CN103727623B - A kind of room heat sink - Google Patents

A kind of room heat sink Download PDF

Info

Publication number
CN103727623B
CN103727623B CN201410035951.2A CN201410035951A CN103727623B CN 103727623 B CN103727623 B CN 103727623B CN 201410035951 A CN201410035951 A CN 201410035951A CN 103727623 B CN103727623 B CN 103727623B
Authority
CN
China
Prior art keywords
water
pipe
water pipe
magnetic valve
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410035951.2A
Other languages
Chinese (zh)
Other versions
CN103727623A (en
Inventor
陈科
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou hair textile Co., Ltd.
Original Assignee
Ningbo Hi-Tech Zone Kehui Creative Product Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Hi-Tech Zone Kehui Creative Product Design Co Ltd filed Critical Ningbo Hi-Tech Zone Kehui Creative Product Design Co Ltd
Priority to CN201410035951.2A priority Critical patent/CN103727623B/en
Publication of CN103727623A publication Critical patent/CN103727623A/en
Application granted granted Critical
Publication of CN103727623B publication Critical patent/CN103727623B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Domestic Plumbing Installations (AREA)

Abstract

A kind of room heat sink, be establish shared running water water inlet manifold at residential building, water inlet manifold is connected with the common tank of residential building roof, and common tank is connected with outfall sewer, and outfall sewer is connected with the running water pipe of each resident family of residential building.Described water inlet manifold establishes the water-supply-pipe of band the 7th magnetic valve and the return pipe of band the 4th magnetic valve, the water inlet manifold between water-supply-pipe and return pipe is established the 8th magnetic valve; Water inlet pipe established by water-supply-pipe outside the 7th magnetic valve, water inlet pipe is connected with the stratum water pipe embedded in stratum, residential building resident family room, stratum water pipe is connected with the western insulation wall water pipe embedded in the partition wall of west, described room, western insulation wall water pipe mixes earth intraplate roof water pipe with embedding roof, described room and is connected, roof water pipe is connected with the eastern insulation wall water pipe embedded in the partition wall of the east, described room, east insulation wall water pipe establishes second outlet pipe, and this outlet pipe is connected with return pipe.Described magnetic valve is connected with the controller be arranged on residential building corridor wall.

Description

A kind of room heat sink
technical fieldthe present invention relates to a kind of device, specifically relates to a kind of room heat sink.
background technologyin summer, present family room adopts air-conditioning to lower the temperature substantially, is single family room or says from entire society and all will consume a large amount of electric energy etc., and causes very large negative effect to environment.Because most people can not clean in time to air-conditioning, easy breed bacteria in air-conditioning, these bacteriums can cause damage to people.In addition, turn on the aircondition for a long time, make room become drying, sulks etc., make people uncomfortable, also unfavorable to health of people.
summary of the inventionthe object of the invention is for solving the problem and providing a kind of room heat sink.
The technical solution adopted in the present invention: be provided with gas heater and heat preservation storage water tank between the domestic hygiene of multi-storey residential buildings, is provided with tube connector between described storage tank and described water heater, and this tube connector is provided with water pump, described storage tank is provided with upper and lower two water level sensors, and this storage tank is connected with running water pipe, and the described running water pipe outside this storage tank is provided with electrically operated valve, described running water pipe is connected with conventional water meter, this conventional water meter is connected with the shared running water outlet house steward of described multi-storey residential buildings, this outfall sewer is connected with the common tank being arranged on described multi-storey residential buildings roof, and this common tank is connected with the running water water inlet manifold shared, the wall of described toilet is provided with the little controller of charged line, and this little controller is connected with described water pump, water level sensor, electrically operated valve by wire, it is characterized in that: described running water water inlet manifold is provided with water-supply-pipe and return pipe, described water inlet manifold between described water-supply-pipe and return pipe is provided with the 8th magnetic valve, side namely near described water inlet manifold inside described water-supply-pipe is provided with first filter, and namely the inner side of described return pipe is provided with second filter near the side of described water inlet manifold, described water-supply-pipe is provided with delivery pipe branch, and the import of this delivery pipe branch is all connected with described water-supply-pipe with outlet, and this delivery pipe branch is provided with idol water meter and accidental water meter and the 5th magnetic valve, described water-supply-pipe between described delivery pipe branch import position and outlet position is provided with the 7th magnetic valve, the import position of described delivery pipe branch is on the described water-supply-pipe between described 7th magnetic valve and first filter, described water-supply-pipe outside described delivery pipe branch outlet position is provided with hot-water line, this hot-water line is connected with described water heater, described hot-water line near described water-supply-pipe is provided with the 3rd filter, and described 3rd described hot-water line between filter and water-supply-pipe is provided with the 6th magnetic valve, described water-supply-pipe outside described hot-water line is provided with water inlet pipe, and this water inlet pipe is connected with the stratum water pipe of coiled, and this stratum water pipe section is flat ellipticity, and this stratum water pipe embeds in the stratum of the family room of described multi-storey residential buildings, be provided with tube connector between the front end of the tail end of described stratum water pipe and the western insulation wall water pipe of coiled, described western insulation wall water pipe section is flat ellipticity, in the west partition wall that this western insulation wall water pipe embeds described room or be arranged on the wall of west partition wall, described western insulation wall water pipe is connected with the roof water pipe of coiled, and this roof water pipe section is flat ellipticity, and the roof that this roof water pipe embeds described room is mixed in earth plate or is arranged on roof and mixes on the bottom surface of earth plate, described roof water pipe is connected with the eastern insulation wall water pipe of coiled, this eastern insulation wall water pipe section is flat ellipticity, in the east partition wall that this eastern insulation wall water pipe embeds described room or be arranged on the wall of partition wall in the east, this eastern insulation wall water pipe is provided with second outlet pipe, this second outlet pipe is connected with described return pipe, and described second outlet pipe near described return pipe is provided with second magnetic valve, described return pipe outside described second outlet pipe is provided with first outlet pipe, and this first outlet pipe is connected with the tail end of described stratum water pipe, and described first outlet pipe near described return pipe is provided with first magnetic valve, described return pipe inside described second outlet pipe is provided with circulation pipe, and this circulation pipe is connected with described storage tank, and the described circulation pipe near described return pipe is provided with the 3rd magnetic valve, described return pipe between described circulation pipe and second filter is provided with the 4th magnetic valve, described water-supply-pipe, return pipe, delivery pipe branch, first, second, 3rd, 4th, 5th, 6th, 7th, 8th magnetic valve and first filter, second filter, 3rd filter, idol water-meter outdoors is in switch-box, this switch-box is arranged on the wall of shared corridor of described multi-storey residential buildings, this switch-box is provided with locking door closure, the controller of charged line is provided with in this switch-box, this controller is by wire and described first, second, 3rd, 4th, 5th, 6th, 7th, 8th magnetic valve connects, described water inlet manifold is through described switch-box, tube connector between described stratum water pipe tail end and described western insulation wall water pipe front end is provided with the 9th magnetic valve, and the 9th magnetic valve is connected with described controller by wire, 9th magnetic valve is arranged in P cock case, and described P cock case is arranged on the west partition wall in described room.
Beneficial effect of the present invention: because of the running water in water inlet manifold inner chamber first after in the pipes such as stratum water pipe, western insulation wall water pipe, roof water pipe, eastern insulation wall water pipe, again flow into water inlet manifold after flow to common tank on multi-storey residential buildings roof again, running water in common tank is by flowing into the running water pipe of man of each resident family again after outfall sewer, as long as have a family family at use running water, not only but also flow into common tank and circulate successively namely running water water level in common tank declines, and the running water in water inlet manifold inner chamber.Resident family in the same corridor of multi-storey residential buildings uses same common tank simultaneously, resident family in same corridor has tens families at least, there are tens families at most, so (on daytime, most people can go to work within one day, from morning to night after all to have resident family to use running water, but a lot of people can handle official business at home, have old man in a lot of family to stay at home for a long time, and just in time have a summer holiday in summer, the time that student stays at home is longer; Summer fever in addition, perspiration is many, have a bath, wash clothes also many; In a word, various factors makes to use summer the frequency of running water greatly to increase), running water can be flowed more.Certainly, the immobilising situation of running water also must have, and as of short duration does not flow, the tap water temperature in the pipes such as stratum water pipe, western insulation wall water pipe, roof water pipe, eastern insulation wall water pipe can not decline too much, even negligible; Time as immobilising in running water is longer, the tap water temperature stayed in the pipes such as stratum water pipe, western insulation wall water pipe, roof water pipe, eastern insulation wall water pipe then can improve, but the temperature of these running water is generally still much lower than the air themperature in summer indoor, start again to flow once running water, running water in water inlet manifold inner chamber can enter in the pipes such as stratum water pipe, western insulation wall water pipe, roof water pipe, eastern insulation wall water pipe again fast, makes the tap water temperature of the tube wall temperature of these pipes and flowing similar.
100 family families are shared same water inlet manifold and same outfall sewer by visual feelings, the family of such use running water is more, make running water to be kept to greatest extent to flow incessantly between (people slept after many thirty in the evening 10 thirty in the at 10 in the morning to evening 10, the immobilising situation of running water can get more and more), the running water of flowing can by the cool degree of self (or according to " heat " extending of word and be called " cool amount ", then all be called herein " cool degree ") conduct to stratum water pipe, western insulation wall water pipe, roof water pipe, east insulation wall water pipe, make the tap water temperature of the tube wall temperature of these pipes and flowing similar, in summer, the cool degree of stratum water pipe, western insulation wall water pipe, roof water pipe, eastern insulation wall water pipe can make the temperature of room air be declined.Because there being the buffering of the running water in common tank, the bore of the same water inlet manifold that 100 family families share and same outfall sewer also need not be too large, makes the bore of stratum water pipe, western insulation wall water pipe, roof water pipe, eastern insulation wall water pipe also need not be too large.
In summer, the tap water temperature of flowing is lower, and what gather as these running water is that its temperature of surface water only has an appointment 20 degree, and what gather as these running water is that its temperature of underground water only has an appointment 15 degree, stratum of the present invention water pipe, western insulation wall water pipe, roof water pipe, east insulation wall water pipe etc. can make by stainless steel and other metal materials, running water flows through the stratum water pipe made by metal material, western insulation wall water pipe, roof water pipe, after east insulation wall water pipe etc., these stratum water pipes, western insulation wall water pipe, roof water pipe, the tube wall temperature of east insulation wall water pipe is about higher than the temperature of running water 1 degree, substantially at 16-21 degree, stratum water pipe, western insulation wall water pipe, roof water pipe, cool degree conducts to floor by east insulation wall water pipe, floor tile, when partition wall and water-proof decorative thin plate etc., these floors, floor tile, the temperature of partition wall and water-proof decorative thin plate etc. is than stratum water pipe, western insulation wall water pipe, roof water pipe, the about high 2-4 degree of tube wall temperature of east insulation wall water pipe is namely about 20-25 degree, if summer, indoor air temperature was more than 28 degree, be in the floor of 20-25 degree, floor tile, the temperature of room air can be fallen 2-3 degree by partition wall and water-proof decorative thin plate etc., when summer indoor air temperature 28 degree and above time, general family will turn on the aircondition, and by the cool degree of floor, floor tile, partition wall and water-proof decorative thin plate etc. indoor air temperature fallen 2-3 degree make indoor air temperature lower than 28 degree time, people just need not turn on the aircondition or postpone time of turning on the aircondition, thus greatly can save electric energy.When summer indoor air temperature have 30 more spend, people not only will turn on the aircondition, and the higher air-conditioner power consumption of indoor air temperature is also larger, after indoor air temperature being fallen 2-3 degree by the cool degree of floor, floor tile, partition wall and water-proof decorative thin plate etc., although indoor air temperature still still will be turned on the aircondition more than 28 degree, but the power consumption of air-conditioning reduces greatly, reach good energy-saving effect equally.Although the effect that the cool degree of self conducts to room air will differ from by the composite floor board arranged on floor, waterproof thin plate etc., solid wooden floor board, but also can conduct some cool degree after all, add that roof, room, west partition wall, east partition wall have cool degree to conduct to room air, indoor air temperature just can effectively decline; If the partition wall in the south in room, back side partition wall also arrange the coiled water pipe of a part, so, some cool degree of partition wall in the south, back side partition wall also can conduct to room air, and indoor air temperature can be declined more; Such family room is seemingly by the ground, on top, the left side, the right, running water pipe above, below surround, indoor temperature lowers by the running water pipe sending out cool, just look like be large summer people to enter cavern the same, cavern crag internal layer oozes cold water, makes cavern more nice and cool.
According to the data of the 6th national census in 2010, China mainland has the family at 400,000,000 families, comprehensive each data, and what urban family joined air-conditioning reaches more than 43 percent, rural households join air-conditioning more than 1 12, and annual all in quick growth.If have 30 percent to be configured with air-conditioning in 400,000,000 family families, so about there is the domestic installation at 1.2 hundred million families air-conditioning in the whole nation.As the wall-hanging air conditioner of two 1.5 is joined by each family, an air-conditioning uses one hour and will consume 1.5 degree of electricity, two air-conditionings use one hour respectively, and (being always two hours) will consume 3 degree of electricity, often degree electricity calculates i.e. 1.5 yuans by 0.5 yuan, it 5 hours is 10 hours altogether that two air-conditionings are opened every day respectively, consume 15 degree of electricity, spend 7.5 yuans; Within 10 days, be namely total up to 100 hours as one family uses the time of two air-conditionings to be respectively in summer, consume 150 degree of electricity, spend 75 yuans; So 1.2 hundred million family families are 1,200,000,000 days namely 12,000,000,000 hours in the time that summer turns on the aircondition, consume 18,000,000,000 degree of electricity, spend 9,000,000,000 yuans (if count the large power air-conditioned of family parlor in, or the central air-conditioning configured in large house, add the air-conditioning that other Business Building, office block etc. uses, reality is also far above 9,000,000,000 yuan), then can cannot calculate with using up 9,000,000,000 yuans the harm that natural environment, social environment, health environment etc. are brought.
In summer, indoor air temperature 28 degree and above time, by the cool degree of floor, floor tile, partition wall and water-proof decorative thin plate etc., indoor air temperature being fallen 2-3 degree makes indoor air temperature lower than 28 degree, a lot of family then can not turn on the aircondition or postpone time of turning on the aircondition, so can save a part of electric energy; When summer indoor air temperature have 30 more spend, after indoor air temperature being fallen 2-3 degree by the cool degree of floor, floor tile, partition wall and water-proof decorative thin plate etc., the air-conditioner power consumption that open is minimized, a part of electric energy can be saved so again.If enforcement of the present invention, can reduce 1-2 hour or can reduce every day the consumption of 3 degree, air-conditioning electricity every day time that one family is turned on the aircondition, then one family can save the electricity charge of 1.5 yuan every day, within 10 days, then can reduce the consumption of 30 degree of electricity as a summer turns on the aircondition, and saves 15 yuan of electricity charge.1.2 hundred million family families can reduce the consumption of 3,600,000,000 degree of electricity when summer turns on the aircondition, the electricity charge saving about 1,800,000,000 yuan (as count the large power air-conditioned of family parlor in, or the central air-conditioning configured in large house, add the air-conditioning that other Business Building, office block etc. uses, the actual electricity charge of saving should be far above 1,800,000,000 yuan), the benefit brought environment etc. is then larger.
Certainly, above data are general measuring and calculating and assessment, but after implementing the present invention, to the time reduced or delay is turned on the aircondition, reduce the energy consumption of air-conditioning, the effect of saving air-conditioning use cost etc. is fairly obvious.And the invention process is relatively easy, input cost also can not be too high, once can Long-Time Service after implementing, not easily damaged, safe and reliable, easy to operate.The present invention needs to consume the energy hardly, and use cost does not almost have, very energy-conserving and environment-protective.
In the winter time, the present invention also can utilize stratum water pipe, western insulation wall water pipe, roof water pipe, eastern insulation wall water pipe etc. to heat to indoor; Or utilize stratum water pipe etc. only to implement heating to ground; Thus expand the scope of application.
Accompanying drawing explanation
Fig. 1 is structural principle schematic diagram of the present invention.
Fig. 2 is the three-dimensional schematic diagram of the present invention.
Fig. 3 is the schematic diagrames such as the narrow wall of the present invention.
Fig. 4 is the schematic diagram of the present invention's overall applicability in multi-storey residential buildings.
detailed description of the inventionnow by reference to the accompanying drawings the embodiment of the present invention is further described.
As shown in Figures 1 to 4, 1. roof water pipes in figure, 2. western insulation wall water pipe, 3. stratum water pipe, 4. eastern insulation wall water pipe, 5. P cock case, 6. the 9th magnetic valve, 7. first outlet pipe, 8. first magnetic valve, 9. second magnetic valve, 10. the 3rd magnetic valve, 11. the 4th magnetic valves, 12. second filter, 13. return pipes, 14. water inlet manifolds, 15. switch-boxes, 16. the 8th magnetic valves, 17. the 5th magnetic valves, 18. delivery pipe branches, 19. idol water meter, 20. water inlet pipes, 21. the 6th magnetic valves, 22. the 7th magnetic valves, 23. water-supply-pipes, 24. second outlet pipe, 25. circulation pipes, 26. hot-water lines, 27. storage tanks, 28. water pumps, 29. water heaters, 30. electrically operated valves, 31. running water pipes, 32. conventional water meters, 33. outfall sewers, 34. east partition walls, 35. west partition walls, 36. narrow walls, 37. Stall resident families, 38. second floor resident families.
Between the domestic hygiene of multi-storey residential buildings, be provided with gas heater 29 and heat preservation storage water tank 27, be provided with tube connector between described storage tank 27 and described water heater 29, this tube connector is provided with water pump 28, described storage tank 27 is provided with upper and lower two water level sensors, and this storage tank 27 is connected with running water pipe 31, and the described running water pipe 31 outside this storage tank 27 is provided with electrically operated valve 30, described running water pipe 31 is connected with conventional water meter 32, this conventional water meter 32 is connected with the shared running water outlet house steward 33 of described multi-storey residential buildings, this outfall sewer 33 is connected with the common tank of the roof being arranged on described multi-storey residential buildings, and this common tank is connected with the running water water inlet manifold 14 shared, the wall of described toilet is provided with the little controller of charged line, and this little controller is connected with described water pump 28, water level sensor, electrically operated valve 30 by wire, it is characterized in that: described running water water inlet manifold 14 is provided with water-supply-pipe 23 and return pipe 13, described water inlet manifold 14 between described water-supply-pipe 23 and return pipe 13 is provided with the 8th magnetic valve 16, side namely near described water inlet manifold 14 inside described water-supply-pipe 23 is provided with first filter, and namely the inner side of described return pipe 13 is provided with second filter 12 near the side of described water inlet manifold 14, described water-supply-pipe 23 is provided with delivery pipe branch 18, and the import of this delivery pipe branch 18 is all connected with described water-supply-pipe 23 with outlet, and this delivery pipe branch 18 is provided with that is accidental water meter of idol water meter 19 and the 5th magnetic valve 17, described water-supply-pipe 23 between described delivery pipe branch 18 import position and outlet position is provided with the 7th magnetic valve 22, the import position of described delivery pipe branch 18 is on the described water-supply-pipe 23 between described 7th magnetic valve 22 and first filter, the described water-supply-pipe 23 that described delivery pipe branch 18 exports outside position is provided with hot-water line 26, this hot-water line 26 is connected with described water heater 29, described hot-water line 26 near described water-supply-pipe 23 is provided with the 3rd filter, and described 3rd described hot-water line 26 between filter and water-supply-pipe 23 is provided with the 6th magnetic valve 21, described water-supply-pipe 23 outside described hot-water line 26 is provided with water inlet pipe 20, and this water inlet pipe 20 is connected with the stratum water pipe 3 of coiled, and this stratum water pipe 3 section is flat ellipticity, and this stratum water pipe 3 embeds in the stratum of the family room of described multi-storey residential buildings, be provided with tube connector between the front end of the tail end of described stratum water pipe 3 and the western insulation wall water pipe 2 of coiled, described western insulation wall water pipe 2 section is flat ellipticity, in the west partition wall 35 that this western insulation wall water pipe 2 embeds described room or be arranged on the wall of west partition wall 35, described western insulation wall water pipe 2 is connected with the roof water pipe 1 of coiled, and this roof water pipe 1 section is flat ellipticity, and the roof that this roof water pipe 1 embeds described room is mixed in earth plate or is arranged on roof and mixes on the bottom surface of earth plate, described roof water pipe 1 is connected with the eastern insulation wall water pipe 4 of coiled, this eastern insulation wall water pipe 4 section is flat ellipticity, in the east partition wall 34 that this eastern insulation wall water pipe 4 embeds described room or be arranged on the wall of partition wall 34 in the east, this eastern insulation wall water pipe 4 is provided with second outlet pipe 24, this second outlet pipe 24 is connected with described return pipe 13, and described second outlet pipe 24 near described return pipe 13 is provided with second magnetic valve 9, described return pipe 13 outside described second outlet pipe 24 is provided with first outlet pipe 7, and this first outlet pipe 7 is connected with the tail end of described stratum water pipe 3, and described first outlet pipe 7 near described return pipe 13 is provided with first magnetic valve 8, described return pipe 13 inside described second outlet pipe 24 is provided with circulation pipe 25, and this circulation pipe 25 is connected with described storage tank 27, and the described circulation pipe 25 near described return pipe 13 is provided with the 3rd magnetic valve 10, described return pipe 13 between described circulation pipe 25 and second filter 12 is provided with the 4th magnetic valve 11, described water-supply-pipe 23, return pipe 13, delivery pipe branch 18, first, second, 3rd, 4th, 5th, 6th, 7th, 8th magnetic valve (8, 9, 10, 11, 17, 21, 22, 16) and first filter, second filter 12, 3rd filter, idol water meter 19 is arranged in switch-box 15, this switch-box 15 is arranged on the wall of shared corridor of described multi-storey residential buildings, this switch-box 15 is provided with locking door closure, the controller of charged line is provided with in this switch-box 15, this controller is by wire and described first, second, 3rd, 4th, 5th, 6th, 7th, 8th magnetic valve (8, 9, 10, 11, 17, 21, 22, 16) connect, described water inlet manifold 14 is through described switch-box 15, tube connector between described stratum water pipe 3 tail end and described western insulation wall water pipe 2 front end is provided with the 9th magnetic valve the 6, nine magnetic valve 6 and is connected with described controller by wire, 9th magnetic valve 6 is arranged in P cock case 5, and described P cock case 5 is arranged on west, described room partition wall 35.
In summer, close first, 3rd, 5th, 6th, 8th magnetic valve (8, 10, 17, 21, 16), open the 7th, 9th, second, 4th magnetic valve (22, 6, 9, 11), because the 8th magnetic valve 16 be arranged on the water inlet manifold 14 between water-supply-pipe 23 and return pipe 13 is closed, so the running water in water inlet manifold 14 can enter water-supply-pipe 23 by nature, enter the running water of water-supply-pipe 23 successively by first filter, 7th magnetic valve 22, water inlet pipe 20, stratum water pipe 3, 9th magnetic valve 6, western insulation wall water pipe 2, roof water pipe 1, east insulation wall water pipe 4, second outlet pipe 24, flow into return pipe 13 after second magnetic valve 9 and pass through the 4th magnetic valve 11, the common tank on described multi-storey residential buildings roof is flowed to after reentering water inlet manifold 14 during second filter 12.Room cooling is can be after the stratum water pipe 3 of running water through described room, western insulation wall water pipe 2, roof water pipe 1, eastern insulation wall water pipe 4; The each household family of multi-storey residential buildings all can implement the present invention simultaneously, and certainly, other residential building and some Business Buildings, enterprise dormitory even also can implement the present invention in machine-operated building etc.; As tens family one-storey house families shared the water inlet manifold 14 of same running water, the running water in water inlet manifold 14 inner chamber flows into common tank after again flowing into water inlet manifold 14 after successively entering the pipe such as stratum water pipe 3, western insulation wall water pipe 2, roof water pipe 1, eastern insulation wall water pipe 4 be arranged in tens family one-storey house family rooms respectively again, and (common tank exceeds one-storey house roof; Certainly, hydraulic pressure as running water is enough, also common tank can not be established, the delivery port of water inlet manifold 14 is directly connected with the water inlet of outfall sewer 33, so both facilitated and also saved cost), the running water in common tank is by flowing into the running water pipe 31 of tens family one-storey house families again after outfall sewer 33.
If when all families of multi-storey residential buildings all implement the present invention and need apply of the present invention simultaneously, first can will be arranged on the 8th magnetic valve 16 Close All on water inlet manifold 14 and corresponding with each resident family, to be arranged on water-supply-pipe 23 and return pipe 13 and seven magnetic valve 22 corresponding with each resident family and the 4th magnetic valve 11 are all opened, running water in water inlet manifold 14 inner chamber first flows into the stratum water pipe 3 be arranged in Stall resident family 37, western insulation wall water pipe 2, roof water pipe 1, again the stratum water pipe 3 be arranged in second floor resident family 38 is flowed into again after flowing back to water inlet manifold 14 after the pipe such as insulation wall water pipe 4 grade of east, western insulation wall water pipe 2, roof water pipe 1, again flow back to water inlet manifold 14 again after the pipe such as insulation wall water pipe 4 grade of east and circulate successively, running water in water inlet manifold 14 inner chamber again flows back to water inlet manifold 14 and finally flows to the common tank on roof after flowing through the pipe such as stratum water pipe 3, western insulation wall water pipe 2, roof water pipe 1, eastern insulation wall water pipe 4 in the resident family in maximum layer building, the running water in common tank is by flowing into the running water pipe 31 of each resident family after outfall sewer 33.
In concrete enforcement, reinforcing bar is had to embedding in advance in the water pipe 1(cast-in-situ floor of roof in the mixed earth plate on the family room roof of the residential building also in construction and floor (except the roof of top layer resident), roof water pipe 1 can be arranged in reinforcing bar), can this roof water pipe 1 be arranged to vertical, as become vertical roof water pipe 1 external diameter height to be 4cm, and the thickness of general floor is 10cm, after roof water pipe 1 embeds floor, floor end face and bottom surface are about 3cm far from roof water pipe 1, so, the running water flowed in this roof water pipe 1 inner chamber can carry out lowering the temperature (in winter for upstairs house Xia Liangjia resident family in summer simultaneously, when roof water pipe 1 is used as heating pipe, hot water in roof water pipe 1 inner chamber can heat for upstairs house Xia Liangjia resident family simultaneously), thus, better benefit can be reached.Roof water pipe 1 embeds after roof mixes earth plate, summer is midsummer particularly, because the tap water temperature flowed in roof water pipe 1 inner chamber is lower, roof water pipe 1 and mixed earth plate is made to send out cool, mix the temperature of temperature far below Indoor Air of earth plate, hydrone in Indoor Air likely can gather and make mixed earth plate bottom surface produces some tiny drops of waters or water stain etc. on the low mixed earth plate bottom surface of temperature and face, roof, and on these globules or the water stain furred ceiling that can drip to roof or floor, room is first-class; So can arrange one deck not only ventilative but also barrier film of waterproof (as reverse osmosis membrane etc.) on this mixed earth plate bottom surface, this barrier film can prevent or reduce tiny drops of water on mixed earth plate bottom surface or water stain etc. generation; After barrier film is set, because of a variety of causes, if when mixed earth plate bottom surface still creating some small water stain grades, because of septate stop, these are water stain can not instill on furred ceiling or floor, room first-class, meanwhile, barrier film is ventilative, and some on these mixed earth plate bottom surfaces are water stain also can be evaporated gradually.Although barrier film againsts mixed earth plate, because mixed earth plate bottom surface can not be accomplished very smooth, so some zonal minim gaps still can be there are between barrier film and mixed earth plate, because the hydrone in Indoor Air can be gathered in these minim gaps, so the bottom surface of barrier film not easily produces the globule or water stain etc., and these zonal minim gaps also can not affect cool degree conduction in mixed earth plate to barrier film barrier film is cooled off; If barrier film bottom surface still creates some globules or water stain, these globules or water stain amount should be few, also natural evaporation can fall and can not drip; Certainly, in order to more reliable, the fancy veneer of waterproof mildew-resistant can be set on barrier film bottom surface, namely this fancy veneer end face is provided with grid-like thinner indenture with the one side of membrane contacts, this indenture is provided with minimum venthole, if barrier film produced, some are water stain etc., and these water stain meetings are gathered in described indenture, these are water stain not easily oozes out from minimum venthole, and enters air in indenture through venthole and water stain in indenture can be evaporated gradually; Do not establish other site area of fancy veneer of indenture larger, after these positions and membrane contacts, make the cool degree on barrier film effectively conduct to fancy veneer; Because air can enter in the indenture of fancy veneer, fancy veneer bottom surface just more not easily produces the globule or water stain etc.Had fancy veneer, if barrier film creates small water stain etc., these water stain grades also natural evaporation can be fallen and not easily drip, and make the present invention have feasibility.Roof water pipe 1 embeds after roof mixes earth plate, because the tap water temperature flowed in roof water pipe 1 inner chamber is lower, roof water pipe 1 is made to send out cool, mixed earth plate is given in the cool degree conduction of roof water pipe 1, the cool degree of self then conducts to barrier film by mixed earth plate, barrier film is by the cool degree conduction of self to fancy veneer, and the cool degree of self is conducted to the air in room by fancy veneer again, and Indoor Air temperature is declined.Roof water pipe 1 embeds after roof mixes earth plate, the cool degree conduction of self can be given the upstairs floor tile in man of resident family room or floor make these floor tiles or floor send out cool by this mixed earth plate simultaneously, the cool degree of self is then conducted to Indoor Air by the floor tile sending out cool or floor, and the Indoor Air temperature of man of resident family is upstairs declined.
As installed roof water pipe 1 on the family room roof of built residential building, this roof water pipe 1 can be passed through short flat support installing on face, roof, guard tube on this roof water pipe 1 cover, this guard tube tube wall can be thinner, this guard tube top is provided with venthole, from section, minim gap is left between this guard tube first half inwall and roof water pipe 1 first half outer wall, this guard tube Lower Half inwall and roof water pipe 1 Lower Half wall contacts, make the cool degree of roof water pipe 1 more effectively conduct to guard tube.Summer is midsummer particularly, because there being the running water of flowing in roof water pipe 1, roof water pipe 1 temperature is equally far below the temperature of Indoor Air, hydrone in Indoor Air likely can be assembled and produce some tiny drops of waters or water stain etc. on low roof water pipe 1 outer wall of temperature, these globules or water stain once drip and can instill in guard tube and can not instill that other is local, because these globules are substantially from the air in room, the formation of the globule also illustrates that indoor air can become dry, dry air makes the water of the globule in instillation guard tube (amount of the water of these globules is few) can evaporate gradually again and incorporate in indoor air, thus form a circulation, certainly, along with the change of indoor temperature, roof water pipe 1 also always can not produce the globule or water stain etc.Because leaving gap between the guard tube first half and roof water pipe 1 first half and being provided with venthole, so guard tube outer wall not easily produces the globule.Can waterproof mildew-resistant fancy veneer be set on guard tube bottom surface.The cool degree of roof water pipe 1 be arranged on mixed earth plate bottom surface and face, roof conducts to guard tube, the cool degree of self conducts to described fancy veneer by guard tube, the cool degree of self is conducted to the air in room by this fancy veneer, and Indoor Air temperature is declined.As long as appropriate design, no matter roof water pipe 1 is embed in mixed earth plate or be arranged on mixed earth plate bottom surface, all can not affect the safety of mixed earth plate, also the normal setting of the pendent lamp, penetration pipe etc. on roof i.e. mixed earth plate can not be affected, can not affect the attractive in appearance of roof, roof and pendent lamp etc. also can not be mouldy etc.As roof water pipe 1 passes through short flat support installing on face, roof and on cover during guard tube, because roof water pipe 1 is horizontal setting, roof water pipe 1 now is highly about about 2cm, adds guard tube, total height also can not more than 2.5cm, so can not affect height of room space; Meanwhile, roof water pipe 1 is horizontal when arranging, and its overall width has about 4cm, and the efficiency of conducting cool degree is higher.Roof water pipe 1 grade is that flat ellipticity does not have corner angle, can avoid or reduce the generation of the inner cavity dirts such as roof water pipe 1.In concrete enforcement, under guarantee does not have the prerequisite of corner angle, the contact area of roof water pipe 1, stratum water pipe 3, western insulation wall water pipe 2, eastern insulation wall water pipe 4 outer wall is done larger as far as possible, make the acceptance of these water pipes or conduct the better effects if of cool degree.
For stratum water pipe 3, in the concrete floor that also can be embedded into the family room of the residential building also in construction and floor, this stratum water pipe 3 is also arranged to vertical, after making stratum water pipe 3 embed floor, floor end face and bottom surface are about 3cm far from stratum water pipe 3, the running water flowed in stratum water pipe 3 inner chamber also can simultaneously for upstairs house Xia Liangjia resident family carries out lower the temperature (when being used as heating pipe winter, can heat for upstairs house Xia Liangjia resident family) simultaneously in summer.After stratum water pipe 3 embeds room floor, as (or the marble etc. of floor tile on this floor, mainly to be used between parlor, toilet, kitchen etc.), then can directly by husky grey mortar, floor tile be layered on floor, stratum water pipe 3 is by cool degree conduction to floor, and floor is by the cool degree conduction of self to husky ash, and the cool degree of self conducts to floor tile by husky ash, the cool degree of self is conducted to room air by floor tile, thus indoor air temperature is declined; If it is small water stain etc. floor to produce some; Husky ash water stain etc. can also to sponge small for these on floor, tile surface not easily maybe can not be produced small water stain etc.
If at described floor upper berth composite floor board etc., then first one deck waterproof thin plate is set on floor end face, the thinner indenture of the one side setting party trellis that namely this waterproof thin plate bottom surface contacts with floor, this indenture is provided with minimum venthole, if it is small water stain etc. floor end face to produce some, these water stain meetings are gathered in indenture, and these are water stain not easily oozes out from minimum venthole, and enter air in indenture through venthole and water stain in indenture can be evaporated gradually; Do not establish other site area of waterproof thin plate of indenture larger, after these positions contact with floor, make the cool degree on floor can effectively conduct to waterproof thin plate; Because air can enter in the indenture of waterproof thin plate, waterproof sheet top surface just not easily maybe can not produce water stain etc., if waterproof sheet top surface creates small water stain etc., its amount is also few, these water stain grades also natural evaporation can be fallen or be sponged by composite floor board, the moisture content of composite floor board is suitably improved a bit, but the quality of composite floor board and normal use can not be affected.Stratum water pipe 3 is by cool degree conduction to floor, and floor is by the cool degree conduction waterproof thin plate of self, and waterproof thin plate is by the cool degree conduction of self to composite floor board, and the cool degree of self is conducted to room air by composite floor board, thus indoor air temperature is declined.Composite floor board then can be more weaker than floor tile when accepting or conducting cool spending.
If at described floor upper berth solid wooden floor board etc., the same waterproof thin plate that tape square shape thin indenture in one deck bottom surface is first set on floor end face, waterproof thin plate arranges shorter keel, and these keel are connected with the floor below waterproof thin plate; On keel waterproof thin plate each other, arrange husky grieshoch etc. again, husky grieshoch surface flushes with keel surface, then on keel, arranges solid wooden floor board, solid wooden floor board bottom surface and keel are surperficial and husky grieshoch surface contact.Cool degree conducts to floor by stratum water pipe 3, floor is by the cool degree conduction waterproof thin plate of self, the cool degree of self conducts to husky grieshoch by waterproof thin plate, the cool degree of self conducts to solid wooden floor board by husky grieshoch, the cool degree of self is conducted to room air by solid wooden floor board, thus indoor air temperature is declined.Solid wooden floor board then can be more weaker than floor tile when accepting or conducting cool spending.If waterproof thin plate occurs small water stain etc., the meetings such as these are water stain be sponged by husky grieshoch, solid wooden floor board can not be had influence on, in addition, the solid wooden floor board that lay has passed through the process such as suitable waterproof all, as brushed one deck priming paint etc. at the solid wooden floor board back side, there is no the solid wooden floor board of priming exactly, because moisture content is low drier, if solid wooden floor board moisture content can be made after absorbing less hydrone suitably to improve a bit, but the quality of solid wooden floor board and normal use can not be affected.
As installed stratum water pipe 3 on the family room concrete plate and floor of built residential building, in the newly-installed husky grieshoch that " wet-laid process " both can have been adopted to imbed by stratum water pipe 3 on floor, then direct floor tile etc. on this husky grieshoch, or the waterproof thin plate of the thin indenture of one deck bottom surface tape square shape is first set on this husky grieshoch, this waterproof thin plate repaves composite floor board or paving solid wooden floor board etc.; As spread solid wooden floor board, then first short keel are set on waterproof thin plate, short keel are connected with the husky grieshoch below waterproof thin plate, keel waterproof thin plate each other arranges the second layer husky grieshoch again and flushes with keel, again solid wooden floor board is fixed on keel, implement after this method, substantially identical with the principle such as water stain on foregoing elimination waterproof thin plate for eliminating the principles such as some that waterproof thin plate occurs are water stain.After implementing this method, stratum water pipe 3 is by cool degree conduction to husky grieshoch, and husky grieshoch is by cool this floor tile of degree conduction of self, and the cool degree of self is conducted to room air by floor tile, thus indoor air temperature is declined; Or cool degree conducts to husky grieshoch by stratum water pipe 3, the cool degree of self then conducts to waterproof thin plate by husky grieshoch, waterproof thin plate is by the cool degree conduction of self to composite floor board, and the cool degree of self is conducted to room air by composite floor board, thus indoor air temperature is declined; Cool degree conducts to husky grieshoch by stratum water pipe 3 besides, the cool degree of self then conducts to waterproof thin plate by husky grieshoch, the cool degree of self conducts to the husky grieshoch of the second layer by waterproof thin plate, the cool degree of self conducts to solid wooden floor board by the husky grieshoch of the second layer, the cool degree of self is conducted to room air by solid wooden floor board, thus indoor air temperature is declined.
When the family room concrete plate and floor of built residential building install stratum water pipe 3, also " dry laid process " can be adopted namely one deck waterproof membrane to be first set on floor, on this waterproof membrane, support is set, this support arranges stratum water pipe 3, stratum water pipe 3 arranges waterproof thin plate, this waterproof thin plate arranges composite floor board; Because stratum water pipe 3 is coileds, as long as stratum water pipe 3 coils closeer, composite floor board can reliably be arranged on waterproof thin plate.As will solid wooden floor board be arranged, as long as arrange some keel on stratum water pipe 3 waterproof membrane each other of coiling, these keel are connected with the floor below waterproof membrane, these keel flush with stratum water pipe 3, on keel and stratum water pipe 3, waterproof thin plate is set again, this waterproof thin plate arranges solid wooden floor board, and this solid wooden floor board is connected with the keel below waterproof thin plate.After implementing this method, cool degree conducts to waterproof thin plate by stratum water pipe 3, waterproof thin plate is by cool degree this composite floor board of conduction of self or solid wooden floor board, and the cool degree of self is conducted to room air by composite floor board or solid wooden floor board, thus indoor air temperature is declined.After adopting " dry laid process " that stratum water pipe 3 is set, generally floor tile or marble etc. should not be set on waterproof thin plate.Because the stratum water pipe 3 of coiling leaves spacing each other, even if stratum water pipe 3 outer wall have accumulated some tiny drops of waters or water stain, or these droplets or water stain when dropping on waterproof membrane, because the water yield is little, along with the decline of temperature, air become drier time, these droplets or water stain can nature by absorption of air etc.The globule that this tittle is little or the water stain quality that also can not affect wooden keel.When the family room concrete plate and floor of built residential building install stratum water pipe 3, can be arranged to horizontal by stratum water pipe 3, make the area of stratum water pipe 3 end face larger, the efficiency of conducting cool degree is also higher.
Western insulation wall water pipe 2, arranging of east insulation wall water pipe 4 is relatively simple, family room as residential building is tridimensional structure, resident family can by east partition wall 34, narrow wall 36 is arranged to by west partition wall 35, western insulation wall water pipe 2 and eastern insulation wall water pipe 4 are embedded in described narrow wall 36, on the two sides of narrow wall 36, the water-proof decorative thin plate wearing thinner grid-like indenture is set in one deck respectively, this indenture is provided with minimum air-vent, if there is tiny drops of water in narrow wall 36 two sides or water stain time, these globules or water stain, can not ooze out from air-vent, these tiny drops of waters or water stain meeting are gathered in the indenture of water-proof decorative thin plate, if these tiny drops of waters or the water stain indenture along water-proof decorative thin plate down drip time, very little aqueduct can be set in the bottom of this indenture, and by this aqueduct, the globule or water stain introducing sewer pipe (but generally need not be arranged aqueduct, the tiny drops of water little because of this tittle or water stain when room air becomes drier can natural evaporation fall), on the surface of water-proof decorative thin plate also not easily or there will not be tiny drops of water or water stain.Cool degree conducts to narrow wall 36 by western insulation wall water pipe 2 or eastern insulation wall water pipe 4, the cool degree of self conducts to water-proof decorative thin plate by 36, narrow wall, the cool degree of self is conducted to the air in two rooms of left and right or front and back by the two-layer water-proof decorative thin plate on narrow wall 36 two sides simultaneously, thus the temperature of two room airs is declined respectively, make the efficiency of cooling higher (some room also visual feelings by partition wall in the south, narrow wall 36 is arranged to by back side partition wall, this narrow wall 36 arranges " southern insulation wall water pipe again, north wall water pipe ", these " southern insulation wall water pipes, north wall water pipe " total height and overall width determined by feelings, " southern insulation wall water pipe, north wall water pipe " setting, before making or below the air themperature in room also can decline simultaneously, make the effect of cooling larger).The wide face of western insulation wall water pipe 2, eastern insulation wall water pipe 4 can be arranged to parallel with narrow wall 36 surface, make western insulation wall water pipe 2, better effects if that eastern insulation wall water pipe 4 conducts cool degree.
If family room is not tridimensional structure, west partition wall 35, in the east partition wall 34 has puzzled and thicker, then western insulation wall water pipe 2 and eastern insulation wall water pipe 4 can be arranged on west partition wall 35, on the wall of east partition wall 34, at western insulation wall water pipe 2 and eastern insulation wall water pipe 4, one deck water-proof decorative thin plate is set on the surface, this water-proof decorative thin plate is provided with minimum air-vent, if there is tiny drops of water in western insulation wall water pipe 2 and eastern insulation wall water pipe 4 tube wall or water stain time, these globules or water stainly can not to ooze out from water-proof decorative thin plate air-vent, if these tiny drops of waters or water stain when dripping, very little aqueduct can be set bottom western insulation wall water pipe 2 and eastern insulation wall water pipe 4, and by this aqueduct by the globule that drips or water stain introducing sewer pipe (certainly, generally need not aqueduct be set, because the western insulation wall water pipe 2 of coiled or eastern insulation wall water pipe 4 leave spacing each other respectively, along with the change of temperature, by the tiny drops of water on western insulation wall water pipe 2 and eastern insulation wall water pipe 4 tube wall or water stainly naturally to sponge when the air in these spacing becomes drier), and on the surface of water-proof decorative thin plate also not easily or there will not be tiny drops of water or water stain.Western insulation wall water pipe 2 or eastern insulation wall water pipe 4 are by cool degree conduction to water-proof decorative thin plate, and the cool degree of self is conducted to the air in room by water-proof decorative thin plate, thus the temperature of room air is declined respectively.People can arrange support on west partition wall 35 and east partition wall 34, and water-proof decorative thin sheet surface arranges various hooks etc., and these hooks are connected with support, then television set, photo frame etc. are hung on hook.The setting of western insulation wall water pipe 2 and eastern insulation wall water pipe 4 can not affect the reliable and secure setting of some supply sockets and penetration pipe, also can not affect the attractive in appearance etc. of partition wall and room.
In concrete enforcement, alternate manner method must be also had to go to arrange stratum water pipe 3, western insulation wall water pipe 2, roof water pipe 1 and eastern insulation wall water pipe 4, and can effectively solve or dispose the globule water soaking occurred on the pipe outer walls such as floor, partition wall, water-proof decorative thin plate, stratum water pipe 3.
Because of the running water in water inlet manifold 14 inner chamber first after stratum water pipe 3, western insulation wall water pipe 2, roof water pipe 1, eastern insulation wall water pipe 4 etc., again flow into water inlet manifold 14 after flow to common tank on multi-storey residential buildings roof again; Running water in common tank is by flowing into the running water pipe 31 of man of each resident family again after outfall sewer 33; Not only but also flow into common tank and circulate successively the running water water yield in common tank is generally constant, as long as have a family family at use running water, namely the running water water level in common tank declines, and the running water in water inlet manifold 14 inner chamber.Resident family in the same corridor of multi-storey residential buildings uses same common tank simultaneously, and the resident family in same corridor has tens families at least, has tens families at most, so, within one day, from morning to night after all there is resident family to use running water, running water can be flowed more.As of short duration not flowing appears in running water, the tap water temperature in stratum water pipe 3, western insulation wall water pipe 2, roof water pipe 1, eastern insulation wall water pipe 4 pipe can not decline too much, even negligible; Time as immobilising in running water is longer, the tap water temperature stayed in stratum water pipe 3, western insulation wall water pipe 2, roof water pipe 1, eastern insulation wall water pipe 4 pipe then can improve, but the temperature of these running water is generally also much lower than the air themperature in summer indoor, start again to flow once running water, running water in water inlet manifold 14 inner chamber can enter again in stratum water pipe 3, western insulation wall water pipe 2, roof water pipe 1, eastern insulation wall water pipe 4 pipe fast, makes the tap water temperature of the tube wall temperature of these pipes and flowing similar.100 family families are shared same water inlet manifold 14 and same outfall sewer 33 by visual feelings, the family of such use running water is more, make running water be kept to greatest extent to flow incessantly between thirty in the at 10 in the morning to evening 10, make the tap water temperature of the tube wall temperature of stratum water pipe 3, western insulation wall water pipe 2, roof water pipe 1, eastern insulation wall water pipe 4 and flowing similar, in summer, the temperature of room air can be lowered by the cool degree of these pipes better.Because there being the buffering of the running water in common tank, the bore of the same water inlet manifold 14 that 100 family families share and same outfall sewer 33 also need not be too large, make the bore of stratum water pipe 3, western insulation wall water pipe 2, roof water pipe 1, eastern insulation wall water pipe 4 also need not be too large, thus in theory, the water flowing capacity of the pipes such as stratum water pipe 3, western insulation wall water pipe 2, roof water pipe 1, eastern insulation wall water pipe 4 is consistent with the water flowing capacity of water inlet manifold 14 and outfall sewer 33.
In summer, the tap water temperature of flowing is lower, and what gather as these running water is that its temperature of surface water only has an appointment 20 degree, and what gather as these running water is that its temperature of underground water only has an appointment 15 degree, stratum of the present invention water pipe 3, western insulation wall water pipe 2, roof water pipe 1, east insulation wall water pipe 4 grade can make by stainless steel and other metal materials, running water flows through the stratum water pipe 3 made by metal material, western insulation wall water pipe 2, roof water pipe 1, after insulation wall water pipe 4 grade of east, these stratum water pipes 3, western insulation wall water pipe 2, roof water pipe 1, the tube wall temperature of east insulation wall water pipe 4 is about higher than the temperature of running water 1 degree, about 16-21 degree, stratum water pipe 3, western insulation wall water pipe 2, roof water pipe 1, cool degree conducts to floor by east insulation wall water pipe 4, floor tile, when partition wall and water-proof decorative thin plate etc., these floors, floor tile, the temperature of partition wall and water-proof decorative thin plate etc. is than stratum water pipe 3, western insulation wall water pipe 2, roof water pipe 1, the about high 2-4 degree of tube wall temperature of east insulation wall water pipe 4 is namely about 20-25 degree, if summer, indoor air temperature was more than 28 degree, be in the floor of 20-25 degree, floor tile, the temperature of room air can be fallen 2-3 degree by partition wall and water-proof decorative thin plate etc., when summer indoor air temperature 28 degree and above time, general family will turn on the aircondition, and by the cool degree of floor, floor tile, partition wall and water-proof decorative thin plate etc. indoor air temperature fallen 2-3 degree make indoor air temperature lower than 28 degree time, people just need not turn on the aircondition or postpone time of turning on the aircondition, thus greatly can save electric energy.When summer indoor air temperature have 30 more spend, people not only will turn on the aircondition, and the higher air-conditioner power consumption of indoor air temperature is also larger, after indoor air temperature being fallen 2-3 degree by the cool degree of floor, floor tile, partition wall and water-proof decorative thin plate etc., although indoor air temperature still still will be turned on the aircondition more than 28 degree, but the power consumption of air-conditioning reduces greatly, reach good energy-saving effect equally.Although the effect that the cool degree of self conducts to room air will differ from by the composite floor board arranged on floor, waterproof thin plate etc., solid wooden floor board, but also can conduct after all, add that roof, room, west partition wall 35, east partition wall 34 have cool degree to conduct to room air, indoor air temperature is made to be able to effective decline, if the partition wall in the south in room, back side partition wall also arrange the coiled water pipe of a part, so, some cool degree of partition wall in the south, back side partition wall also can conduct to room air, and indoor air temperature can be declined more; Such family room is seemingly by the ground, on top, the left side, the right, running water pipe 31 above, below surround, indoor temperature lowers by the running water pipe 31 sending out cool, just look like be large summer people to enter cavern the same, cavern crag internal layer oozes cold water, makes cavern more nice and cool.
Terminate when summer, when not needing to lower the temperature to indoor with stratum water pipe 3, western insulation wall water pipe 2, roof water pipe 1, eastern insulation wall water pipe 4, the door closure of switch-box 15 can be opened, the 7th magnetic valve 22, the 5th magnetic valve 17, the 4th magnetic valve 11 is closed by the switch on controller, open the 8th magnetic valve 16 on water inlet manifold 14, make the running water in water inlet manifold 14 inner chamber flow directly into common tank without all water pipes such as the stratum water pipes 3 in family of resident family.
In the winter time, as warmed oneself in resident family room, when close the 7th magnetic valve 22, the 5th magnetic valve 17, the 4th magnetic valve 11, then close first magnetic valve 8, open the 6th magnetic valve 21, the 9th magnetic valve 6, second magnetic valve 9, the 3rd magnetic valve 10.By the switch activated water pump 28 on little controller, the water (first inputting water to storage tank 27 by running water pipe 31) in storage tank 27 is inputted water heater 29 to heat, the hot water that water heater 29 exports again flows into storage tank 27 and circulates successively after hot-water line 26, the 3rd filter, the 6th magnetic valve 21, water-supply-pipe 23, water inlet pipe 20, stratum water pipe 3, the 9th magnetic valve 6, western insulation wall water pipe 2, roof water pipe 1, eastern insulation wall water pipe 4, second outlet pipe 24, second magnetic valve 9, return pipe 13, the 3rd magnetic valve 10, circulation pipe 25.By floor, floor tile, floor, partition wall, water-proof decorative thin plate etc., heated in room when hot water flows through stratum water pipe 3, western insulation wall water pipe 2, roof water pipe 1, eastern insulation wall water pipe 4.
During as only needed floor heating, when close the 7th magnetic valve 22, the 5th magnetic valve 17, the 4th magnetic valve 11, close the 9th magnetic valve 6, second magnetic valve 9 again, open the 6th magnetic valve 21, first magnetic valve 8, the 3rd magnetic valve 10.Start water pump 28 to be heated by the water input water heater 29 in storage tank 27, the hot water that water heater 29 exports again flows into storage tank 27 and circulates successively after hot-water line 26, the 3rd filter, the 6th magnetic valve 21, water-supply-pipe 23, water inlet pipe 20, stratum water pipe 3, first outlet pipe 7, first magnetic valve 8, return pipe 13, the 3rd magnetic valve 10, circulation pipe 25.Hot water can heat to ground, room when flowing through stratum water pipe 3.
Hot water can be lossy in circulation trickling process, when the water level in storage tank 27 drops to the height only having storage tank 27 inwall 1/3rd gradually, under one of them water level sensor in storage tank 27 and the acting in conjunction of little controller, the electrically operated valve 30 be arranged on running water pipe 31 is opened automatically, namely running water flows into storage tank 27, when storage tank 27 water is full, under another water level sensor in storage tank 27 and the acting in conjunction of little controller, electrically operated valve 30 is automatically closed and is cut off running water simultaneously and lead to storage tank 27.
Summer arrives again, when people lower the temperature to room again, the 7th magnetic valve 22 can be closed, 6th magnetic valve 21, first magnetic valve 8, 4th magnetic valve 11, open the 5th magnetic valve 17 again, 9th magnetic valve 6, second magnetic valve 9, 3rd magnetic valve 10, a part of running water in water inlet manifold 14 inner chamber successively flows through water-supply-pipe 23, delivery pipe branch 18, even with water meter 19, 5th magnetic valve 17, water inlet pipe 20, stratum water pipe 3, 9th magnetic valve 6, western insulation wall water pipe 2, roof water pipe 1, east insulation wall water pipe 4, second outlet pipe 24, second magnetic valve 9, return pipe 13, 3rd magnetic valve 10, storage tank 27 is entered after circulation pipe 25, and the water in these water pipes is punched in storage tank 27, the water in these water pipes is made to flow to common tank, in addition, as closed the 7th magnetic valve 22, 6th magnetic valve 21, 9th magnetic valve 6, second magnetic valve 9, 4th magnetic valve 11, open the 5th magnetic valve 17 again, first magnetic valve 8, 3rd magnetic valve 10, a part of running water in water inlet manifold 14 inner chamber successively flows through water-supply-pipe 23, delivery pipe branch 18, even with water meter 19, 5th magnetic valve 17, water inlet pipe 20, stratum water pipe 3, first outlet pipe 7, first magnetic valve 8, return pipe 13, 3rd magnetic valve 10, storage tank 27 is entered after circulation pipe 25, and the water in first outlet pipe 7 grade is punched in storage tank 27, the water in these water pipes is made to flow to common tank.The setting of the first filter, second filter 12, the 3rd filter, make in pipe such as stratum water pipe 3 grade running water can ensure sanitary when being finally again back to water inlet manifold 14.When carrying out aforesaid operations, the 8th magnetic valve 16 on water inlet manifold 14 still opens, and makes another part running water in water inlet manifold 14 inner chamber can continue directly to flow to common tank.
To enter in pipe such as stratum water pipe 3 grade because the running water in water inlet manifold 14 inner chamber is through idol water meter 19 and the water in pipe such as stratum water pipe 3 grade is punched in storage tank 27, so, this part running water entered in pipe such as stratum water pipe 3 grade can occasionally promptly and accurately be recorded with water meter 19, the water rate of this part running water is then born by each resident family, all to the water in pipe such as stratum water pipe 3 grade be punched in storage tank 27 before arriving annual summer, so all these water rates can be produced every year, but these water rates are few, this water rate generally can not be haggled over by resident family, and the water circulation use that the water be washed in storage tank 27 can be used as heating after water heater 29 heats can not be wasted, as more in the water in storage tank 27, also can be used for (between storage tank 27 and cistern, the parts such as tube connector are set) such as flush toilet.The door closure key of switch-box 15 can be held by the property of residential quarters, if the door closure key of switch-box 15 by resident family, extremely indivedual resident family only may open the 7th magnetic valve 22, the running water in water inlet manifold 14 inner chamber is directly entered in pipe such as stratum water pipe 3 grade without idol water meter 19 and is punched in storage tank 27 by the water in pipe such as stratum water pipe 3 grade; In addition, when water shortage in storage tank 27, the running water in water inlet manifold 14 inner chamber also can directly enter storage tank 27 without idol water meter 19 by the 7th pipe such as magnetic valve 22 and stratum water pipe 3, causes public running water by steal.After the door closure key of switch-box 15 is held by property, the problems referred to above can be avoided.Resident family can make property personnel open switch-box 15 at any time, and implements the operations such as unlatching or closedown by the controller in switch-box 15 to various magnetic valve; Certainly, in the epoch of current large data, cloud computing, controller can be connected with internet, as long as resident family's phone, namely property personnel carry out flexible operating by smart mobile phone etc. to the controller in switch-box 15, fast open exactly or close various magnetic valves etc., for resident family provides satisfied service.
The various simple change made by those of ordinary skill in the art, remodeling all would not depart from the scope of the present invention.

Claims (1)

1. a room heat sink, be provided with gas heater and heat preservation storage water tank between the domestic hygiene of multi-storey residential buildings, be provided with tube connector between described storage tank and described gas heater, this tube connector is provided with water pump, described storage tank is provided with upper and lower two water level sensors, and this storage tank is connected with running water pipe, and the described running water pipe outside this storage tank is provided with electrically operated valve, described running water pipe is connected with conventional water meter, this conventional water meter is connected with the shared running water outlet house steward of described multi-storey residential buildings, this outfall sewer is connected with the common tank being arranged on described multi-storey residential buildings roof, and this common tank is connected with the running water water inlet manifold shared, the wall of described toilet is provided with the little controller of charged line, and this little controller is connected with described water pump, water level sensor, electrically operated valve by wire, it is characterized in that: described running water water inlet manifold is provided with water-supply-pipe and return pipe, described water inlet manifold between described water-supply-pipe and return pipe is provided with the 8th magnetic valve, side namely near described water inlet manifold inside described water-supply-pipe is provided with first filter, and namely the inner side of described return pipe is provided with second filter near the side of described water inlet manifold, described water-supply-pipe is provided with delivery pipe branch, and the import of this delivery pipe branch is all connected with described water-supply-pipe with outlet, and this delivery pipe branch is provided with idol water meter and accidental water meter and the 5th magnetic valve, described water-supply-pipe between described delivery pipe branch import position and outlet position is provided with the 7th magnetic valve, the import position of described delivery pipe branch is on the described water-supply-pipe between described 7th magnetic valve and first filter, described water-supply-pipe outside described delivery pipe branch outlet position is provided with hot-water line, this hot-water line is connected with described gas heater, described hot-water line near described water-supply-pipe is provided with the 3rd filter, and described 3rd described hot-water line between filter and water-supply-pipe is provided with the 6th magnetic valve, described water-supply-pipe outside described hot-water line is provided with water inlet pipe, and this water inlet pipe is connected with the stratum water pipe of coiled, and this stratum water pipe section is flat ellipticity, and this stratum water pipe embeds in the stratum of the family room of described multi-storey residential buildings, be provided with tube connector between the front end of the tail end of described stratum water pipe and the western insulation wall water pipe of coiled, described western insulation wall water pipe section is flat ellipticity, in the west partition wall that this western insulation wall water pipe embeds described room or be arranged on the wall of west partition wall, described western insulation wall water pipe is connected with the roof water pipe of coiled, and this roof water pipe section is flat ellipticity, and the roof that this roof water pipe embeds described room is mixed in earth plate or is arranged on roof and mixes on the bottom surface of earth plate, described roof water pipe is connected with the eastern insulation wall water pipe of coiled, this eastern insulation wall water pipe section is flat ellipticity, in the east partition wall that this eastern insulation wall water pipe embeds described room or be arranged on the wall of partition wall in the east, this eastern insulation wall water pipe is provided with second outlet pipe, this second outlet pipe is connected with described return pipe, and described second outlet pipe near described return pipe is provided with second magnetic valve, described return pipe outside described second outlet pipe is provided with first outlet pipe, and this first outlet pipe is connected with the tail end of described stratum water pipe, and described first outlet pipe near described return pipe is provided with first magnetic valve, described return pipe inside described second outlet pipe is provided with circulation pipe, and this circulation pipe is connected with described storage tank, and the described circulation pipe near described return pipe is provided with the 3rd magnetic valve, described return pipe between described circulation pipe and second filter is provided with the 4th magnetic valve, described water-supply-pipe, return pipe, delivery pipe branch, first magnetic valve, second magnetic valve, 3rd magnetic valve, 4th magnetic valve, 5th magnetic valve, 6th magnetic valve, 7th magnetic valve, 8th magnetic valve and first filter, second filter, 3rd filter, idol water-meter outdoors is in switch-box, this switch-box is arranged on the wall of shared corridor of described multi-storey residential buildings, this switch-box is provided with locking door closure, the controller of charged line is provided with in this switch-box, this controller is by wire and described first, second, 3rd, 4th, 5th, 6th, 7th, 8th magnetic valve connects, described water inlet manifold is through described switch-box, tube connector between described stratum water pipe tail end and described western insulation wall water pipe front end is provided with the 9th magnetic valve, and the 9th magnetic valve is connected with described controller by wire, 9th magnetic valve is arranged in P cock case, and described P cock case is arranged on the west partition wall in described room.
CN201410035951.2A 2014-01-26 2014-01-26 A kind of room heat sink Active CN103727623B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410035951.2A CN103727623B (en) 2014-01-26 2014-01-26 A kind of room heat sink

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410035951.2A CN103727623B (en) 2014-01-26 2014-01-26 A kind of room heat sink

Publications (2)

Publication Number Publication Date
CN103727623A CN103727623A (en) 2014-04-16
CN103727623B true CN103727623B (en) 2016-04-06

Family

ID=50451815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410035951.2A Active CN103727623B (en) 2014-01-26 2014-01-26 A kind of room heat sink

Country Status (1)

Country Link
CN (1) CN103727623B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104896631A (en) * 2015-04-30 2015-09-09 四川远畅新能源科技有限公司 Automatic-water-pumping indoor cooling device
CN109340870B (en) * 2017-12-21 2020-06-09 扬州大学 Heating floor slab for duplex apartment and installation method thereof
CN110005223A (en) * 2019-04-10 2019-07-12 中铁十八局集团有限公司 It is a kind of with heating, cooling, fire-fighting steel pipeline movable plank house
CN112752494A (en) * 2021-01-14 2021-05-04 深圳市远信储能技术有限公司 Uniform heat dissipation system
CN113795094B (en) * 2021-07-02 2022-12-06 深圳市瑞嘉达电子有限公司 Waterproof power adapter and use method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2919087Y (en) * 2006-06-29 2007-07-04 尚建国 Countryside household water circulation cold-hot dual-purpose apparatus
CN201944969U (en) * 2010-12-06 2011-08-24 曹春刚 Multifunctional water utilizing system for refrigeration, heating and purification
CN102944047A (en) * 2012-12-14 2013-02-27 陈科 Automatic living room air circulation device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS594614B2 (en) * 1979-11-22 1984-01-31 矢崎総業株式会社 How to control the number of hot and cold water machines

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2919087Y (en) * 2006-06-29 2007-07-04 尚建国 Countryside household water circulation cold-hot dual-purpose apparatus
CN201944969U (en) * 2010-12-06 2011-08-24 曹春刚 Multifunctional water utilizing system for refrigeration, heating and purification
CN102944047A (en) * 2012-12-14 2013-02-27 陈科 Automatic living room air circulation device

Also Published As

Publication number Publication date
CN103727623A (en) 2014-04-16

Similar Documents

Publication Publication Date Title
CN103727623B (en) A kind of room heat sink
CN101457594B (en) Green ecological zero energy consumption integration house
CN101975412A (en) Building integrative heat accumulation and cold accumulation room temperature adjustment device
CN203373815U (en) System utilizing solar water heating system for preventing freezing and preserving heat for fire water tank compartment
US20140259994A1 (en) Building Architecture for Residential Dwelling
CN205296898U (en) Novel prefabricated whole bathroom
CN203097323U (en) Temperature control bathing insulating room
CN107269106B (en) Noiseless closed fireproof high-rise building without digging ground well and with natural air conditioner two-storey building garage
JP2008253706A (en) Bathtub, bathtub plug and system for utilizing bath residual hot water
CN203050154U (en) Environment-friendly and energy-saving building
Melo et al. Improving the consumption and water heating efficiency in smart buildings
CN110906170A (en) Liquid discharge pipeline anti-freezing method and anti-freezing device thereof
CN204754104U (en) Bathroom floor heating cuts off waterproof construction
CN204645359U (en) A kind of without seam Prefabricated integral polyurethane floor
CN203224039U (en) Anti-freezing solar water heater
CN102747845B (en) Movable solar shower system
KR20080092618A (en) Roof water piping
CN1160504C (en) Comprehensive water supply system
Ye et al. Design and analysis of water supply and drainage engineering for a residential building
JP2003336865A (en) Floor heating and skeleton cooling system for building using coldness of tap water
JPH09256501A (en) Wall water tank facilitating heating/cooking, fire extinguishment and supply of drinking water
JP2020063847A (en) Air conditioning system and dwelling facility comprising air conditioning system
CN203270994U (en) Automatic-temperature-control multi-functional decorative house wallboard
CN106593022A (en) Energy-saving intelligent type toilet capable of being warm in winter and cool in summer
CN206554546U (en) A kind of intelligent lavatory of energy-conservation cool in summer and warm in winter

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160223

Address after: 315000 Zhejiang city of Ningbo province high tech Zone Jinghua Road No. 188 Building 2 room 206-175

Applicant after: NINGBO HI-TECH ZONE KEHUI CREATIVE PRODUCT DESIGN CO., LTD.

Address before: Zhongshan East Road, Jiangdong District, Zhejiang city of Ningbo province 315000 888 Lane 21, Room 204

Applicant before: Chen Ke

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180109

Address after: 6 417A room, building No. 1188, west two ring road, Shengze Town, Wujiang District, Jiangsu, Suzhou, 215228

Patentee after: Suzhou hair textile Co., Ltd.

Address before: 315000 Zhejiang city of Ningbo province high tech Zone Jinghua Road No. 188 Building 2 room 206-175

Patentee before: NINGBO HI-TECH ZONE KEHUI CREATIVE PRODUCT DESIGN CO., LTD.

TR01 Transfer of patent right