CN103754750B - Suspender - Google Patents
Suspender Download PDFInfo
- Publication number
- CN103754750B CN103754750B CN201410028527.5A CN201410028527A CN103754750B CN 103754750 B CN103754750 B CN 103754750B CN 201410028527 A CN201410028527 A CN 201410028527A CN 103754750 B CN103754750 B CN 103754750B
- Authority
- CN
- China
- Prior art keywords
- hook
- suspender
- crystallizer
- dummy bar
- bar head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The invention discloses a kind of suspender, including lattice suspension bracket, described lattice suspension bracket includes the support beam that two parallel relative crossbeams and at least two vertical rack are located on crossbeam, and described crossbeam is provided with at least two chain sling, and described support beam is provided with at least one pair of hook.The suspender of present invention design can the simultaneously multiple crystallizer of handling or dummy bar head, use the suspender of the present invention can reduce labor strength, simplify more changing jobs of crystallizer and dummy bar head, shorten online replacing construction, improve production efficiency.
Description
Technical field
The present invention relates to aluminium alloy casting technology field, particularly relate to a kind of suspender.
Background technology
During aluminium alloy casting, different size ingot casting needs with different crystallizers and dummy bar head.General aluminium alloy direct water-cooling semi continuous flat bloom casting machine can cast polylith aluminium alloy flat bloom simultaneously, needs to use many set crystallizers and dummy bar head simultaneously, and the casting machine of sub-aluminum at most can need with 5 set crystallizer and dummy bar heads with 5 aluminium alloy flat blooms of one-step casting.When changing specification, need all to pull down dummy bar head and crystallizer, install dummy bar head and the crystallizer of dimension the most again, traditional way is by dummy bar head and crystallizer pulling down one by one, another installation of one, the most not only intricate operation increases labor strength, and time-consuming longer, is substantially reduced production efficiency.
Prior art dismantles dummy bar head and crystallizer method is as follows: use driving and suspender belt, chain sling, utilize four chain slings to catch on the loser of crystallizer, then put to relevant position with driving a vehicle to hang old crystallizer, such a one pull down old crystallizer;Utilize two suspender belts to entangle bottom dummy bar head, then with driving dummy bar head hung and put to relevant position, such a one pull down old dummy bar head;Then with identical method installation dummy bar head one by one and crystallizer.
When being folded down and install dummy bar head and crystallizer, can only one dummy bar head of a handling or crystallizer, intricate operation, labor strength is big, and the longest, production efficiency is low.
Summary of the invention
Based on this, it is an object of the invention to provide a kind of suspender.
Concrete technical scheme is as follows:
A kind of suspender, including lattice suspension bracket, described lattice suspension bracket includes that the support beam that two parallel relative crossbeams and six vertical racks are located on crossbeam, each described crossbeam are provided with at least four chain sling;Described chain sling is uniformly distributed along crossbeam center to both sides, and the length of described chain sling lengthens along crossbeam center successively to both sides, and chain sling is used for handling crystallizer;The support beam being positioned at crossbeam both sides is provided with single hook hook, in remaining four support beam, the direction along vertical crossbeams is provided with four pairs of double hook hooks that spacing is different, the spacing between every pair of described double hook hook in each support beam is 0.10-0.17m, and single hook hook or double hook hook are for handling dummy bar head.
Wherein in an embodiment, the distance between the axis of adjacent two support beams is 0.8-1.2m.
Wherein in an embodiment, described lattice suspension bracket is also arranged above extremity chain sling.
Beneficial effects of the present invention is as follows:
The suspender of present invention design can the simultaneously multiple crystallizer of handling or dummy bar head.The chain sling arranged on the crossbeam of lattice suspension bracket is for handling crystallizer, mutually collide for crystallizer adjacent during avoiding handling and keep the steady of crystallizer, reduce the quantity of staff during installing or unloading, the chain sling length of handling different size crystallizer is different, it is positioned at the chain sling in the middle part of crossbeam the shortest, lengthens successively to both sides along crossbeam center.
The hook arranged in the support beam of lattice suspension bracket is for handling dummy bar head, and dummy bar head is hung between adjacent two support beam, and dummy bar head is hung on hook by suspender belt.In order to adapt to various sizes of dummy bar head, in support beam can setting space different 4 to hook.
