CN103774678A - Lime soil backfill technology - Google Patents
Lime soil backfill technology Download PDFInfo
- Publication number
- CN103774678A CN103774678A CN201210411417.8A CN201210411417A CN103774678A CN 103774678 A CN103774678 A CN 103774678A CN 201210411417 A CN201210411417 A CN 201210411417A CN 103774678 A CN103774678 A CN 103774678A
- Authority
- CN
- China
- Prior art keywords
- dirt
- lime
- soil
- backfill
- sieve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Soil Conditioners And Soil-Stabilizing Materials (AREA)
Abstract
A lime soil backfill technology comprises the steps that (1) soil and lime are screened respectively to ensure the fact that grain diameters meet requirements, wherein the quality and the variety of the soil and the quality and the variety of the lime meet standard requirements; (2) a blending process is carried out with the volume ratio of lime:soil=3:7; (3) a trough bottom and a base soil surface are cleaned cleanly; (4) lime soil is backfilled evenly in a multilayered mode, and flatness needs to be ensured after the backfill; (5) the lime soil is rammed according to the dry density requirement of the lime soil; (6) after the uppermost layer of the lime soil is completed, the elevation and the flatness are checked, higher portions are evened out, lower portions are supplemented with the lime soil, and the top elevation of the lime soil is -0.08m.
Description
Technical field
The present invention relates to a kind of dirt backfilling process.
Background technology
Ash earthen backfill refers to that the part that foundation trench excavates in addition from bottom land to grade exterior wall must be grey earthen backfill, and must tamp, mainly contain two parts, when a part is foundation construction from the part of mark excavation naturally, another part is that nature absolute altitude is to design elevation part, in Specific construction, lack the method for standard, cause the poor effect of backfill.
Summary of the invention
In order to overcome above-mentioned the deficiencies in the prior art, the object of the present invention is to provide a kind of dirt backfilling process.
To achieve these goals, the technical solution used in the present invention is:
A kind of dirt backfilling process, comprises the steps:
The first step, the earth material and the lime that quality and kind are met to standard-required do not sieve, the sieve of 3-8mm for lime, earth material 15-18mm sieve, to guarantee particle diameter requirement;
Second step, with the volume ratio batching of volume ratio lime: earth material=3:7, uniformity, at least turns twice, and the dirt solid colour mixing, when dirt construction, is controlled water content;
The 3rd step, should clean out bottom land and base soil surface;
The 4th step, by thick 400mm dirt, point even backfill of multilayer, will pave after backfill;
The 5th step, requires to pound according to dirt dry density, after every layer of compacting of grey earthen backfill, carries out cutting ring sampling according to code requirement, measures dirt dry density, while reaching designing requirement, just can carry out spreading out and putting on of last layer dirt;
The 6th step, after the last layer of dirt completes, checks absolute altitude and planeness, and superelevation place is evened out; Dirt is mended at low-lying place, and dirt top mark height is-0.08m.
Compared with prior art, work progress of the present invention is simple, rams densification in fact, and surface is without loose, peeling.
The specific embodiment
Below in conjunction with embodiment, the present invention is described in further details.
A kind of dirt backfilling process, comprises the steps:
The first step, the earth material and the lime that quality and kind are met to standard-required do not sieve, the sieve of 3-8mm for lime, earth material 15-18mm sieve, to guarantee particle diameter requirement;
Second step, with the volume ratio batching of volume ratio lime: earth material=3:7, uniformity, at least turns twice, and the dirt solid colour mixing, when dirt construction, is controlled water content;
The 3rd step, should clean out bottom land and base soil surface;
The 4th step, by thick 400mm dirt, point even backfill of multilayer, will pave after backfill;
The 5th step, requires to pound according to dirt dry density, after every layer of compacting of grey earthen backfill, carries out cutting ring sampling according to code requirement, measures dirt dry density, while reaching designing requirement, just can carry out spreading out and putting on of last layer dirt;
The 6th step, after the last layer of dirt completes, checks absolute altitude and planeness, and superelevation place is evened out; Dirt is mended at low-lying place, and dirt top mark height is-0.08m.
Claims (1)
1. a dirt backfilling process, is characterized in that, comprises the steps:
The first step, the earth material and the lime that quality and kind are met to standard-required do not sieve, the sieve of 3-8mm for lime, earth material 15-18mm sieve, to guarantee particle diameter requirement;
Second step, with the volume ratio batching of volume ratio lime: earth material=3:7, uniformity, at least turns twice, and the dirt solid colour mixing, when dirt construction, is controlled water content;
The 3rd step, should clean out bottom land and base soil surface;
The 4th step, by thick 400mm dirt, point even backfill of multilayer, will pave after backfill;
The 5th step, requires to pound according to dirt dry density, after every layer of compacting of grey earthen backfill, carries out cutting ring sampling according to code requirement, measures dirt dry density, while reaching designing requirement, just can carry out spreading out and putting on of last layer dirt;
The 6th step, after the last layer of dirt completes, checks absolute altitude and planeness, and superelevation place is evened out; Dirt is mended at low-lying place, and dirt top mark height is-0.08m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210411417.8A CN103774678A (en) | 2012-10-25 | 2012-10-25 | Lime soil backfill technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210411417.8A CN103774678A (en) | 2012-10-25 | 2012-10-25 | Lime soil backfill technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103774678A true CN103774678A (en) | 2014-05-07 |
Family
ID=50567389
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210411417.8A Pending CN103774678A (en) | 2012-10-25 | 2012-10-25 | Lime soil backfill technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103774678A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114164817A (en) * | 2021-12-20 | 2022-03-11 | 北京天恒建设集团有限公司 | Tamping equipment and process for backfill soil of foundation outer wall of building foundation pit |
-
2012
- 2012-10-25 CN CN201210411417.8A patent/CN103774678A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114164817A (en) * | 2021-12-20 | 2022-03-11 | 北京天恒建设集团有限公司 | Tamping equipment and process for backfill soil of foundation outer wall of building foundation pit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202450536U (en) | Shallow dewatering and plugging construction device in foundation pit | |
CN101476315B (en) | Method for processing soft foundation by net bag method | |
CN104612179B (en) | Through the construction method of the diaphram wall of super thick silty sand ground | |
AU2018376026A1 (en) | Microbial modification filling-based coal mining method | |
CN103711114A (en) | Foundation treatment method | |
CN104264653B (en) | Ultra high energy level strong rammer construction technology compatible with displacement | |
CN203808088U (en) | Gabion gully detention structure for top of hydropower station slag yard | |
CN101634139B (en) | Dynamic compaction method for backfill foundation with drainage layer | |
CN103031835A (en) | Method for increasing foundation bearing capacity | |
CN202390860U (en) | Anti-leakage system capable of guiding and discharging seepage of garbage sanitary landfill | |
CN203463029U (en) | Well pipe structure | |
CN104790404B (en) | A kind of dam foundation high-pressure grouting structure and grouting method | |
CN100595388C (en) | Large area soil dredging-filling ground treatment method | |
CN102677681A (en) | Layering processing method for rapid backfill of large-scale earthwork | |
CN106958239A (en) | Precipitation union gently rams soft soil foundation reinforcing method | |
CN103774678A (en) | Lime soil backfill technology | |
CN102359101A (en) | Foundation treatment method for collapsible soil | |
CN106049413B (en) | A kind of composite power drain consolidation system and construction method applied to deep layer foundation in saturated soft soil | |
CN108930323B (en) | Pipe jacking construction method | |
CN208293556U (en) | A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system | |
CN104775414B (en) | Super-soft dredger fill surface layer solidification crusting and foundation treatment method | |
CN110172980A (en) | A kind of coarse grain block stone superelevation fill foundation ruggedized construction and its construction method | |
CN202202339U (en) | Geogrid reinforced soil retaining wall of concrete module | |
CN201943060U (en) | Reinforcing structure for gate dam foundation of deep riverbed covering layer | |
CN203755332U (en) | Device for treating collapsible loess with lime-soil compaction piles and CFG rigid piles combined |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140507 |