CN103779955A - 基于n-1准则的备自投投退控制方法 - Google Patents

基于n-1准则的备自投投退控制方法 Download PDF

Info

Publication number
CN103779955A
CN103779955A CN201310647038.3A CN201310647038A CN103779955A CN 103779955 A CN103779955 A CN 103779955A CN 201310647038 A CN201310647038 A CN 201310647038A CN 103779955 A CN103779955 A CN 103779955A
Authority
CN
China
Prior art keywords
prepared auto
automatic switching
auto restart
backup automatic
throwing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310647038.3A
Other languages
English (en)
Inventor
苏宜强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Lianyungang Power Supply Co of Jiangsu Electric Power Co
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Lianyungang Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Lianyungang Power Supply Co of Jiangsu Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201310647038.3A priority Critical patent/CN103779955A/zh
Publication of CN103779955A publication Critical patent/CN103779955A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明基于N-1准则的备自投投退控制方法,包括以下步骤:首先,对电网进行拓扑分析,由此生成N-1故障集及关联的备自投,从这些关联的备自投中形成所有存在的备自投组合,按照一定的算法对这些组合进行排序;其次,采集超短期负荷预测数据且同时对各备自投组合动作后的电网进行潮流计算,根据潮流计算的最后结果找到最优的备自投组合;最后,主站系统按照选出的最优备自投组合遥控现场备自投的投退从而完成最终的备自投投退。本发明基于N-1准则的备自投投退控制方法保证了备自投投退的正确运行,为整个电力系统提供可靠地保障。

Description

基于N-1准则的备自投投退控制方法
技术领域
本发明属于备自投投退领域,特别是基于N_1准则的备自投投退控制方法。
背景技术
近年来,电网规模不断扩大,却仍无法满足地区电力用户的需求。随着夏季冬季电网高峰负荷的到来,大部分主变的负荷较重,达到70%,少部分主变接近满载,在这种情况下,若变电站内一台主变发生故障,备自投动作,将导致另一台主变严重过载,引发连锁事故。
地区电网在负荷高峰时,备自投的动作可能带来备用电源侧的过负荷,因此备自投投退控制应充分考虑远方备用电源侧主变的容载比、线路的热稳定极限、电压越限等约束条件。由于备自投配置联切负荷装置布线复杂,可靠性低,现场一般通过停用备自投的方法来解决上述问题,影响了整个电力系统的正常运行。
发明内容
本发明为了解决上述问题,从而提供了基于N_1准则的备自投投退控制方法。
实现本发明目的的技术解决方案为:
基于N_1准则的备自投投退控制方法,包括以下步骤:
首先,对电网进行拓扑分析,由此生成N-1故障集及关联的备自投,从这些关联的备自投中形成所有存在的备自投组合,按照一定的算法对这些组合进行排序;
其次,采集超短期负荷预测数据且同时对各备自投组合动作后的电网进行潮流计算,根据潮流计算的最后结果找到最优的备自投组合;
最后,主站系统按照选出的最优备自投组合遥控现场备自投的投退从而完成最终的备自投投退。
本发明与现有技术相比,其显著优点:
本发明基于N_1准则的备自投投退控制方法进行220kV主变N-1,110kV主变N-l、1I0kV线路N-l,110kV变电站和220kV变电站的110kV母线N-1故障下的备自投投退控制分析,能够考虑220kV主变、220kV线路、110kV主变及110kV线路过载的情况,能够考虑线路负荷权值λ对备自投投退组合的影响,保证了备自投投退的正确运行,为整个电力系统提供可靠地保障。
下面结合附图对本发明作进一步详细描述。
附图说明
图1为本发明基于N_1准则的备自投投退控制方法的流程示意图。
具体实施方式
如图1所示:基于N_1准则的备自投投退控制方法,其特征在于,包括以下步骤:
首先,对电网进行拓扑分析,由此生成N-1故障集及关联的备自投,从这些关联的备自投中形成所有存在的备自投组合,按照一定的算法对这些组合进行排序;
其次,采集超短期负荷预测数据且同时对各备自投组合动作后的电网进行潮流计算,根据潮流计算的最后结果找到最优的备自投组合;
最后,主站系统按照选出的最优备自投组合遥控现场备自投的投退从而完成最终的备自投投退。
结合下面实施例对本发明基于N_1准则的备自投投退控制方法作进一步的说明:
本发明基于N_1准则的备自投投退控制方法,其特征在于,包括以下步骤:
首先,对电网进行拓扑分析,由此生成N-1故障集及关联的备自投,从这些关联的备自投中形成所有存在的备自投组合,按照一定的算法对这些组合进行排序;
其次,采集超短期负荷预测数据且同时对各备自投组合动作后的电网进行潮流计算,根据潮流计算的最后结果找到最优的备自投组合;
最后,主站系统按照选出的最优备自投组合遥控现场备自投的投退从而完成最终的备自投投退。
以凤凰变2#主变故障为例,分析了高峰负荷期间凤凰变2#主变故障时,备自投的投退情况。表1给出了高峰负荷期间主变的额定容量、热稳定极限情况下的容量以及负荷的大小。表2给出了凤凰变35kV母线的负荷大小以及相关线路的负荷和权值。
表1 N-1故障前各主变负荷情况
主变名称 额定容量(MW) 热稳定极限容量(MW) 负荷大小(MW)
凤凰1#主变 120 168 94
凤凰2#主变 120 168 97
茅口1#主变 120 168 93
茅口2#主变 120 168 95
苍梧1#主变 63 94 36
苍梧2#主变 35.5 50 34
[0026] 表2各线路负荷及权值大小
Figure BDA0000429810240000031
若不采用备自投投退策略,按照电压等级的备自投配合时备自投动作。凤凰变2#主变故障后,凤凰变110kV和35kV母联备自投优先动作,负荷倒至1#主变,负荷大小为94+97=191(MW),导致主变负荷严重越限,跳三侧开关,扩大了事故范围。
应用备自投在线投退系统对备自投组合进行优化,分析结果如表3所示:
①凤凰变35kV备自投停用后,任一台主变故障,均不会造成110kV母线的失电。
②苍梧变10kV备自投动作停用,原因是考虑到苍梧变10kV备自投动作后造成2#主变的严重过载。
表3备自投投退及原因
Figure BDA0000429810240000032

Claims (1)

1.基于N−1准则的备自投投退控制方法,其特征在于,包括以下步骤:首先网进行拓扑分析,由此生成N-1故障集及关联的备自投,从这些关联的备自投中形成所有存在的备自投组合,按照一定的算法对这些组合进行排序;其次采集超短期负荷预测数据且同时对各备自投组合动作后的电网进行潮流计算,根据潮流计算的最后结果找到最优的备自投组合;最后主站系统按照选出的最优备自投组合遥控现场备自投的投退从而完成最终的备自投投退。
CN201310647038.3A 2013-12-04 2013-12-04 基于n-1准则的备自投投退控制方法 Pending CN103779955A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310647038.3A CN103779955A (zh) 2013-12-04 2013-12-04 基于n-1准则的备自投投退控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310647038.3A CN103779955A (zh) 2013-12-04 2013-12-04 基于n-1准则的备自投投退控制方法

Publications (1)

Publication Number Publication Date
CN103779955A true CN103779955A (zh) 2014-05-07

Family

ID=50571917

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310647038.3A Pending CN103779955A (zh) 2013-12-04 2013-12-04 基于n-1准则的备自投投退控制方法

Country Status (1)

Country Link
CN (1) CN103779955A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104201766A (zh) * 2014-09-23 2014-12-10 东方电子股份有限公司 基于电源点追踪确定备自投时序及组合的方法
CN104600833A (zh) * 2014-12-24 2015-05-06 广州供电局有限公司 备自投投退组合确定方法和系统
CN104836333A (zh) * 2015-05-13 2015-08-12 国家电网公司 备自投装置监测方法和装置
CN108565853A (zh) * 2018-04-11 2018-09-21 深圳供电局有限公司 一种基于整数规划的备自投投退组合确定方法及系统
CN109191006A (zh) * 2018-09-28 2019-01-11 广东电网有限责任公司 一种电网110 kV主变N-1风险自动扫描分析的方法
CN110492488A (zh) * 2019-09-09 2019-11-22 国网天津市电力公司 一种地区电网低频低压减负荷序位自动生成方法
CN111585283A (zh) * 2020-07-03 2020-08-25 国网安徽省电力有限公司亳州供电公司 基于数据预判的智慧化备自投装置在线投退方法
CN111600306A (zh) * 2020-07-03 2020-08-28 国网安徽省电力有限公司亳州供电公司 一种站域全站备自投装置策略构建方法

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104201766B (zh) * 2014-09-23 2016-02-03 东方电子股份有限公司 基于电源点追踪确定备自投时序及组合的方法
CN104201766A (zh) * 2014-09-23 2014-12-10 东方电子股份有限公司 基于电源点追踪确定备自投时序及组合的方法
CN104600833A (zh) * 2014-12-24 2015-05-06 广州供电局有限公司 备自投投退组合确定方法和系统
CN104600833B (zh) * 2014-12-24 2017-02-22 广州供电局有限公司 备自投投退组合确定方法和系统
CN104836333A (zh) * 2015-05-13 2015-08-12 国家电网公司 备自投装置监测方法和装置
CN108565853B (zh) * 2018-04-11 2021-06-04 深圳供电局有限公司 一种基于整数规划的备自投投退组合确定方法及系统
CN108565853A (zh) * 2018-04-11 2018-09-21 深圳供电局有限公司 一种基于整数规划的备自投投退组合确定方法及系统
CN109191006A (zh) * 2018-09-28 2019-01-11 广东电网有限责任公司 一种电网110 kV主变N-1风险自动扫描分析的方法
CN109191006B (zh) * 2018-09-28 2021-08-10 广东电网有限责任公司 一种电网110 kV主变N-1风险自动扫描分析的方法
CN110492488A (zh) * 2019-09-09 2019-11-22 国网天津市电力公司 一种地区电网低频低压减负荷序位自动生成方法
CN110492488B (zh) * 2019-09-09 2022-09-30 国网天津市电力公司 一种地区电网低频低压减负荷序位自动生成方法
CN111585283A (zh) * 2020-07-03 2020-08-25 国网安徽省电力有限公司亳州供电公司 基于数据预判的智慧化备自投装置在线投退方法
CN111600306A (zh) * 2020-07-03 2020-08-28 国网安徽省电力有限公司亳州供电公司 一种站域全站备自投装置策略构建方法

Similar Documents

Publication Publication Date Title
CN103779955A (zh) 基于n-1准则的备自投投退控制方法
CN104518564B (zh) 一种具有区域自投功能的备自投装置及备自投方法
CN103022994B (zh) 一种实现渗透分布式电源的配电网故障隔离和恢复方法
CN103093276B (zh) 一种城市电网风险评估方法
CN102157923B (zh) 配电网自愈的分层递阶控制方法
CN103593708A (zh) 一种配电网多重故障供电恢复方法
CN102088209A (zh) 配电网自愈控制方法
CN106208391B (zh) 一种基于配电cps的集中式与分布式fa协同故障处理方法
CN105470928A (zh) 基于城市输电网故障恢复的分区分层负荷转移方法
CN102769278A (zh) 层次化保护系统
CN103956748A (zh) 一种多母线失压时负荷转移的故障恢复方案生成方法
CN210780230U (zh) 一种用于大功率离网转并网的开关装置
CN107846015B (zh) 基于对等式通讯的智能配电网负荷转供最优路径选择方法
CN105406599A (zh) 一种厂级agc接入电力监控网络的冗余架构方法
CN105375465A (zh) 城市中心区配电网及负荷转供方法
CN102290863A (zh) 基于分布式馈网自动化系统的远方监控终端及其实现方法
CN205123280U (zh) 风电场的拓扑结构、升压控制装置及系统
CN104485732A (zh) 变电站的备用电源投入控制方法
CN104201767A (zh) 备自投压板优化投退控制方法
CN104333126A (zh) 一种大型水电工程的供电系统
CN103532221A (zh) 一种自适应330kV变电站接线及运行方式的线路备自投实现方法
CN104201766B (zh) 基于电源点追踪确定备自投时序及组合的方法
CN204156594U (zh) 一种区域备自投装置
CN109462230A (zh) 一种基于高速总线的负荷转供决策系统及方法
CN104600833A (zh) 备自投投退组合确定方法和系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140507