The suspender using the present invention can reduce labor strength, simplifies crystallizer and dummy bar head more changes jobs, shorten online replacing construction, improve production efficiency.
Using the crystallizer suspender of the present invention, the time changing primary crystallization device and dummy bar head was down to 15 minutes by original 2 hours, and man-hours requirement was down to for 1.5 man-hours by 10 original man-hours, changes efficiency and improves 8 times, and work efficiency improves 6.7 times.
Use the driving of existing crystallizer suspender need to walk back and forth 8~10 times, use newly-designed crystallizer suspender, driving only need to walk back and forth 2 times, simplify replacing dummy bar head and the work of crystallizer, also reduce the labor intensity of workman and the loss of driving.
Accompanying drawing explanation
Fig. 1 is the top view of suspender of the present invention;
Fig. 2 is the front view of suspender of the present invention;
Fig. 3 is the side view of suspender of the present invention;
Fig. 4 is the structural representation of double hook hook;
Fig. 5 is the structural representation of single hook hook.
Description of reference numerals:
101, four chain slings;102, crossbeam;103, support beam;104, hook;105, chain sling.
Detailed description of the invention
Below in conjunction with drawings and Examples, the application is further elaborated.
With reference to Fig. 1-Fig. 5, a kind of suspender, including lattice suspension bracket, described lattice suspension bracket includes the support beam 103 that two parallel relative crossbeams 102 and 6 vertical racks are located on crossbeam, distance between the axis of adjacent two support beams is 1.0m, each described crossbeam is provided with 10 chain slings 105, and described support beam is provided with 4 to hook 104.
Described chain sling is uniformly distributed along crossbeam center to both sides, and the length of described chain sling lengthens along crossbeam center successively to both sides.
The hook being positioned in the support beam of crossbeam both sides is single hook hook, and the hook in remaining support beam is double hook hook.Spacing between 4 pairs of hooks is respectively 0.10m, 0.12m, 0.14m, 0.17m.
Described lattice suspension bracket is also arranged above extremity chain sling and is connected with driving.
Suspender of the present invention is for changing the operating procedure of dummy bar head:
(1) dummy bar head fixed screw is pulled down;
(2) select the hook corresponding with dummy bar head specification, quantity to hang up suspender belt, entangle bottom dummy bar head with the suspender belt other end;
(3) start driving, dummy bar head is left under order and puts to pallet;
(4) by needing dummy bar head to be mounted to set by the respective distance on dummy bar head base, entangle bottom with suspender belt, winch to the position that dummy bar head base is corresponding;
(5) fixed screw is tightened.
Suspender of the present invention is for changing the operating procedure of crystallizer:
(1) the fastening screw on old crystallizer is unclamped;
(2) loser on crystallizer is caught on the chain sling on suspender;
(3) start driving, crystallizer is left under order crystallizer platform, puts to crystallizer pallet;
(4) by needing the crystallizer changed to set by the respective distance on crystallizer platform, hook loser with chain sling, start driving and crystallizer is adjusted on crystallizer platform;
(5) fixed screw is tightened.
The suspender of present invention design can the simultaneously multiple crystallizer of handling or dummy bar head.The chain sling arranged on the crossbeam of lattice suspension bracket is for handling crystallizer, mutually collide for crystallizer adjacent during avoiding handling and keep the steady of crystallizer, reduce the quantity of staff during installing or unloading, the chain sling length of handling different size crystallizer is different, it is positioned at the chain sling in the middle part of crossbeam the shortest, lengthens successively to both sides along crossbeam center.
The hook arranged in the support beam of lattice suspension bracket is for handling dummy bar head, and dummy bar head is hung between adjacent two support beam, and dummy bar head is hung on hook by suspender belt.In order to adapt to various sizes of dummy bar head, in support beam can setting space different 4 to hook.
The suspender using the present invention can reduce labor strength, simplifies crystallizer and dummy bar head more changes jobs, shorten online replacing construction, improve production efficiency.
Using the crystallizer suspender of the present invention, the time changing primary crystallization device and dummy bar head was down to 15 minutes by original 2 hours, and man-hours requirement was down to for 1.5 man-hours by 10 original man-hours, changes efficiency and improves 8 times, and work efficiency improves 6.7 times.
Use the driving of existing crystallizer suspender need to walk back and forth 8~10 times, use newly-designed crystallizer suspender, driving only need to walk back and forth 2 times, simplify replacing dummy bar head and the work of crystallizer, also reduce the labor intensity of workman and the loss of driving.
Concrete data are as follows:
Embodiment described above only have expressed the several embodiments of the present invention, and it describes more concrete and detailed, but therefore can not be interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that, for the person of ordinary skill of the art, without departing from the inventive concept of the premise, it is also possible to make some deformation and improvement, these broadly fall into protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be as the criterion with claims.
Claims (3)
1. a suspender, it is characterised in that include that lattice suspension bracket, described lattice suspension bracket include that two parallel relative crossbeams and six vertical racks are located at
Support beam on crossbeam, each described crossbeam is provided with at least four chain sling;Described chain sling is uniformly distributed along crossbeam center to both sides, and described
The length of chain sling lengthens along crossbeam center successively to both sides, and chain sling is used for handling crystallizer;The support beam being positioned at crossbeam both sides is provided with single hook hook,
In remaining four support beam, the direction along vertical crossbeams is provided with four pairs of double hook hooks that spacing is different, every pair of described double hook hook in each support beam
Between spacing be 0.10-0.17m, single hook hook or double hook hook are for handling dummy bar head.
Suspender the most according to claim 1, it is characterised in that the distance between the axis of adjacent two support beams is 0.8-1.2m.
Suspender the most according to claim 1 and 2, it is characterised in that described lattice suspension bracket is also arranged above four chain slings.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410028527.5A CN103754750B (en) | 2014-01-21 | 2014-01-21 | Suspender |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410028527.5A CN103754750B (en) | 2014-01-21 | 2014-01-21 | Suspender |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103754750A CN103754750A (en) | 2014-04-30 |
CN103754750B true CN103754750B (en) | 2017-01-04 |
Family
ID=50522120
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410028527.5A Active CN103754750B (en) | 2014-01-21 | 2014-01-21 | Suspender |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103754750B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106759368B (en) * | 2015-11-16 | 2018-12-18 | 骆雪芬 | A kind of operating equipment of mine |
CN106012849B (en) * | 2016-06-08 | 2018-08-14 | 江苏燕宁工程科技集团有限公司 | A kind of cantilever casting beam straightway steel bar overall binding construction method for hanging and bridge |
CN106882697B (en) * | 2017-02-28 | 2018-05-04 | 中国葛洲坝集团第一工程有限公司 | A kind of large scale structure reinforcing bar is without deformation suspender and hanging method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2530929Y (en) * | 2002-03-30 | 2003-01-15 | 涟源钢铁集团有限公司 | Electric push-bar chain loading and unloading sling |
CN2536565Y (en) * | 2002-03-24 | 2003-02-19 | 胡平光 | Electric chain hoist |
CN2723407Y (en) * | 2004-08-16 | 2005-09-07 | 天津港第一港埠公司 | Hoist special for 8 ton aluminium ingot |
CN2851213Y (en) * | 2005-09-29 | 2006-12-27 | 天津港第一港埠公司 | Dedicated sling having one hook capable of simultaneous hoisting double container for empty container operation for use in loading and unloading containers |
CN201217608Y (en) * | 2008-04-23 | 2009-04-08 | 天津赛瑞机器设备有限公司 | Integral component suspending beam for hoisting |
CN201284182Y (en) * | 2008-10-29 | 2009-08-05 | 青岛港(集团)有限公司 | Special sling for double-layer cast pipe |
