Prior art keywords
power consumption
product
production
allocation step
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410028091.XA
Other languages
Chinese (zh)
Other versions
CN103761616B (en
Inventor
丁雪梅
李昕
张音
吴雄英
冯文艳
陈丽竹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Donghua University
Original Assignee
Donghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Donghua University filed Critical Donghua University
Priority to CN201410028091.XA priority Critical patent/CN103761616B/en
Publication of CN103761616A publication Critical patent/CN103761616A/en
Application granted granted Critical
Publication of CN103761616B publication Critical patent/CN103761616B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/82Energy audits or management systems therefor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/84Greenhouse gas [GHG] management systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/84Greenhouse gas [GHG] management systems
    • Y02P90/845Inventory and reporting systems for greenhouse gases [GHG]

Abstract

The invention relates to a method for distributing product power consumption based on device power and operation time. The method is characterized by comprising the steps that power consumption data are collected, wherein a data collection range is determined according to a preset calculation boundary; secondly, the data are distributed into three layers which are production device power consumption data, production auxiliary device power consumption data and operation device power consumption data; the data of the first level are distributed to each device; the data of the second level are distributed to each kind of products; the data of the third level are distributed to each kind of products according to the yield proportional relation; power consumption of the three levels is added so that power consumption of each kind of products can be obtained; the sum of power consumption of the three levels is divided by the yield so that power consumption of one kind of products in one unit can be obtained. According to the method, complex power consumption data of an enterprise can be creatively distributed to one kind of products, assessment of product power consumption is facilitated, and therefore power consumption of one kind of products can be obtained. Thus, difficulty in calculation of product power consumption is overcome.

Description

A kind of distribution method of the product power consumption based on plant capacity and working time
Technical field
The present invention relates in process of producing product statistics and the assignment problem of total power consumption, particularly, relate to and utilize the parameter such as power of machinery and equipment to carry out the distribution of power consumption.
Background technology
Environmental problem comes into one's own day by day at present, and greenhouse gases are one of major reasons that cause ecological deterioration.In January, 2014, weather department of National Development and Reform Commission has externally issued < < and has pointed out about the suggestion > > that strengthens reply climate change statistical work, the greenhouse gases basis statistical system of establishing and improve fields such as covering energyactivities, industrial processes, the statistics of improving the establishment of greenhouse gases inventory and discharge accounting supports.Power consumption is one of major reason causing greenhouse gas emission.Therefore, adopt rational distribution method to adjust in industrial processes different product power consumption most important.How by power consumption data allocations, to each product, to be problem demanding prompt solution.Because factory produces more than one product more, and a lot of operations of need of production, in production run, need multiple current consuming apparatus.But most enterprises fails to realize the measuring equipment to every machine power consumption, this adjusts to product power consumption and has caused very large difficulty.
The existing accounting to product power consumption, simply to distribute by product yield ratio mostly, ignored between different product the factor of other influences power consumption except output, as the difference of device category, process time, and these differences directly cause the difference of power consumption between different product production run.The present invention utilizes the parameters such as current consuming apparatus power, process time to distribute the overall power consumption data of enterprise, is intended to obtain single power consumption of planting the product commercial production stage.Thereby targetedly the production run of single product is carried out to energy-saving and emission-reduction.
Summary of the invention
For the blank spot in power consumption data allocations, the object of this invention is to provide a kind of distribution method of production stage power consumption, obtain single power consumption of planting product.
In order to achieve the above object, technical scheme of the present invention has been to provide a kind of distribution method of the product power consumption based on plant capacity and working time, it is characterized in that, step is:
Allocation step one: carry out power consumption Data Collection, Data Collection scope is determined according to the accounting border of setting in advance;
Allocation step two: be three levels by data allocations: production equipment power consumption, production utility appliance power consumption and operation equipment power consumption:
in formula:
Q monthfor the overall monthly power consumption of factory;
Q the moon is producedfor all production equipment power consumption, i.e. the first level power consumption;
Q the moon is auxiliaryfor all production utility appliance power consumption, i.e. the second level power consumption;
Q moon operationfor the power consumption of enterprise operation part, i.e. tri-layer power consumption;
P produce ifor the rated power of production equipment i;
N produce ifor the number of production equipment i;
T produce ifor production equipment i working time every day;
P auxiliary ifor the rated power of production utility appliance i;
N auxiliary ifor the number of production utility appliance i;
T auxiliary ifor production utility appliance i working time every day;
P operation ifor the rated power of enterprise operation current consuming apparatus i;
N operation ifor the number of enterprise operation current consuming apparatus i;
T operation ifor enterprise operation current consuming apparatus i working time every day;
M is the kind of production equipment;
N is the kind of production utility appliance;
L is the kind of operation department current consuming apparatus;
Allocation step three: to each equipment, wherein, the monthly consumption of production equipment i is Q by the data allocations of the first level the moon is produced i:
Allocation step four: the second level power consumption is assigned to every kind of product, utilizes production time scale to distribute, wherein, the power consumption that the power consumption of Workshop Production utility appliance is distributed on product x is Q the moon is auxiliary(x):
in formula:
U (x) is the yield in unit time of product x, i.e. the configuration production capacity of product x;
Allocation step five: tri-layer is assigned on every kind of product according to the proportionate relationship of output, and wherein, the power consumption that the power consumption of enterprise operation part is distributed on product x is Q moon operation(x):
Allocation step six: the power consumption of three levels is added to the power consumption that obtains every kind of product, then obtains the power consumption of unit of certain product divided by output, wherein, the power consumption of product x is Q (x):
Preferably, in described allocation step one, at least need the statistics of the monthly power consumption that obtains the each workshop of enterprise and office, and the title of the current consuming apparatus that in factory, each workshop comprises and power consumption equipment, number, rated power and configuration production capacity.
Preferably, in described allocation step three, if current device is produced multiple product, also need power consumption to be assigned on every kind of product, wherein, the power consumption of product x on production equipment i is Q the moon is produced i(x):
in formula, m (x) is product x monthly output.
Preferably, in described allocation step four, the configuration production capacity of product x adopts the configuration production capacity of the bottleneck operation of non-total operation in product x production run.
This method is planted the power consumption data allocations of enterprise's complexity on product to single innovatively, is conducive to the assessment of product power consumption, thereby obtains single power consumption of planting product.Solved the difficulty of adjusting product power consumption.
Accompanying drawing explanation
Fig. 1 is that distribution method provided by the invention is by the key diagram of overall power consumption data allocations to three level;
Fig. 2 is the step schematic diagram of distribution method provided by the invention;
Tu3Shi A factory Administrative Area schematic diagram;
Fig. 4 is A factory products process flow diagrams.
Embodiment
For the present invention is become apparent, hereby with preferred embodiment, and coordinate accompanying drawing to be described in detail below.
The present embodiment is adjusted as example take the carbon footprint of product power consumption, carbon footprint is a kind of method of analyzing greenhouse gas emission quantity, and it refers to the whole life cycle of an activity, a product (or service) or a certain geographic range is directly interior and the indirect CO2 emissions (or CO2 equivalent discharge capacity) that produce.Wherein, the use of product carbon footprint label becomes a kind of international trend, and increasing enterprise requires supplier that the carbon footprint value of product is provided.And in carbon footprint calculation process, the greenhouse gas emission that power consumption causes is the important component part of product carbon footprint.Therefore this enforcement is applied as typical take the calculation process of product power consumption carbon footprint, but the present invention is not limited only to the accounting of product carbon footprint.
The layout of Tu3Shi A factory, the product sequence of Tu4Shi A factory, following table 1 is the production equipment information table of A factory, table 2 is current consuming apparatus information tables of producing auxiliary and shop office, table 3 is administration office current consuming apparatus information tables, and in January, 2012, power consumption was 41680kwh.
Table 1
Table 2
Table 3
The present invention carries out the implementation case study of the inventive method take above data as analytic target.In conjunction with Fig. 2, concrete calculation procedure is as follows:
Allocation step one: according to A plant data: total power consumption calculates with the power consumption 4768kw in January, 2012; The information such as title, number, rated power and the configuration production capacity of the current consuming apparatus that in factory, each workshop comprises and power consumption equipment are as table 1, and the current consuming apparatus title of shop office and Administrative area, number, rated power, working time every day are as table 2 and table 3.
Allocation step two: be then three levels by data allocations: production equipment power consumption, production utility appliance power consumption and operation equipment power consumption, Fig. 1 illustrates three levels of Data Collection.The ratio of utilizing rated power × equipment number × darg time, formula is as follows:
Allocation step three: to each equipment, be also to utilize the proportionate relationship of rated power × equipment number × darg time to distribute, as formula (4) by the data allocations of the first level; If this device fabrication multiple product, also needs power consumption to be assigned on every kind of product, method is to distribute according to product yield ratio, concrete formula following (5).
Allocation step four: the second level power consumption is assigned to every kind of product, utilizes production time scale to distribute, concrete formula following (6).
Allocation step five: last, tri-layer is assigned on every kind of product to concrete formula following (8) according to the proportionate relationship of output.
Allocation step six: the power consumption of three levels is added to the power consumption that obtains every kind of product, then divided by output, obtains the power consumption of unit of certain product, concrete as formula (9).
Allocation step seven: unit product power consumption is multiplied by electric carbon emission coefficient and can obtains single unit product power consumption carbon footprint of planting product, concrete as formula (10), the total power consumption that wherein Q (x) is certain product, unit is kwh; f efor the carbon emission coefficient of institute of A factory electricity consumption, be 0.8244kgCO 2e/kwh.
ECF x=Q(x)×f E (10)
ECF a=3.433×0.8244=2.83kgCO 2e;
ECF b=2.392×0.8244=1.972kgCO 2e;
ECF c=2.713×0.8244=2.237kgCO 2e。

Claims (4)

1. a distribution method for the product power consumption based on plant capacity and working time, is characterized in that, step is:
Allocation step one: carry out power consumption Data Collection, Data Collection scope is determined according to the accounting border of setting in advance;
Allocation step two: be three levels by data allocations: production equipment power consumption, production utility appliance power consumption and operation equipment power consumption:
in formula:
Q monthfor the overall monthly power consumption of factory;
Q the moon is producedfor all production equipment power consumption, i.e. the first level power consumption;
Q the moon is auxiliaryfor all production utility appliance power consumption, i.e. the second level power consumption;
Q moon operationfor the power consumption of enterprise operation part, i.e. tri-layer power consumption;
P produce ifor the rated power of production equipment i;
N produce ifor the number of production equipment i;
T produce ifor production equipment i working time every day;
P auxiliary ifor the rated power of production utility appliance i;
N auxiliary ifor the number of production utility appliance i;
T auxiliary ifor production utility appliance i working time every day;
P operation ifor the rated power of enterprise operation current consuming apparatus i;
N operation ifor the number of enterprise operation current consuming apparatus i;
T operation ifor enterprise operation current consuming apparatus i working time every day;
M is the kind of production equipment;
N is the kind of production utility appliance;
L is the kind of operation department current consuming apparatus;
Allocation step three: to each equipment, wherein, the monthly consumption of production equipment i is Q by the data allocations of the first level the moon is produced i:
Allocation step four: the second level power consumption is assigned to every kind of product, utilizes production time scale to distribute, wherein, the power consumption that the power consumption of Workshop Production utility appliance is distributed on product x is Q the moon is auxiliary(x):
in formula:
U (x) is the yield in unit time of product x, i.e. the configuration production capacity of product x;
Allocation step five: tri-layer is assigned on every kind of product according to the proportionate relationship of output, and wherein, the power consumption that the power consumption of enterprise operation part is distributed on product x is Q moon operation(x):
Allocation step six: the power consumption of three levels is added to the power consumption that obtains every kind of product, then obtains the power consumption of unit of certain product divided by output, wherein, the power consumption of product x is Q (x):
2. the distribution method of a kind of product power consumption based on plant capacity and working time as claimed in claim 1, it is characterized in that, in described allocation step one, at least need the statistics of the monthly power consumption that obtains the each workshop of enterprise and office, and the title of the current consuming apparatus that in factory, each workshop comprises and power consumption equipment, number, rated power and configuration production capacity.
3. the distribution method of a kind of product power consumption based on plant capacity and working time as claimed in claim 1, it is characterized in that, in described allocation step three, if current device is produced multiple product, also need power consumption to be assigned on every kind of product, wherein, the power consumption of product x on production equipment i is Q the moon is produced i(x):
in formula, m (x) is product x monthly output.
4. the distribution method of a kind of product power consumption based on plant capacity and working time as claimed in claim 1, it is characterized in that, in described allocation step four, the configuration production capacity of product x adopts the configuration production capacity of the bottleneck operation of non-total operation in product x production run.
CN201410028091.XA 2014-01-22 2014-01-22 Method for distributing product power consumption based on device power and operation time Expired - Fee Related CN103761616B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410028091.XA CN103761616B (en) 2014-01-22 2014-01-22 Method for distributing product power consumption based on device power and operation time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410028091.XA CN103761616B (en) 2014-01-22 2014-01-22 Method for distributing product power consumption based on device power and operation time

Publications (2)

