CN103761616B - Method for distributing product power consumption based on device power and operation time - Google Patents

Method for distributing product power consumption based on device power and operation time Download PDF

Info

Publication number
CN103761616B
CN103761616B CN201410028091.XA CN201410028091A CN103761616B CN 103761616 B CN103761616 B CN 103761616B CN 201410028091 A CN201410028091 A CN 201410028091A CN 103761616 B CN103761616 B CN 103761616B
Authority
CN
China
Prior art keywords
power consumption
product
production
equipment
allocation step
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410028091.XA
Other languages
Chinese (zh)
Other versions
CN103761616A (en
Inventor
丁雪梅
李昕
张音
吴雄英
冯文艳
陈丽竹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Donghua University
Original Assignee
Donghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Donghua University filed Critical Donghua University
Priority to CN201410028091.XA priority Critical patent/CN103761616B/en
Publication of CN103761616A publication Critical patent/CN103761616A/en
Application granted granted Critical
Publication of CN103761616B publication Critical patent/CN103761616B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/82Energy audits or management systems therefor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/84Greenhouse gas [GHG] management systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/84Greenhouse gas [GHG] management systems
    • Y02P90/845Inventory and reporting systems for greenhouse gases [GHG]

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a method for distributing product power consumption based on device power and operation time. The method is characterized by comprising the steps that power consumption data are collected, wherein a data collection range is determined according to a preset calculation boundary; secondly, the data are distributed into three layers which are production device power consumption data, production auxiliary device power consumption data and operation device power consumption data; the data of the first level are distributed to each device; the data of the second level are distributed to each kind of products; the data of the third level are distributed to each kind of products according to the yield proportional relation; power consumption of the three levels is added so that power consumption of each kind of products can be obtained; the sum of power consumption of the three levels is divided by the yield so that power consumption of one kind of products in one unit can be obtained. According to the method, complex power consumption data of an enterprise can be creatively distributed to one kind of products, assessment of product power consumption is facilitated, and therefore power consumption of one kind of products can be obtained. Thus, difficulty in calculation of product power consumption is overcome.