CN201530681U (en) * | 2009-11-03 | 2010-07-21 | 南京钢铁股份有限公司 | Special gantry crane rigging for slow cooling of circular steel bar |
DE202011005188U1 (en) * | 2011-04-08 | 2012-07-11 | Gebrüder Bolzani Hebezeugtechnik GmbH | Special truss for tram bogies GT series, Flexity, Tatra, GT6, cast steel |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7905528B2 (en) * | 2007-05-23 | 2011-03-15 | Eric P Marcel | Spreader frame for cargo container |
-
2014
- 2014-01-21 CN CN201410028527.5A patent/CN103754750B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2536565Y (en) * | 2002-03-24 | 2003-02-19 | 胡平光 | Electric chain hoist |
CN2530929Y (en) * | 2002-03-30 | 2003-01-15 | 涟源钢铁集团有限公司 | Electric push-bar chain loading and unloading sling |
CN2723407Y (en) * | 2004-08-16 | 2005-09-07 | 天津港第一港埠公司 | Hoist special for 8 ton aluminium ingot |
CN2851213Y (en) * | 2005-09-29 | 2006-12-27 | 天津港第一港埠公司 | Dedicated sling having one hook capable of simultaneous hoisting double container for empty container operation for use in loading and unloading containers |
CN201217608Y (en) * | 2008-04-23 | 2009-04-08 | 天津赛瑞机器设备有限公司 | Integral component suspending beam for hoisting |
CN201284182Y (en) * | 2008-10-29 | 2009-08-05 | 青岛港(集团)有限公司 | Special sling for double-layer cast pipe |
CN201530681U (en) * | 2009-11-03 | 2010-07-21 | 南京钢铁股份有限公司 | Special gantry crane rigging for slow cooling of circular steel bar |
DE202011005188U1 (en) * | 2011-04-08 | 2012-07-11 | Gebrüder Bolzani Hebezeugtechnik GmbH | Special truss for tram bogies GT series, Flexity, Tatra, GT6, cast steel |
Also Published As
Publication number | Publication date |
---|---|
CN103754750A (en) | 2014-04-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103754750B (en) | Suspender | |
JP6012578B2 (en) | Heavy material transport method and heavy material transport device | |
CN106244956B (en) | Super large-scale aluminium alloy slab keeps flat the method that vertical quenching is realized in shove charge | |
CN203306916U (en) | Large-size wire coil hanger | |
CN213537032U (en) | Special clamp crown block for carbon pre-roasting anode workshop | |
CN103863937A (en) | Lifting appliance for large aluminum alloy round bars while leaving out of well | |
CN103754751B (en) | The erecting by overhang of a kind of aircraft skin part handling | |
CN203475318U (en) | Cable-clamp-free hanging appliance used for anchoring stay cable at tower end in cable bent tower steel anchor beam area | |
CN204621039U (en) | Semi-continuous casting crystallizer is installed and quick replacement device | |
CN204079244U (en) | A kind of Combined changable is apart from suspension rod | |
CN110395656B (en) | Lifting appliance for sand core with semi-cantilever structure and lifting method thereof | |
CN209242469U (en) | A kind of boat frame hoisting structure | |
CN206553594U (en) | A kind of steel-pushing type heater for rolling steel discharging roller-way steel-fastening processing unit | |
CN102251090B (en) | Special lifting appliance for pit type heat treatment furnace | |
CN202575681U (en) | Steel coil lifting device | |
CN207226817U (en) | A kind of suspender of shaped object handling | |
CN205772813U (en) | For 40 tons of door machines built-in decelerator remove and install one suspender | |
CN205662225U (en) | Become a bundle semitrailer pterygoid lamina special lifting device | |
CN210420106U (en) | Material frame for homogenizing aluminum alloy cast ingot | |
CN210682944U (en) | Aluminum alloy square bar goes out well hoist | |
CN203830721U (en) | Cast ingot tilting prevention frame | |
CN109534151B (en) | Laser welding machine lifting device | |
CN214555843U (en) | Aluminum mould board ash handling equipment | |
CN209736615U (en) | aluminium liquid circulation groove cable suspension device | |
CN207608205U (en) | A kind of hoisting rigging device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160923 Address after: 528000 Guangdong Province Nanhai District of Foshan city Guicheng street lamp Lake Road No. 20 building 6 poly Watertown 33 shop of 33C Applicant after: GUANGDONG ALUHOUSE TECHNOLOGY CO., LTD. Address before: 526238 hi tech Industrial Development Zone, Guangdong, Zhaoqing Applicant before: Asia Aluminum (China) Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |