CN2851213Y - Dedicated sling having one hook capable of simultaneous hoisting double container for empty container operation for use in loading and unloading containers - Google Patents

Dedicated sling having one hook capable of simultaneous hoisting double container for empty container operation for use in loading and unloading containers Download PDF

Info

Publication number
CN2851213Y
CN2851213Y CN 200520027559 CN200520027559U CN2851213Y CN 2851213 Y CN2851213 Y CN 2851213Y CN 200520027559 CN200520027559 CN 200520027559 CN 200520027559 U CN200520027559 U CN 200520027559U CN 2851213 Y CN2851213 Y CN 2851213Y
Authority
CN
China
Prior art keywords
loading
hook
sling
container
unloading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200520027559
Other languages
Chinese (zh)
Inventor
纪鸿恩
杨加永
井伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN HARBOUR FIRST STEVEDORING CO Ltd
Original Assignee
TIANJIN HARBOUR FIRST STEVEDORING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN HARBOUR FIRST STEVEDORING CO Ltd filed Critical TIANJIN HARBOUR FIRST STEVEDORING CO Ltd
Priority to CN 200520027559 priority Critical patent/CN2851213Y/en
Application granted granted Critical
Publication of CN2851213Y publication Critical patent/CN2851213Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to a special sling having one hook capable of simultaneously hoisting double containers for the empty container operation of loading and unloading containers. The utility model is provided with a rectangular framework-shaped hanger frame, four corners of the hanger frame are downwards connected with lower suspension cables and the lower end of the lower suspension cable is connected with a hook. One kind of the special sling having one hook capable of simultaneously hoisting double containers for the empty container operation of loading and unloading containers used for loading and unloading door machines has the structure that the four corners of the rectangular framework-shaped hanger frame are upwards connected with upper suspension cables, and the upper suspension cables are connected with hooks of the door machine. The other kind of the special sling having one hook capable of simultaneously hoisting double containers for the empty container operation used for shore bridges has the structure that the four corners on the rectangular framework-shaped hanger frame are provided with oblong locking holes which are matched with a twist lock of the original sling on a bridge container sling, and the rectangular framework-shaped hanger frame is connected to the sling of the original shore bridge container through the twist lock of a shore bridge sling. The special sling having one hook capable of simultaneously hoisting double containers for the empty container operation of loading and unloading containers has the advantages of reasonable design, compact structure, convenient use and safety, work efficiency is enhanced and the stopping time of container ships in a harbor is reduced.