Description

A kind of distribution method of the product power consumption based on plant capacity and working time
Technical field
The present invention relates to the statistics of total power consumption and assignment problem in process of producing product, in particular it relates to be set using machine The parameters such as standby power carry out the distribution of power consumption.
Background technology
Environmental problem is increasingly subject to pay attention at present, and greenhouse gases are to cause one of major reason of ecological deterioration.2014 In January in year, weather department of National Development and Reform Commission externally issues《With regard to strengthening the suggestion of reply climate change statistical work》Point out, Establish and improve the greenhouse gases basic statistical system covering the fields such as energyactivities, industrial processes, improve greenhouse gases The statistics of bill compilation and discharge accounting supports.Power consumption is to cause one of major reason of greenhouse gas emission.Therefore, using conjunction It is most important that the distribution method of reason adjusts different product power consumption in industrial processes.How by power consumption data distribution to each It is problem demanding prompt solution on product.Because producing more than one product factory, and producing needs much individual operations more, producing During need multiple current consuming apparatus.But most enterprises do not enable the measuring apparatus to every machine power consumption, this gives Product power consumption is adjusted and is caused very big difficulty.
The existing accounting to product power consumption, is simply to be distributed with product yield ratio mostly, have ignored different products Between product in addition to yield other influences power consumption factor, such as device category, the difference of process time, and these differences directly result in The difference of power consumption between different product production process.The present invention utilizes the parameter such as current consuming apparatus power, process time to enterprise Overall power consumption data is allocated it is intended to obtain the power consumption in single product commercial production stage.Thus it is targetedly right The production process of single product carries out energy-saving and emission-reduction.
Content of the invention
For the blank spot in power consumption data distribution, it is an object of the invention to provide a kind of production stage power consumption Distribution method, obtains the power consumption of single product.
In order to achieve the above object, the technical scheme is that provide a kind of based on plant capacity and working time The distribution method of product power consumption is it is characterised in that step is:
Allocation step one:Carry out power consumption data collection, data collection scope determines according to the accounting border being previously set;
Allocation step two:Data distribution is three levels:Production equipment power consumption, produces auxiliary equipment power consumption and operation sets Standby power consumption:
In formula:
QMonthFor the overall monthly power consumption of factory;
QThe moon producesFor all production equipment power consumption, i.e. the first level power consumption;
QThe moon assistsFor all production auxiliary equipment power consumption, i.e. the second level power consumption;
QMoon operationFor the power consumption of enterprise operation part, i.e. third level power consumption;
PProduce iRated power for production equipment i;
NProduce iNumber for production equipment i;
TProduce iFor the production equipment i daily working time;
PAuxiliary iFor producing the rated power of auxiliary equipment i;
NAuxiliary iFor producing the number of auxiliary equipment i;
TAuxiliary iFor producing the auxiliary equipment i daily working time;
POperation iRated power for enterprise operation current consuming apparatus i;
NOperation iNumber for enterprise operation current consuming apparatus i;
TOperation iFor the enterprise operation current consuming apparatus i daily working time;
M is the species of production equipment;
N is the species producing auxiliary equipment;
L is the species of operation department current consuming apparatus;
Allocation step three:By the data distribution of the first level to each equipment, wherein, the monthly consumption of production equipment i is QThe moon produces i
Allocation step four:Second level power consumption is assigned to every kind of product, using the distribution of production time scale, its In, power consumption on product x for the Workshop Production auxiliary equipment power consumption distribution is QThe moon assists(x):
In formula:
M (x) is product x monthly output;U (x) is the yield in unit time of product x, i.e. the configuration production capacity of product x;
Allocation step five:Third level is assigned on every kind of product according to the proportionate relationship of yield, wherein, enterprise operation Power consumption on product x for the part power consumption distribution is QMoon operation(x):
Allocation step six:The power consumption of three levels is added the power consumption obtaining every kind of product, then obtains divided by yield The power consumption of unit of certain product, wherein, the power consumption of product x is Q (x):
Preferably, at least need to obtain the monthly power consumption of each workshop of enterprise and office in described allocation step one Statistical data, and the title of current consuming apparatus that in factory, each workshop includes and power consumption equipment, number, rated power and join Put production capacity.
Preferably, in described allocation step three, if current device produces multiple product in addition it is also necessary to distribute power consumption To on every kind of product, wherein, power consumption in production equipment i for the product x is QThe moon produces i(x):
In formula, m (x) is product x monthly output.
Preferably, in described allocation step four, the configuration production capacity of product x adopts non-shared work in product x production process The configuration production capacity of the bottleneck operation of sequence.
This method innovatively by power consumption data distribution complicated for enterprise on single product, be conducive to commenting of product power consumption Estimate, thus obtaining the power consumption of single product.Solve the difficulty adjusting product power consumption.
Brief description
Fig. 1 is the distribution method that provides of the present invention by the explanatory diagram of overall power consumption data distribution to three levels;
Fig. 2 is the step schematic diagram of the distribution method that the present invention provides;
Tu3Shi A factory Administrative Area schematic diagram;
Fig. 4 is A factory products flow chart.
Specific embodiment
For making the present invention become apparent, hereby with preferred embodiment, and accompanying drawing is coordinated to be described in detail below.
So that the carbon footprint of product power consumption is adjusted as a example, carbon footprint is a kind of analysis greenhouse gas emission quantity to the present embodiment Method, it refer in an activity, the whole life cycle of product (or service) or a certain geographic range directly and The CO2 emissions (or CO2 equivalent discharge capacity) indirectly producing.Wherein, the use of product carbon footprint label becomes A kind of international trend, increasing enterprise requirements supplier provides the carbon footprint value of product.And adjusted in carbon footprint Cheng Zhong, the greenhouse gas emission that power consumption causes is the important component part of product carbon footprint.Therefore this enforcement is with product power consumption carbon The calculation process of footprint is typical case's application, but the present invention is not limited only to the accounting of product carbon footprint.
The layout of Tu3Shi A factory, the product sequence of Tu4Shi A factory, table 1 below is the production equipment letter of A factory Breath table, table 2 is the current consuming apparatus information table producing auxiliary and shop office, and table 3 is administration office current consuming apparatus information table, In January, 2012 power consumption is 41680kwh.
Table 1
Table 2
Table 3
The present invention carries out the implementation case study of the inventive method with data above for analysis object.In conjunction with Fig. 2, concrete meter Calculate step as follows:
Allocation step one:According to A plant data:Total power consumption is calculated with the power consumption 4768kw in January, 2012;Factory Current consuming apparatus and the information such as table 1 such as the title of power consumption equipment, number, rated power and configuration production capacity that each workshop interior includes, The current consuming apparatus title of shop office and Administrative area, number, rated power, daily working time such as table 2 and table 3.
Allocation step two:Then by data distribution be three levels:Production equipment power consumption, produces auxiliary equipment power consumption and fortune Battalion's equipment power consumption, Fig. 1 illustrates three levels of data collection.Ratio using rated power × equipment number × darg time Example, formula is as follows:
Allocation step three:By the data distribution of the first level to each equipment, also with rated power × equipment number The proportionate relationship of × darg time is allocated, such as formula (4);If this equipment produces multiple product in addition it is also necessary to incite somebody to action Power consumption is assigned on every kind of product, and method is to be allocated according to product yield ratio, and concrete formula is following (5).
Allocation step four:Second level power consumption is assigned to every kind of product, using the distribution of production time scale, tool Body formula is following (6).
Allocation step five:Finally, third level is assigned on every kind of product according to the proportionate relationship of yield, concrete formula As follows (8).
Allocation step six:The power consumption of three levels is added the power consumption obtaining every kind of product, then obtains divided by yield The power consumption of unit of certain product, concrete such as formula (9).
Allocation step seven:The unit that the carbon emission coefficient that unit product power consumption is multiplied by electricity can get single product is produced Product power consumption carbon footprint, concrete such as formula (10), wherein Q (x) is the total power consumption of certain product, and unit is kwh;fEFor A factory The carbon emission coefficient of institute's electricity consumption, is 0.8244kgCO2e/kwh.
ECFx=Q (x) × fE(10)
ECFa=3.44 × 0.8244=2.84kgCO2e;
ECFb=2.40 × 0.8244=1.98kgCO2e;
ECFc=2.72 × 0.8244=2.24kgCO2e.

