CN103774678A - Lime soil backfill technology - Google Patents

Lime soil backfill technology Download PDF

Info

Publication number
CN103774678A
CN103774678A CN201210411417.8A CN201210411417A CN103774678A CN 103774678 A CN103774678 A CN 103774678A CN 201210411417 A CN201210411417 A CN 201210411417A CN 103774678 A CN103774678 A CN 103774678A
Authority
CN
China
Prior art keywords
dirt
lime
soil
backfill
sieve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210411417.8A
Other languages
Chinese (zh)
Inventor
刘斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Longhai Engineering Construction Co Ltd
Original Assignee
Shaanxi Longhai Engineering Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Longhai Engineering Construction Co Ltd filed Critical Shaanxi Longhai Engineering Construction Co Ltd
Priority to CN201210411417.8A priority Critical patent/CN103774678A/en
Publication of CN103774678A publication Critical patent/CN103774678A/en
Pending legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Soil Conditioners And Soil-Stabilizing Materials (AREA)

Abstract

A lime soil backfill technology comprises the steps that (1) soil and lime are screened respectively to ensure the fact that grain diameters meet requirements, wherein the quality and the variety of the soil and the quality and the variety of the lime meet standard requirements; (2) a blending process is carried out with the volume ratio of lime:soil=3:7; (3) a trough bottom and a base soil surface are cleaned cleanly; (4) lime soil is backfilled evenly in a multilayered mode, and flatness needs to be ensured after the backfill; (5) the lime soil is rammed according to the dry density requirement of the lime soil; (6) after the uppermost layer of the lime soil is completed, the elevation and the flatness are checked, higher portions are evened out, lower portions are supplemented with the lime soil, and the top elevation of the lime soil is -0.08m.

Description

A kind of dirt backfilling process
Technical field
The present invention relates to a kind of dirt backfilling process.
Background technology
Ash earthen backfill refers to that the part that foundation trench excavates in addition from bottom land to grade exterior wall must be grey earthen backfill, and must tamp, mainly contain two parts, when a part is foundation construction from the part of mark excavation naturally, another part is that nature absolute altitude is to design elevation part, in Specific construction, lack the method for standard, cause the poor effect of backfill.
Summary of the invention
In order to overcome above-mentioned the deficiencies in the prior art, the object of the present invention is to provide a kind of dirt backfilling process.
To achieve these goals, the technical solution used in the present invention is:
A kind of dirt backfilling process, comprises the steps:
The first step, the earth material and the lime that quality and kind are met to standard-required do not sieve, the sieve of 3-8mm for lime, earth material 15-18mm sieve, to guarantee particle diameter requirement;
Second step, with the volume ratio batching of volume ratio lime: earth material=3:7, uniformity, at least turns twice, and the dirt solid colour mixing, when dirt construction, is controlled water content;
The 3rd step, should clean out bottom land and base soil surface;
The 4th step, by thick 400mm dirt, point even backfill of multilayer, will pave after backfill;
The 5th step, requires to pound according to dirt dry density, after every layer of compacting of grey earthen backfill, carries out cutting ring sampling according to code requirement, measures dirt dry density, while reaching designing requirement, just can carry out spreading out and putting on of last layer dirt;
The 6th step, after the last layer of dirt completes, checks absolute altitude and planeness, and superelevation place is evened out; Dirt is mended at low-lying place, and dirt top mark height is-0.08m.
Compared with prior art, work progress of the present invention is simple, rams densification in fact, and surface is without loose, peeling.
The specific embodiment
Below in conjunction with embodiment, the present invention is described in further details.
A kind of dirt backfilling process, comprises the steps:
The first step, the earth material and the lime that quality and kind are met to standard-required do not sieve, the sieve of 3-8mm for lime, earth material 15-18mm sieve, to guarantee particle diameter requirement;
Second step, with the volume ratio batching of volume ratio lime: earth material=3:7, uniformity, at least turns twice, and the dirt solid colour mixing, when dirt construction, is controlled water content;
The 3rd step, should clean out bottom land and base soil surface;
The 4th step, by thick 400mm dirt, point even backfill of multilayer, will pave after backfill;
The 5th step, requires to pound according to dirt dry density, after every layer of compacting of grey earthen backfill, carries out cutting ring sampling according to code requirement, measures dirt dry density, while reaching designing requirement, just can carry out spreading out and putting on of last layer dirt;
The 6th step, after the last layer of dirt completes, checks absolute altitude and planeness, and superelevation place is evened out; Dirt is mended at low-lying place, and dirt top mark height is-0.08m.

Claims (1)

1. a dirt backfilling process, is characterized in that, comprises the steps:
The first step, the earth material and the lime that quality and kind are met to standard-required do not sieve, the sieve of 3-8mm for lime, earth material 15-18mm sieve, to guarantee particle diameter requirement;
Second step, with the volume ratio batching of volume ratio lime: earth material=3:7, uniformity, at least turns twice, and the dirt solid colour mixing, when dirt construction, is controlled water content;
The 3rd step, should clean out bottom land and base soil surface;
The 4th step, by thick 400mm dirt, point even backfill of multilayer, will pave after backfill;
The 5th step, requires to pound according to dirt dry density, after every layer of compacting of grey earthen backfill, carries out cutting ring sampling according to code requirement, measures dirt dry density, while reaching designing requirement, just can carry out spreading out and putting on of last layer dirt;
The 6th step, after the last layer of dirt completes, checks absolute altitude and planeness, and superelevation place is evened out; Dirt is mended at low-lying place, and dirt top mark height is-0.08m.
CN201210411417.8A 2012-10-25 2012-10-25 Lime soil backfill technology Pending CN103774678A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210411417.8A CN103774678A (en) 2012-10-25 2012-10-25 Lime soil backfill technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210411417.8A CN103774678A (en) 2012-10-25 2012-10-25 Lime soil backfill technology

Publications (1)

Publication Number Publication Date
CN103774678A true CN103774678A (en) 2014-05-07

Family

ID=50567389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210411417.8A Pending CN103774678A (en) 2012-10-25 2012-10-25 Lime soil backfill technology

Country Status (1)

Country Link
CN (1) CN103774678A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114164817A (en) * 2021-12-20 2022-03-11 北京天恒建设集团有限公司 Tamping equipment and process for backfill soil of foundation outer wall of building foundation pit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114164817A (en) * 2021-12-20 2022-03-11 北京天恒建设集团有限公司 Tamping equipment and process for backfill soil of foundation outer wall of building foundation pit

Similar Documents

Publication Publication Date Title
CN202450536U (en) Shallow dewatering and plugging construction device in foundation pit
CN101476315B (en) Method for processing soft foundation by net bag method
CN104612179B (en) Through the construction method of the diaphram wall of super thick silty sand ground
AU2018376026A1 (en) Microbial modification filling-based coal mining method
CN103711114A (en) Foundation treatment method
CN104264653B (en) Ultra high energy level strong rammer construction technology compatible with displacement
CN203808088U (en) Gabion gully detention structure for top of hydropower station slag yard
CN101634139B (en) Dynamic compaction method for backfill foundation with drainage layer
CN103031835A (en) Method for increasing foundation bearing capacity
CN202390860U (en) Anti-leakage system capable of guiding and discharging seepage of garbage sanitary landfill
CN203463029U (en) Well pipe structure
CN104790404B (en) A kind of dam foundation high-pressure grouting structure and grouting method
CN100595388C (en) Large area soil dredging-filling ground treatment method
CN102677681A (en) Layering processing method for rapid backfill of large-scale earthwork
CN106958239A (en) Precipitation union gently rams soft soil foundation reinforcing method
CN103774678A (en) Lime soil backfill technology
CN102359101A (en) Foundation treatment method for collapsible soil
CN106049413B (en) A kind of composite power drain consolidation system and construction method applied to deep layer foundation in saturated soft soil
CN108930323B (en) Pipe jacking construction method
CN208293556U (en) A kind of blowing filling soft soil foundation vacuum dynamic compaction method composite drainage system
CN104775414B (en) Super-soft dredger fill surface layer solidification crusting and foundation treatment method
CN110172980A (en) A kind of coarse grain block stone superelevation fill foundation ruggedized construction and its construction method
CN202202339U (en) Geogrid reinforced soil retaining wall of concrete module
CN201943060U (en) Reinforcing structure for gate dam foundation of deep riverbed covering layer
CN203755332U (en) Device for treating collapsible loess with lime-soil compaction piles and CFG rigid piles combined

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140507