Description

The two case special hangers of loading and unloading container empty van operation one hook
Technical field
The utility model belongs to lifting spreader, the two case special hangers of particularly a kind of loading and unloading container empty van operation one hook.
Background technology
The harbour handling freight container has special equipment and suspender such as door machine and An Qiao at present, and existing these equipment can only lift a freight container when operation.When the lifting empty container, though be empty van, box weight has alleviated widely, also can only load and unload singly according to the freight container that load is arranged, and obviously wastes production time like this.Can not faster load and unload collection dress empty van, take boats and ships, influence stevedoring efficient at the port length of the halt.
Summary of the invention
Technical problem to be solved in the utility model is: provide a kind of loading and unloading container empty van operation one hook two case special hangers.Improve operating efficiency, reduce container ship in the port stopping time.
The technical solution of the utility model is:
The two case special hangers of a kind of loading and unloading container empty van operation one hook is characterized in that: a rectangular-shaped frame frame shape suspension bracket is arranged, and four angles of frame shape suspension bracket connect hoist cable down down, and the lower end of following hoist cable connects the suspension hook that can cooperate with the lifting hole(eyelet) on the freight container.
Its a kind of two case special hangers of loading and unloading container empty van operation one hook that are used on the handling door machine are: connect hoist cable on four angles of rectangular-shaped frame frame shape suspension bracket.Last hoist cable connects door machine suspension hook.
The two case special hangers of loading and unloading container empty van operation one hook that another kind is used to lift on the quayside container crane are: top four jiaos of rectangular-shaped frame frame shape suspension bracket have the Long Circle lockhole that can cooperate with original bank bridge crane tool twist lock on the lifting quayside container crane container spreader.Rectangular-shaped frame frame shape suspension bracket is connected on original bank bridge container suspender by bank bridge crane tool twist lock.
The utility model effect is:
This suspender is reasonable in design, compact conformation, esy to use, safe and reliable.During operation, after the operation driver lifted by crane equalizing bar, operating worker was hung on two casees outside lifting eye with 4 gib head one end hooks, and end intersection is hooked in two casees inboard lifting eye, can lift by crane.Both guaranteed that two case co-altitudes merge lifting, had guaranteed that again casing is not destroyed.
Improve operating efficiency, reduce container ship in the port stopping time; Guarantee that boats and ships are dynamic; Satisfy ship and cargo interests requirement, use 35 tons of door machines and 35 tons of two case special hangers of bank bridge operation empty van one hook.After (two kinds of 20 chis and 40 chis) are put into operation, under the prerequisite that guarantees job safety and cargo mass, increased substantially economic benefit.The service promise of " operation 1000 casees do not surpass 20 hour with interior box ship " that group company announces medium is reliably guaranteed.This suspender has obtained the very satisfied of a line operating personnel and ship, cargo interests after using from going into operation, and has not only guaranteed safety and the quality in the operation, and makes the empty van operating efficiency improve more than 40%.According to annual job through-put 400,000 TEU of my company, empty van rate 20% and empty van take 180 yuan/part and calculate, and can raise the efficiency the whole year to reach 3.2 ten thousand TEU, and the wound economic benefit can reach more than 5,000,000 yuan every year.Meanwhile, also make shipping company and traffic unit receive the good social benefit.
Description of drawings
Fig. 1 is the structural representation that is used for the two case special hangers of loading and unloading container empty van operation one hook of a machine
Fig. 2 is the structural representation that is used for the two case special hangers of loading and unloading container empty van operation one hook of bank bridge
Fig. 3 is used for the two case special hangers of loading and unloading container empty van operation one hook of bank bridge and the structural representation of run-of-bank gravel bridge container suspender connecting portion
Fig. 4 is the freight container suspension hook and the freight container connecting portion structural representation of the two case special hangers of loading and unloading container empty van operation one hook
The specific embodiment
The two case special hangers of a kind of loading and unloading container empty van operation one hook shown in Figure 1 have a rectangular frame shape suspension bracket 1, and four angles below the rectangular frame shape suspension bracket are connected with down hoist cable 2 respectively downwards, following hoist cable bottom connection freight container suspension hook 3.
Nose 4 is hung at four angles below the rectangular frame shape suspension bracket, hangs nose and connects suspension ring 5, and suspension ring connect and connect the shackle 6 of hoist cable upper end down respectively downwards; There is shackle 7 following hoist cable bottom, and shackle connects freight container suspension hook 3.
This two case special hangers of loading and unloading container empty van operation one hook that are used for a machine (gantry crane loader-unloader): four angles above the rectangular frame shape suspension bracket upwards are connected with hoist cable 8 respectively.
Nose 9 is hung at four angles above the rectangular frame shape suspension bracket, hangs nose and connects suspension ring 10, and suspension ring connect and upwards connect the shackle 11 of going up the hoist cable lower end respectively.
The shackle 12 of last hoist cable upper end is connected on the suspension hook 3 of a machine.
Shown in Figure 2 is, and another kind is used for the two case special hangers of loading and unloading container empty van 16 operations one hook of bank bridge (handling bridge): the Long Circle lockhole 15 that the upper surface at 12 4 angles of rectangular frame shape suspension bracket has the twist lock 14 with original bank bridge container suspender 13 to be connected.
The two case special hangers of loading and unloading container empty van operation one hook that shown in Figure 3 is is used for the bank bridge have Long Circle lockhole 15 with the upper surface at 12 4 angles of structure rectangle frame shape suspension bracket of run-of-bank gravel bridge container suspender connecting portion, and the twist lock 14 of Long Circle lockhole 15 and original bank bridge container suspender 13 is connected.
Fig. 4 is the freight container suspension hook and the freight container connecting portion structure of the two case special hangers of loading and unloading container empty van operation one hook: the following hoist cable 2 below the rectangular frame shape suspension bracket has shackle 7, shackle connecting shackle 3 is arranged, and suspension hook colludes on the hole (twist lock hole) 17 on 16 4 jiaos in the freight container.
Mainly (it is hook head that the door machine operation hangs by steel rope to this suspender by equalizing bar rectangular frame shape suspension bracket, the operation of bank bridge connects by changeing rope), steel rope hangs and is and special-purpose hook (the own forging) and be formed by connecting by shackle, is applicable to two casing workings of a machine (or bank bridge) operation 20 chi freight containers or 40 chis zero load freight container.This suspender is reasonable in design, compact conformation, esy to use, safe and reliable.During operation, after the operation driver lifted by crane equalizing bar, operating worker was hung on two casees outside lifting eye with 4 gib head one end hooks, and end intersection is hooked in two casees inboard lifting eye, can lift by crane.Both guaranteed that two case co-altitudes merge lifting, had guaranteed that again casing is not destroyed.
This suspender has obtained the very satisfied of a line operating personnel and ship, cargo interests after using from going into operation, and has not only guaranteed safety and the quality in the operation, and makes the empty van operating efficiency improve more than 40%.According to annual job through-put 400,000 TEU of my company, empty van rate 20% and empty van take 180 yuan/part and calculate, and can raise the efficiency the whole year to reach 3.2 ten thousand TEU, and the wound economic benefit can reach more than 5,000,000 yuan every year.Meanwhile, also make shipping company and traffic unit receive the good social benefit.

Claims (3)

1, the two case special hangers of a kind of loading and unloading container empty van operation one hook is characterized in that: a rectangular-shaped frame frame shape suspension bracket is arranged, and four angles of frame shape suspension bracket connect hoist cable down down, and the lower end of following hoist cable connects the suspension hook that can cooperate with the lifting hole(eyelet) on the freight container.
2, the two case special hangers of loading and unloading container empty van according to claim 1 operation one hook is characterized in that: connect hoist cable on four angles of rectangular-shaped frame frame shape suspension bracket.
3, the two case special hangers of loading and unloading container empty van according to claim 1 operation one hook is characterized in that: top four jiaos of rectangular-shaped frame frame shape suspension bracket have the Long Circle lockhole that can cooperate with original bank bridge crane tool twist lock on the lifting quayside container crane container spreader.
CN 200520027559 2005-09-29 2005-09-29 Dedicated sling having one hook capable of simultaneous hoisting double container for empty container operation for use in loading and unloading containers Expired - Fee Related CN2851213Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520027559 CN2851213Y (en) 2005-09-29 2005-09-29 Dedicated sling having one hook capable of simultaneous hoisting double container for empty container operation for use in loading and unloading containers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520027559 CN2851213Y (en) 2005-09-29 2005-09-29 Dedicated sling having one hook capable of simultaneous hoisting double container for empty container operation for use in loading and unloading containers

Publications (1)

Publication Number Publication Date
CN2851213Y true CN2851213Y (en) 2006-12-27

Family

ID=37585168

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520027559 Expired - Fee Related CN2851213Y (en) 2005-09-29 2005-09-29 Dedicated sling having one hook capable of simultaneous hoisting double container for empty container operation for use in loading and unloading containers

Country Status (1)

Country Link
CN (1) CN2851213Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102009908A (en) * 2010-08-20 2011-04-13 张家港市新港星科技有限公司 Hoisting tool
CN103754750A (en) * 2014-01-21 2014-04-30 亚洲铝业(中国)有限公司 Spreader
CN103803399A (en) * 2012-11-15 2014-05-21 中国科学院沈阳自动化研究所 Special lifting appliance for submersible device
CN105438675A (en) * 2014-09-24 2016-03-30 南通中集特种运输设备制造有限公司 Top cover and open-top container with same
CN104044992B (en) * 2014-05-27 2017-06-16 北京航天发射技术研究所 The big vertical hoisting sling of rigidity frame structure of oblique pull suspension cable type and assembling suspender

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102009908A (en) * 2010-08-20 2011-04-13 张家港市新港星科技有限公司 Hoisting tool
CN103803399A (en) * 2012-11-15 2014-05-21 中国科学院沈阳自动化研究所 Special lifting appliance for submersible device
CN103803399B (en) * 2012-11-15 2015-12-09 中国科学院沈阳自动化研究所 A kind of submersible special hanger
CN103754750A (en) * 2014-01-21 2014-04-30 亚洲铝业(中国)有限公司 Spreader
CN103754750B (en) * 2014-01-21 2017-01-04 广东铝遊家科技有限公司 Suspender
CN104044992B (en) * 2014-05-27 2017-06-16 北京航天发射技术研究所 The big vertical hoisting sling of rigidity frame structure of oblique pull suspension cable type and assembling suspender
CN105438675A (en) * 2014-09-24 2016-03-30 南通中集特种运输设备制造有限公司 Top cover and open-top container with same
CN105438675B (en) * 2014-09-24 2018-09-21 南通中集特种运输设备制造有限公司 Head cover and hard open top container with it

Similar Documents

Publication Publication Date Title
CN2851215Y (en) Dedicated sling for bulk steel pipe with anti-loose clamp
CN2851213Y (en) Dedicated sling having one hook capable of simultaneous hoisting double container for empty container operation for use in loading and unloading containers
CN101357736B (en) Method for hoisting and turning over large articles using frame crane
CN201077713Y (en) Cramping apparatus and combination sling special for steel rail
CN103640987A (en) Folding arm hydraulic crane
CN201614242U (en) Deck crane hoisting mechanism with emergency luffing function
CN203558761U (en) Hydraulic knuckle crane
CN206033063U (en) Electronic change width of cloth loop wheel machine
CN200967703Y (en) Chain binding rigging
CN201077715Y (en) Container lifting base angle lockhole sling with localization
CN201077714Y (en) Container lifting base angle lockhole special slings
CN2855988Y (en) Special hook block of trail beam type heavy lorry
CN203346000U (en) Cargo hold article lifting device
CN203128025U (en) Special hanger for loading and unloading work of glass packed in box
CN200961084Y (en) Square steel loading and unloading gripping apparatus
CN2658128Y (en) Device for controlling and regulating steering of hook of crane
CN200967705Y (en) Clamp apparatus for handling H-bar
CN201907631U (en) Rudder blade hoisting device
CN200949006Y (en) Square steel loading and unloading sling
CN2823222Y (en) Hanging frame special for container crane
CN202687757U (en) Special hanger for combination of gantry cranes
CN200964319Y (en) Special-purpose combination sling for container bag
CN200943030Y (en) Steel roll cabin loading sling for fork truck
CN207158599U (en) A kind of suspender of three 40 chi empty vans capable of hoisting
CN218434453U (en) 40-ton multifunctional lifting appliance

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20061227

Termination date: 20100929