Claims (4)

1. a kind of distribution method of the product power consumption based on plant capacity and working time is it is characterised in that step is:
Allocation step one:Carry out power consumption data collection, data collection scope determines according to the accounting border being previously set;
Allocation step two:Data distribution is three levels:Production equipment power consumption, produces auxiliary equipment power consumption and operating facilities electricity Consumption:
In formula:
QMonthFor the overall monthly power consumption of factory;
QThe moon producesFor all production equipment power consumption, i.e. the first level power consumption;
QThe moon assistsFor all production auxiliary equipment power consumption, i.e. the second level power consumption;
QMoon operationFor the power consumption of enterprise operation part, i.e. third level power consumption;
PProduce iRated power for production equipment i;
NProduce iNumber for production equipment i;
TProduce iFor the production equipment i daily working time;
PAuxiliary iFor producing the rated power of auxiliary equipment i;
NAuxiliary iFor producing the number of auxiliary equipment i;
TAuxiliary iFor producing the auxiliary equipment i daily working time;
POperation iRated power for enterprise operation current consuming apparatus i;
NOperation iNumber for enterprise operation current consuming apparatus i;
TOperation iFor the enterprise operation current consuming apparatus i daily working time;
M is the species of production equipment;
N is the species producing auxiliary equipment;
L is the species of operation department current consuming apparatus;
Allocation step three:By the data distribution of the first level to each equipment, wherein, the monthly consumption of production equipment i is QThe moon produces i
Allocation step four:Second level power consumption is assigned to every kind of product, is distributed using production time scale, wherein, Power consumption on product x for the Workshop Production auxiliary equipment power consumption distribution is QThe moon assists(x):
In formula:
U (x) is the yield in unit time of product x, i.e. the configuration production capacity of product x, and m (x) is product x monthly output;
Allocation step five:Third level is assigned on every kind of product according to the proportionate relationship of yield, wherein, enterprise operation part Power consumption on product x for the power consumption distribution is QMoon operation(x):
Allocation step six:The power consumption of three levels is added the power consumption obtaining every kind of product, then obtains unit divided by yield The power consumption of certain product, wherein, the power consumption of product x is Q (x):
2. a kind of distribution method of the product power consumption based on plant capacity and working time as claimed in claim 1, it is special Levy and be, at least need to obtain the statistical number of the monthly power consumption of each workshop of enterprise and office in described allocation step one According to, and the title of current consuming apparatus that in factory, each workshop includes and power consumption equipment, number, rated power and configuration production capacity.
3. a kind of distribution method of the product power consumption based on plant capacity and working time as claimed in claim 1, it is special Levy and be, in described allocation step three, if current device produces multiple product in addition it is also necessary to power consumption is assigned to every kind of product On product, wherein, power consumption in production equipment i for the product x is QThe moon produces i(x):
In formula, m (x) is product x monthly output.
4. a kind of distribution method of the product power consumption based on plant capacity and working time as claimed in claim 1, it is special Levy and be, in described allocation step four, the configuration production capacity of product x adopts the bottleneck of non-shared operation in product x production process The configuration production capacity of operation.
CN201410028091.XA 2014-01-22 2014-01-22 Method for distributing product power consumption based on device power and operation time Expired - Fee Related CN103761616B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410028091.XA CN103761616B (en) 2014-01-22 2014-01-22 Method for distributing product power consumption based on device power and operation time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410028091.XA CN103761616B (en) 2014-01-22 2014-01-22 Method for distributing product power consumption based on device power and operation time

Publications (2)

Publication Number Publication Date
CN103761616A CN103761616A (en) 2014-04-30
CN103761616B true CN103761616B (en) 2017-02-15

Family

ID=50528850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410028091.XA Expired - Fee Related CN103761616B (en) 2014-01-22 2014-01-22 Method for distributing product power consumption based on device power and operation time

Country Status (1)

Country Link
CN (1) CN103761616B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104732355B (en) * 2015-04-07 2018-12-21 哈尔滨理工大学 The device drives integrated dispatch method of equipment free time section adjustment
CN106384004A (en) * 2016-09-22 2017-02-08 上海化工研究院 Method for evaluating power consumption of compound fertilizer production equipment
CN106792866B (en) * 2016-11-24 2019-11-22 西安电子科技大学 WPC system power and the distribution method of time based on piecewise linearity EH model
CN109976219A (en) * 2019-04-10 2019-07-05 苏州云沃嘉智能科技有限公司 It is a kind of intelligence workshop appliance remote auto report method for repairment
CN115470250B (en) * 2022-11-15 2023-03-24 中关村科学城城市大脑股份有限公司 Personnel information processing method and device, electronic equipment and computer readable medium

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103380557A (en) * 2011-02-23 2013-10-30 株式会社日立制作所 Apparatus for forecasting electric power load of industrial park, system and method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103380557A (en) * 2011-02-23 2013-10-30 株式会社日立制作所 Apparatus for forecasting electric power load of industrial park, system and method

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
Electric energy consumption in the cotton textile processing stages;S. Palamutcu;《Energy》;20101231;第2945-2952页 *
the application of life cycle assessment in textile industry;WANG L,DING X,WU X.;《Joumal of Xi"an Polytechnic University》;20091231;第100页 *
水泥工业碳排放影响因素分析及数学建模;庞翠娟;《中国优秀硕士学位论文全文数据库 经济与管理科学辑》;20130115(第01期);第1-89页 *
纺织服装工业碳足迹核算中的若干问题;李昕,吴雄英,丁雪梅;《印染》;20130615(第12期);第35-38页 *

Also Published As

Publication number Publication date
CN103761616A (en) 2014-04-30

Similar Documents

Publication Publication Date Title
CN103761616B (en) Method for distributing product power consumption based on device power and operation time
Guo et al. Embodied energy use in the global construction industry
Wang et al. A study on the spatial distribution of the renewable energy industries in China and their driving factors
CN103824128B (en) Method for scale prediction of regional distributed type comprehensive energy-supply system
CN106485417A (en) Photovoltaic plant based on dynamic self-adapting task scheduling strategy moves O&M method
Lu et al. Measuring the urban land use efficiency of three urban agglomerations in China under carbon emissions
Koo et al. Economic evaluation of renewable energy systems under varying scenarios and its implications to Korea’s renewable energy plan
CN103049801A (en) Optimal design method for production line layout
US7684901B2 (en) Automatic utility usage rate analysis methodology
Cui et al. CO2 emissions and their spatial patterns of Xinjiang cities in China
CN113724103B (en) Regional carbon emission monitoring method, system, equipment and medium based on intelligent electric meter
Lee et al. Allocation of emissions permit for China's iron and steel industry in an imperfectly competitive market: a Nash equilibrium DEA method
CN102183931A (en) Time-constraint-based scheduling optimization method for machining production process
CN104200389A (en) Product power consumption allocation method based on production process time and equipment working time
CN113627737A (en) Carbon emission monitoring method, system, electronic device and storage medium
Yu et al. Sustainability assessment of one industrial region: A combined method of emergy analysis and IPAT (Human Impact Population Affluence Technology)
CN109544006A (en) A method of evaluation electric automobile charging station economic benefit
CN108764626A (en) A kind of diagnosis of energy saving method and apparatus
CN110866706A (en) Method for differential comprehensive analysis and evaluation of regional power utilization requirements
CN115271390A (en) Carbon neutralization system based on industrial park
CN105743124B (en) The energy storage configuration method and system of a kind of renewable energy power generation
CN106168793A (en) A kind of method automatically generating control equipment and system
CN101271546A (en) Manpower resource optimization configuration method of multi-assembly line workshop
CN106447517A (en) Angiography device of building enterprise carbon emission management system
CN116402635A (en) Method for calculating energy consumption and carbon emission of rail transit vehicle product manufacturing environment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170215

Termination date: 20200122

CF01 Termination of patent right due to non-payment of annual fee