Publication Number Publication Date
CN103761616A true CN103761616A (en) 2014-04-30
CN103761616B CN103761616B (en) 2017-02-15

Family

ID=50528850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410028091.XA Expired - Fee Related CN103761616B (en) 2014-01-22 2014-01-22 Method for distributing product power consumption based on device power and operation time

Country Status (1)

Country Link
CN (1) CN103761616B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104732355A (en) * 2015-04-07 2015-06-24 哈尔滨理工大学 Device drive integrated dispatching method for adjusting devices during idle time period
CN106384004A (en) * 2016-09-22 2017-02-08 上海化工研究院 Method for evaluating power consumption of compound fertilizer production equipment
CN106792866A (en) * 2016-11-24 2017-05-31 西安电子科技大学 WPC system powers and the distribution method of time based on piecewise linearity EH models
CN109976219A (en) * 2019-04-10 2019-07-05 苏州云沃嘉智能科技有限公司 It is a kind of intelligence workshop appliance remote auto report method for repairment

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012175847A (en) * 2011-02-23 2012-09-10 Hitachi Ltd Electric power load prediction device, system, and method for industrial park

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104732355A (en) * 2015-04-07 2015-06-24 哈尔滨理工大学 Device drive integrated dispatching method for adjusting devices during idle time period
CN104732355B (en) * 2015-04-07 2018-12-21 哈尔滨理工大学 The device drives integrated dispatch method of equipment free time section adjustment
CN106384004A (en) * 2016-09-22 2017-02-08 上海化工研究院 Method for evaluating power consumption of compound fertilizer production equipment
CN106792866A (en) * 2016-11-24 2017-05-31 西安电子科技大学 WPC system powers and the distribution method of time based on piecewise linearity EH models
CN106792866B (en) * 2016-11-24 2019-11-22 西安电子科技大学 WPC system power and the distribution method of time based on piecewise linearity EH model
CN109976219A (en) * 2019-04-10 2019-07-05 苏州云沃嘉智能科技有限公司 It is a kind of intelligence workshop appliance remote auto report method for repairment

Also Published As

Publication number Publication date
CN103761616B (en) 2017-02-15

Similar Documents

Publication Publication Date Title
CN103761616A (en) Method for distributing product power consumption based on device power and operation time
Wang et al. China’s water–energy nexus: greenhouse-gas emissions from groundwater use for agriculture
CN103426032B (en) A kind of economic optimization dispatching method of cogeneration units
Yu et al. Analysis of driving factors and allocation of carbon emission allowance in China
CN106651161B (en) Dynamic dispatching method for collection operation and maintenance
CN104570739A (en) Ore dressing multi-production-index optimized decision making system and method based on cloud and mobile terminal
CN106485417A (en) Photovoltaic plant based on dynamic self-adapting task scheduling strategy moves O&M method
CN103824128A (en) Method for scale prediction of regional distributed type comprehensive energy-supply system
CN104200389A (en) Product power consumption allocation method based on production process time and equipment working time
CN104573848A (en) Power demand prediction and planning and reliability-based power distribution network construction method
CN113724103B (en) Regional carbon emission monitoring method, system, equipment and medium based on intelligent electric meter
CN104992237B (en) The tower photo-thermal solar electricity generation field heliostat optimization placement method of level terrain
CN110866706A (en) Method for differential comprehensive analysis and evaluation of regional power utilization requirements
CN104167731A (en) Multi-region multi-power-source coordinated planning method
CN104537451B (en) It is a kind of to be used for method that is accurate and rapidly adjusting homologous series product carbon emission
CN103455885B (en) The computing method of a kind of automatic editing parts factory stamping parts quantity
CN106655189B (en) Optimal power flow coordination optimization method based on virtual generator
CN104636853A (en) Transformer substation full-life cycle cost estimation method
CN105512823A (en) Method for constructing loss reduction energy efficiency index system after load-network-source coordinated control
CN104156272B (en) A kind of product steam consumption distribution method based on unit steam consumption
CN105404957A (en) Urban greening planning and management system and method
CN104933486A (en) APP operation method for quickly judging building information in building entire life cycle
CN110400097A (en) A kind of a kind of information-based method of soil testing and fertilizer recommendation
CN106451425B (en) A kind of method for automatic modeling and device of micro-capacitance sensor
CN105335614B (en) A kind of product Evolutionary Design method that product functionality merges with environment compatibility

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170215

Termination date: 20200122

CF01 Termination of patent right due to non-payment of annual fee