CN103728504A - 用于检测分布式发电机的孤岛运行的方法 - Google Patents

用于检测分布式发电机的孤岛运行的方法 Download PDF

Info

Publication number
CN103728504A
CN103728504A CN201310467252.0A CN201310467252A CN103728504A CN 103728504 A CN103728504 A CN 103728504A CN 201310467252 A CN201310467252 A CN 201310467252A CN 103728504 A CN103728504 A CN 103728504A
Authority
CN
China
Prior art keywords
frequency
change
threshold value
rate
electrical network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310467252.0A
Other languages
English (en)
Other versions
CN103728504B (zh
Inventor
扬内·赫尔贝里
基莫·海诺宁
亚里·乌西迈基
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Malich holding Netherlands private limited liability company
Original Assignee
ABB AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ABB AB filed Critical ABB AB
Publication of CN103728504A publication Critical patent/CN103728504A/zh
Application granted granted Critical
Publication of CN103728504B publication Critical patent/CN103728504B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/28Testing of electronic circuits, e.g. by signal tracer
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/388Islanding, i.e. disconnection of local power supply from the network

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

提供了一种用于检测分布式发电机的孤岛运行的方法。该方法包括确定与分布式发电机连接的电网的频率、测量分布式发电机的输出处的电网的频率的变化率、确定针对变化速度的阈值、将电网的频率的变化率与阈值进行比较、以及当测得的频率变化率超过阈值达一定时间段时检测孤岛运行。

Description

用于检测分布式发电机的孤岛运行的方法
技术领域
本发明涉及检测连接到公用电网的分布式发电机的孤岛运行。
背景技术
分布式电源用来将另外的有功功率馈送到靠近电力负载的公用电网中,或者用来确保当来自电网的电力暂时不可用时用于关键负载的备用电源。分布式电源借助于电力电子开关连接到公用电网或负载。
当一个或更多个分布式电源变得与电力系统的其余部分孤立并且不经意地继续独立于公用电网来服务于局部孤岛负载时,该状况称为“电源丢失”或“无意孤岛”。
一旦已失去由公用电网提供的稳定性,则由局部孤岛中的负载所消耗的有功功率和无功功率与由分布式电源生成的功率之间的差异可以导致局部电网中突然的剧烈电压和/或频率变化。这些剧烈的电压和/或频率变化通常引起分布式电源保护装置起作用并且立即断开。
然而,如果局部孤岛中的负载的有功功率和无功功率与由分布式电源生成的有功功率和无功功率匹配,则不会发生将触发分布式电源的被动保护装置的电压和/或频率变化。除非提供主动的孤岛检测,否则分布式发电机继续运行。即使一些分布式发电机设计成在孤岛电网中运行,然而大量的潜在严重问题与孤岛相关联:
–分布式电源能够在电源丢失期间变成孤立的电源,从而对电业人员和设备造成伤害。
–局部电网中不受控的电压和/或频率变化可以损害用户设备。
–由分布式电源对线路的不经意的供电可以伤害电业人员或公众。
因此,理想的是,能够立即检测出无意的电源丢失以便于将分布式电源与网络断开。
欧洲专利公布1764894公开了一种用于检测分布式发电机的孤岛运行的方法。该方法包括如下步骤:将无功电流参考方波引入电网、检测在无功电流参考波中每个变化处的负载电压变化、以及确定检测的负载电压变化是否超过预定的孤岛检测阈值、指示电源丢失以及分布式发电机的孤岛运行。无功电流参考方波的幅度是恒定的。
发明内容
本发明的目的是实现一种用于检测分布式发电机的孤岛运行的可靠的方法和布置。根据本发明的方法和布置的特征在于独立权利要求中所陈述的特征。
根据本发明的方法是基于测量分布式发电机处的频率变化率并且将测得的变化率与阈值进行比较的思想。当测得的频率变化率超过阈值达一定时间段时,确定:电网丢失并且分布式发电机将电力馈送至孤岛网络。在以上确定之后,分布式发电机与电网断开。
在实施方式中,在分布式电源的运行期间通过测量当孤岛网络不存在时的频率变化率来确定用在本方法中的阈值。这使得能够精确地确定阈值,并且使得阈值能够适用于当前状况。另外,这样的阈值的使用不需要任何有关网络性质的信息。
根据本发明的方法和布置提供了对即使在由孤岛网络中的负载所消耗的有功功率和无功功率对应于由孤岛网络中的分布式发电机产生的有功功率和无功功率的情况下的孤岛的可靠检测。
根据本发明的方法不必要求:应该将独立的有源激励如无功电流参考引入到电网中以便于能够确定是否发生孤岛运行。
根据本发明的方法可以应用于例如通过电子逆变器连接到电网的太阳能发电站。在这样的情况下,太阳能发电站形成分布式电源。
附图说明
下面将借助于优选的实施方式并且参照附图来更详细地描述本发明,在附图中:
图1示出了电网的电路模型,以及
图2示出了本发明的原理。
具体实施方式
图1示出了电网的电路模型。当断开将局部孤岛电网LG连接到主电网MG的第一断路器Bg时,局部孤岛电网LG中的分布式电源DG继续将电力提供给局部孤岛电网LG。
如果局部孤岛电网LG的有功负载和无功负载与由分布式发电机DG生成的有功功率和无功功率显著地不同,则当断开第一断路器Bg时在局部孤岛电网LG中发生剧烈的电压和/或频率变化。该剧烈的电压和/或频率变化指示市电电网MG丢失。分布式电源DG保护装置将起作用并且通过断开与分布式电源DG相关联的第二断路器BDR来将分布式电源DG与局部孤岛电网LG断开。因此在这样的情况下不需要另外的动作。图1示出了第二断路器BDR在分布式发电机的外部。然而断路器也可以位于分布式电源中,更准确地在太阳能逆变器中。
然而,如果局部孤岛电网LG的有功功率和无功功率与由分布式电源DG产生的有功功率和无功功率完全匹配,则不发生将会触发保护装置的电压和/或频率变化,并且分布式电源DG继续运行。UL1741标准规定了:即使在这样的状况下也必须在两秒内断开分布式电源DG。
对该问题的现有技术解决方案是将有源激励馈送至局部孤岛以便于能够基于电压或电流的变化来检测孤岛。然而,本发明不必要求:应该将有源激励馈送至局部孤岛。在本发明中,通过监视电网的频率变化率来实施孤岛检测。即使局部孤岛电网LG的有功功率和无功功率与由分布式电源DG产生的有功功率和无功功率完全匹配,当局部孤岛电网LG变得孤立时也发生频率变化率的改变。这是可能的,原因是在实际中逆变器控制自身像能够根据电网频率变化率被发现的弱激励信号一样起作用。在孤岛网络中,即使小激励信号也能引起电网频率的可检测的变化。
电网频率的变化率在局部孤岛电网LG变得孤立时的改变可以通过将激励引入局部孤岛电网LG来增强。由于目的仅是增强频率的变化速度,即,不是电压的变化,因此激励可以相当小。可以馈送到局部网络中的激励的幅度能够例如与由分布式电源DG产生的有功功率成正比。将激励引入到局部孤岛电网LG中将形成局部孤岛电网的主动监视。在没有激励的情况下,局部孤岛电网LG的监视将是被动的。
当开启分布式电源例如太阳能阵列以及连接到太阳能阵列的电子逆变器时,频率变化率的监视被开启。
为了确定频率变化率,确定电网频率。优选地,通过测量电网的相电压、电源电压或相电流并且通过根据测得的值确定电网频率来确定电网频率。根据测量值以任何已知方式来确定频率。
最简单地,能够通过检测电网电压或电流的过零点并且根据过零点之间的时间差来计算频率值来确定频率。确定频率的更精确的方法包括例如使用锁相环。还应该注意的是,连接到网络用于从分布式电源馈送电力的电力电子装置还需要与网络同步,从而装置如逆变器还需要频率信息。
根据本发明,计算频率变化率。连续地确定电网的频率并且根据所确定的频率值来确定频率的变化。如果随时间间隔ts来更新频率值,则将频率变化速度或速率计算为在由时间间隔ts划分的时间间隔内的频率变化。所获得的值表示频率的时间导数,并且其单位能够给定为Hz/s。
另外,在本发明中,将频率变化率与阈值进行比较。因此阈值是表示可容许的频率变化率的值。最简单地,在本方法中阈值能够给定为常数值。该常数值能够根据历史数据或经验数据来近似。
根据实施方式,在开启分布式电源之后基于测得的频率变化率来确定阈值。当开启系统时,还将频率的变化率的测量值初始化。采集测量值,并且根据测得的数据来确定表示正常网络状况的值。这样的正常状况指的是其中分布式电源未在对孤岛网络进行馈送的情况。
在本发明的实施方式中,根据表示频率变化率的历史数据来确定阈值。根据测得的频率变化率的绝对值来形成包络曲线。还将该包络曲线乘以常数值,并且利用具有与公用网络的周期时间相比较大的时间常数的滤波器来对该包络曲线进行低通滤波。另外的解决方案是根据包络曲线计算移动平均。移动平均有效地对获得的数据进行平均,从而获得正常的频率变化率。
根据本发明,通过将频率的变化率的幅值与阈值进行比较来检测孤岛网络。因此,在本方法中,将形成的包络曲线与阈值进行比较。一旦包络曲线超过阈值达一定时间段,则确定:孤岛网络被形成。
能够将在形成阈值中使用的常数给予本方法作为参数。常数具有大于1的值,并且常数的目的是提高所形成的在正常运行中基本上在包络曲线上方的包络曲线平均。使用的常数改变本方法的灵敏度,使得当所选择的常数较大时频率变化率必须改变更大以便于超过阈值。
由于根据实施方式计算阈值作为包络曲线的移动平均,所以阈值自适应于变化的状况。也就是说,如果频率变化率的正常变化趋势改变,则阈值跟随该趋势。然而,如果频率变化率突然改变,则形成的包络曲线在阈值改变之前超过阈值。
以上通过使用包络曲线描述了本发明。包络曲线表示用在本方法中的获得的值。在离散系统中,以采样频率对频率进行采样,即以时间间隔Ts来获取样本。通过存储样本来形成包络曲线,并且类似地,通过选择在平均中使用的样本数目并且计算所选择的最终样本的平均来计算移动平均。当形成阈值时也可以应用其他平均方法。
当形成阈值时,能够通过确定一定数目的连续样本是否具有高于阈值的绝对值来实现确定频率变化率是否超过阈值达一定时间段。因此,当采样周期固定时,一定时间段对应于一定数目的样本。然而,本发明中所描述的方法不必要求任何固定的采样周期。
图2示出了在实施方式运行期间的波形示例。在图2中,线A1示出了作为时间T的函数的瞬时频率变化率。能够看出,瞬时变化率在正常运行中也变化显著。线A2示出了根据线A1通过计算频率的变化率的绝对值获得的包络曲线。
另外,图2示出了已乘以用于增加曲线水平的常数的经过低通滤波的曲线A3。曲线A3是在本方法中与包络曲线A2相比较的阈值曲线。
在图2中,频率的瞬时变化率的幅度即包络曲线A2在时刻T0处超过阈值A3。当包络曲线A2保持在阈值A3上方达一定时间段时,得出的结论是电源在对孤岛网络进行馈送。在图2中,包络曲线A2在时刻T0之后保持在阈值A3上方,因此检测出孤岛网络。
在检测出孤岛网络之后,将分布式电源与孤岛网络断开,使得不供给网络电力。
根据实施方式,分布式发电机产生无功功率用于增强孤岛网络形成的检测。特别地当要求孤岛检测应该为主动孤岛检测时产生无功功率。在本实施方式中,来自分布式发电机的无功功率连续地改变。所注入的无功功率的幅度保持在当被供给的网络在其正常状态时无功功率不干扰网络的这样的水平。一旦形成孤岛,注入的无功功率改变频率变化率,从而检测出孤岛。
将针对无功功率的另外的参考值与当前无功功率参考相加。根据实施方式,所产生的无功功率的幅度与由分布式发电机产生的有功功率成比例。随着由分布式发电机产生的有功功率的量改变,针对无功功率的幅度的参考也改变。无功功率参考可以是包括改变的方波信号或某些其他信号波形,该改变对频率变化率具有预期效果。
优选地,本发明的方法被实施在作为分布式发电机的一部分并且用于将电力供应给网络的逆变器中。这样的分布式发电机的示例是连接到公用电网的光伏发电系统。在这样的系统中,光伏阵列连接到电力电子装置。电力电子装置用于从光伏阵列中提取最大可用电力并且还用于修改电压,使得能够将电力馈送到公用网络。装置中电力的转换一般包括:以一个或更多个级提升电压,并且将电压控制到设定的DC水平。另外,DC电压最终转换成适于馈送到公用电网的AC电压。电力电子装置一般称为太阳能逆变器或光伏逆变器。
这样的太阳能逆变器包括能够用于实施本发明的方法的处理能力。另外,太阳能逆变器包括用于测量电网电压和电网频率的测量电路。另外,太阳能逆变器包括断路器,该断路器能够用于当得出结论是来自发电机的电力馈送到孤立网络中时、将分布式发电机与电网断开。因此,本发明的布置能够使用太阳能逆变器来实施。
对于本领域技术人员将明显的是,随着技术进步,能够以各种方式实施该创造性构思。本发明及其实施方式不限于以上所描述的示例,而可以在权利要求的范围内改变。

