CN101651337A - 基于相位偏移和频率变化的复合型孤岛检测方法 - Google Patents

基于相位偏移和频率变化的复合型孤岛检测方法 Download PDF

Info

Publication number
CN101651337A
CN101651337A CN 200910018774 CN200910018774A CN101651337A CN 101651337 A CN101651337 A CN 101651337A CN 200910018774 CN200910018774 CN 200910018774 CN 200910018774 A CN200910018774 A CN 200910018774A CN 101651337 A CN101651337 A CN 101651337A
Authority
CN
China
Prior art keywords
delta
island
phase deviation
phase
frequency change
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200910018774
Other languages
English (en)
Other versions
CN101651337B (zh
Inventor
侯梅毅
高厚磊
张永武
胡晓东
孙爱民
武志刚
李玉志
曹华明
林勇
陆以军
姚翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Shandong University
Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University, Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Shandong University
Priority to CN 200910018774 priority Critical patent/CN101651337B/zh
Publication of CN101651337A publication Critical patent/CN101651337A/zh
Application granted granted Critical
Publication of CN101651337B publication Critical patent/CN101651337B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开了一种基于相位偏移和频率变化的复合型孤岛检测方法。首先,设置两个相位偏移动作值Δθ1和Δθ2,且满足Δθ1>Δθ2;当分布式发动机(DG,Distributed Generator)端电压的相位偏移角Δθ>Δθ1时,直接判断DG为孤岛运行;而当Δθ1>Δθ>Δθ2时,引入频率变化值Δf作为辅助检测量,只有同时满足Δθ>Δθ2且Δf<Δf1时,Δf1为频率变化动作值,检测装置才动作,判断为孤岛状态;孤岛检测的复合型动作判据归纳如下:Δθ>Δθ1 (1)或Δθ>Δθ2且Δf<Δf1 (2)上述判据(1)用于孤岛瞬间DG和负载有功功率不匹配程度较大时的情况,而判据(2)用于孤岛后DG所带负载有功功率变化不大的情况,即传统相位偏移法无法检测出的孤岛状况,通过引入频率变化量,将相位偏移和频率变化相结合,判断DG是否处于孤岛状态。

