CN103727933B - Pipe installing center positioning device and localization method thereof - Google Patents

Pipe installing center positioning device and localization method thereof Download PDF

Info

Publication number
CN103727933B
CN103727933B CN201410000020.9A CN201410000020A CN103727933B CN 103727933 B CN103727933 B CN 103727933B CN 201410000020 A CN201410000020 A CN 201410000020A CN 103727933 B CN103727933 B CN 103727933B
Authority
CN
China
Prior art keywords
center
claw
straight tube
positioning device
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410000020.9A
Other languages
Chinese (zh)
Other versions
CN103727933A (en
Inventor
杨云龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201410000020.9A priority Critical patent/CN103727933B/en
Publication of CN103727933A publication Critical patent/CN103727933A/en
Application granted granted Critical
Publication of CN103727933B publication Critical patent/CN103727933B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors
    • F16L1/10Accessories therefor, e.g. anchors for aligning
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/0243Laying or reclaiming pipes on land, e.g. above the ground above ground
    • F16L1/0246Laying or reclaiming pipes on land, e.g. above the ground above ground at a certain height off the ground
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L5/00Devices for use where pipes, cables or protective tubing pass through walls or partitions

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • A Measuring Device Byusing Mechanical Method (AREA)

Abstract

The present invention relates to the center positioning device of pipeline center and preformed hole center centering during a kind of Pipe installing and localization method thereof.This center positioning device includes positioning disc, claw, and positioning disc is provided centrally with centre bore, and disc circumference is fixed with the claw being radially evenly arranged, and on claw, segmentation has graduation mark the positioning pin equipped with energy activity.During centralized positioning, center positioning device is fixed on body of wall reserving hole, and makes the positioning disc of center positioning device be positioned at reserving hole center;A straight tube is inserted from the centre bore positioning disc, and lay level indicator on this straight tube, it is ensured that after lifting pipeline and this straight tube are horizontal relationship, directly measure the parallel position deviation treating lifting pipeline with straight tube, calculate the height treating lifting pipeline, complete pipeline center location.The present invention adopts center positioning device to complete pipeline center's centering, quick, simple, it is to avoid installation personnel too much causes personnel crowded, can be greatly improved Pipe installing efficiency.