Claims (10)

1.一种检测分布式发电机的孤岛运行的方法,其特征在于,所述方法包括:
确定所述分布式发电机连接到的电网的频率,
测量所述分布式发电机的输出处的所述电网的频率的变化率,
确定针对变化速度的阈值,
将所述电网的频率的变化率与所述阈值进行比较,以及
当测得的频率的变化率超过所述阈值达一定时间段时检测出孤岛运行。
2.根据权利要求1所述的方法,其特征在于,针对所述电网的频率的变化率的所述阈值通过下述步骤来确定:
根据频率的瞬时变化率的绝对值来形成包络曲线,
对所形成的包络曲线进行平均,以及
将经过平均的曲线乘以常数用于获得所述阈值。
3.根据权利要求2所述的方法,其特征在于,对所述所形成的包络曲线进行平均包括对所述所形成的包络曲线进行低通滤波。
4.根据权利要求2所述的方法,其特征在于,对所述所形成的包络曲线进行平均包括对所述所形成的包络曲线的移动平均进行计算。
5.根据前述权利要求2至4中任一项所述的方法,其特征在于,将测得的频率的变化率与所述阈值进行比较的步骤包括:
将所述所形成的包络曲线与所述阈值进行比较。
6.根据前述权利要求1至5中任一项所述的方法,其特征在于,所述方法还包括:
通过所述分布式发电机将无功功率馈送至所述电网,其中,所述无功功率具有与由所述分布式发电机产生的有功功率成比例的幅度。
7.根据权利要求6所述的方法,其特征在于,馈送至所述电网的所述无功功率具有方波波形。
8.根据权利要求6所述的方法,其特征在于,馈送至所述电网的所述无功功率具有包括变化的波形,所述变化在孤岛网络形成时改变频率的变化率。
9.根据前述权利要求1至8中任一项所述的方法,其特征在于,所述方法还包括:
当检测出孤岛运行时将所述分布式发电机与所述电网断开。
10.一种用于检测分布式发电机的孤岛运行的布置,其特征在于,所述布置包括:
用于确定所述分布式发电机连接到的电网的频率的装置,
用于测量所述分布式发电机的输出处的所述电网的频率的变化率的装置,
用于确定针对变化速度的阈值的装置,
用于将所述电网的频率的变化率与所述阈值进行比较的装置,以及
用于当测得的频率的变化率超过所述阈值达一定时间段时检测出孤岛运行的装置。
CN201310467252.0A 2012-10-10 2013-10-09 用于检测分布式发电机的孤岛运行的方法 Active CN103728504B (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
EP12187942.3 2012-10-10
EP12187942.3A EP2720338B1 (en) 2012-10-10 2012-10-10 Method and arrangement for detecting an islanding operation of a distributed power generator

Publications (2)

Publication Number Publication Date
CN103728504A true CN103728504A (zh) 2014-04-16
CN103728504B CN103728504B (zh) 2016-09-07

Family

ID=47022532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310467252.0A Active CN103728504B (zh) 2012-10-10 2013-10-09 用于检测分布式发电机的孤岛运行的方法

Country Status (4)

Country Link
US (1) US9494637B2 (zh)
EP (1) EP2720338B1 (zh)
CN (1) CN103728504B (zh)
ES (1) ES2886050T3 (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104242270A (zh) * 2014-09-18 2014-12-24 南京南瑞继保电气有限公司 一种被动式防孤岛保护防误动方法
CN106664046A (zh) * 2014-06-26 2017-05-10 通用电气公司 跟随瞬态电网事件的发电系统控制
CN107422196A (zh) * 2017-02-27 2017-12-01 国电南瑞科技股份有限公司 一种基于谐波畸变率和频率的孤岛检测方法
CN107976609A (zh) * 2017-11-27 2018-05-01 王建安 一种孤网识别系统及方法
CN108008218A (zh) * 2017-11-27 2018-05-08 王建安 一种微、小电网运行状态识别方法
CN111541271A (zh) * 2020-05-13 2020-08-14 广东电网有限责任公司韶关供电局 一种小水电站孤岛运行和并网运行的识别方法和系统

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10310480B2 (en) * 2010-08-24 2019-06-04 Schweitzer Engineering Laboratories, Inc. Systems and methods for under-frequency blackout protection
US9287714B2 (en) * 2011-11-30 2016-03-15 Michael Ropp Method and system for island detection and anti-islanding protection in distributed power generation systems
DE102014108706B4 (de) * 2014-06-20 2016-08-04 Sma Solar Technology Ag Verfahren und Vorrichtung zum Erkennen einer Inselnetzsituation in einem Energieversorgungsnetz
CN104659758A (zh) * 2015-01-26 2015-05-27 国网浙江海盐县供电公司 一种分布式电源系统防孤岛效应的并网开关保护方法及并网开关装置
CN104993512B (zh) * 2015-06-05 2017-10-31 许继集团有限公司 一种适用于三相并网逆变器的快速模型预测控制方法
CN105375804B (zh) * 2015-12-17 2018-01-12 福州大学 一种不对称电压下基于npc拓扑并网逆变器的模型预测电流控制方法
US11424931B2 (en) 2016-01-27 2022-08-23 Blackberry Limited Trusted execution environment
US10599409B2 (en) * 2016-02-02 2020-03-24 Blackberry Limited Application lifecycle operation queueing
JP6160790B1 (ja) 2017-03-10 2017-07-12 富士電機株式会社 検出装置、パワーコンディショナ、検出方法、および検出プログラム
CN110663154A (zh) * 2017-05-31 2020-01-07 施耐德电气太阳能逆变器美国股份有限公司 用于孤岛检测的系统和方法
DE102017114306B4 (de) * 2017-06-28 2019-01-17 Sma Solar Technology Ag Verfahren zum betrieb eines inselnetzes und inselnetz
JP7007994B2 (ja) * 2018-06-14 2022-01-25 一般財団法人電力中央研究所 周波数変化率耐量の算出プログラム、算出方法および算出装置
CN111130134B (zh) * 2019-10-18 2021-06-29 国家电网有限公司 一种基于系统仿真的孤岛检测方法
EP3920357A1 (en) * 2020-06-05 2021-12-08 Vito NV System for managing power flow or energy in a nano- or microgrid

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101257209A (zh) * 2008-01-10 2008-09-03 清华大学深圳研究生院 光伏并网发电系统的孤岛运行检测方法
CN101268218A (zh) * 2005-09-19 2008-09-17 Abb瑞士有限公司 分布式发电机孤岛操作的检测方法
CN101651337A (zh) * 2009-09-17 2010-02-17 山东大学 基于相位偏移和频率变化的复合型孤岛检测方法
CN101794988A (zh) * 2010-03-30 2010-08-04 华中科技大学 一种微网孤岛状态的检测方法
CN102590663A (zh) * 2012-02-02 2012-07-18 浙江大学 一种改进的间歇性无功功率扰动孤岛检测方法
CN102680858A (zh) * 2012-05-30 2012-09-19 陕西长岭光伏电气有限公司 一种用于并网逆变器的孤岛效应检测方法

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1193351A (fr) * 1983-06-14 1985-09-10 Gerald Roberge Methode et systeme d'interconnexion de reseaux triphases syncrones au asynchrones au moyen d'impedances reactives variables
EP1057234A4 (en) 1997-11-24 2007-10-31 Robert H Wills PROCESS FOR AVOIDING THE ISLAND OPERATION AND DEVICE FOR PRODUCING DISTRIBUTED ENERGY
WO2001079872A1 (en) * 2000-04-13 2001-10-25 Genscape, Inc. Apparatus and method for the measurement and monitoring of electrical power generation and transmission
EP1276202B1 (en) * 2001-06-26 2008-01-09 Sanyo Denki Co., Ltd. Uninterruptible power supply and method of turning off AC switch for uninterruptible power supply
US20030213246A1 (en) * 2002-05-15 2003-11-20 Coll John Gordon Process and device for controlling the thermal and electrical output of integrated micro combined heat and power generation systems
JP4804375B2 (ja) * 2007-01-30 2011-11-02 三洋電機株式会社 系統連系装置及び系統連系システム
US8200372B2 (en) * 2008-03-31 2012-06-12 The Royal Institution For The Advancement Of Learning/Mcgill University Methods and processes for managing distributed resources in electricity power generation and distribution networks
US8560136B2 (en) * 2008-04-02 2013-10-15 Meidensha Corporation System stabilizing device
EP2208867A1 (de) * 2008-08-25 2010-07-21 Siemens Aktiengesellschaft Verfahren und Vorrichtung zum Regeln eines Dampfkraftwerks
WO2010108979A2 (en) * 2009-03-25 2010-09-30 Vestas Wind Systems A/S Improved frequency control
US8346402B2 (en) * 2009-05-11 2013-01-01 Schweitzer Engineering Laboratories Inc Islanding detection in an electrical power delivery system
US9077208B2 (en) * 2011-12-30 2015-07-07 Schneider Electric USA, Inc. Method of detecting instability in islanded electrical systems
US20130257054A1 (en) * 2012-03-29 2013-10-03 General Electric Company Gas Turbine - Variable Frequency Transformer Power Systems and Methods

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101268218A (zh) * 2005-09-19 2008-09-17 Abb瑞士有限公司 分布式发电机孤岛操作的检测方法
CN101257209A (zh) * 2008-01-10 2008-09-03 清华大学深圳研究生院 光伏并网发电系统的孤岛运行检测方法
CN101651337A (zh) * 2009-09-17 2010-02-17 山东大学 基于相位偏移和频率变化的复合型孤岛检测方法
CN101794988A (zh) * 2010-03-30 2010-08-04 华中科技大学 一种微网孤岛状态的检测方法
CN102590663A (zh) * 2012-02-02 2012-07-18 浙江大学 一种改进的间歇性无功功率扰动孤岛检测方法
CN102680858A (zh) * 2012-05-30 2012-09-19 陕西长岭光伏电气有限公司 一种用于并网逆变器的孤岛效应检测方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106664046A (zh) * 2014-06-26 2017-05-10 通用电气公司 跟随瞬态电网事件的发电系统控制
CN106664046B (zh) * 2014-06-26 2019-05-10 通用电气公司 跟随瞬态电网事件的发电系统控制
CN104242270A (zh) * 2014-09-18 2014-12-24 南京南瑞继保电气有限公司 一种被动式防孤岛保护防误动方法
CN104242270B (zh) * 2014-09-18 2017-01-18 南京南瑞继保电气有限公司 一种被动式防孤岛保护防误动方法
CN107422196A (zh) * 2017-02-27 2017-12-01 国电南瑞科技股份有限公司 一种基于谐波畸变率和频率的孤岛检测方法
CN107422196B (zh) * 2017-02-27 2019-12-06 国电南瑞科技股份有限公司 一种基于谐波畸变率和频率的孤岛检测方法
CN107976609A (zh) * 2017-11-27 2018-05-01 王建安 一种孤网识别系统及方法
CN108008218A (zh) * 2017-11-27 2018-05-08 王建安 一种微、小电网运行状态识别方法
CN111541271A (zh) * 2020-05-13 2020-08-14 广东电网有限责任公司韶关供电局 一种小水电站孤岛运行和并网运行的识别方法和系统
CN111541271B (zh) * 2020-05-13 2024-02-13 广东电网有限责任公司韶关供电局 一种小水电站孤岛运行和并网运行的识别方法和系统

Also Published As

Publication number Publication date
US9494637B2 (en) 2016-11-15
US20140098449A1 (en) 2014-04-10
ES2886050T3 (es) 2021-12-16
EP2720338B1 (en) 2021-06-09
EP2720338A1 (en) 2014-04-16
CN103728504B (zh) 2016-09-07

Similar Documents

Publication Publication Date Title
CN103728504A (zh) 用于检测分布式发电机的孤岛运行的方法
Mulhausen et al. Anti-islanding today, successful islanding in the future
US8346402B2 (en) Islanding detection in an electrical power delivery system
EP2501014B1 (en) Method and apparatus for detecting islanding conditions of distributed generator
EP2733805B1 (en) Systems and methods of discriminating DC arcs and load switching noise
EP1855367A1 (en) Method and device for injecting reactive current during a mains supply voltage dip
CN103645404A (zh) 一种微电网孤岛检测方法
EP2590291B1 (en) Method and apparatus for detecting islanding conditions of a distributed grid
EP2645517B1 (en) Improvement for islanding detection reliability in electricity distribution network
EP2645516B1 (en) Islanding detection in electricity distribution network
EP3079217A1 (en) Method for detecting islanding in grid connected power generation systems and related dc/ac converter apparatus
CN104242267A (zh) 一种风力发电送出输电线路距离保护方法
CN105334390A (zh) 适用于多机集群的外部集中扰动式阻抗测量孤岛检测法
CN104655957A (zh) 一种主被动结合的混合型孤岛检测方法
Mostaro et al. Islanding detection based on impedance estimation using small signal injection
EP2840674A2 (en) Systems and methods for power swing angle estimation in an electrical power system
KR101277141B1 (ko) 전자식 전력량계와 이의 배전계통 감시방법
JP4038318B2 (ja) 分散型電源の系統連系保護方法およびその装置
CN103314302B (zh) 增强旋转电机上的发电机接地故障检测的可靠性的方法和设备
EP2937965B1 (en) Detection of islanding state in electricity network
Lukač et al. Anti-islanding protection of distributed generators with regard to sensitivity in a balance and power system stability
KR100538439B1 (ko) 계통 연계 분산 전원의 단독운전 판단 방법
Sumner et al. Intelligent protection for embedded generation using active impedance estimation
Patil et al. A novel method for islanding detection of distribution system with distributed generator
US11988698B2 (en) Verifying the accuracy of measurements taken by an electricity meter

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180418

Address after: Baden, Switzerland

Patentee after: ABB TECHNOLOGY LTD.

Address before: Helsinki

Patentee before: ABB AB

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201124

Address after: Rotterdam

Patentee after: Malich holding Netherlands private limited liability company

Address before: Baden, Switzerland

Patentee before: ABB Switzerland Co.,Ltd.