Description

基于相位偏移和频率变化的复合型孤岛检测方法
技术领域
本发明涉及属于配电网的保护与控制技术领域和分布式发电技术领域,更具体地说是涉及一种分布式同步发电机的基于相位偏移和频率变化的复合型孤岛检测方法。
背景技术
并网运行的分布式电源需安装孤岛检测装置,快速、准确地检测出孤岛状态,一旦孤岛发生立即采取相应措施,消除孤岛运行可能产生的危害。由于分布式发电机(DG,DistributedGenerator)的种类及其并网方式不同,其孤岛检测的方法也不同。对于同步发电机而言,一般采用基于本地(DG侧)电气量变化的被动检测法。其中,利用DG端电压相位偏移进行孤岛检测是一种运用于实际的孤岛检测方法,但该方法存在灵敏度及可靠性问题。
相位偏移法的依据是孤岛发生瞬间DG输出的有功功率与负载有功功率的不平衡,从而引起DG端电压频率的变化及相位的偏移。当孤岛瞬间功率不平衡的程度较小时,DG端电压的相位偏移量很小,而DG与电网并联运行时负载的变化也会引起同样大小的相位偏移值,装置无法区分孤岛与非孤岛。为防止孤岛检测装置误动,必须设定一个较高的相位偏移动作值,从而降低了检测装置的灵敏度。仅靠检测相位偏移不能解决灵敏度和误动的矛盾。
发明内容
针对传统相位偏移法存在的灵敏度和可靠性问题,本发明提出了一种基于相位偏移和频率变化的复合型孤岛检测方法,将频率变化引入孤岛检测,与相位偏移相结合组成复合判据,在保证可靠性的前提下,有效地提高孤岛检测装置的灵敏。
为实现上述目的,本发明采用如下技术方案:
一种基于相位偏移和频率变化的复合型孤岛检测方法,它通过检测DG端电压的相位偏移量Δθ和频率变化值Δf来判断DG是否处于孤岛运行状态;
首先,设置两个相位偏移动作值Δθ1和Δθ2,且满足Δθ1>Δθ2;当分布式发动机端电压的相位偏移角Δθ>Δθ1时,直接判断DG为孤岛运行;而当Δθ1>Δθ>Δθ2时,引入频率变化值Δf作为辅助检测量,只有同时满足Δθ>Δθ2且Δf<Δf1时,Δf1为频率变化动作值,检测装置才动作,判断为孤岛状态;孤岛检测的复合型动作判据归纳如下:
Δθ>Δθ1    (1)
或Δθ>Δθ2且Δf<Δf1(2)
上述判据(1)用于孤岛瞬间DG和负载有功功率不匹配程度较大时的情况,而判据(2)用于孤岛后DG所带负载有功功率变化不大的情况,即传统相位偏移法无法检测出的孤岛状况,通过引入频率变化量,将相位偏移和频率变化相结合,判断DG是否处于孤岛状态。
所述频率变化动作值Δf1的选取应大于孤岛瞬间功率不匹配程度较小时产生的频率变化最大值,相位偏移动作值Δθ1应大于DG与电网并联运行时负载的变化引起的相位偏移最大值,Δθ2的选取与灵敏度要求有关,选取的值越小灵敏度越高。
图1为安装有相位偏移继电器的分布式发电系统等值电路,假定分布式电源为同步发电机。在正常运行情况下,如果断路器CB2跳开则会形成孤岛,由于DG所带负载功率的突然增加(或减少),DG端电压U和电动势E之间的功角δ会发生变化,端电压将从孤岛前的u跳变到一个新的值u′,其相位也会随之改变。随着时间的推移u′与u之间的相位差Δθ逐渐增大,直至DG的频率重新回归到额定值,如图2所示。端电压的这种变化称之为相位偏移,相位偏移法就是基于这一特性而建立的一种孤岛检测方法。相位偏移继电器不间断地检测端电压U的相位变化值Δθ,如果Δθ大于继电器设定的阈值α,则发出孤岛运行信号。
基于相位偏移和频率变化的复合型孤岛检测方法。该方法通过检测DG端电压的相位偏移量Δθ和频率变化值Δf来判断DG是否处于孤岛运行状态,设置两个相位偏移动作值Δθ1和Δθ2,且满足Δθ1>Δθ2。这里,Δθ1为大定值,Δθ2为小定值。当相位偏移角Δθ>Δθ1时,直接判断DG为孤岛运行;而当Δθ1>Δθ>Δθ2时,引入频率变化值Δf作为辅助检测量,只有同时满足Δθ>Δθ2且Δf<Δf1时,检测装置才动作,判断为孤岛状态。孤岛检测的复合型动作判据归纳如下:
Δθ>Δθ1(1)
或Δθ>Δθ2且Δf<Δf1(2)
上述判据(1)用于孤岛瞬间DG和负载有功功率不匹配程度较大时的情况,而判据(2)用于孤岛后DG所带负载有功功率变化不大的情况,即传统相位偏移法无法检测出的孤岛状况,通过引入频率变化量,将相位偏移和频率变化相结合,判断DG是否处于孤岛状态。频率变化动作值Δf1的选取应大于孤岛瞬间功率不匹配程度较小时可能产生的频率变化最大值,相位偏移动作值Δθ1应大于DG与电网并联运行时负载的变化引起的相位偏移最大值,Δθ2的选取与灵敏度要求有关,选取的值越小灵敏度越高。
本发明的有益效果为:本发明提出的基于相位偏移和频率变化的复合型孤岛检测方法与传统相位偏移法相比较,当孤岛瞬间功率不平衡的程度较小时引入了频率变化量,用于区别孤岛与非孤岛,其实质就是在保证可靠性的前提下,通过降低阈值,提高孤岛检测装置的灵敏度。
附图说明
图1装有相位偏移继电器的系统等值电路;
图2DG端电压的相位偏移图;
图3相位偏移与频率变化的关系图;
图4动态模拟系统图;
图5a频率变化与相位偏移的动模仿真试验结果;
图5b为孤岛前DG所带有功功率为7.5kW的变化情况;
图5c为孤岛前DG所带有功功率为8.0kW的变化情况;
图5d为孤岛前DG所带的有功功率为8.5kW时相位的变化情况;
图5e是负载由6kW增加到10kW时DG端电压相位的变化情况。
具体实施方式
下面结合附图和实施例对本发明作进一步描述。
本发明的检测原理:
相位偏移角Δθ是频率变化Δf引起的累计值,其大小由频率变化的大小和变化所持续的时间两个因素决定,可以推导出它们之间的关系为:
Δθ=2π∫Δfdt
由上式可知,对于相同的相位偏移量,频率变化所持续的时间不同,相应的频率变化最大值也不同,可用图3表示,其中t1、t2及t1′、t2′分别为两种不同情况下频率变化的启始及结束时刻,Δθ为图中阴影部分的面积。可见,对于相同的Δθ,相应的频率变化最大值是不同的。
对DG而言,当与电网并联运行时负载变化引起的相位偏移与孤岛状态下的相位偏移相等时,相应的频率变化值是不同的。对于前一种情况,由于电网的频率调节能力较强,其频率变化的持续时间较短,相应的频率变化值较大;而对后一种情况,由于DG自身的频率调节能力相对较弱,其频率调节持续的时间相对较长,相同的相位偏移所对应的频率变化值较小。因而,可以将频率变化值作为孤岛检测量,与相位偏移相结合组成复合判据用于孤岛检测。当孤岛瞬间DG输出有功功率和负载有功功率不匹配程度较小、产生的相位偏移也较小时,仅根据相位偏移无法区分孤岛与非孤岛,此时可根据频率变化的大小来判断DG是否处于孤岛状态。
动模试验分析。动模仿真系统如图4所示,其中DG为一15KVA同步发电机,负载L由静态负荷和旋转的电动机组成,故障录波器安装在DG的并网连接处。当断路器CB2或CB3跳开时,DG和负载L脱离公用电网组成一个孤岛系统。孤岛后DG的端电压由故障录波器测得,然后根据录波器记录的瞬时值,离线计算出DG端电压的频率变化及相位偏移。
1.孤岛瞬间DG端电压的相位偏移。DG与电网并列运行,负载L的有功功率为10kW,功率因数为0.9,由DG和电网共同提供,其中DG负担的有功功率为7kW。t=0时,跳开断路器CB3,DG处于孤岛运行状态,负载的有功功率完全由DG提供。由于孤岛发生的瞬间DG输出的有功功率与负载功率不平衡,从而引起端电压频率的变化及相位偏移,试验结果如图5(a)所示。图中显示,孤岛发生后DG端电压的频率下降,相应地引起相位的偏移。相位偏移角度Δθ在大约5个周波时达到5°,如果VS继电器的动作值设定为5°,则相位偏移方法将在5个周波内检测出孤岛状态。可见,利用相位偏移能快速检测孤岛的发生。
2.有功功率不平衡程度对相位偏移法的影响。为了分析孤岛形成瞬间有功功率不平衡对相位偏移法的影响,进行下述仿真研究。负载L的有功功率仍为10kW,功率因数为0.9。DG与电网并列运行时,其负担的有功功率分别为9kW、8.5kW、8kW、7.5kW。跳开断路器CB3,DG处于孤岛运行状态,负载的功率完全由DG提供。孤岛状态下DG端电压的相位偏移如图5b至图5d所示。图5b、图5c分别为孤岛前DG所带有功功率为7.5kW和8.0kW的情况。图5b显示,相位的偏移角Δθ在大约6个周波时达到5°,而图5c显示,Δθ在大约7个周波时才达到5°。可见,随着孤岛发生时有功功率不平衡程度的减小,相位的变化也随之减小,相位偏移法检测出孤岛的时间延长。图5d为孤岛前DG所带的有功功率为8.5kW时相位的变化情况,图中同时给出了频率的变化情况。图5d显示,最大相位偏移值为3°,这是由于孤岛发生时功率不平衡程度很小,相应的频率变化及相位偏移也很小。当DG趋于稳定时,频率恢复到正常值,相位偏移角Δθ不再发生变化。如果动作值仍为5°,则VS方法将不能检测出孤岛状态。若将VS继电器的动作值减小到3°可以检测出孤岛状态,但动作值的减小会引起检测装置的误动(见仿真结果)。
3.负载变化对相位偏移法的影响。当DG与电网并网运行时,负载有功功率的变化也会引起DG端电压相位的偏移,有可能使VS继电器误动作,对此进行下述动模仿真试验:DG与电网并网运行,负载L的功率由DG和电网共同提供,分别将负载的有功功率由6kW、7kW、8kW增加到10kW,检测DG端电压频率及相位的变化。图5e是负载由6kW增加到10kW时DG端电压相位的变化情况,图中同时给出了频率的变化情况。由图5e可以看出,负载有功功率的变化同样会引起频率及相位的变化。但由于DG与电网并联运行,虽然负载的有功功率变化很大,频率及相位的变化并不十分明显,但最大相位偏移角度Δθ仍然达到3°。另一项研究是将负载的有功功率从10kW分别减小到6kW、7kW、8kW,可得到相似的结果,不同之处在于负载的减小将引起频率的增加,相位偏移将反方向增加。由此可见,如果将VS继电器的动作值减小到3°,将会引起检测装置的误动。
由上述动模试验可以看出,利用DG端电压的相位偏移能快速地检测出DG是否处于孤岛状态。但随着孤岛瞬间DG输出有功功率和负载有功功率不匹配程度的降低,相位偏移值随之减小,当减小到DG与电网并网运行时负载变化引起的相位偏移值时,装置无法区分孤岛与非孤岛。如果设定一个较高的相位偏移动作值(如5°),可以避免检测装置的误动,但却降低了孤岛检测的灵敏度,这对配电网是不利的。从保证电网安全的角度考虑,可降低阈值(如3°)来提高检测装置的灵敏度,但随之而来的是误动几率的增大,即DG在非孤岛运行状态下被错误地从电网中退出的几率增大。可见,仅仅检测相位偏移不能解决灵敏度和误动的矛盾。而根据本发明提出的基于相位偏移和频率变化的复合型孤岛检测方法,针对孤岛瞬间功率不匹配较小时的孤岛检测,引入频率变化作为检测量,与相位偏移相结合,则能可靠地区分孤岛与非孤岛状态。假定设定Δθ1为5°,Δθ2为3°,Δf1为0.4Hz,则图5d对应的孤岛瞬间有功功率不匹配很小时的孤岛状态可以被检测出来,而对于图5d对应的DG与电网并联运行时负载波动的情况,虽然引起的相位偏移值大于3°,但频率变化值大于0.4Hz,不会造成检测装置误动。可见,本发明提出的检测方法,其实质就是在保证可靠性的前提下,通过降低阈值,提高孤岛检测的灵敏度。
动模仿真试验结果证明了本发明针同步发动机提出的孤岛检测新方法的正确性,该方法可以在保证可靠性的前提下,提高检测装置的灵敏度。随着分布式发电技术的推广,并网DG的孤岛检测问题会越来越重要,新孤岛检测方法的使用将极大地提高含分布式电源配电网运行的安全性,同时提高了分布式发电商的经济效益。

Claims (2)

1.一种基于相位偏移和频率变化的复合型孤岛检测方法,其特征是,它通过检测DG端电压的相位偏移量Δθ和频率变化值Δf来判断DG是否处于孤岛运行状态;
首先,设置两个相位偏移动作值Δθ1和Δθ2,且满足Δθ1>Δθ2;当分布式发动机端电压的相位偏移角Δθ>Δθ1时,直接判断DG为孤岛运行;而当Δθ1>Δθ>Δθ2时,引入频率变化值Δf作为辅助检测量,只有同时满足Δθ>Δθ2且Δf<Δf1时,Δf1为频率变化动作值,检测装置才动作,判断为孤岛状态;孤岛检测的复合型动作判据归纳如下:
Δθ>Δθ1                (1)
或Δθ>Δθ2且Δf<Δf1   (2)
上述判据(1)用于孤岛瞬间DG和负载有功功率不匹配程度较大时的情况,而判据(2)用于孤岛后DG所带负载有功功率变化不大的情况,即传统相位偏移法无法检测出的孤岛状况,通过引入频率变化量,将相位偏移和频率变化相结合,判断DG是否处于孤岛状态。
2.如权利要求1所述的基于相位偏移和频率变化的复合型孤岛检测方法,其特征是,所述频率变化动作值Δf1的选取应大于孤岛瞬间功率不匹配程度较小时产生的频率变化最大值,相位偏移动作值Δθ1应大于DG与电网并联运行时负载的变化引起的相位偏移最大值,Δθ2的选取与灵敏度要求有关,选取的值越小灵敏度越高。
CN 200910018774 2009-09-17 2009-09-17 基于相位偏移和频率变化的复合型孤岛检测方法 Expired - Fee Related CN101651337B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910018774 CN101651337B (zh) 2009-09-17 2009-09-17 基于相位偏移和频率变化的复合型孤岛检测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910018774 CN101651337B (zh) 2009-09-17 2009-09-17 基于相位偏移和频率变化的复合型孤岛检测方法

Publications (2)

Publication Number Publication Date
CN101651337A true CN101651337A (zh) 2010-02-17
CN101651337B CN101651337B (zh) 2011-06-08

Family

ID=41673495

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910018774 Expired - Fee Related CN101651337B (zh) 2009-09-17 2009-09-17 基于相位偏移和频率变化的复合型孤岛检测方法

Country Status (1)

Country Link
CN (1) CN101651337B (zh)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101794988A (zh) * 2010-03-30 2010-08-04 华中科技大学 一种微网孤岛状态的检测方法
CN101931219A (zh) * 2010-08-24 2010-12-29 西安交通大学 一种基于相位偏移的自抗扰孤岛检测方法
CN101944746A (zh) * 2010-07-20 2011-01-12 郑军 光伏并网发电系统的孤岛检测方法、装置及系统
CN101986496A (zh) * 2010-09-29 2011-03-16 天津大学 含分布式电源的配电系统孤岛形成方法
CN102183733A (zh) * 2011-03-07 2011-09-14 河海大学 一种改善电能质量的光伏并网逆变器孤岛检测方法
CN103116103A (zh) * 2013-02-04 2013-05-22 江苏大全凯帆电器股份有限公司 主动式频率偏移孤岛检测方法
CN103296643A (zh) * 2013-03-19 2013-09-11 昆明理工大学 一种基于广域信息电压相位差比较式孤岛检测及孤岛保护方法
WO2014032249A1 (en) * 2012-08-30 2014-03-06 General Electric Company System and method for detecting islanding of electrical machines and protecting same
CN103728504A (zh) * 2012-10-10 2014-04-16 Abb公司 用于检测分布式发电机的孤岛运行的方法
CN103969549A (zh) * 2014-04-18 2014-08-06 珠海许继电气有限公司 电源设备的孤岛检测方法及孤岛检测装置
CN104090195A (zh) * 2014-07-31 2014-10-08 阳光电源股份有限公司 一种孤岛检测方法和装置
CN104316786A (zh) * 2014-10-10 2015-01-28 湖南大学 一种混合孤岛检测方法
CN106124890A (zh) * 2016-04-14 2016-11-16 国网辽宁省电力有限公司电力科学研究院 一种光伏并网发电系统的反孤岛检测方法
CN107526009A (zh) * 2017-09-13 2017-12-29 国电南瑞科技股份有限公司 一种根据频率和电流变化时序的孤岛检测防误闭锁方法
CN109298284A (zh) * 2018-09-18 2019-02-01 四川大学 利用pmu测量相量角度数据进行孤岛效应检测的方法及系统
US10637249B2 (en) 2016-11-24 2020-04-28 Huawei Technologies Co., Ltd. Inverter anti-islanding control system
CN111856311A (zh) * 2020-07-06 2020-10-30 上海交通大学 中低压直流系统分布式电源孤岛检测方法和系统
CN112731014A (zh) * 2020-12-18 2021-04-30 佛山科学技术学院 一种直流互联配电系统的孤岛检测方法以及装置

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101794988B (zh) * 2010-03-30 2012-07-04 华中科技大学 一种微网孤岛状态的检测方法
CN101794988A (zh) * 2010-03-30 2010-08-04 华中科技大学 一种微网孤岛状态的检测方法
CN101944746A (zh) * 2010-07-20 2011-01-12 郑军 光伏并网发电系统的孤岛检测方法、装置及系统
CN101944746B (zh) * 2010-07-20 2013-06-05 深圳市红岩电控设备有限公司 光伏并网发电系统的孤岛检测方法、装置及系统
CN101931219A (zh) * 2010-08-24 2010-12-29 西安交通大学 一种基于相位偏移的自抗扰孤岛检测方法
CN101931219B (zh) * 2010-08-24 2013-02-06 西安交通大学 一种基于相位偏移的自抗扰孤岛检测方法
CN101986496A (zh) * 2010-09-29 2011-03-16 天津大学 含分布式电源的配电系统孤岛形成方法
CN101986496B (zh) * 2010-09-29 2012-08-08 天津大学 含分布式电源的配电系统孤岛形成方法
CN102183733A (zh) * 2011-03-07 2011-09-14 河海大学 一种改善电能质量的光伏并网逆变器孤岛检测方法
WO2014032249A1 (en) * 2012-08-30 2014-03-06 General Electric Company System and method for detecting islanding of electrical machines and protecting same
US20150263508A1 (en) * 2012-08-30 2015-09-17 Huibin Zhu System and method for detecting islanding of electrical machines and protecting same
CN103728504A (zh) * 2012-10-10 2014-04-16 Abb公司 用于检测分布式发电机的孤岛运行的方法
US9494637B2 (en) 2012-10-10 2016-11-15 Abb Oy Method for detecting islanding operation of distributed power generator
CN103116103A (zh) * 2013-02-04 2013-05-22 江苏大全凯帆电器股份有限公司 主动式频率偏移孤岛检测方法
CN103296643A (zh) * 2013-03-19 2013-09-11 昆明理工大学 一种基于广域信息电压相位差比较式孤岛检测及孤岛保护方法
CN103296643B (zh) * 2013-03-19 2017-02-22 昆明理工大学 一种基于广域信息电压相位差比较式孤岛检测及孤岛保护方法
CN103969549A (zh) * 2014-04-18 2014-08-06 珠海许继电气有限公司 电源设备的孤岛检测方法及孤岛检测装置
CN103969549B (zh) * 2014-04-18 2016-08-17 珠海许继电气有限公司 电源设备的孤岛检测方法及孤岛检测装置
CN104090195A (zh) * 2014-07-31 2014-10-08 阳光电源股份有限公司 一种孤岛检测方法和装置
CN104090195B (zh) * 2014-07-31 2017-06-16 阳光电源股份有限公司 一种孤岛检测方法和装置
CN104316786A (zh) * 2014-10-10 2015-01-28 湖南大学 一种混合孤岛检测方法
CN106124890A (zh) * 2016-04-14 2016-11-16 国网辽宁省电力有限公司电力科学研究院 一种光伏并网发电系统的反孤岛检测方法
CN106124890B (zh) * 2016-04-14 2019-05-17 国网辽宁省电力有限公司电力科学研究院 一种光伏并网发电系统的反孤岛检测方法
US10637249B2 (en) 2016-11-24 2020-04-28 Huawei Technologies Co., Ltd. Inverter anti-islanding control system
CN107526009A (zh) * 2017-09-13 2017-12-29 国电南瑞科技股份有限公司 一种根据频率和电流变化时序的孤岛检测防误闭锁方法
CN109298284A (zh) * 2018-09-18 2019-02-01 四川大学 利用pmu测量相量角度数据进行孤岛效应检测的方法及系统
CN111856311A (zh) * 2020-07-06 2020-10-30 上海交通大学 中低压直流系统分布式电源孤岛检测方法和系统
CN111856311B (zh) * 2020-07-06 2021-08-03 上海交通大学 中低压直流系统分布式电源孤岛检测方法和系统
CN112731014A (zh) * 2020-12-18 2021-04-30 佛山科学技术学院 一种直流互联配电系统的孤岛检测方法以及装置
CN112731014B (zh) * 2020-12-18 2023-12-26 佛山科学技术学院 一种直流互联配电系统的孤岛检测方法以及装置

Also Published As

Publication number Publication date
CN101651337B (zh) 2011-06-08

Similar Documents

Publication Publication Date Title
CN101651337B (zh) 基于相位偏移和频率变化的复合型孤岛检测方法
CN102270854B (zh) 基于电压谐波畸变率正反馈的孤岛检测方法
CN103645404B (zh) 一种微电网孤岛检测方法和检测系统
CN103412207B (zh) 基于负序电流注入的光伏并网逆变器孤岛检测方法
CN104538939B (zh) 适应三相跳闸形成的含风电孤网运行送出线的重合方法
CN104267315B (zh) 基于主动频率偏移和电压幅值变化的复合型孤岛检测方法
CN105334390B (zh) 适用于多机集群的外部集中扰动式阻抗测量孤岛检测法
CN101777758A (zh) 施加脉冲电流干扰的频率偏移孤岛检测方法
CN103217641A (zh) 一种风电变流器的crowbar电路的测试装置及测试方法
CN105762829A (zh) 基于相角估算的微电网逆变器离并网无缝切换控制方法
CN101626158B (zh) 一种随调式消弧线圈自动调谐控制方法
CN103730906A (zh) 一种抑制混合直流输电换相失败的协调控制方法
CN115085367A (zh) 一种孤岛检测方法以及装置
Balaguer et al. Survey of photovoltaic power systems islanding detection methods
Rawat et al. Evolution of islanding detection methods for microgrid systems
CN109638865A (zh) 一种储能变流器抑制励磁涌流的方法
CN103515981B (zh) 并网光伏发电系统及其自动式相位移孤岛现象检测方法
Li et al. Modeling and transient stability analysis of mixed-GFM-GFL-based power system
CN101577415B (zh) 一种电力系统继电保护的系统失稳判定方法
Shen et al. Transient performance comparison of grid-forming converters with different FRT control strategies
Bashir et al. Islanding detection of a distributed generation system using angle between negative sequence voltage and current
Abdolrasol et al. Three phase grid connected anti-islanding controller based on distributed generation interconnection
CN110635499B (zh) 基于并离网暂态过程分段控制的储能变流器平滑切换方法
Murugesan et al. Band pass filter based active island detection technique for PMSG based WECS
Aiming et al. An Active Protection Scheme for Microgrids Based on the Harmonic Injection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110608

Termination date: 20150917

EXPY Termination of patent right or utility model