种土钉墙在深基坑支护中的应用方法,其特征在于:土方分四层开挖,第一层3.0米,以下每层1.5~2.0米。
3. 根据权利要求1所述的一种土钉墙在深基坑支护中的应用方法,其特征在于:使用洛阳铲人工成孔,按照设计师的要求测量划线,然后按照设计要求的孔深、孔的俯角和孔径进行成孔。
4.根据权利要求1所述的一种土钉墙在深基坑支护中的应用方法,其特征在于:安放土钉时,为使土钉处于孔的中心位置,每隔2.0m焊接一个居中支架,将土钉安放在孔内。
5.根据权利要求1所述的一种土钉墙在深基坑支护中的应用方法,其特征在于:安装好土钉的孔内注入水灰比为0.45~ 0.5的纯水泥浆,其强度等级不低于C20。
6. 根据权利要求1所述的一种土钉墙在深基坑支护中的应用方法,其特征在于:在修好的边坡坡面上,按设计要求,铺上一层φ6300×300钢筋网,网筋之间用扎丝绑扎牢固。
7.根据权利要求1所述的一种土钉墙在深基坑支护中的应用方法,其特征在于:用φl2圆钢将土钉头部连接起来,焊在杆体上,各焊接点必须牢固。
8. 根据权利要求1所述的一种土钉墙在深基坑支护中的应用方法,其特征在于:砼的配比为水泥:石:砂=1:2:2,水泥选用32.5普硅水泥,强度达到C20,砼厚度80—l00mm,要求表面平整。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410021662.7A CN103790168A (zh) | 2014-01-17 | 2014-01-17 | 一种土钉墙在深基坑支护中的应用方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410021662.7A CN103790168A (zh) | 2014-01-17 | 2014-01-17 | 一种土钉墙在深基坑支护中的应用方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103790168A true CN103790168A (zh) | 2014-05-14 |
Family
ID=50666188
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410021662.7A Pending CN103790168A (zh) | 2014-01-17 | 2014-01-17 | 一种土钉墙在深基坑支护中的应用方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103790168A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104328790A (zh) * | 2014-11-12 | 2015-02-04 | 中建六局土木工程有限公司 | 现浇喷射混凝土暗承台及暗地梁胎模 |
CN104912083A (zh) * | 2015-04-17 | 2015-09-16 | 上海三凯建设管理咨询有限公司 | 一种深基坑支护方法 |
CN107642095A (zh) * | 2017-06-02 | 2018-01-30 | 杨昌亚 | 一种复合土钉墙支护加强基坑侧壁刚度的施工方法 |
CN108677967A (zh) * | 2018-05-28 | 2018-10-19 | 郑林 | 一种填土层中钢花管土钉组合地锚支护方法 |
CN115492127A (zh) * | 2022-10-28 | 2022-12-20 | 深圳市市政工程总公司 | 坑中坑基坑支护综合应用施工方法 |
-
2014
- 2014-01-17 CN CN201410021662.7A patent/CN103790168A/zh active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104328790A (zh) * | 2014-11-12 | 2015-02-04 | 中建六局土木工程有限公司 | 现浇喷射混凝土暗承台及暗地梁胎模 |
CN104912083A (zh) * | 2015-04-17 | 2015-09-16 | 上海三凯建设管理咨询有限公司 | 一种深基坑支护方法 |
CN107642095A (zh) * | 2017-06-02 | 2018-01-30 | 杨昌亚 | 一种复合土钉墙支护加强基坑侧壁刚度的施工方法 |
CN107642095B (zh) * | 2017-06-02 | 2020-04-17 | 杨昌亚 | 一种复合土钉墙支护加强基坑侧壁刚度的施工方法 |
CN108677967A (zh) * | 2018-05-28 | 2018-10-19 | 郑林 | 一种填土层中钢花管土钉组合地锚支护方法 |
CN115492127A (zh) * | 2022-10-28 | 2022-12-20 | 深圳市市政工程总公司 | 坑中坑基坑支护综合应用施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103469939B (zh) | 一种砌体填充墙与主体柔性连接抗震结构及其施工方法 | |
CN102444142B (zh) | 一种群桩改柱扩建地下室及其施工工法 | |
CN206503150U (zh) | 一种玄武岩复合筋材锚杆格构梁支挡结构 | |
CN103790168A (zh) | 一种土钉墙在深基坑支护中的应用方法 | |
CN102444143B (zh) | 一种取消地下室外立面操作通道的施工方法 | |
CN102071698B (zh) | 基础下翻梁、承台垫层的施工方法 | |
CN102912798A (zh) | 一种复合土钉墙基坑支护方法 | |
CN103088830A (zh) | 超深地下室复合外墙结构的施工方法 | |
CN108560949B (zh) | 土坯墙外立面加固结构及土坯墙外立面加固方法 | |
CN113374295A (zh) | 一种老旧钢木结构屋架拆除复建施工方法 | |
US20130219808A1 (en) | Building block, system and method | |
CN209923945U (zh) | 坡面防护结构 | |
CN104328790A (zh) | 现浇喷射混凝土暗承台及暗地梁胎模 | |
CN207829511U (zh) | 一种既有建筑外墙改造结构 | |
CN103215950A (zh) | 回填区桩基接长施工方法 | |
CN105821895A (zh) | 一种筏板基础钢筋支撑架防水处理施工工艺 | |
CN102587611A (zh) | 一种天然块石假干砌装饰墙及施工方法 | |
CN106193120A (zh) | 地下室悬挑底板逆作结构及施工方法 | |
CN1548661A (zh) | 一种利用土钉支护软弱地层基坑的方法 | |
WO2014096802A4 (en) | Reinforced blockwork construction method | |
CN103510537A (zh) | 塔式起重机基础与建筑地下室底板结合的施工方法 | |
CN110439002A (zh) | 一种内支撑临时水平结构用作永久结构梁板的方法 | |
CN207499200U (zh) | 室外文化展墙 | |
CN207079605U (zh) | 公路护坡装配式预制砼格框 | |
CN102535493B (zh) | 一种倒置式基础梁的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140514 |
|
WD01 | Invention patent application deemed withdrawn after publication |