Description

Pipe installing center positioning device and localization method thereof
Technical field
The present invention relates to pipeline through-wall or aerial pipeline installation method, specifically the center positioning device of pipeline center and preformed hole center centering and localization method thereof during a kind of Pipe installing.
Background technology
In pipeline mounting construction, when pipeline through-wall or aerial pipeline are connected with fixing pipe fitting, it is necessary in advance hole or fixing pipe fitting center are carried out centering.Tradition aligning method adopts conventional leveling measuring method, and the required working time is longer, and subject to conditions cannot set up measuring table.
Summary of the invention
Present invention seek to address that in existing pipeline mounting construction, the problems referred to above that pipeline center's centering exists, and a kind of Pipe installing center positioning device and localization method thereof are provided.
This invention address that described problem the technical scheme is that
A kind of Pipe installing center positioning device, including positioning disc, claw, described positioning disc is provided centrally with centre bore, and disc circumference is fixed with the claw being radially evenly arranged, and on described claw, segmentation has graduation mark the positioning pin equipped with energy activity.
The method utilizing above-mentioned Pipe installing center positioning device to carry out pipeline center location, carries out in the steps below:
A. utilize the claw of center positioning device, by regulating positioning pin position on claw, center positioning device is fixed on body of wall reserving hole, and makes the positioning disc of center positioning device be positioned at reserving hole center;
B. a straight tube is inserted from the centre bore positioning disc, and lay level indicator on this straight tube, it is ensured that after lifting pipeline and this straight tube are horizontal relationship, directly measure the parallel position deviation treating lifting pipeline with straight tube, calculate the height treating lifting pipeline, complete pipeline center location.
Adopting the present invention of technique scheme, compared with prior art, its prominent feature is:
Center positioning device available job site wastes of iron and steel makes, with low cost, according to pipe diameter size, claw length is lengthened, and rounds maximum caliber in a pipeline engineering and makes, then improves center positioning device utilization rate;
Center positioning device is adopted to complete pipeline center's centering, quick, simple, it is to avoid installation personnel too much causes personnel crowded, can be greatly improved Pipe installing efficiency.
As preferably, Pipe installing center positioning device further technical scheme is:
Described positioning disc periphery is radially fixed with three claws being mutually hexagonal angle, has elongated slot in the middle of each claw along its length, and elongated slot is embedded in positioning pin that can be movable.
Described positioning pin is bolt arrangement, and bolt is positioned on claw through the elongated slot on claw by locking nut, and the nut upper vertical of bolt is fixed with location-plate.
Accompanying drawing explanation
Fig. 1 is Pipe installing center positioning device perspective view in embodiment.
Fig. 2 is the front schematic view that in embodiment, Pipe installing center positioning device is fixed on reserving hole.
Fig. 3 is that lifting pipeline is higher than parallel position deviation instrumentation plan during reserving hole absolute altitude.
Parallel position deviation instrumentation plan when Fig. 4 is to lift pipeline lower than reserving hole absolute altitude.
In figure: positioning disc 1, claw 2, locking nut 3, bolt 4, location-plate 5, elongated slot 6, centre bore 7, reserving hole 8, straight tube 9, level indicator 10, lift pipeline 11.
Detailed description of the invention
Below in conjunction with embodiment in detail the present invention is described in detail, only for purpose of being more fully understood that present invention.Therefore, the cited case is not limiting as protection scope of the present invention.
Referring to Fig. 1, this Pipe installing center positioning device have employed scroll chuck structure, its main part is positioning disc 1, the disk of the φ 50 being made up of steel plate, the centre of positioning disc 1 is provided with centre bore 7, positioning disc 1 surrounding connects three claws 2, claw 2 segments graduation mark, claw 2 center has elongated slot 6, elongated slot 6 is embedded in positioning pin that can be movable, this positioning pin is bolt arrangement, and bolt 4 is positioned on claw 2 through the elongated slot 6 on claw 2 by locking nut 3, and the nut upper vertical of bolt 4 is fixed with location-plate 5.
The method utilizing above-mentioned Pipe installing center positioning device to carry out pipeline center location, carries out in the steps below:
(1) utilize the claw 2 of center positioning device, by regulating positioning pin position on claw 2, center positioning device is fixed on body of wall reserving hole 8, and makes the positioning disc 1 of center positioning device be positioned at reserving hole 8 center (referring to Fig. 2).
(2) straight tube 9 is inserted from the centre bore 7 positioning disc 1, straight tube 9 is the seamless steel pipe of a Φ 50*6, this straight tube 9 lays level indicator 10, ensure after lifting pipeline 11 and this straight tube 9 are horizontal relationship, directly measure the parallel position deviation treating lifting pipeline 11 with straight tube 9, calculate the height treating lifting pipeline 11, complete pipeline center location.
Referring to Fig. 3, reserving hole 8 center absolute altitude (measuring in advance before Pipe installing) is lower than in time lifting pipeline 11 central axis, by h=h1 -D2/2+D1/ 2 survey calculation pipe absolute altitudes.
Referring to Fig. 4, reserving hole 8 center absolute altitude is higher than in time lifting pipeline 11 central axis, by h=h1+D2/2+D1/ 2 survey calculation pipe absolute altitudes.
Measure above-mentioned size to measure either directly through tape measure, convenient and swift.

Claims (2)

1. a Pipe installing center positioning device, including positioning disc, claw, it is characterized in that: positioning disc, claw constitute scroll chuck structure, positioning disc is provided centrally with centre bore, positioning disc periphery is radially fixed with three claws being mutually hexagonal angle, on claw, segmentation has graduation mark, has elongated slot in the middle of each claw along its length, and elongated slot is embedded in positioning pin that can be movable;Positioning pin is bolt arrangement, and bolt is positioned on claw through the elongated slot on claw by locking nut, and the nut upper vertical of bolt is fixed with location-plate.
2. one kind utilizes the method that Pipe installing center positioning device described in claim 1 carries out pipeline center location, it is characterised in that carry out in the steps below:
A. utilize the claw of center positioning device, by regulating positioning pin position on claw, center positioning device is fixed on body of wall reserving hole, and makes the positioning disc of center positioning device be positioned at reserving hole center;
B. a straight tube is inserted from the centre bore positioning disc, and lay level indicator on this straight tube, it is ensured that after lifting pipeline and this straight tube are horizontal relationship, directly measure the parallel position deviation treating lifting pipeline with straight tube, calculate the height treating lifting pipeline, complete pipeline center location;
Reserving hole center absolute altitude is lower than in time lifting central axis, by h=h1-D2/2+D1/ 2 survey calculation pipe absolute altitudes;
Reserving hole center absolute altitude is higher than in time lifting central axis, by h=h2+D2/2+D1/ 2 survey calculation pipe absolute altitudes;
Wherein: h1For treating the lifting pipeline upper surface distance to straight tube upper surface;H2For treating the lifting pipeline upper surface distance to straight tube lower surface;D1For straight tube diameter;D2For treating lifting pipe diameter.
CN201410000020.9A 2014-01-01 2014-01-01 Pipe installing center positioning device and localization method thereof Active CN103727933B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410000020.9A CN103727933B (en) 2014-01-01 2014-01-01 Pipe installing center positioning device and localization method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410000020.9A CN103727933B (en) 2014-01-01 2014-01-01 Pipe installing center positioning device and localization method thereof

Publications (2)

Publication Number Publication Date
CN103727933A CN103727933A (en) 2014-04-16
CN103727933B true CN103727933B (en) 2016-06-29

Family

ID=50452113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410000020.9A Active CN103727933B (en) 2014-01-01 2014-01-01 Pipe installing center positioning device and localization method thereof

Country Status (1)

Country Link
CN (1) CN103727933B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109911757A (en) * 2019-04-22 2019-06-21 安徽华菱汽车有限公司 A kind of buckle-type boom hoisting
CN110595324A (en) * 2019-09-17 2019-12-20 安徽同华新能源动力股份有限公司 Motor center height measuring tool
CN112344091B (en) * 2020-10-27 2022-08-05 中建三局安装工程有限公司 Hanging-hole-free drainage pipeline installation method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5573229A (en) * 1995-02-21 1996-11-12 Lycan; Goodwin A. Fixture for aligning and clamping pipes
CN201988979U (en) * 2011-04-03 2011-09-28 金海重工股份有限公司 Stern tube processing central point locator
CN203240125U (en) * 2013-05-23 2013-10-16 中建五局工业设备安装有限公司 Pipeline centering and positioning device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62116130A (en) * 1985-11-15 1987-05-27 Sekisui Chem Co Ltd Manufacture of spiral tube

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5573229A (en) * 1995-02-21 1996-11-12 Lycan; Goodwin A. Fixture for aligning and clamping pipes
CN201988979U (en) * 2011-04-03 2011-09-28 金海重工股份有限公司 Stern tube processing central point locator
CN203240125U (en) * 2013-05-23 2013-10-16 中建五局工业设备安装有限公司 Pipeline centering and positioning device

Also Published As

Publication number Publication date
CN103727933A (en) 2014-04-16

Similar Documents

Publication Publication Date Title
CN103727933B (en) Pipe installing center positioning device and localization method thereof
CN205537635U (en) Simple and easy control survey system in long distance straight line push pipe center
CN103451338B (en) Ascending pipe and five-way ball mounting method for blast furnace gas system
CN102226698A (en) Weight-type inclinometer
CN105628001A (en) Extension measuring orientation method of mine shaft well under separating layer
CN106996483B (en) A kind of city integrated piping lane pipe sedimentation automatic control support
CN202008362U (en) Counter weight type inclinometer
CN106088756A (en) A kind of method of the cartridge type steel storage tank hydraulic pressure lift upside-down mounting based on BIM technology
CN103484584B (en) Method for installing down pipe of blast furnace gas system
CN202057311U (en) Side slope monitoring device
CN104354141B (en) Large-scale pipeline and valve adpting flange installation servicing unit and using method thereof
CN103089000B (en) Inclined strut buckle and sliding sleeve thereof for steel pipe scaffold
CN105403203A (en) Long distance linear top pipe center simple control measuring system and method
CN205482931U (en) Rotary kiln coal powder injection pipe horizontal location appearance
CN104359369A (en) Ship fitting-out pipe center locating device
CN104535044A (en) Displacement type soil layering settlement deformation monitoring system
CN204171980U (en) Large-scale pipeline and valve adpting flange installation servicing unit
CN103967038B (en) A kind of cavern-pile method steel pipe column pedestal embedded board and construction method thereof
CN204101032U (en) A kind of total station prism forced centering apparatus
CN203443589U (en) Measurement mobile base
CN204237492U (en) Telescopic well testing top sheave
CN204662936U (en) The fastening devices of overhanging type discharging platform anchored end
CN104457714A (en) Measurement mobile base
CN202731886U (en) Oil field underground casing pipe detection location instrument
CN203455000U (en) 360-degree leveling-free forced centering sighting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant